PAKET Peningkatan Struktur Jalan Lintas Selatan Prigi - Batas Kab.

Tulungagung - Klatak-Brumbun
RUAS : Lot.6
SUB. CONT. : PT. GORIP NANDA GUNA
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG

EXISTING DATA UKUR REALISASI


STA. 14+864.00 14+864.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
29.000
0.000 22.005 0.000
1 -23.000 21.361 0.000 22.005 -5.325 43.074 -114.685 27.000
2 -7.722 20.647 -5.325 21.069 1.575 42.184 33.220 25.000
3 0.000 22.005 -3.750 21.115 3.750 42.340 79.388
23.000
4 8.556 22.100 0.000 21.225 3.750 42.340 79.388
5 15.741 19.910 3.750 21.115 1.750 42.178 36.906 21.000
6 25.295 19.639 5.500 21.063 1.910 42.070 40.177 19.000
7.410 21.007 2.500 42.014 52.518 17.000
9.910 21.007 2.000 42.014 42.014
11.910 21.007 0.031 42.075 0.652 15.000
11.941 21.068 -3.385 43.168 -73.062
8.556 22.100 -8.556 44.105 -188.681
0.000 22.005 0.000 22.005 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
14+864.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -12.166

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET Peningkatan Struktur Jalan Lintas Selatan Prigi - Batas Kab. Tulungagung - Klatak-Brumbun
RUAS : Lot.6
SUB. CONT. : PT. GORIP NANDA GUNA
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+850.00 14+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 30.000
1 -20.672 24.665 0.000 0.000 0.000 29.000
2 -12.998 23.479 0.000 24.002 0.000 28.000
3 -6.418 23.300 0.000 24.002 -6.418 47.302 -151.792 27.000
4 0.000 24.002 -6.418 23.300 -5.733 46.756 -134.026 26.000
5 13.002 23.467 -12.151 23.456 0.241 46.430 5.595 25.000
6 20.276 22.865 -11.910 22.974 2.000 45.948 45.948 24.000
7 23.659 21.602 -9.910 22.974 2.500 45.948 57.435 23.000
-7.410 22.974 1.910 46.004 43.934 22.000
-5.500 23.030 1.750 46.112 40.348 21.000
-3.750 23.082 3.750 46.274 86.764 20.000
0.000 23.192 3.750 46.274 86.764 -25 -24 -23 -22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
3.750 23.082 1.750 46.112 40.348
5.500 23.030 1.910 46.004 43.934
EXISTING DATA UKUR REALISASI
7.410 22.974 2.500 45.948 57.435
9.910 22.974 2.000 45.948 45.948
11.910 22.974 0.264 46.475 6.135
14+850.00
12.174 23.501 -12.174 47.503 -289.151
0.000 24.002 0.000 24.002 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -14.382

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET Peningkatan Struktur Jalan Lintas Selatan Prigi - Batas Kab. Tulungagung - Klatak-Brumbun
RUAS : Lot.6
SUB. CONT. : PT. GORIP NANDA GUNA
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+825.00 14+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -24.312 24.923 0.000 0.000 0.000 30.000
2 -12.999 23.959 0.000 0.000 0.000 29.000
3 -4.909 24.017 0.000 0.000 0.000 28.000
4 -3.168 23.515 0.000 0.000 0.000 27.000
5 0.000 25.123 10.518 24.959 131.259 26.000
6 5.510 25.095 10.518 24.959 -5.008 50.054 -125.335 25.000
7 10.518 24.959 5.510 25.095 -5.510 50.218 -138.351 24.000
8 13.001 24.067 0.000 25.123 -1.481 49.494 -36.650 23.000
9 22.714 22.089 -1.481 24.371 1.481 48.786 36.126 22.000
0.000 24.415 3.750 48.720 91.350 21.000
3.750 24.305 1.750 48.559 42.489 20.000
5.500 24.254 1.910 48.452 46.272 -25 -24 -23-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
7.410 24.198 2.500 48.396 60.495
9.910 24.198 2.000 48.396 48.396 EXISTING DATA UKUR REALISASI
11.910 24.198 0.111 48.617 2.698
12.021 24.419 -1.503 49.378 -37.108
10.518 24.959 -10.518 24.959 -131.259
14+825.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -9.618

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET Peningkatan Struktur Jalan Lintas Selatan Prigi - Batas Kab. Tulungagung - Klatak-Brumbun
RUAS : Lot.6
SUB. CONT. : PT. GORIP NANDA GUNA
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+825.00 14+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -24.312 24.923 0.000 0.000 0.000 30.000
2 -12.999 23.959 -1.481 24.371 -18.047 29.000
3 -4.909 24.017 -1.481 24.371 -2.269 48.676 -55.223 28.000
4 -3.168 23.515 -3.750 24.305 -1.750 48.559 -42.489 27.000
5 0.000 25.123 -5.500 24.254 -1.910 48.452 -46.272 26.000
6 5.510 25.095 -7.410 24.198 -0.403 48.194 -9.711 25.000
7 10.518 24.959 -7.813 23.996 2.904 48.013 69.715 24.000
8 13.001 24.067 -4.909 24.017 1.741 47.532 41.377 23.000
9 22.714 22.089 -3.168 23.515 1.687 47.886 40.392 22.000
-1.481 24.371 1.481 24.371 18.047 21.000
0.000 0.000 0.000 20.000
-25 -24 -23 -22 -21 -20 -19-18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
14+825.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 2.211

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+800.00 14+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -14.253 25.369 0.000 0.000 0.000 30.000
2 -6.579 24.183 0.000 0.000 0.000 29.000
3 0.000 24.004 0.000 0.000 0.000 28.000
4 2.310 24.394 0.000 0.000 0.000 27.000
5 6.418 24.706 0.000 0.000 0.000 26.000
6 19.421 24.171 12.717 24.447 155.446 25.000
7 26.694 23.569 12.717 24.447 -6.298 49.153 -154.783 24.000
8 30.078 22.306 6.419 24.706 -4.109 49.100 -100.876 23.000
2.310 24.394 -2.310 48.398 -55.900 22.000
0.000 24.004 -6.579 48.187 -158.511 21.000
-6.579 24.183 -6.275 49.336 -154.792 20.000
-12.854 25.153 0.944 48.417 22.853
-11.910 23.264 2.000 46.528 46.528
-9.910 23.264 2.500 46.528 58.160 EXISTING DATA UKUR REALISASI
-7.410 23.264 1.910 46.584 44.488
-5.500 23.320 1.750 46.691 40.855
-3.750 23.371 3.750 46.525 87.234
14+800.00
0.000 23.154 3.750 46.095 86.428
3.750 22.941 1.750 45.831 40.102
5.500 22.890 1.910 45.724 43.666
7.410 22.834 2.500 45.668 57.085
9.910 22.834 2.000 45.668 45.668
11.910 22.834 0.807 47.281 19.078
12.717 24.447 -12.717 24.447 -155.446
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -32.716

