cernineanion para mer 2 U8" SHOGUN NT SYSTEM
Arron or PERFORATING SYSTEM EVALUATION. SECTIONS 1 AND 2
Seni Comp [AVAIABLETO ALL FROM OWEN OL TOOLS,NC sine Waht__140_gm,_HBOX pow Cae Mul STEEL
(a. 00 a Tata A SHOGUN SPRAL STP SYSTEM. Sov Temp BRET 3 e100, e
age Na Tie Show ‘sina Ps Rang 29000 pl Caer Nawal STB
Mowtscae Gage PN _STP.22540007 Da aca TST ‘Set Dy Tee. ‘ ah
(Gn Type Wine Tea aig Si, Se pene Resend! Maina 1D or Rang 21
Pag Tad AS depen ng Orr X Top owns ome pai ing Moe x tea
‘ees Deesion STEBLCHIS ibe Wigs 6p Dee, r ‘ene
Remus IME? 1 SHON STEM NCIUDES 4 OR & SPE RUASE STR, DOGREN STU, PHASEAOLELINR, AND SPIRAL PHASED RETRIEVAL STP
ing Do, sur _ 00, We now,
Tap Da. 00, Bit Comps Seah
nc om
(ete Dit, Sa aa Tame
(ig He Dane Lng A a
Teal De
ur
‘Cn Hl Damar Sho A
(Gain le Damar Leg a
‘ven Cag Hee Dims,
‘eal ep
er he
ens PENETRATION NORMALIZED TO 0 fl CONCRETE WOULD!
es Ba ey, Se He Dame, Sh A
eg eit an
De of BT, ‘eagle Det
Tea De
“et Cae: Sef) Th Pay
cry i et sw a stig oe pl oun ALR 3, Ream Pei ann of Wel Peas Fie Boy 1, Al hue en ase
CSIR Sa rk Sp Sa ESAS hyn pn ig ed nd dy mum Pater pe a ch
‘Slot oe ad eset in saw the equipment wach Would be ured 1 peru awe or any ope.
ENONEEUING 21 ANU wo TOG. pena Hak USA