You are on page 1of 6

perhitungan volume

pembuatan drainase

DATA PONDASI 1:5


Panjang 340 0
Lebar atas 0.25 0
Tinggi atas 0.60 0
Lebar bawah 0.40 0
Tinggi bawah 0.40 0
Lebar dasar saluran 0.20 0
Tebal Bodeman 0.05 0

v 110.5
3.4

volume 113.9

buis 20 340 bh

galian darinase 127.5

galian 4447.5

timbunan 4447.5

pagar brc 216.6667

pipa 1 1/2'' 217.6667


VOL 4447.5

A. TENAGA

1. Pekerja (L01) oh 0.0776 345.126


2. Mandor (L03) oh 0.0192 85.392
C. PERALATAN

1. Excavator Back H(E10) Jam 0.0129 57.37275


2. Dump Truck (E09) Jam 0.046 204.585
buldozer jam 0.0024 10.674
3. Alat Bantu Ls 1

URAIAN KOEF
BAHAN
Batu belah = 1.1000 x 113.90
Semen (50kg) 136 Kg = 2.7200 x 113.90
Pasir = 0.5440 x 113.90
UPAH
Pekerja = 1.5000 x 113.90
Tukang = 0.660 x 113.90
Mandor = 0.075 x 113.90
346
86

58
205
11 2 hr 16 jm

= 125.29 m3 126
= 309.81 sak 310
= 61.96 m3 62

= 170.85 OH 171
= 75.17 OH 76
= 8.54 OH 9
RENCANA ANGGARAN BIAYA PEKERJAAN GALIAN DAN TIMBUNAN LAPANG SEPAK
DESA ………………… KECAMATAN …………………..
TAHUN ANGGARAN 2021

Bidang :
Kegiatan :
Pagu Anggaran :
Waktu Pelaksanaan :
Rincian Pendanaan :

NO. URAIAN SATUAN

Upah Tenaga Kerja


a. Mandor Lapangan oh
b. Kepala Tukang oh
b. Tukang / Buruh Terlatih oh
c. Pekerja / Buruh tak terlatih oh

Alat
Ember Aduk bh
Benang bh
Tali Rapia bh
Sewa Excavator jam
Sewa Dump Truck jam
Sewa Buldozer jam

Bahan
Batu belah m3
Semen (50kg) sak
Pasir m3
Buis Beton U D=20 cm bh
BRC t=120 besi d=5.4 mm unit
Pipa Galvanis 1 1/2''Tiang Pagar t=150 bh
pipa pvc 2'' btng
Piting T 2'' bh
Doop 2'' bh
JUMLAH RENCANA ANGGARAN BIAYA
DAN TIMBUNAN LAPANG SEPAK BOLA DAN SALURAN DRAINASE
…… KECAMATAN …………………..
UN ANGGARAN 2021

VOLUME HARGA SATUAN JUMLAH HARGA (Rp.)


(Rp.)

95 150,000 14,250,000
- 150,000 -
76 120,000 9,120,000
517 100,000 51,700,000
-
-
8 25,000 200,000
4 5,000 20,000
8 11,000 88,000
58 300,000 17,400,000
205 95,000 19,475,000
16 325,000 5,200,000

-
126 300,000 37,800,000
310 70,000 21,700,000
62 300,000 18,600,000
340 40,000 13,600,000
217 235,000 50,995,000
219 165,000 36,135,000
45 80,000 3,600,000
9 6,000 54,000
9 7,000 63,000
ANGGARAN BIAYA 300,000,000
HARGA UPAH DAN BAHAN

Upah Tenaga Kerja SATUANHARGA SATUAN


a. Mandor Lapangan oh 150,000
b. Kepala Tukang oh 150,000
b. Tukang / Buruh Terlatih oh 120,000
c. Pekerja / Buruh tak terlatih oh 100,000

Alat
Ember Aduk bh 25,000
Benang bh 5,000
Tali Rapia bh 11,000
Sewa Excavator jam 300,000
Sewa Dump Truck jam 95,000
Sewa Buldozer jam 325,000

Bahan
Batu belah m3 300,000
Semen (50kg) sak 70,000
Pasir m3 300,000
Buis Beton U D=20 cm bh 40,000
BRC t=120 unit 235,000
Pipa Galvanis Tiang Pagar t=140 unit 165,000
pipa pvc 2'' btng 80,000
Piting T 2'' bh 6,000
Doop 2'' bh 7,000