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+775.00 14+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -25.453 27.842 0.000 25.297 0.000 30.000
2 -15.904 26.791 0.000 25.297 -5.601 50.952 -142.691 29.000
3 -5.601 25.655 -5.601 25.655 -7.250 52.109 -188.895 28.000
4 0.000 25.297 -12.851 26.454 0.941 51.026 24.008 27.000
5 9.456 25.179 -11.910 24.572 2.000 49.144 49.144 26.000
6 13.000 23.326 -9.910 24.572 2.500 49.144 61.430 25.000
7 17.743 22.043 -7.410 24.572 1.910 49.200 46.986 24.000
8 23.000 21.448 -5.500 24.628 1.750 49.308 43.145 23.000
-3.750 24.680 3.750 49.095 92.053 22.000
0.000 24.415 3.750 48.570 91.069 21.000
3.750 24.155 1.750 48.258 42.226 20.000
5.500 24.103 1.910 48.150 45.983
7.410 24.047 2.500 48.094 60.118
9.910 24.047 1.710 48.094 41.120 EXISTING DATA UKUR REALISASI
11.620 24.047 -2.164 49.226 -53.263
9.456 25.179 -9.456 50.476 -238.651
0.000 25.297 0.000 25.297 0.000
14+775.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -26.2183

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+750.00 14+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -31.238 30.500 7.767 26.554 103.122
3 -20.360 28.061 7.767 26.554 -6.319 53.203 -168.095
5 -1.018 25.876 1.448 26.649 -1.299 53.042 -34.451 34.000
7 0.000 26.364 0.149 26.393 3.601 52.537 94.593 32.000
9 1.448 26.649 3.750 26.144 1.750 52.236 45.707
30.000
11 7.767 26.554 5.500 26.092 1.910 52.128 49.782
13 13.002 23.172 7.410 26.036 5.123 49.511 126.822 28.000
14 22.854 21.594 12.533 23.475 -4.766 50.029 -119.219 26.000
7.767 26.554 -7.767 26.554 -103.122
24.000
0.000 0.000 0.000
0.000 0.000 0.000 22.000
0.000 0.000 0.000 20.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
14+750.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -4.861

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+750.00 14+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -31.238 30.500 0.000 0.000 0.000
34.000
3 -20.360 28.061 0.000 26.364 0.000
5 -1.018 25.876 0.000 26.364 0.149 52.757 3.930 32.000
7 0.000 26.364 0.149 26.393 -0.149 52.797 -3.933 30.000
9 1.448 26.649 0.000 26.404 -3.750 53.073 -99.512 28.000
11 7.767 26.554 -3.750 26.669 -1.750 53.286 -46.625
26.000
13 13.002 23.172 -5.500 26.617 -1.652 53.186 -43.932
14 22.854 21.594 -7.152 26.569 6.134 52.445 160.849 24.000
-1.018 25.876 1.018 52.240 26.590 22.000
0.000 26.364 0.000 26.364 0.000
20.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
14+750.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 2.633

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 14+750.00 14+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
1 -31.238 30.500 0.000 0.000 0.000
3 -20.360 28.061 -12.199 27.139 -165.534 34.000
5 -1.018 25.876 -12.199 27.139 0.289 53.700 7.760 32.000
7 0.000 26.364 -11.910 26.561 2.000 53.122 53.122
30.000
9 1.448 26.649 -9.910 26.561 2.500 53.122 66.403
11 7.767 26.554 -7.410 26.561 0.258 53.130 6.854 28.000
13 13.002 23.172 -7.152 26.569 -5.047 53.708 -135.532 26.000
14 22.854 21.594 -12.199 27.139 12.199 27.139 165.534
24.000
0.000 0.000 0.000
0.000 0.000 0.000 22.000
0.000 0.000 0.000 20.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
14+750.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -1.394

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+800.00 03+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-29.601 241.063 0.000 239.317 0.000
-25.902 240.719 0.000 239.317 -4.401 478.735 -1,053.456 250.000
-17.701 240.341 -4.401 239.418 -0.698 479.046 -167.187 248.000
-12.747 239.898 -5.099 239.628 -4.001 479.243 -958.726 246.000
-9.100 239.615 -9.100 239.615 -3.647 479.513 -874.392 244.000
-5.099 239.628 -12.747 239.898 -4.954 480.239 -1,189.552
242.000
-4.401 239.418 -17.701 240.341 -3.718 480.853 -893.906
240.000
0.000 239.317 -21.419 240.512 7.519 484.784 1,822.545
238.000
9.152 239.438 -13.900 244.272 0.300 488.544 73.282
11.349 237.980 -13.600 244.272 1.500 488.574 366.431 236.000
17.597 237.848 -12.100 244.302 2.500 488.654 610.818 234.000
19.046 238.101 -9.600 244.352 9.200 488.888 2,248.885 232.000
24.948 237.408 -0.400 244.536 0.250 489.075 61.134
37.301 237.393 -0.150 244.539 0.150 489.075 36.681
45.197 237.345 0.000 244.536 0.150 489.075 36.681 EXISTING DATA UKUR REALISASI
52.293 237.346 0.150 244.539 0.250 489.075 61.134
0.400 244.536 9.200 488.888 2,248.885
9.600 244.352 2.500 488.654 610.818
03+800.00
12.100 244.302 1.500 488.574 366.431
13.600 244.272 0.300 488.544 73.282
13.900 244.272 11.700 482.694 2,823.760
25.600 238.422 2.000 476.884 476.884
27.600 238.462 2.106 475.864 501.085
29.706 237.402 -4.758 474.810 -1,129.573
24.948 237.408 -5.902 475.509 -1,403.227
19.046 238.101 -1.449 475.949 -344.825
17.597 237.848 -6.248 475.828 -1,486.487
11.349 237.980 -2.197 477.418 -524.444
9.152 239.438 -9.152 478.755 -2,190.783
0.000 239.317 0.000 239.317 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 202.176

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+825.00 03+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-27.845 243.504 0.000 241.695 0.000
-22.695 242.727 0.000 241.695 -4.601 483.381 -1,112.018 260.000
-19.598 242.709 -4.601 241.686 -5.603 483.773 -1,355.290
-18.796 242.249 -10.204 242.087 -1.495 484.612 -362.247 255.000
-17.944 242.192 -11.699 242.525 -6.245 484.717 -1,513.529
-11.699 242.525 -17.944 242.192 -0.852 484.441 -206.372 250.000
-10.204 242.087 -18.796 242.249 -0.536 484.805 -129.928
-4.601 241.686 -19.332 242.556 5.432 487.828 1,324.941 245.000
0.000 241.695 -13.900 245.272 0.300 490.544 73.582
2.753 241.836 -13.600 245.272 1.500 490.574 367.931 240.000
3.103 241.362 -12.100 245.302 2.500 490.654 613.318
9.100 241.224 -9.600 245.352 9.200 490.888 2,258.085 235.000
9.999 240.835 -0.400 245.536 0.250 491.075 61.384
18.797 240.771 -0.150 245.539 0.150 491.075 36.831
19.393 240.310 0.000 245.536 0.150 491.075 36.831
EXISTING DATA UKUR REALISASI
26.039 240.169 0.150 245.539 0.250 491.075 61.384
28.891 240.338 0.400 245.536 9.200 490.888 2,258.085
29.846 239.871 9.600 245.352 2.500 490.654 613.318
03+825.00
35.950 239.681 12.100 245.302 1.500 490.574 367.931
44.952 239.707 13.600 245.272 0.300 490.544 73.582
48.150 239.754 13.900 245.272 10.120 485.484 2,456.549
24.020 240.212 -4.627 480.522 -1,111.688
19.393 240.310 -0.596 481.081 -143.362
18.797 240.771 -8.798 481.606 -2,118.585
9.999 240.835 -0.899 482.059 -216.686
9.100 241.224 -5.997 482.586 -1,447.034
3.103 241.362 -0.350 483.198 -84.560
2.753 241.836 -2.753 483.531 -665.580
0.000 241.695 0.000 241.695 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 136.870

