Professional Documents
Culture Documents
RB Msjid
RB Msjid
PONDASI UTAMA J = 6 BH
P = 0.3 M
L = 0.3 M
T = 0.2 M
VOLUME = 0.108 M3
VOLUME BESI
DAK P = 25 M
L = 3M
KEB. BESI WEIRMES = 75 M2
= 7.5 LMBR
= 8 LMBR
VOLUME BHN
JUMLAH BESI 10 = 56 BTNG
JUMLAH BESI 6 = 16 BTNG
WEIRMES = 8 LMBR
Semen = 77 ZK
Pasir Beton = 7 M3
Kerikil = 9 M3
77 ZK
7 M3
9 M3
RENCANA ANGGARAN BIAYA DAK
HARGA JUMLAH
NO PEKERJAAN SATUAN VOLUME
SATUAN HARGA