ee OE
MICOM P40 Agile P741, P742, P743 (CM) 10-23,
9, For protection group settings and disturbance recorder settings, the changes must be
confirmed before they are used, When all required changes have been entered, return
to the column heading level and press the down cursor key. Before returning to the
default display, the following prompt appears,
10, Press the Enter key to accept the new settings or press the Clear key to discard the
new settings
Note: If the menu time-out occurs before the setting changes have been
confirmed, the setting values are also discarded.
Control and support settings are updated immediately after they are entered,
without the Update settings prompt
Itis not possible to change the PSL using the IED’s front panel HMI
Care: Where the installation needs application-specific PSL, the
relevant .psl files, must be transferred to the IED, for each
and every setting group that will be used. If you do not do
this, the factory default PSL will still be resident. This may
have severe operational and safety consequences.
62 Howto Measure the Burden Resistance (Re)
Insertion of the testblock to open current circuit gio cxcuit of the secondary
py ez orMMLG Auinding of the current transformer
(HV site)
a,
@
in
v a
or
Figure 5: Wiring
‘Short-circuit the secondary winding of the HV current transformer (see above)
Open the wiring by inserting a test block
Connect the current testing circuit ofthe test block (phase + neutral)
Inject a current (1A recommended) and measure the voltage at the resistive circuit
terminals.
5. An excel tool is available to help calculate the values below accurately.ee eee ee
(om 10-28 MICOM P40 Agile P741, P742, P743
6. Calculate the load resistance Re per phase using the following equation
Ra = Unease Inet
Repeat the above operation for each resistive circuit
RAN between loads A and N
RBN between loads B and N
RCN between loads C and N
RAB between loads A et B
621 RBn/ RBwis close to 1
Insertion of the test block to open current circuit
ose ae atMLG Short-circuit of the secondary
Auiinding of the current transformer
(HV site)
cr,
Pu,
i
Es
A
j
3
3
j
RBa = (RAB + RAN- RBN) /2
RBw = RAN - RB
RRBs = RAB - RE
RBc = RON RBsee OE
MICOM P40 Agile P741, P742, P743 (CM) 10-25
6.22
63
RBpn/ RBx is close to 3
CT,
CT,
;
\ 3 cr,
3
3
= PSQU1ENa
RBa = RAN/2
RBs = REN/2
RBc = RON/2
RBy = (RBq + RBo + RBc)/9
The highest of the 3 phase values must be multiplied by 1.25 (25% increase at a 75°C
temperature) and set in cell [CT AND VT RATIOS, RB in ohms}
The average of the 3 phase values (RBs, RBs, RBc) should be divided by the neutral
resistance, RBw, and set in cell [RB in ohms, RBex / RBN]
Note: The use of the excel spreadsheet tool called "LeadBurdenR’is strongly
recommended to calculate these values.
Demonstrate correct relay operation
The purpose of these tests is as follows:
To determine that the primary protection function of the relay, current differential, can trip
according to the correct application settings.
To verily correct setting of any backup phase overcurrent protection.
To verify correct assignment of the inputs, relays and trip contacts, by monitoring the
response to a selection of fault injections.