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+850.00 03+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-43.046 244.839 0.000 242.915 0.000
-39.148 244.758 0.000 242.915 -6.154 486.050 -1,495.576 260.000
-22.600 243.959 -6.154 243.135 -0.647 486.610 -157.418
-20.698 244.061 -6.801 243.475 -4.699 487.011 -1,144.232 255.000
-12.003 244.003 -11.500 243.536 -0.503 487.539 -122.616
-11.500 243.536 -12.003 244.003 -6.349 488.048 -1,549.308 250.000
-6.801 243.475 -18.352 244.045 4.452 490.317 1,091.446
-6.154 243.135 -13.900 246.272 0.300 492.544 73.882 245.000
0.000 242.915 -13.600 246.272 1.500 492.574 369.431
2.952 243.591 -12.100 246.302 2.500 492.654 615.818 240.000
7.598 242.967 -9.600 246.352 9.200 492.888 2,267.285
12.548 242.912 -0.400 246.536 0.250 493.075 61.634 235.000
14.400 242.610 -0.150 246.539 0.150 493.075 36.981
17.499 242.571 0.000 246.536 0.150 493.075 36.981
18.148 241.926 0.150 246.539 0.250 493.075 61.634
EXISTING DATA UKUR REALISASI
21.249 241.857 0.400 246.536 9.200 492.888 2,267.285
27.496 241.514 9.600 246.352 2.500 492.654 615.818
28.046 241.468 12.100 246.302 1.500 492.574 369.431
03+850.00
45.549 241.371 13.600 246.272 0.300 492.544 73.882
46.645 241.348 13.900 246.272 9.013 488.038 2,199.343
22.913 241.766 -1.664 483.623 -402.374
21.249 241.857 -3.101 483.783 -750.106
18.148 241.926 -0.649 484.497 -157.219
17.499 242.571 -3.099 485.181 -751.788
14.400 242.610 -1.852 485.522 -449.593
12.548 242.912 -4.950 485.879 -1,202.551
7.598 242.967 -4.646 486.558 -1,130.274
2.952 243.591 -2.952 486.506 -718.083
0.000 242.915 0.000 242.915 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 109.709

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+875.00 03+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.893 247.059 0.000 244.409 0.000
-33.393 245.931 0.000 244.409 -3.902 488.921 -953.885 260.000
-18.345 246.029 -3.902 244.512 -0.902 489.908 -220.949
-17.900 245.665 -4.804 245.396 -12.341 491.045 -3,029.993 255.000
-4.804 245.396 -17.145 245.649 3.245 492.921 799.764
-3.902 244.512 -13.900 247.272 0.300 494.544 74.182 250.000
0.000 244.409 -13.600 247.272 1.500 494.574 370.931
6.595 244.563 -12.100 247.302 2.500 494.654 618.318 245.000
7.248 244.025 -9.600 247.352 9.200 494.888 2,276.485
13.102 244.044 -0.400 247.536 0.250 495.075 61.884 240.000
13.553 243.662 -0.150 247.539 0.150 495.075 37.131
16.654 243.549 0.000 247.536 0.150 495.075 37.131 235.000
17.305 243.361 0.150 247.539 0.250 495.075 61.884
21.057 243.611 0.400 247.536 9.200 494.888 2,276.485
22.658 242.865 9.600 247.352 2.500 494.654 618.318
EXISTING DATA UKUR REALISASI
38.010 243.058 12.100 247.302 1.500 494.574 370.931
38.913 243.302 13.600 247.272 0.300 494.544 74.182
40.165 243.332 13.900 247.272 8.814 490.138 2,160.038
03+875.00
22.714 242.866 -0.056 485.731 -13.600
22.658 242.865 -1.601 486.476 -389.424
21.057 243.611 -3.752 486.972 -913.559
17.305 243.361 -0.651 486.910 -158.489
16.654 243.549 -3.101 487.211 -755.421
13.553 243.662 -0.451 487.706 -109.978
13.102 244.044 -5.854 488.069 -1,428.578
7.248 244.025 -0.653 488.588 -159.524
6.595 244.563 -6.595 488.972 -1,612.385
0.000 244.409 0.000 244.409 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 91.876

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+900.00 03+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
250.000
-40.541 248.766 0.000 247.460 0.000
249.000
-32.196 248.706 0.000 247.460 -15.516 494.924 -3,839.620
-23.448 248.884 -15.516 247.464 1.616 495.736 400.555 248.000
-22.553 247.466 -13.900 248.272 0.300 496.544 74.482 247.000
0.000 247.460 -13.600 248.272 1.500 496.574 372.431 246.000
3.852 247.597 -12.100 248.302 2.500 496.654 620.818 245.000
5.556 246.064 -9.600 248.352 9.200 496.888 2,285.685 244.000
6.410 245.943 -0.400 248.536 0.250 497.075 62.134 243.000
13.908 245.894 -0.150 248.539 0.150 497.075 37.281
242.000
14.905 245.444 0.000 248.536 0.150 497.075 37.281
241.000
34.406 245.206 0.150 248.539 0.250 497.075 62.134
240.000
38.860 245.612 0.400 248.536 9.200 496.888 2,285.685
9.600 248.352 2.500 496.654 620.818
12.100 248.302 1.500 496.574 372.431
13.600 248.272 0.300 496.544 74.482
EXISTING DATA UKUR REALISASI
13.900 248.272 5.771 493.658 1,424.450
19.671 245.386 -4.766 490.830 -1,169.648
14.905 245.444 -0.997 491.338 -244.932
03+900.00
13.908 245.894 -7.498 491.837 -1,843.897
6.410 245.943 -0.854 492.007 -210.087
5.556 246.064 -1.704 493.661 -420.599
3.852 247.597 -3.852 495.057 -953.480
0.000 247.460 0.000 494.920 0.000
0.000 247.460 0.000 247.460 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 48.401

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+925.00 03+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.201 250.388 0.000 249.602 0.000
-31.503 250.070 0.000 249.602 -0.703 499.184 -175.463 251.000
-22.552 250.181 -0.703 249.582 -10.250 499.149 -2,558.139
-21.001 249.532 -10.953 249.567 -8.116 499.106 -2,025.372 250.000
-10.953 249.567 -19.069 249.539 0.469 498.843 116.979
249.000
-0.703 249.582 -18.600 249.304 1.600 498.576 398.861
0.000 249.602 -17.000 249.272 3.100 498.544 772.743 248.000
0.901 248.345 -13.900 249.272 0.300 498.544 74.782
247.000
11.651 248.345 -13.600 249.272 1.500 498.574 373.931
12.297 247.792 -12.100 249.302 2.500 498.654 623.318 246.000
25.548 247.618 -9.600 249.352 9.200 498.888 2,294.885
27.403 247.262 -0.400 249.536 0.250 499.075 62.384 245.000
29.001 247.505 -0.150 249.539 0.150 499.075 37.431
29.400 247.363 0.000 249.536 0.150 499.075 37.431
30.802 247.370 0.150 249.539 0.250 499.075 62.384 EXISTING DATA UKUR REALISASI
0.400 249.536 9.200 498.888 2,294.885
9.600 249.352 2.500 498.654 623.318
12.100 249.302 1.500 498.574 373.931
03+925.00
13.600 249.272 0.300 498.544 74.782
13.900 249.272 3.082 497.002 765.880
16.982 247.730 -4.685 495.522 -1,160.760
12.297 247.792 -0.646 496.137 -160.252
11.651 248.345 -10.750 496.690 -2,669.709
0.901 248.345 -0.901 497.947 -224.325
0.000 249.602 0.000 249.602 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 13.901

