Professional Documents
Culture Documents
52SS Page 1
2. Verify that the slide bushings (1) are installed in timing cover.
3. Install cover and new gasket. Tighten fasteners to 28 Nm (250 in. lbs.).
4. Install the oil pan and pick up tubeSee: Engine Lubrication/Oil Pan/Service and Repair/Engine Oil Pan - Installation.
5. Install the A/C compressor.
6. Install the generator.
7. Install power steering pump.
8. Install the dipstick support bolt.
9. Install the thermostat housing.
10. Install crankshaft damperSee: Cylinder Block Assembly/Harmonic Balancer - Crankshaft Pulley/Service and Repair/Vibration Damper -
Installation.
11. Install accessory drive belt tensioner assembly and both idler pulleys.
12. Install radiator lower hose.
13. Install both heater hoses.
14. Install the cooling module.
2010 Dodge or Ram Truck RAM 2500 Truck 4WD V8-5.7L Copyright © 2013, ALLDATA 10.52SS Page 2