FERTS vite wife
ISO Qoot:Ro0e Cert. Reg. No.RQWV/CERS
sede moreatta pare, ot ERE LYE STATE,
ER Rael te, He A ae stat, a, TH-wez oo
‘FRA : -020-28)90408% email : cemjppn@gmail.com
FAD PAM AAA JE EO [ROR Feria BO/ed/RoR’
pata m2
firey :- Hoftarea FA 20RR-22 TAT TIT Beater at arta avis ae
aeeuterert
aot: - andere arferctar, meres sles water Has aT HF. HBCH/EP-319(RoR)
Rots FE, RR.0C, ORL
wyatt erage Ba RON Re AT HATA HATA BATA API LIA STAT
srg at area cee ate ae Se sation, ot aia wie SOIT ae Te,
fae aevare area aes sare arate ata eA, GAM HL ATTA
FRA STS STA STAT
acme. [ara me [STA ar tat ore ara
g é {to |Genaral Notes Genaral Notes
Following increase in % over normal |Following increase in % over normal
lschedule of rates of M..P. for 2021-|schedule of rates of Mu.P. for 20214
22 will be applicable. (Ref. PWD GR. |22 will be applicable. (Ref. PWD GR.
No. DSR/1091/CR-6577/Pianning-No. _ DSR/1091/CR-6577/Planning-
13,dated 08/07/2003). '3.dated 08/07/2003).
Sr No Area % | Sr.No Area %
Increase Increase
= [= ~ 1 [Rajbhavan 20%
= = 7 |ForNaxaite Area |” 10%
(Notified)
2 | % | @ |Genarat Notes Genaral Notes
IThe royalty charges are considered |The royalty charges are considered
lin the rate analysis of CSR 2021-22 |in the rate analysis of CSR 2021-22.
lAs per Government Resolution No. |As per the Government of
Rev and forest Dept Gaukhani |Maharashtra, Revenue and Forest
}10/1009/ Prakra. 309/ Kha {Departments Gazette No.67 Dt. 15
IMantralaya dt.11.2.2010. May 2015[area
jar
aaa
we avant
RR
Providing supplying in standard
length (PE material) HDPE Double
|wall corrugated pipe for non
Ipressure underground drainage
land sewerage with smooth internal
I& corrugated external surface
lconfirming to IS 16098:Part-2 2013
lwith spigot or plain end with
Inecessary jointing material coupler
including transportation and freight
Jcharges, inspection charges, loading
land unloading charges, conveyance
Ito departmental store and stacking
lthe same in closed shade duly
protecting from direct sun ray and
rains excluding GST levied by Gol
land GoM in all respect. etc. complete.
[Providing supplying in standard
length (PE material) Structured-Wall
plastic piping system for Non-
pressure underground drainage
land sewerage with smooth internal
|& corrugated external surface
lconfirming to 1S 16098:Part-2 2013
lwith spigot or plain
Inecessary jointing material coupler
including transportation and freight
Icharges, inspection charges, loading
land unloading charges, conveyance
to departmental store and stacking
the same in closed shade duly
protecting from direct sun ray and
rains excluding GST levied by Gol
land GoM in all respect, etc. complete
end with
Re
Lowering, Laying and Jointing (PE
material) HDPE double wall
‘corrugated pipe for non-pressure
lunderground by heating to the ends
lof pipes with the help of teffion
|coated electric heater to the required
ltemparature and then
pressing the ends together against
leach other, to form @ monolithic &
leak proof joint by thermosetting
process. The pressing may be
required to be done with Jacks!
Hydraulic Jacks/Butt fusion machine
lete. complete with all
Imaterials labours as directed by
[Engineer - in - charge. including
Lowering, Laying and Jointing (PE
material) Structured-Wall_ plastic
piping system for Non- pressure
lunderground drainage and
lsewerage underground by heating
to the ends of pipes with the help of
teffion coated electric heater to the
Irequired temparature and then
lpressing the ends together against
leach other, to form a monolithic &
lleak proof joint by thermosetting
lprocess. The pressing may be
Irequired to be done with Jacks!
Hydraulic Jacks / Butt fusion machine
letc. complete with all materials
labours as directed by Engineer - in -
Ichargeara
ara
a ast
‘wa ara
RO
item wording
lHycraulic testing of HDPE double
lwall corrugated pipe for non
Ipressure underground line to
|specified pressure including cost of
all materials and labour and water for
testing for specified length including
lcutting, placing end
lcap making arrangement for filing
lsafe water using reciprocating type
pumps which should be able to
provide specified test pressure
lgauges and other necessary
lequipments, labour, operation
Icharges, etc. required for testing. The
rate under this item shall also include
Icost of retesting, if necessary and
reinstating to original position
item wording
Hydraulic testing of Structured-Wal
plastic piping system for Non-
pressure underground drainage
land sewerage underground jine to
specified pressure including cost of
all materials and labour and water for
testing for specified length including
cutting, placing end cap making
jarrangement for filing safe water
lusing reciprocating type pumps
lwhich should be able to provide
specified test pressure gauges and
lother necessary equipments, labour,
loperation charges, etc. required for
testing. The rate under this item shall
jalso include cost of retesting, if
Inecessary and reinstating to original
position
aidicttarat orata
Wa: 30 atten, arene cass hey, HiT, Has BAT Are TaTaTST a Ait Pen
upload evararet
arenes, erat ate aT
yer atria
‘asia sree Paar yt
2 AL La Blea, Here Sites sateen Hag aia are tetas ata STS
per afircien, Herne sia aftr amet, aaferery aiteerere/ area ATER STAT
anders after Cpe) / orders aftetar tered Prats, dances a afar