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+950.00 03+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.901 251.578 0.000 0.000 0.000
-31.800 251.697 0.000 250.330 0.000
-15.749 251.634 0.000 250.330 -2.405 500.676 -602.063 259.000
-14.147 250.639 -2.405 250.346 -0.596 501.139 -149.339 257.000
-3.001 250.793 -3.001 250.793 -11.146 501.432 -2,794.481
255.000
-2.405 250.346 -14.147 250.639 -1.602 502.273 -402.321
0.000 250.330 -15.749 251.634 -5.555 503.290 -1,397.888 253.000
6.245 250.457 -21.304 251.656 2.704 501.960 678.650 251.000
6.895 249.824 -18.600 250.304 1.600 500.576 400.461
249.000
20.846 249.688 -17.000 250.272 3.100 500.544 775.843
21.892 249.174 -13.900 250.272 0.300 500.544 75.082 247.000
28.189 249.093 -13.600 250.272 1.500 500.574 375.431 245.000
31.885 249.009 -12.100 250.302 2.500 500.654 625.818
-9.600 250.352 9.200 500.888 2,304.085
-0.400 250.536 0.250 501.075 62.634
EXISTING DATA UKUR REALISASI
-0.150 250.539 0.150 501.075 37.581
0.000 250.536 0.150 501.075 37.581
0.150 250.539 0.250 501.075 62.634
03+950.00
0.400 250.536 9.200 500.888 2,304.085
9.600 250.352 2.500 500.654 625.818
12.100 250.302 1.500 500.574 375.431
13.600 250.272 0.300 500.544 75.082
13.900 250.272 1.053 500.017 263.259
14.953 249.745 -8.058 499.569 -2,012.764
6.895 249.824 -0.650 500.281 -162.591
6.245 250.457 -6.245 500.787 -1,563.707
0.000 250.330 0.000 250.330 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -5.682

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 03+975.00 03+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.747 252.634 0.000 252.472 0.000
-32.043 252.646 0.000 252.472 -6.750 505.031 -1,704.480 255.000
-19.593 252.584 -6.750 252.559 -0.345 505.357 -87.174 254.000
-7.095 252.798 -7.095 252.798 -12.498 505.382 -3,158.132 253.000
-6.750 252.559 -19.593 252.584 -1.583 505.176 -399.847
252.000
0.000 252.472 -21.176 252.592 2.576 503.896 649.018
251.000
6.354 252.541 -18.600 251.304 1.600 502.576 402.061
8.606 251.299 -17.000 251.272 3.100 502.544 778.943 250.000
12.856 251.185 -13.900 251.272 0.300 502.544 75.382 249.000
13.253 250.780 -13.600 251.272 1.500 502.574 376.931 248.000
20.750 250.723 -12.100 251.302 2.500 502.654 628.318
247.000
27.497 250.756 -9.600 251.352 9.200 502.888 2,313.285
31.351 250.753 -0.400 251.536 0.250 503.075 62.884
-0.150 251.539 0.150 503.075 37.731
0.000 251.536 0.150 503.075 37.731 EXISTING DATA UKUR REALISASI
0.150 251.539 0.250 503.075 62.884
0.400 251.536 9.200 502.888 2,313.285
9.600 251.352 2.500 502.654 628.318
03+975.00
12.100 251.302 1.500 502.574 376.931
13.600 251.272 0.300 502.544 75.382
13.900 251.272 1.008 502.039 253.028
14.908 250.767 -1.655 501.547 -415.030
13.253 250.780 -0.397 501.965 -99.640
12.856 251.185 -4.250 502.484 -1,067.779
8.606 251.299 -2.252 503.840 -567.324
6.354 252.541 -6.354 505.013 -1,604.426
0.000 252.472 0.000 252.472 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -31.723

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+000.00 04+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.264 254.052 0.000 252.848 0.000
-31.866 253.992 0.000 252.848 -3.654 505.881 -924.245
-21.561 254.046 -3.654 253.033 -0.498 506.480 -126.114 259.000
-9.556 254.168 -4.152 253.447 -3.852 506.719 -975.941 257.000
-8.004 253.272 -8.004 253.272 -1.552 507.440 -393.773 255.000
-4.152 253.447 -9.556 254.168 -12.005 508.214 -3,050.555
253.000
-3.654 253.033 -21.561 254.046 -0.518 508.089 -131.595
0.000 252.848 -22.079 254.043 3.479 506.347 880.791 251.000
5.296 252.874 -18.600 252.304 1.600 504.576 403.661 249.000
6.950 253.009 -17.000 252.272 0.400 504.544 100.909 247.000
15.896 252.287 -16.600 252.272 2.700 504.544 681.134
245.000
22.000 252.390 -13.900 252.272 0.300 504.544 75.682
27.701 252.444 -13.600 252.272 1.500 504.574 378.431
31.901 252.479 -12.100 252.302 2.500 504.654 630.818
EXISTING DATA UKUR REALISASI
-9.600 252.352 9.200 504.888 2,322.485
-0.400 252.536 0.250 505.075 63.134
-0.150 252.539 0.150 505.075 37.881
0.000 252.536 0.150 505.075 37.881
0.150 252.539 0.250 505.075 63.134
0.400 252.536 9.200 504.888 2,322.485
9.600 252.352 2.500 504.654 630.818
12.100 252.302 1.500 504.574 378.431
04+000.00
13.600 252.272 0.300 504.544 75.682
13.900 252.272 2.700 504.544 681.134
16.600 252.272 0.400 504.544 100.909
17.000 252.272 1.600 504.576 403.661
18.600 252.304 0.059 504.638 14.887
18.659 252.334 -2.763 504.621 -697.134
15.896 252.287 -8.946 505.296 -2,260.189
6.950 253.009 -1.654 505.883 -418.365
5.296 252.874 -5.296 505.722 -1,339.152
0.000 252.848 0.000 252.848 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -33.1177

