CHECKLIST FOR PLASTER WORK Completion
WIR No. 9700 Location:‐ A9‐003 10/03/2022
Checked by Checked by Checked by

SN Items to be checked Contractor QC Team Consultnat Remarks

N/A

N/A

N/A
Yes

Yes

Yes
No

No

No
HSE Requirements
1 All the HSE requirtments are fulfilled √
QA/QC Requirements
Ensure the availability of the documents such as  Material 
1 √
approval,method statements, subcontractor’s approvals etc

2 Ensure that plastering accessories are approved and are available   √

3 Ensure the Surfaces to receive plastering free from all loose particles. √

4 Ensure that surfaces are wet prior to plaster. √
Ensure the sequence of plaster application with installation and 
5 protection of other works, embedments, finishings and corners have  √
been carried out as per requirement.
Ensure the area near wood frames, skirting and around pipes or fittings 
6 √
as true and level.
7 Check the installation of level Guides. √
Ensure the required number of coats of plaster have been applied with 
8 √
respect to the requirements.
9 Check that the finish coats are applied as per requirement. √
10 Check that proper curing is provided.. √
For Final Approval
Contractor Site Engineer Contractor QA/QC Inspector  Consultant Representative

Name: Name: Mijun Name:

Signature: Signature: Signature:

Date: Date: 10/03/2022 Date:

TGC/QAQC/CHK/CVL/PLW/01 REV‐00 Page 1 of 1