‘lient Project Director, Kerala State Transport Project -IV SAI
THERUVATH-PRE ‘Authority's Engineer: SAI Consulting Engineers Pt. Limited ot Oe
{in JV with Orion infra Consultancy Pvt.Ltd ORION
= Contractor : Theruvath - PRLIV Sateen
PROJECT : KSTPUIIRKI PACKAGE IV-ROAD 3- Rehabilitation and Upgradation Of Pathanamthitta Ayroor - Muttukudukka llathupadi -Muttukudukka
‘Prakkanam- Prakkanam Elavumthitta -Kulanada - Ramanchira -Thannikkurhy -Thonniamala Road in Pathanamthitta District (Length 28.204) Km
Format No.TBPRL/ C/F6
‘CHECKLIST FOR FORMWORK INSPECTION -As per IRC SP 47
‘Structure /tocation Date
RFINO, Drawing No.
sino. item Description mat =—
ve | No | NA
1_| Formwork design/drawing/sketch approved including de-shuttering arrangements we
2__| Wal panel approved (required)
2 | Formwork alingmentcorect va
@_| Formwork levels correct including sereeds a
5 | Formwork dimensions correct wa
6 _|_ Formwork member spacing corect —
7_|_ Formwork member material quaiy acceptable -
| Falsework member ses correct =
9 | False member spacing correct wz
10 | Falsework member material quality acceptable a
1a | Gaps between primary and secondary members dosed/wedged =
12_ | Face boarding/Pywood/Metal thickness correct wa
13_| Joints between panels closed (no gaps) ea
14 | oints between panels us no stepsins) =
15_| Panel flatness acceptable =
16__| Gaps between secondary members and face panels closed =
a7_| Te rod material and sizes correct —
18 | Tie rod spacing correct, a
19. | Tie rods ght. face cones flush —
20_|_ Spacers between shutter surface tightly fitting =
21_| Box outs, Cast in tems, ducts fed corect securely val
72_|Prestresing sheathing and vents, angen ond spacing of supports accepatble ma
23_|_ Empty sheathing secured against flotation ra
24_|Presitesing anchorage postions and fring acceptable =
25_| Chamnfra/ilets ses, straightness xing accepatble -
26_| Formwork dean a
27_| Formwork release oll material approved =
28_| Formwork release ol eplied correctly wa
29. | Construction joint preparation satisfactory =
30__|Contraction/exparsion joint preparation satisfactory —
Bi_| Safe access constucted ma
32_| Adequate work space provider for labour, equipment
33__|_ Shutter vibrators (required) location and fing arrangements approved =
Remarks
‘TSPRLIV Representative ‘Authority Representative
Page 1 of 1“Gent Proje Dretor, Kerala State Wanspon Projea WV SAI
"HERUTAT- PRL ‘Authority’ Engineer: SAI Consulting Engineers Pt, Lites mille.
ae |nJV with Orion infra Consultancy Pt. td iON
Format NoTEPRY CIF
‘CHECKLIST FOR PRE CONCRETE “As per RESP 47
Strumture [vocation Date
BAN. Drawing No
Resut Remarks
sino. ‘tem Description
‘ee Ye [te [WA
1 [Method statement approved ~
2 [Bathing olan mers in working order feporate cspenser for edmiure, required
valiabe)
3 [Stendy batchern working oder wa
4 [eter sand coarse agareate coment, admixture cement approved —
5 [Water sand coarse aggregate, cement, admixture, cement stock suficent a
ona cong raga cag TaN me aD WaRIDGnGRON es |
suffcent capacity)
7. Formwork approved wa
8 [Reinforcement approved wa
9 [Prestressing sheathing approved —
110 [concreting equipment n worn order -
11_[Standby crane, wbrators present =
12 [Fremie working order (or under water work) um
13, [concrete gang presen, including carpenter steel fixer, mechanics and electricians 1
14, [Access provided =
15 _[otetyarrangementssdequated wv
16 [Uehting provided va
117 [Gommunieatons between various points provised —
18 [Arongements for arranging suspensons/stoppage of concrete provided ea
19. [eung arrangements made va
20 [laboratory ntiea a
Remarks
"TSPRLIV Representative ‘Authority Representative“Giant Project Direc, Wetala tate Tanspon ProjectW SAI
a ‘Authority's Engineer: SAI Consulting Engineers Pvt. Umited Eile.
ee |nsV with Orion infra Consultancy Put. Ltd ORION
Contractor: Therwvath- PRL Neraprarawine
[PROJECT :KSTPIL Ki PACKAGE V-ROAD 3-Rehablltation and Upgradation Of Pathanamthitta Ayroor- Muttukudukka Wathupadi -Muttukudukta|
Prakkanam -Prakkanam Eavumthitta-Kulanada -Ramanchira-Thannikkuzhy Thonniamala Road In Pathanamthitta District (Length 28.208) Km
Format No:TBPRI/ CFS
‘CHECKLIST FOR POST CONCRETE As por IRCSP47
‘Structure / Location ‘Stage of inspection
Date of Pouring Date of inspection
Result Remarks
sun Item Description
ves | No
a [aignment a
2 | Postion/Dimensions ofthe Member Levels —
3 Dimensions, um
4 No defects =
=| ier toner contigo ear Naor detec
6 Major defects
7 | Glassfish =
8 Jno cracks
9 | cracks [cracks Date Fst Observed
10 [nature of cracks
11 | Any other defect —
12 | Nor-conformance Report No [Report No/tot Applicable —
‘Note: Post concreting Inspection shall be eavied at vanous stages, such as after stripping of side shuttering each stage ofprestressing, decentering
and/or as per designers stipulation
Isfactory, NS = NOt Satisfactory
TOPRLIV Representative “authority Representative