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+025.00 04+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.151 254.803 0.000 254.142 0.000
-31.949 254.823 0.000 254.142 -4.556 508.320 -1,157.953
-22.301 255.064 -4.556 254.178 -1.501 508.799 -381.854 259.000
-21.403 254.779 -6.057 254.621 -9.146 509.410 -2,329.532
257.000
-15.203 254.789 -15.203 254.789 -6.200 509.568 -1,579.661
-6.057 254.621 -21.403 254.779 -0.402 509.686 -102.447 255.000
-4.556 254.178 -21.805 254.907 3.205 508.211 814.408 253.000
-0.060 254.142 -18.600 253.304 1.600 506.576 405.261 251.000
6.489 254.113 -17.000 253.272 0.400 506.544 101.309
249.000
11.242 254.186 -16.600 253.272 2.700 506.544 683.834
247.000
11.466 253.730 -13.900 253.272 0.300 506.544 75.982
20.738 253.553 -13.600 253.272 1.500 506.574 379.931 245.000
23.133 253.356 -12.100 253.302 2.500 506.654 633.318
28.338 253.297 -9.600 253.352 9.200 506.888 2,331.685
31.990 253.493 -0.400 253.536 0.250 507.075 63.384 EXISTING DATA UKUR REALISASI
-0.150 253.539 0.150 507.075 38.031
0.000 253.536 0.150 507.075 38.031
0.150 253.539 0.250 507.075 63.384
0.400 253.536 9.200 506.888 2,331.685
04+025.00
9.600 253.352 2.500 506.654 633.318
12.100 253.302 1.500 506.574 379.931
13.600 253.272 0.300 506.544 75.982
13.900 253.272 2.700 506.544 683.834
16.600 253.272 0.400 506.544 101.309
17.000 253.272 1.600 506.576 405.261
18.600 253.304 0.558 506.887 141.421
19.158 253.583 -7.692 507.313 -1,951.126
11.466 253.730 -0.224 507.916 -56.887
11.242 254.186 -4.753 508.299 -1,207.973
6.489 254.113 -6.489 508.255 -1,649.033
0.000 254.142 0.000 254.142 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -35.168

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+050.00 04+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-31.946 255.037 0.000 255.168 0.000
-30.545 255.560 0.000 255.168 -4.598 510.797 -1,174.322
-23.241 255.604 -4.598 255.629 -0.199 511.642 -50.908
-22.190 256.336 -4.797 256.013 -16.096 511.930 -4,120.013 260.000
-20.893 255.917 -20.893 255.917 -1.297 512.253 -332.196 259.000
-4.797 256.013 -22.190 256.336 -0.198 512.534 -50.741 258.000
-4.598 255.629 -22.388 256.198 3.788 510.502 966.891 257.000
0.000 255.168 -18.600 254.304 1.600 508.576 406.861 256.000
9.350 255.187 -17.000 254.272 0.400 508.544 101.709 255.000
11.252 255.023 -16.600 254.272 2.700 508.544 686.534 254.000
17.807 254.972 -13.900 254.272 0.300 508.544 76.282 253.000
29.302 254.912 -13.600 254.272 1.500 508.574 381.431 252.000
31.448 254.473 254.302 2.500 508.654 635.818 251.000
-12.100
250.000
-9.600 254.352 9.200 508.888 2,340.885
-0.400 254.536 0.250 509.075 63.634
-0.150 254.539 0.150 509.075 38.181
0.000 254.536 0.150 509.075 38.181 EXISTING DATA UKUR REALISASI
0.150 254.539 0.250 509.075 63.634
04+050.00
0.400 254.536 9.200 508.888 2,340.885
9.600 254.352 2.500 508.654 635.818
12.100 254.302 1.500 508.574 381.431
13.600 254.272 0.300 508.544 76.282
13.900 254.272 2.700 508.544 686.534
16.600 254.272 0.400 508.544 101.709
17.000 254.272 1.600 508.576 406.861
18.600 254.304 1.314 509.265 334.587
19.914 254.961 -2.107 509.933 -537.214
17.807 254.972 -6.555 509.995 -1,671.509
11.252 255.023 -1.902 510.210 -485.210
9.350 255.187 -9.350 510.355 -2,385.910
0.000 255.168 0.000 255.168 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -43.878

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+075.00 04+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-31.725 256.383 0.000 256.131 0.000
-14.277 256.565 0.000 256.131 -0.480 512.247 -122.939
260.000
-12.930 256.182 -0.480 256.116 -12.450 512.298 -3,189.055
259.000
-0.480 256.116 -12.930 256.182 -1.347 512.747 -345.335
258.000
0.000 256.131 -14.277 256.565 -6.705 513.060 -1,720.034
257.000
5.122 256.294 -20.982 256.495 2.382 511.799 609.553 256.000
5.926 255.915 -18.600 255.304 1.600 510.576 408.461 255.000
20.778 256.029 -17.000 255.272 0.400 510.544 102.109 254.000
21.579 255.574 -16.600 255.272 2.700 510.544 689.234 253.000
23.634 255.686 -13.900 255.272 0.300 510.544 76.582 252.000
24.435 254.913 -13.600 255.272 1.500 510.574 382.931 251.000
28.530 253.776 -12.100 255.302 2.500 510.654 638.318 250.000
29.827 253.716 -9.600 255.352 9.200 510.888 2,350.085
-0.400 255.536 0.250 511.075 63.884
-0.150 255.539 0.150 511.075 38.331 EXISTING DATA UKUR REALISASI
0.000 255.536 0.150 511.075 38.331
0.150 255.539 0.250 511.075 63.884
0.400 255.536 9.200 510.929 2,350.273
9.600 255.393 2.500 510.748 638.435
12.100 255.355 1.500 510.686 383.015
13.600 255.331 0.300 510.662 76.599
13.900 255.331 2.700 510.662 689.394
04+075.00
16.600 255.331 0.400 510.662 102.132
17.000 255.331 1.600 510.694 408.555
18.600 255.363 1.318 511.385 337.003
19.918 256.022 -13.992 511.937 -3,581.511
5.926 255.915 -0.804 512.209 -205.908
5.122 256.294 -5.122 512.425 -1,312.320
0.000 256.131 0.000 256.131 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -29.996

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+100.00 04+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 257.062 0.000
-36.068 256.740 0.000 257.062 -0.870 514.138 -223.650
-31.869 256.811 -0.870 257.076 -7.348 513.980 -1,888.363 260.000
-30.569 257.433 -8.218 256.904 -11.550 513.792 -2,967.149 259.000
-24.519 257.465 -19.768 256.888 1.168 513.192 299.704 258.000
-21.866 256.885 -18.600 256.304 1.600 512.576 410.061 257.000
-8.218 256.904 -17.000 256.272 0.400 512.544 102.509 256.000
255.000
-0.870 257.076 -16.600 256.272 2.700 512.544 691.934
254.000
0.000 257.062 -13.900 256.272 0.300 512.544 76.882
253.000
12.677 256.856 -13.600 256.272 1.500 512.574 384.431
252.000
14.778 256.287 -12.100 256.302 2.500 512.654 640.818
251.000
18.978 255.187 -9.600 256.352 9.200 512.888 2,359.285 250.000
21.024 255.084 -0.400 256.536 0.250 513.075 64.134
21.669 254.056 -0.150 256.539 0.150 513.075 38.481
23.170 253.739 0.000 256.536 0.150 513.075 38.481
EXISTING DATA UKUR REALISASI
25.215 255.547 0.150 256.539 0.250 513.075 64.134
28.220 255.604 0.400 256.536 9.200 513.021 2,359.897
9.600 256.485 2.500 512.957 641.196
12.100 256.472 1.500 512.935 384.701
13.600 256.463 0.300 512.926 76.939
13.900 256.463 0.227 512.926 58.217
04+100.00
14.127 256.463 -1.450 513.319 -372.156
12.677 256.856 -12.677 513.918 -3,257.469
0.000 257.062 0.000 257.062 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -16.984

