You are on page 1of 20
10 20 40 Lon IFICATION FOR SHAFT, SLEEVES AND PUMP SPARES Scope: “This specication covers Manufacturing mepeetion, Testing, Packing, and supply of Staniess- staeiarbon Stee shai, leaves and purip spre, Note: Each shaft shall be supplied with accessories viz, all the keys, beaing lock washers and beating locknuts, having the same MOC as ofthe shaft Standards Material Standard: ASTM A 276, ENS. Testing Standards: ASTM A 388, ASTM A 745 & ASTM E 165 Details of drawings: 1. Drawing no, HWPMUMP153 (Shaft for P7 Pump) Drawing no. HINPM/MP-155 (Shaft sleeve for 43-P-2 1/23) 3. Drawing no. HWPMMP-457 (Shaf for 43-P-1201 A/S) {4 Drawing no. HWPMMP-475 (Shaft for 42-P2-12/3) 5. Drawing no. HWWPMMP.484 (Shaft for 43-P-202 A/S) 6. Drawing no. HWWPMMPIMISP/43-111 (Shaft Bearing Insert for Dion water Purp) 2. Drawing no. HWPMMPIMSP/43-113 (Line shaft taeve fr dilution water Purp) {Drawing no. HIWPMIMPIMISP/43-1 18 (Discharge bow! bearing sleeve for Dilution water Pump) 9. Drawing no. HINPMIMPIMSP/43-1 18 (Shaft threaded couping for Dikton water Pump) 10. Drawing no. HWPMIMPIM/SP/43-122 (Discharge case bearing sleove for Dilton water Pump) 1. Drawing no. HWPMIMPM/SP/43-123 (Pump shaft coupling for Dutton water Pump) 12 Drawing no. HWWPMVMPIMISP/43-124 (Bow Bearing for Ditton water Purp) 13, Drawing no. HWPMIMPIMSP/43-128 (Line shaft-2 for Dution water Purp) 14, Drawing no. HWWPMIMPIMSP/43-127 (Line shaft-2 for Dution water Purp) 15. Drawing no. HWPAVMPIMISP/43-128 (Head shaf fr Diuiion water Purp 16. Drawing no. HWPMIMPIMSP/43-128 (Line shaft for Dilsion water Pump) 17 Drawing no. HWPMIWMISPI43-130 (Pump shaft for Daation water Pump) 18, Drawing no. HWPMIWMISPI43-131 (Gland packing sleeve fr Ditton water Pump) Inspections/Tests to be carried out Utrasonie testing ofthe raw material shal be cariad out & acceptance shal be in accordance wit ASTM Practice A 388/388M and Practice A745 St “Trueness of the shaft shall be within + 0.03 mm after fnal machining ‘All the machined surfaces shall DP test acceptance shal be in accordance wit ASTM E 165. {All other dimensions and surace finishes shal be in accordance with our cravings ‘Acceptance Criteria at site 40 Visual Inspection 2. Dimensional Inspection Material dontication using PM 4. Vertcation of testing certfcates as per list below. ortiicates to be furnished: Physical & Chemscal properties certificates from government approved laboratry. Dimensional checking certificates including surface finish DP. Test cerificate of machined component. UT. Certificate of aw materi Packing & forwarding Each shaft shal be individually packed in wooden locks and properly pacted in such @ way that there is no damage accurse while in transport Material shall be ospaiched to Stores officer DPS, Heavy Water Plant, Manuguru, Bhadrad- Kothagucem Distt, Telangana -507116, TOWING TINOLY AO _INSREAVATT IGM 10 ANaNNYAAOD ww 94 9 SOBER TH - a a iA sis pia Nore: 1. ALL-OINENSIONS ARE. uu. 2. wor $$ 304 3. GENERAL TOLERENCE 20.1 ‘Siar? SuEDVE for s0--2 1/979, “GONERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY Tee mew / 155 ° erman/maa | SC ee eer oe = Se Sam] Gorn onesie & ror roti iba anvIaS ana Pale g/¥ Woai=d~tr HOd LIVES ‘oucas satan TUG SINGLY 40 IKenAvaad ‘a se mel von oes ! ky ‘ani 4 LABMNWEAOD a} A Sar Ons FOROS | ENOINS | EWS er BEE a St-aW/ nau \ fOr oS ZT 6a MOR OF ee a at é {1 toe oo 1 zo Lowe OH Gdavi ee Lie 098 Hida SHXSEW }}1ZO'O+ Z0'O+| He Holl exs'6s9-t) [pO O+| 700+ LOXZ LNEOB1 AVM, AS (Ga). Houazxoce - zomamsoz avn x34) Qs rg ° wanna | JF @ =. a] Taam zs ae invrd UR AAW = ADSINS DIWOLY 20 LNSWLaveSd S/veoe—d-eh WOd LAVES sive | a ‘ian 30 ANSANSSAGD al e “anda TMS “GAN“O1S (3LGO345 LON MSIGASHM SONVASTOL WEGND -"y otis: Nowonusnoo 40 Twain “= “30 Q30NNOW 36 TAS S85NAIOD aAMS TW. “Z ‘RW N13 SNOISNBHG TW“ SION OlF ‘oes cL Z| oF Sel ely vel ‘99 0g sokotwx0% Lavi) Ad | OF ry Sc a VI L zee gee. YT coe. i MI ors cree __ | Leze Hy S'LHOUa Ops rors OF (goo |v ove o0+ zoo zaxonn@itAvn ABT o-orp OO} SHOXEMEST AVIA ADE (Ha) SE Hold o2e- Ousey WI=e0/68//au/ aM a ‘ow ova] a ‘AUADANYR oS] asi wana AavaH | KOHaNE oimoiv Jo INaRIEFaga kunt “ONRIVE LEYS Vian 40" LAEWAEEAOD, Wve Doris ry eneerres(oiaai/Maa | ‘aunoaNyR ANE WELW AAVSH FSHENE SINOLY 0 cNanGavaaa WiGNt 4G" LNaWNREAOD be ‘oaxaant off IsIv SS ~AuYN = cowauo| fas Waa munonwvn NVI MHLYA. AAV axamts ONTIVGa TMOG SOUVHOSIO 5 TSENG OINOLY 40 INENISVaSA aicaauva ore Isiv SS ~"UMK ont —aib BFE ano rao 100 2/4" arr au STEEL GOVERNMENT OF INDIA DEPARTMENT. OF ATOMIC ENERGY om [ar | suAFT THREADED couPLING ao oe ‘or DUN WunEE PME) [es a ae 7 ae ? t [awn ee se%43- 6 REV ° -rerser/ee/uass/CAMHL ov ove 0 ‘AuADANVR INvId BHLVK AAVSH —XOUGNE SINGLY do INGMLEVaTa | Mant Wo LAaMNIIACS Gyr woe BNL FTE BT DL 5 a 1 ea Qy:- a1 MATL: STEEL co ae ‘GOVERNMENT OF INDIA = a Pour suart courunc | DEPARTMENT OP ATOMIC ENERGY ae [ee | ra tron waren por) HEAVY WAR PLANT aNUCURU. [ee fee aa a al ar few t wpe /ey/SF59-22 ° scm ‘GOVERNMENT OF INDIA | DEPARTMENT OF ATOMIC ENERGY la ‘BOWL BEARING HEAVY WATER PLANT MaNUGURU HWM / n/n / soe “3 TENG. ° e-sesfula/ nant ‘wou! aT ‘aunOANWA [ters aie ava ‘ViGNt 30 GASMNEAAOS [aa STE ° L-sye5(hfa6/ NAME ‘280 : ‘aundANYR SSE uerra waive kava Elivas ancl aa | xowaNe Sino to CNERERVaEG | MONI SO UaeMNNSAOS ARAN Soty ao_ANaRIS AT WOK dO -LNSMNBAOD 9 621 “rid / Hdd / MMH TS aansnary f3——— rd Rav be ate ate wo oa avig snr | FORAYS OmOWY dO INERIEaaG MIQNU GO LNSRNESAGD. “@ wag : 2 ce -t4/epafesi/ ML ovow0 ‘aunonsvn SE) end vation dave xia ta os eT “avHs and ‘KSUaNS DIMOLY 40 ceanTuVasT MiaNI dO. LNaMNESACD res Orrey ere lan/ MAA ‘funoawrn el evi Na AVE iris ONDDVa aNVID ASHE SINGLY 40 INaRUEVaTG | O8SViant wo wseinNeano>

You might also like