You are on page 1of 6

Learning Outcomes:

After 40 hours of learning activities, the trainees will be able to effectively:


1. Install network cables
2. Set network configuration
3. Set router/Wi-Fi/wireless access point/repeater configuration
4. Inspect and test the configured computer networks

A. INTRODUCTION
This module covers the outcomes required in setting-up computers networks for LANs and small-office home-office
(SOHO) systems. It consists of competencies to install network cables, set network configuration, set router/Wi-Fi/ wireless
access point/repeater configuration as well as to inspect and test the configured computer networks.
B. LEARNING ACTIVITIES

LO 1: Install Network Cables


Learning
Methods Presentation Practice Feedback Resources Time
Content
1. Network Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
Cable Paced 2.1-1 Kinds of Network check 2.1-1 with answer key 30
Installation Group Cables 2.1-1 minutes
Discussion

Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
Paced 2.1-2 on Network Design check 2.1-2 with answer key 30
Group 2.1-2 minutes
Discussion
Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
30
Paced 2.1-3 on Cable Routes check 2.1-3 with answer key
Group 2.1-3 minutes
Discussion
Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
Paced 2.1-4 on Cable Raceway check 2.1-4 with answer key 30
Group and Ducts 2.1-4 minutes
Discussion
4. Copper Cable Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
Splicing and Paced 2.1-5 on CAT5 UTP check 2.1-5 with answer key 30
Cable Testing Group Network Cable 2.1-5 minutes
Discussion
Demonstration Study Task Sheet 2.1-1 Perform Task Check Performance Crimping
on Make a Network Cable Sheet 2.1-1 with Performance Tool
Using Copper Cable Make a Network Criteria Checklist UTP Cable 1 Hour
Cable Using 2.1-1 RJ 45
Copper Cable LAN Tester
6. Fiber Optic Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
Cable Paced 2.1-6 on Fiber Optic check 2.1-6 with answer key 30
Splicing and Group Cable and Installation 2.1-6 minutes
installation Discussion Requirements
requirements Demonstration Study Task Sheet 2.1-2 Perform Task Check Performance Crimping
on Make a Network Cable Sheet 2.1-2 on with Performance Tool
Using Fiber Optic Make a Network Criteria Checklist Fiber Optic 1 hour
Cable Using 2.1-2 Cable
Fiber Optic
8. OHS Modular Self- Read Information Sheet Answer Self- Compare answers CBLM
standards Paced 2.1-7 on OHS Standards check 2.1-7 with answer key 30
and 5S Group 2.1-7 minutes
principles Discussion
Modular Self- Read Information Sheet Answer Self- Compare answers CBLM 30
Paced 2.1-8 on 5S Principles check 2.1-8 with answer key
Group 2.1-8 minutes
Discussion
10. Practicing Modular Self- Read Information Sheet Answer Self- Compare answer CBLM
3Rs – reduce, Paced 2.1-9 on 3Rs check 2.1-9 with answer key
re-use, Group Environmental Policies 2.1-9 30
recycle/recov Discussion minutes
er
11. Managing Modular Self- Read Information Sheet Answer Self- Compare answer CBLM
Waste from Paced 2.1-10 on Electrical and check 2.1-10 with answer key
Electrical Group Electronic Waste 2.1-10 30
and Discussion Management minutes
Electronic
Equipment
(WEEE)
LO 2: Set Network Configuration
1. IPV4 and Modular Self- Read Information Answer Self- Compare answer CBLM 30
IPV6 Paced Sheet 2.2-1 on check 2.2-1 with answer key minute
Group Discussion Network Wiring 2.2-1 s
2. Network Modular Self- Read Information Answer Self- Compare answer CBLM
30
Connectivity Paced Sheet 2.2-2 on check 2.2-2 with answer key
minute
Testing Group Discussion Network System 2.2-2
s
Problems
Demonstration Study Job Sheet 2.1- Perform Job Check Performance Computer
1 Troubleshoot Sheet 2.1-1 on with Performance Loopback