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+125.00 04+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 257.182 0.000
-37.840 258.136 0.000 257.182 -1.290 514.385 -331.778
260.000
-32.136 258.188 -1.290 257.203 -0.901 514.739 -231.890
259.500
-24.931 258.086 -2.191 257.536 -3.891 515.000 -1,001.933
259.000
-14.430 258.057 -6.082 257.464 -0.897 515.533 -231.217
258.500
-6.979 258.069 -6.979 258.069 -7.451 516.126 -1,922.827 258.000
-6.082 257.464 -14.430 258.057 -5.708 516.130 -1,473.035 257.500
-2.191 257.536 -20.138 258.073 1.538 515.377 396.325 257.000
-1.290 257.203 -18.600 257.304 1.600 514.576 411.661 256.500
0.000 257.182 -17.000 257.272 0.400 514.544 102.909 256.000
0.310 257.177 -16.600 257.272 2.700 514.544 694.634 255.500
1.505 256.422 -13.900 257.272 0.300 514.544 77.182 255.000
3.356 255.844 -13.600 257.272 1.500 514.574 385.931
4.703 256.623 -12.100 257.302 2.500 514.654 643.318
14.200 256.651 -9.600 257.352 9.200 514.888 2,368.485 EXISTING DATA UKUR REALISASI
15.753 257.411 -0.400 257.536 0.250 515.075 64.384
18.956 257.442 -0.150 257.539 0.150 515.075 38.631
22.908 257.909 0.000 257.536 0.150 515.075 38.631
04+125.00
27.311 257.938 0.150 257.539 0.250 515.075 64.384
30.865 257.993 0.400 257.536 9.200 515.113 2,369.520
9.600 257.577 2.500 515.166 643.958
12.100 257.589 1.500 515.184 386.388
13.600 257.595 0.300 515.190 77.279
13.900 257.595 1.103 514.639 283.823
15.003 257.044 -0.803 513.695 -206.249
14.200 256.651 -9.497 513.274 -2,437.282
4.703 256.623 -1.347 512.467 -345.147
3.356 255.844 -1.851 512.266 -474.102
1.505 256.422 -1.195 513.599 -306.875
0.310 257.177 -0.310 514.359 -79.726
0.000 257.182 0.000 257.182 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 5.381

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+150.00 04+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 257.389 0.000
260.000
-36.701 259.483 0.000 257.389 -1.650 514.988 -424.865
259.500
-32.503 259.383 -1.650 257.599 -1.597 515.288 -411.457
259.000
-29.850 259.502 -3.247 257.689 -0.849 516.588 -219.292
258.500
-29.048 259.188 -4.096 258.899 -10.850 517.836 -2,809.260 258.000
-28.345 259.067 -14.946 258.937 -0.599 518.320 -155.237 257.500
-27.593 259.478 -15.545 259.383 -5.297 518.808 -1,374.063 257.000
-15.545 259.383 -20.842 259.425 2.242 517.729 580.374 256.500
-14.946 258.937 -18.600 258.304 1.600 516.576 413.261 256.000
-4.096 258.899 -17.000 258.272 0.400 516.544 103.309 255.500
-3.247 257.689 -16.600 258.272 2.700 516.544 697.334 255.000
-1.650 257.599 -13.900 258.272 0.300 516.544 77.482
0.000 257.389 -13.600 258.272 1.500 516.574 387.431
1.646 257.180 -12.100 258.302 2.500 516.654 645.818 EXISTING DATA UKUR REALISASI
2.197 256.775 -9.600 258.352 9.200 516.888 2,377.685
3.098 256.870 -0.400 258.536 0.250 517.075 64.634
5.896 257.995 -0.150 258.539 0.150 517.075 38.781
04+150.00
12.297 258.247 0.000 258.536 0.150 517.075 38.781
13.245 258.752 0.150 258.539 0.250 517.075 64.634
20.293 258.650 0.400 258.536 9.200 517.205 2,379.143
20.991 259.126 9.600 258.669 2.500 517.375 646.719
26.940 259.287 12.100 258.706 1.500 517.433 388.075
30.536 259.400 13.600 258.727 0.300 517.454 77.618
13.900 258.727 1.045 517.454 270.370
14.945 258.727 -1.700 517.479 -439.857
13.245 258.752 -0.948 516.999 -245.058
12.297 258.247 -6.401 516.242 -1,652.233
5.896 257.995 -2.798 514.865 -720.296
3.098 256.870 -0.901 513.645 -231.397
2.197 256.775 -0.551 513.955 -141.595
1.646 257.180 -1.646 514.569 -423.490
0.000 257.389 0.000 257.389 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 3.347

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+175.00 04+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 258.880 0.000
0.000 258.880 -1.890 517.653 -489.182
-38.203 261.262 -1.890 258.773 -1.255 517.366 -324.647
265.000
-37.348 260.138 -3.145 258.593 -0.601 516.678 -155.262
264.000
-32.895 260.157 -3.746 258.085 -0.697 515.903 -179.792
263.000
-25.443 260.270 -4.443 257.818 -1.145 516.148 -295.495
262.000
-23.941 260.425 -5.588 258.330 -1.497 516.109 -386.308 261.000
-23.638 260.117 -7.085 257.779 -2.051 517.262 -530.452 260.000
-23.234 260.025 -9.136 259.483 -3.099 518.949 -804.111 259.000
-22.685 260.404 -12.235 259.466 -0.728 519.534 -189.110 258.000
-22.034 260.075 -12.963 260.068 -7.176 520.142 -1,866.269 257.000
-12.963 260.068 -20.139 260.074 1.539 519.378 399.661 256.000
-12.235 259.466 -18.600 259.304 1.600 518.576 414.861 255.000
-9.136 259.483 -17.000 259.272 0.400 518.544 103.709
-7.085 257.779 -16.600 259.272 2.700 518.544 700.034
-5.588 258.330 -13.900 259.272 0.300 518.544 77.782 EXISTING DATA UKUR REALISASI
-4.443 257.818 -13.600 259.272 1.500 518.574 388.931
-3.746 258.085 -12.100 259.302 2.500 518.654 648.318
-3.145 258.593 -9.600 259.352 9.200 518.888 2,386.885
-1.890 258.773 -0.400 259.536 0.250 519.075 64.884
04+175.00
0.000 258.880 -0.150 259.539 0.150 519.075 38.931
4.111 259.114 0.000 259.536 0.150 519.075 38.931
4.863 259.625 0.150 259.539 0.250 519.075 64.884
13.364 259.550 0.400 259.536 9.200 519.256 2,388.578
13.865 260.085 9.600 259.720 2.500 519.490 649.363
26.817 259.977 12.100 259.770 1.500 519.570 389.678
30.567 259.928 13.600 259.800 0.300 519.600 77.940
13.900 259.800 2.700 519.600 701.460
16.600 259.800 0.400 519.600 103.920
17.000 259.800 1.600 519.632 415.706
18.600 259.832 0.420 519.874 109.174
19.020 260.042 -5.155 520.127 -1,340.627
13.865 260.085 -0.501 519.635 -130.169
13.364 259.550 -8.501 519.175 -2,206.753
4.863 259.625 -0.752 518.739 -195.046
4.111 259.114 -4.111 517.994 -1,064.737
0.000 258.880 0.000 258.880 0.000
AREA ( M2 ) 5.666

