Professional Documents
Culture Documents
eCB-eAB Report
eCB-eAB Report
Date : / /
Branch Name :
Branch Code :
Zone :
Test for Device Workability and Network Reachability
S.N. Description Yes or No Remarks
Note: All responses should be complied as YES for acceptance of the site
Details of the New Devices (To be filled by OnSite Installation Engineer)
Sr Device Name Device Make Qty Device Model Serial No
1 Router Cisco
2 Switch Cisco
3 IP Phone Cisco
4 GLC SFPs Cisco
5 Video Phone Grandstream
6 Modem Nomus
6 Rack Valrack Not Applicable
Verified by (Branch official) Installation and checking done by (Representative from vendor)
We hereby confirm that the new Devices are installed and working with above
functionalities. We also confirm that Old devices of the branch has been received
by us. We hereby confirm that the new Devices are installed and checked by
me at the branch and is working fine.
We also physically checked and found OK that Deviecs in Rack are
propelry mounted and fitted
Date: Date:
Name: Name:
Designation: Designation:
PF No. : Employee ID :
Mobile No. : Mobile No. :