You are on page 1of 3
ee OE MICOM P40 Agile P741, P742, P743 (CM) 10-23, 9, For protection group settings and disturbance recorder settings, the changes must be confirmed before they are used, When all required changes have been entered, return to the column heading level and press the down cursor key. Before returning to the default display, the following prompt appears, 10, Press the Enter key to accept the new settings or press the Clear key to discard the new settings Note: If the menu time-out occurs before the setting changes have been confirmed, the setting values are also discarded. Control and support settings are updated immediately after they are entered, without the Update settings prompt Itis not possible to change the PSL using the IED’s front panel HMI Care: Where the installation needs application-specific PSL, the relevant .psl files, must be transferred to the IED, for each and every setting group that will be used. If you do not do this, the factory default PSL will still be resident. This may have severe operational and safety consequences. 62 Howto Measure the Burden Resistance (Re) Insertion of the testblock to open current circuit gio cxcuit of the secondary py ez orMMLG Auinding of the current transformer (HV site) a, @ in v a or Figure 5: Wiring ‘Short-circuit the secondary winding of the HV current transformer (see above) Open the wiring by inserting a test block Connect the current testing circuit ofthe test block (phase + neutral) Inject a current (1A recommended) and measure the voltage at the resistive circuit terminals. 5. An excel tool is available to help calculate the values below accurately. ee eee ee (om 10-28 MICOM P40 Agile P741, P742, P743 6. Calculate the load resistance Re per phase using the following equation Ra = Unease Inet Repeat the above operation for each resistive circuit RAN between loads A and N RBN between loads B and N RCN between loads C and N RAB between loads A et B 621 RBn/ RBwis close to 1 Insertion of the test block to open current circuit ose ae atMLG Short-circuit of the secondary Auiinding of the current transformer (HV site) cr, Pu, i Es A j 3 3 j RBa = (RAB + RAN- RBN) /2 RBw = RAN - RB RRBs = RAB - RE RBc = RON RBs ee OE MICOM P40 Agile P741, P742, P743 (CM) 10-25 6.22 63 RBpn/ RBx is close to 3 CT, CT, ; \ 3 cr, 3 3 = PSQU1ENa RBa = RAN/2 RBs = REN/2 RBc = RON/2 RBy = (RBq + RBo + RBc)/9 The highest of the 3 phase values must be multiplied by 1.25 (25% increase at a 75°C temperature) and set in cell [CT AND VT RATIOS, RB in ohms} The average of the 3 phase values (RBs, RBs, RBc) should be divided by the neutral resistance, RBw, and set in cell [RB in ohms, RBex / RBN] Note: The use of the excel spreadsheet tool called "LeadBurdenR’is strongly recommended to calculate these values. Demonstrate correct relay operation The purpose of these tests is as follows: To determine that the primary protection function of the relay, current differential, can trip according to the correct application settings. To verily correct setting of any backup phase overcurrent protection. To verify correct assignment of the inputs, relays and trip contacts, by monitoring the response to a selection of fault injections.

You might also like