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+200.00 04+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 260.342 0.000
-37.260 262.029 0.000 260.342 -0.655 520.688 -170.525
265.000
-32.861 262.254 -0.655 260.346 -1.305 520.995 -339.949
264.000
-31.188 262.594 -1.960 260.649 -1.000 520.980 -260.490
263.000
-30.440 261.725 -2.960 260.331 -0.398 520.554 -103.590 262.000
-23.840 261.913 -3.358 260.223 -0.987 520.461 -256.848 261.000
-23.191 261.466 -4.345 260.238 -1.403 521.520 -365.846 260.000
-17.489 261.583 -5.748 261.282 -11.345 522.431 -2,963.490 259.000
-17.093 261.149 -17.093 261.149 -0.396 522.732 -103.501 258.000
-5.748 261.282 -17.489 261.583 -3.524 523.094 -921.692 257.000
-4.345 260.238 -21.013 261.511 2.413 521.815 629.570 256.000
-3.358 260.223 -18.600 260.304 1.600 520.576 416.461 255.000
-2.960 260.331 -17.000 260.272 3.100 520.544 806.843
-1.960 260.649 -13.900 260.272 0.300 520.544 78.082
-0.655 260.346 -13.600 260.272 1.500 520.574 390.431 EXISTING DATA UKUR REALISASI
0.000 260.342 -12.100 260.302 2.500 520.654 650.818
5.245 260.312 -9.600 260.352 9.200 520.888 2,396.085
12.041 260.296 -0.400 260.536 0.250 521.075 65.134
15.839 260.398 -0.150 260.539 0.150 521.075 39.081
04+200.00
17.138 261.313 0.000 260.536 0.150 521.075 39.081
27.090 261.092 0.150 260.539 0.250 521.075 65.134
31.039 261.067 0.400 260.536 9.200 521.256 2,397.778
9.600 260.720 2.500 521.490 651.863
12.100 260.770 1.500 521.570 391.178
13.600 260.800 0.300 521.600 78.240
13.900 260.800 2.700 521.600 704.160
16.600 260.800 0.400 521.600 104.320
17.000 260.800 1.600 521.632 417.306
18.600 260.832 0.859 522.093 224.239
19.459 261.261 -2.321 522.574 -606.447
17.138 261.313 -1.299 521.711 -338.851
15.839 260.398 -3.798 520.694 -988.798
12.041 260.296 -6.796 520.608 -1,769.026
5.245 260.312 -5.245 520.654 -1,365.415
0.000 260.342 0.000 260.342 0.000
0.000 0.000 0.000
AREA ( M2 ) -8.668

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+225.00 04+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 262.341 0.000
-37.317 263.802 0.000 262.341 -1.910 524.647 -501.038
-32.969 263.860 -1.910 262.306 -5.255 524.801 -1,378.915
265.000
-31.922 263.464 -7.165 262.495 -0.554 525.545 -145.576
-28.118 263.404 -7.719 263.050 -8.652 526.008 -2,275.511 264.000
-17.022 263.545 -16.371 262.958 -0.651 526.503 -171.377 263.000
-16.371 262.958 -17.022 263.545 -5.910 527.015 -1,557.329 262.000
-7.719 263.050 -22.932 263.470 4.332 524.774 1,136.660 261.000
-7.165 262.495 -18.600 261.304 1.600 522.576 418.061 260.000
-1.910 262.306 -17.000 261.272 3.100 522.544 809.943 259.000
0.000 262.341 -13.900 261.272 0.300 522.544 78.382 258.000
12.894 262.581 -13.600 261.272 1.500 522.574 391.931 257.000
14.041 262.254 -12.100 261.302 2.500 522.654 653.318 256.000
14.645 260.937 -9.600 261.352 9.200 522.888 2,405.285 255.000
15.742 260.989 -0.400 261.536 0.250 523.075 65.384
16.595 261.423 -0.150 261.539 0.150 523.075 39.231
25.496 261.730 0.000 261.536 0.150 523.075 39.231
26.048 262.410 0.150 261.539 0.250 523.075 65.384 EXISTING DATA UKUR REALISASI
27.895 262.167 0.400 261.536 9.200 523.256 2,406.978
31.643 262.143 9.600 261.720 2.500 523.490 654.363
12.100 261.770 1.500 523.570 392.678
13.600 261.800 0.300 523.600 78.540
04+225.00
13.900 261.800 0.453 523.373 118.544
14.353 261.573 -0.312 523.827 -81.717
14.041 262.254 -1.147 524.835 -300.993
12.894 262.581 -12.894 524.922 -3,384.172
0.000 262.341 0.000 262.341 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -42.717

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+250.00 04+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-36.782 264.793 0.000 264.586 0.000 270.000
-33.031 265.194 0.000 264.586 -1.780 529.144 -470.938 269.000
268.000
-21.584 265.264 -1.780 264.558 -10.454 529.342 -2,766.871
267.000
-13.784 265.233 -12.234 264.784 -1.550 530.017 -410.763
266.000
-12.234 264.784 -13.784 265.233 -7.800 530.497 -2,068.938
265.000
-1.780 264.558 -21.584 265.264 -2.901 530.510 -769.505 264.000
0.000 264.586 -24.485 265.246 5.885 527.550 1,552.316 263.000
5.016 264.666 -18.600 262.304 1.600 524.576 419.661 262.000
5.870 264.111 -17.000 262.272 3.100 524.544 813.043 261.000
15.368 264.219 -13.900 262.272 0.300 524.544 78.682 260.000
18.518 262.816 -13.600 262.272 1.500 524.571 393.428
23.268 262.692 -12.100 262.299 2.500 524.651 655.814
24.265 262.206 -9.600 262.352 9.200 524.888 2,414.485 EXISTING DATA UKUR REALISASI
25.611 262.029 -0.400 262.536 0.250 525.075 65.634
26.014 262.572 -0.150 262.539 0.150 525.075 39.381
27.414 262.408 0.000 262.536 0.150 525.075 39.381
30.568 262.375 0.150 262.539 0.250 525.075 65.634
0.400 262.536 9.200 525.256 2,416.178
04+250.00
9.600 262.720 2.500 525.490 656.863
12.100 262.770 1.500 525.570 394.178
13.600 262.800 0.300 525.600 78.840
13.900 262.800 3.100 525.600 814.680
17.000 262.800 1.487 525.630 390.806
18.487 262.830 -3.119 527.049 -821.933
15.368 264.219 -9.498 528.330 -2,509.039
5.870 264.111 -0.854 528.777 -225.788
5.016 264.666 -5.016 529.252 -1,327.364
0.000 264.586 0.000 264.586 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) -82.137