Network problems Troubleshoot Criteria Checklist plug 1 hour
Network 2.1-1 Cable tester
problems UTP cable
4. Network Modular Self- Read Information Answer Self- Compare Answer CBLM 30
Interface Paced Sheet 2.2-3 on check 2.2-3 with answer key minute
Card (NIC) Group Discussion Network Interface 2.2-3 s
Settings Card (NIC) Settings
Demonstration Study Task Sheet Perform Task Check Performance Desktop
2.2-1 on Configure Sheet 2.2-1 on with Performance Network
Network Interface Configure Criteria Checklist Interface
1 hour
Card Settings Network 2.2-1 Card
Interface Card
Settings
LO 3: Set Router/ Wireless Access Point/ Repeater Configuration
1. Device Modular Self- Read Information Answer Self- Compare answers CBLM
30
System Paced Sheet 2.3-1 on Device check 2.3-1 with answer key
minutes
Settings Group Discussion System Setting 2.3-1
Configuratio
Demonstration Study Task Sheet Perform Task Check Performance Desktop
n
2.3-1 on Device Sheet 2.3-1 on with Performance Router
Network Settings Configure Criteria Checklist 1 hour
Device Network 2.3-1
Settings
3. Local Area Modular Self- Read Information Answer Self- Compare answers CBLM
30
Network Paced Sheet 2.3-2 on Local check 2.3-2 with answer key
minutes
(LAN) Port Group Discussion Area Network 2.3-2
Configuratio
Demonstration Study Task Sheet Perform Task Check Performance Desktop
n
2.3-2 on Configure Sheet 2.3-2 on with Performance Router
Local Area Network Configure Local Criteria Checklist 1 hour
Port Area Network 2.3-2
Port
5. Wide Area Modular Self- Read Information Answer Self- Compare answers CBLM 30
Network Paced Sheet 2.3-3 on Wide check 2.3-3 with answer key minutes
(WAN) Port Group Discussion Area Network
Configuratio 2.3-3
n
Demonstration Study Task Sheet Perform Task Check Performance Desktop
2.3-3 on Configure Sheet 2.3-3 on with Performance Router
Wide Area Network Configure Wide Criteria Checklist 1 hour
Port Area Network 2.3-3
Port
7. Wireless Modular Self- Read Information Answer Self- Compare answers CBLM
30
Settings Paced Sheet 2.3-4 on check 2.3-4 with answer key
minutes
Configuratio Group Discussion Wireless Settings 2.3-4
n
Demonstration Study Task Sheet Perform Task Check Performance Desktop
2.3-4 on Configure Sheet 2.3-4 on with Performance Router
Wireless Settings Configure Criteria Checklist 1 hour
Wireless 2.3-3 Access
Settings point
9. Security/ Modular Self- Read Information Answer Self- Compare answers CBLM
Firewall/ Paced Sheet 2.3-5 on check 2.3-5 with answer key 30
Advance Group Discussion Firewall with Advance 2.3-5 minutes
Settings Settings
Configuratio Demonstration Study Task Sheet Perform Task Check Performance Desktop
n 2.3-5 on Set up Sheet 2.3-5 on with Performance Router
Firewall with Advance Set up Firewall Criteria Checklist 1 hour
Settings with Advance 2.3-3
Settings
LO 4. Inspect and Test the Configured Computer Networks
1. Final Modular Self- Read Information Answer Self- Compare Answer CBLM
30
Inspection Paced Sheet 2.4-1 on Final check 2.4-1 with answer key
minutes
Group Discussion Inspection 2.4-1
Demonstration Study Job Sheet 2.4- Perform Job Check Performance Computer 1 hour
1 on Inspect Sheet 2.4-1 on with Performance UTP Cable
Computer Networks Inspect and Criteria Checklist Router
Check 2.4-1
Computer
Networks
3. Report Modular Self- Read Information Answer Self- Compare Answer CBLM
30
Preparation Paced Sheet 2.4-2 on check 2.4-2 with answer key
minutes
Group Discussion Report Preparation 2.4-2
Demonstration Study Job Sheet 2.4- Perform Job Check Performance
2 on Prepare Reports Sheet 2.4-2 on with Performance
1 hour
Prepare Reports Criteria Checklist
2.4-2
C. ASSESSMENT PLAN
 Written Test
 Oral Questioning
 Performance Test
D. TEACHER’S SELF-REFLECTION OF THE SESSION

You might also like