10
20
40
Lon IFICATION FOR SHAFT, SLEEVES AND PUMP SPARES
Scope:
“This specication covers Manufacturing mepeetion, Testing, Packing, and supply of Staniess-
staeiarbon Stee shai, leaves and purip spre,
Note: Each shaft shall be supplied with accessories viz, all the keys, beaing lock washers and
beating locknuts, having the same MOC as ofthe shaft
Standards
Material Standard: ASTM A 276, ENS.
Testing Standards: ASTM A 388, ASTM A 745 & ASTM E 165
Details of drawings:
1. Drawing no, HWPMUMP153 (Shaft for P7 Pump)
Drawing no. HINPM/MP-155 (Shaft sleeve for 43-P-2 1/23)
3. Drawing no. HWPMMP-457 (Shaf for 43-P-1201 A/S)
{4 Drawing no. HWPMMP-475 (Shaft for 42-P2-12/3)
5. Drawing no. HWWPMMP.484 (Shaft for 43-P-202 A/S)
6. Drawing no. HWWPMMPIMISP/43-111 (Shaft Bearing Insert for Dion water Purp)
2. Drawing no. HWPMMPIMSP/43-113 (Line shaft taeve fr dilution water Purp)
{Drawing no. HIWPMIMPIMISP/43-1 18 (Discharge bow! bearing sleeve for Dilution water Pump)
9. Drawing no. HINPMIMPIMSP/43-1 18 (Shaft threaded couping for Dikton water Pump)
10. Drawing no. HWPMIMPIM/SP/43-122 (Discharge case bearing sleove for Dilton water Pump)
1. Drawing no. HWPMIMPM/SP/43-123 (Pump shaft coupling for Dutton water Pump)
12 Drawing no. HWWPMVMPIMISP/43-124 (Bow Bearing for Ditton water Purp)
13, Drawing no. HWPMIMPIMSP/43-128 (Line shaft-2 for Dution water Purp)
14, Drawing no. HWWPMIMPIMSP/43-127 (Line shaft-2 for Dution water Purp)
15. Drawing no. HWPAVMPIMISP/43-128 (Head shaf fr Diuiion water Purp
16. Drawing no. HWPMIMPIMSP/43-128 (Line shaft for Dilsion water Pump)
17 Drawing no. HWPMIWMISPI43-130 (Pump shaft for Daation water Pump)
18, Drawing no. HWPMIWMISPI43-131 (Gland packing sleeve fr Ditton water Pump)
Inspections/Tests to be carried out
Utrasonie testing ofthe raw material shal be cariad out & acceptance shal be in accordance wit
ASTM Practice A 388/388M and Practice A745 St
“Trueness of the shaft shall be within + 0.03 mm after fnal machining
‘All the machined surfaces shall DP test acceptance shal be in accordance wit ASTM E 165.
{All other dimensions and surace finishes shal be in accordance with our cravings
‘Acceptance Criteria at site
40 Visual Inspection
2. Dimensional Inspection
Material dontication using PM
4. Vertcation of testing certfcates as per list below.ortiicates to be furnished:
Physical & Chemscal properties certificates from government approved laboratry.
Dimensional checking certificates including surface finish
DP. Test cerificate of machined component.
UT. Certificate of aw materi
Packing & forwarding
Each shaft shal be individually packed in wooden locks and properly pacted in such @ way that
there is no damage accurse while in transport
Material shall be ospaiched to Stores officer DPS, Heavy Water Plant, Manuguru, Bhadrad-
Kothagucem Distt, Telangana -507116,TOWING TINOLY AO _INSREAVATT
IGM 10 ANaNNYAAOD
ww 94 9 SOBER TH- a
a iA
sis
pia
Nore:
