You are on page 1of 1
cernineanion para mer 2 U8" SHOGUN NT SYSTEM Arron or PERFORATING SYSTEM EVALUATION. SECTIONS 1 AND 2 Seni Comp [AVAIABLETO ALL FROM OWEN OL TOOLS,NC sine Waht__140_gm,_HBOX pow Cae Mul STEEL (a. 00 a Tata A SHOGUN SPRAL STP SYSTEM. Sov Temp BRET 3 e100, e age Na Tie Show ‘sina Ps Rang 29000 pl Caer Nawal STB Mowtscae Gage PN _STP.22540007 Da aca TST ‘Set Dy Tee. ‘ ah (Gn Type Wine Tea aig Si, Se pene Resend! Maina 1D or Rang 21 Pag Tad AS depen ng Orr X Top owns ome pai ing Moe x tea ‘ees Deesion STEBLCHIS ibe Wigs 6p Dee, r ‘ene Remus IME? 1 SHON STEM NCIUDES 4 OR & SPE RUASE STR, DOGREN STU, PHASEAOLELINR, AND SPIRAL PHASED RETRIEVAL STP ing Do, sur _ 00, We now, Tap Da. 00, Bit Comps Seah nc om (ete Dit, Sa aa Tame (ig He Dane Lng A a Teal De ur ‘Cn Hl Damar Sho A (Gain le Damar Leg a ‘ven Cag Hee Dims, ‘eal ep er he ens PENETRATION NORMALIZED TO 0 fl CONCRETE WOULD! es Ba ey, Se He Dame, Sh A eg eit an De of BT, ‘eagle Det Tea De “et Cae: Sef) Th Pay cry i et sw a stig oe pl oun ALR 3, Ream Pei ann of Wel Peas Fie Boy 1, Al hue en ase CSIR Sa rk Sp Sa ESAS hyn pn ig ed nd dy mum Pater pe a ch ‘Slot oe ad eset in saw the equipment wach Would be ured 1 peru awe or any ope. ENONEEUING 21 ANU wo TOG. pena Hak USA

You might also like