Retaining Wall Construction Steel Cutting, Bending, Binding & Placing
including binding wire with all tools & tackles required with any grades of LS082A02 concrete (Steel & concrete provide by company) Labour with shuterring MT 0.00 6,000.00 material. Retaining Wall Construction including pouring of concrete shuttering deshuttering & steel c/b/f as per drawing & specification, Shuttering LR046A03 material, Oil, Nails, Binding wire, with Curing person (Concrete & steel Cum 0.00 1,300.00 provide by company) Any grade of Concrete (Labour rate)
Retaining Wall PCC including pouring of concrete shuttering deshuttering &
steel c/b/f as per drawing & specification, Shuttering material, Oil, Nails, LR047A03 Binding wire, with Curing person with any grades of concrete (Steel & Cum 0.00 550.00 concrete provide by company) Labour with shuterring material.
Retaining Wall Raft including pouring of concrete shuttering deshuttering &
steel c/b/f as per drawing & specification, Shuttering material, Oil, Nails, LR048A03 Binding wire, with Curing person with any grades of concrete (Steel & Cum 0.00 750.00 concrete provide by company) Labour with shuterring material. Labour charges for fixing Weep Holes / drainage spout etc. as per desing & LL007A03 drawing and tender techinical specifications etc. Nos 0.00 50.00