1. ALL-OINENSIONS ARE. uu.
2. wor $$ 304
3. GENERAL TOLERENCE 20.1
‘Siar? SuEDVE
for s0--2 1/979,
“GONERNMENT OF INDIA
DEPARTMENT OF ATOMIC ENERGY
Tee
mew / 155° erman/maa |
SC ee eer oe
= Se Sam] Gorn onesie & ror roti
iba anvIaS ana Pale
g/¥ Woai=d~tr HOd LIVES ‘oucas satan
TUG SINGLY 40 IKenAvaad ‘a se mel von oes ! ky
‘ani 4 LABMNWEAOD a} A
Sar
Ons FOROS | ENOINS | EWS
er BEEa St-aW/ nau
\
fOr oS ZT
6a MOR OF
ee a
at
é {1
toe oo 1
zo Lowe
OH Gdavi ee Lie 098
Hida SHXSEW }}1ZO'O+ Z0'O+|
He Holl exs'6s9-t) [pO O+| 700+ LOXZ LNEOB1 AVM, AS
(Ga). Houazxoce -
zomamsoz avn x34)
Qs rg° wanna | JF @ =. a]
Taam zs ae
invrd UR AAW =
ADSINS DIWOLY 20 LNSWLaveSd S/veoe—d-eh WOd LAVES sive | a
‘ian 30 ANSANSSAGD al e
“anda TMS “GAN“O1S (3LGO345 LON MSIGASHM SONVASTOL WEGND -"y
otis: Nowonusnoo 40 Twain “=
“30 Q30NNOW 36 TAS S85NAIOD aAMS TW. “Z
‘RW N13 SNOISNBHG TW“
SION
OlF ‘oes
cL Z| oF Sel ely vel ‘99 0g
sokotwx0%
Lavi) Ad | OF ry Sc a
VI L zee gee. YT coe. i MI ors cree __ | Leze
Hy S'LHOUa Ops rors OF (goo |v
ove o0+ zoo
zaxonn@itAvn ABT o-orp OO} SHOXEMEST AVIA ADE
(Ha) SE Hold o2e-
OuseyWI=e0/68//au/ aM
a ‘ow ova]
a ‘AUADANYR
oS] asi wana AavaH
| KOHaNE oimoiv Jo INaRIEFaga
kunt “ONRIVE LEYS
Vian 40" LAEWAEEAOD,
Wve
Doris ryeneerres(oiaai/Maa |
‘aunoaNyR
ANE WELW AAVSH
FSHENE SINOLY 0 cNanGavaaa
WiGNt 4G" LNaWNREAOD
be
‘oaxaant off IsIv SS ~AuYN= cowauo|
fas Waa
munonwvn
NVI MHLYA. AAV
axamts ONTIVGa TMOG SOUVHOSIO 5
TSENG OINOLY 40 INENISVaSA
aicaauva ore Isiv SS ~"UMK
ont —aibBFE ano rao 100 2/4"
arr
au STEEL
GOVERNMENT OF INDIA
DEPARTMENT. OF ATOMIC ENERGY
om [ar | suAFT THREADED couPLING
ao oe ‘or DUN WunEE PME)
[es a ae 7
ae ? t
[awn ee se%43- 6
REV° -rerser/ee/uass/CAMHL
ov ove
0
‘AuADANVR
INvId BHLVK AAVSH
—XOUGNE SINGLY do INGMLEVaTa |
Mant Wo LAaMNIIACS
Gyr woe
BNL FTE BT DL5 a
1
ea
Qy:- a1
MATL: STEEL
co ae ‘GOVERNMENT OF INDIA
= a Pour suart courunc | DEPARTMENT OP ATOMIC ENERGY
ae [ee | ra tron waren por) HEAVY WAR PLANT
aNUCURU.
[ee fee aa a al ar
few t wpe /ey/SF59-22 °scm
‘GOVERNMENT OF INDIA |
DEPARTMENT OF ATOMIC ENERGY
la ‘BOWL BEARING
HEAVY WATER PLANT
MaNUGURU
HWM / n/n / soe “3
TENG.° e-sesfula/ nant
‘wou!
aT
‘aunOANWA
[ters aie ava
‘ViGNt 30 GASMNEAAOS[aa STE
° L-sye5(hfa6/ NAME
‘280 :
‘aundANYR
SSE uerra waive kava
Elivas ancl aa
| xowaNe Sino to CNERERVaEG |
MONI SO UaeMNNSAOSARAN Soty ao_ANaRIS AT
WOK dO -LNSMNBAOD9 621 “rid / Hdd / MMH
TS aansnary
f3——— rd Rav be
ate ate wo oa
avig snr |
FORAYS OmOWY dO INERIEaaG
MIQNU GO LNSRNESAGD.
“@ wag : 2ce -t4/epafesi/ ML
ovow0
‘aunonsvn
SE) end vation dave
xia ta os eT
“avHs and
‘KSUaNS DIMOLY 40 ceanTuVasT
MiaNI dO. LNaMNESACD
res
Orreyere lan/ MAA
‘funoawrn
el evi Na AVE
iris ONDDVa aNVID
ASHE SINGLY 40 INaRUEVaTG
| O8SViant wo wseinNeano>