You are on page 1of 1
“Gent rojo Director Kerala State Wanspon Projed WT ‘Authority's Engineer: SA! Consulting Engineers Pvt. Limited ‘nV with Oclon Infra Consultancy Pvt td Contractor: Therwath -PRLIV SAL, QBION PROJECT KSTP-I RKI PACKAGE V-ROAD 3- Rehabilitation and Upgradation Of Pathanamthitta Ayroor-Muttokudukka Mathupadi-Muttukudukka Prakisnarn -PrakkanamElavurthita-Kulanada - Ramanchra-Thanildazhy -Thonniamala Read In Pathanamthitta District (Length 28.208) Km Format NosTBPAL/ C/F7 (GHEOKUST FOR REINFORCEMENT -As per RCSP 47 Structure / Location Date RAN. Drawing No Resa Remarts sino, tem Description a Tak | Wortng Drawing Checked and Approved — 2_| tates revision being used Ma 3 | arschedlerapproved a 4¢_|_ Reinforcing tel Material approved 7 S| Bor bending & Cutting stsfartony 5 | crroson treatment od bars, required satisfactory = 7_| Borskes cower ve 8_| Bar spacing corect Wa 3 | Barlplength correc a 10 | Bartopsat covet tocations a 11 | Bartird as specified va 12 | Bar assembly rgd and adequately supported [including spacers/@ai supports) — 13. | Coverto bottom bars covrect v 2a_[_covertoside bars coven ma 15. | Coverto top barscorreat = 36__| Cove Blocks approved including fing Remarks ‘TOPRLIV Representative ‘Authority Representative

You might also like