Subject: Reply to queries for the tender named "Design, Supply, lnstallation, Testing and
Commissioning of 28MVA 33/11KV Container Based Mobile Substation on Turnkey Basis" invited
through tender invitation no. 87.106.315.00.00.352.2020.720; Date:0710612020.
Clarification to the queries received from the prospective tenderer are here below, which will form a part
of the tender document. Other parts of the tender document shall remain unchanged.
ii. Queries from Shanqdonq Taishan Electric Power Construction Enqineerinq Co. Ltd..
China, and Replv of the queries
sl. Reply
Queries
No.
1 Central Procurement Technical Unit (CPTU) has
published a standard Tender Document (PGSA) for
Turnkey project. Ihttps://cptu.gov.bd/standard-
documents/standard-tender-document. htmll. CPTU Please follow the tender document
has asked all the utility to follow the standard
document for turnkey projects. A payment term has
recommended on this standard tender document by
+P-
A(Letter English ) 415
sl.
Queries Reply
No.
CPTU. All utilities like BPDB, DESCO, WZPDCL,
EGCB, APSCL and NESCO follow these standard
document. Unfortunately, DPDC does not follow
this standard document for payment terms.
2. There is no payment against shipment for an
international tender. This is completely violation of
the rules of international chamber of commerce.
This payment term is very much non standard for
international business.
? Even DPDC has paid 0-80% of the payment
against the shipping documents in their various
tenders/ contracts. But it is very much fishy that in
this turnkey document payment against the shipmet
is not allowed. Even it is non standard practice in
DPDC.
4. This kind of non standard payment terms will
increase the project cost because bidder will not get
payment timely so it will increase bank interest and
cost of investment.
5. This kind of payment terms will provide extra
benefits or advantages to some local
manufacturers. We strongly believe that DPDC will
consider thisissue and take it seriously.
6. ln your tender document payment is also related to
FAC. But there is no definition of FAC and how to
achieve it. lt is only mentioned that After Defect
liability period FAC will be issued.
Please confirm.
2. As per BOQ and Price schedule 11kV and 33kV panel
should be Gas lnsulated Type but Type test report
Please follow Amendment-1
asked for Air lnsulated Type.
Please confirm.
3. 1. STL laboratories are qualified and well proven
laboratories worldwide. They have certain sets of
rules and regulations & standard. Asking test
report from STL lab or its member laboratories is
good to ensure quality product. At the same time,
DPDC through this clause allows test report from
any independent and well known testing
laboratories.
We as a bidder/ manufacturer, even DPDC is not
sure about the qualification and standard of the
independent and well known testing lab. An
independent and well known testing lab is not in
same standard of Sft taO.
2. A STL lab is also independent and well known. So
what is the meaning of asking test report from STL Please follow the tender document
lab separately? Rather you can ask test report
from independent and well known testing lab.
3. Our understanding is that the alternative of a high
standard requirement [STL lab] cannot be a low
standard requirement [independent and well
known labl
4. We are refereeing to BPDB, WZPDCL and
NESCO for power transformer test report
requirement, They only accept the type test report
from STL member lab for power transformer
5. ln your tender document payment is also related to
FAC. But there is no definition of FAC and how to
achieve it. lt is only mentioned that After Defect
liability period FAC will be issued.
Please confirm.
6$,', J- \ (\-/-
l,er es :'orn lvlM Enterprise, Banqladesh and Replv of the queries
Queries Reply
.'- . . : 3,'.::-:=:'
: - :- -= ,ald.
r.':: - -'-=--.':'nrain bus: 2000 A
:=.=: .- :: : -.: CUffent. 25 kA Please follow Amendment-1.
='.-- -: l:S:'PtlOn,
='.'.: ----:-: '3r main bus: 2500 A
r :'-' :- :- : -te current. 31.5 kA
2 tn cirawings did not mention the position of auxiliary The drawings attached with the tender
bansformer. document are only for tender purpose.
The tenderer will submit final drawing
showinq all items.
- ::. . 3LS Switchgear
l-r Technrcal data:
:--. :ar type. Single Please follow Amendment-1.
- :e:hnical descriPtlon,
3"s bar type. Double
:1xV GIS Switchqear
I ndoor breaker specification:
The 11kV switchgear unit indoor vacuum CB will be Please follow Amendment-1
draw out type"
11kV indoor GIS switchgear cannot make draw out
t/pe
tr
As per table of Drawing, 11kV GIS have 07 sets Please follow the BOQ of tender
As per SLD, 11kV GIS have 08 sets document
As per BOQ, 11kV GIS have 09 sets
b. BOQ ltems '12 (Gas leak detector) &13 (Fire alarm and
automatic fire fighting system) ,EMS & Communication Please follow Amendment-1.
svstems no specification
7 Losses and Evaluation of Loss calculation for Please follow Amendment-1.
transformer not clear
B Completion trme should be '12 (twelve) months from the Please follow the tender document.
date of LC not contract siqninq