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+275.00 04+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.272 265.928 0.000 265.701 0.000
-32.171 265.994 0.000 265.701 -1.610 531.310 -427.705
275.000
-18.317 265.888 -1.610 265.609 -3.054 531.397 -811.443
273.000
-5.716 266.030 -4.664 265.788 -1.052 531.818 -279.736
-4.664 265.788 -5.716 266.030 -12.601 531.918 -3,351.349 271.000
-1.610 265.609 -18.317 265.888 -5.536 531.818 -1,472.072 269.000
0.000 265.701 -23.853 265.930 5.253 529.234 1,390.033 267.000
4.886 265.979 -18.600 263.304 1.600 526.576 421.261
265.000
6.935 265.155 -17.000 263.272 3.100 526.544 816.143
263.000
12.037 265.317 -13.900 263.272 0.300 526.544 78.982
12.540 264.616 -13.600 263.272 1.500 526.574 394.931 261.000
16.244 264.820 -12.100 263.302 2.500 526.654 658.318 259.000
16.848 264.138 -9.600 263.352 9.200 526.888 2,423.685 257.000
18.001 264.360 -0.400 263.536 0.250 527.075 65.884
255.000
18.899 264.849 -0.150 263.539 0.150 527.075 39.531
27.249 264.758 0.000 263.536 0.150 527.075 39.531
30.500 264.707 0.150 263.539 0.250 527.075 65.884
0.400 263.536 9.200 527.256 2,425.378
9.600 263.720 2.500 527.490 659.363 EXISTING DATA UKUR REALISASI
12.100 263.770 1.500 527.570 395.678
13.600 263.800 0.300 527.600 79.140
13.900 263.800 3.100 527.600 817.780
04+275.00
17.000 263.800 1.600 527.632 422.106
18.600 263.832 1.997 528.662 527.869
20.597 264.830 -1.698 529.679 -449.697
18.899 264.849 -0.898 529.209 -237.615
18.001 264.360 -1.153 528.498 -304.679
16.848 264.138 -0.604 528.958 -159.745
16.244 264.820 -3.704 529.436 -980.515
12.540 264.616 -0.503 529.933 -133.278
12.037 265.317 -5.102 530.472 -1,353.234
6.935 265.155 -2.049 531.134 -544.147
4.886 265.979 -4.886 531.680 -1,298.894
0.000 265.701 0.000 265.701 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -82.617

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+300.00 04+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-33.699 266.802 0.000 266.749 0.000
-30.196 266.713 0.000 266.749 -1.450 533.497 -386.785
-11.897 266.722 -1.450 266.748 -10.447 533.470 -2,786.581 275.000
-1.450 266.748 -11.897 266.722 -11.528 533.438 -3,074.737 273.000
0.000 266.749 -23.425 266.716 4.825 531.020 1,281.086 271.000
7.096 266.756 -18.600 264.304 1.600 528.576 422.861 269.000
9.600 265.988 -17.000 264.272 3.100 528.544 819.243 267.000
10.054 265.325 -13.900 264.272 0.300 528.544 79.282 265.000
12.004 265.684 -13.600 264.272 1.500 528.574 396.431 263.000
13.107 266.669 -12.100 264.302 2.500 528.654 660.818 261.000
20.052 266.605 -9.600 264.352 9.200 528.888 2,432.885
259.000
26.556 266.538 -0.400 264.536 0.250 529.075 66.134
257.000
31.702 266.472 -0.150 264.539 0.150 529.075 39.681
255.000
0.000 264.536 0.150 529.075 39.681
0.150 264.539 0.250 529.075 66.134
0.400 264.536 9.200 529.256 2,434.578
9.600 264.720 2.500 529.490 661.863 EXISTING DATA UKUR REALISASI
12.100 264.770 1.500 529.570 397.178
13.600 264.800 0.300 529.600 79.440
13.900 264.800 3.100 529.600 820.880
17.000 264.800 1.600 529.632 423.706
18.600 264.832 3.504 531.416 931.041
04+300.00
22.104 266.584 -2.052 533.189 -547.052
20.052 266.605 -6.945 533.274 -1,851.794
13.107 266.669 -1.103 532.353 -293.593
12.004 265.684 -1.950 531.009 -517.734
10.054 265.325 -0.454 531.313 -120.608
9.600 265.988 -2.504 532.744 -666.995
7.096 266.756 -7.096 533.505 -1,892.876
0.000 266.749 0.000 266.749 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -85.836

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+325.00 04+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-33.039 267.299 0.000 0.000 0.000
-28.889 267.398 0.000 267.309 0.000
-18.141 267.387 0.000 267.309 -1.290 534.601 -344.818 275.000
273.000
-1.290 267.292 -1.290 267.292 -16.851 534.679 -4,504.938
271.000
0.000 267.309 -18.141 267.387 -4.634 534.779 -1,239.083
269.000
10.361 267.449 -22.775 267.392 4.175 532.696 1,112.003
267.000
11.811 267.106 -18.600 265.304 1.600 530.576 424.461 265.000
12.511 267.178 -17.000 265.272 3.100 530.544 822.343 263.000
13.415 267.430 -13.900 265.272 0.300 530.544 79.582 261.000
26.511 268.325 -13.600 265.272 1.500 530.574 397.931 259.000
29.761 268.196 -12.100 265.302 2.500 530.654 663.318 257.000
-9.600 265.352 9.200 530.888 2,442.085 255.000
-0.400 265.536 0.250 531.075 66.384
-0.150 265.539 0.150 531.075 39.831
0.000 265.536 0.150 531.075 39.831 EXISTING DATA UKUR REALISASI
0.150 265.539 0.250 531.075 66.384
0.400 265.536 9.200 531.256 2,443.778
9.600 265.720 2.500 531.490 664.363
12.100 265.770 1.500 531.570 398.678
04+325.00
13.600 265.800 0.300 531.600 79.740
13.900 265.800 3.100 531.600 823.980
17.000 265.800 1.600 531.632 425.306
18.600 265.832 4.523 533.925 1,207.471
23.123 268.093 -9.708 535.523 -2,599.429
13.415 267.430 -0.904 534.608 -241.643
12.511 267.178 -0.700 534.284 -186.999
11.811 267.106 -1.450 534.555 -387.552
10.361 267.449 -10.361 534.758 -2,770.314
0.000 267.309 0.000 267.309 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -77.310

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+350.00 04+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-31.687 268.794 0.000 0.000 0.000
-28.782 268.951 0.000 266.819 0.000 275.000
-25.532 268.295 0.000 266.819 -1.130 534.999 -302.274 273.000
-12.885 268.298 -1.130 268.180 -11.755 536.478 -3,153.149 271.000
-1.130 268.180 -12.885 268.298 -9.698 536.594 -2,601.944 269.000
0.000 268.188 -22.583 268.296 3.983 534.600 1,064.656 267.000
12.872 268.282 -18.600 266.304 1.600 532.576 426.061 265.000
13.969 268.530 -17.000 266.272 3.100 532.544 825.443 263.000
14.624 268.152 -13.900 266.272 0.300 532.544 79.882 261.000
15.123 268.124 -13.600 266.272 1.500 532.574 399.431 259.000
257.000
15.470 269.056 -12.100 266.302 2.500 532.654 665.818
255.000
25.116 268.882 -9.600 266.352 9.200 532.888 2,451.285
26.319 269.151 -0.400 266.536 0.250 533.075 66.634
29.422 269.342 -0.150 266.539 0.150 533.075 39.981
0.000 266.536 0.150 533.075 39.981 EXISTING DATA UKUR REALISASI
0.150 266.539 0.250 533.075 66.634
0.400 266.536 9.200 533.256 2,452.978
9.600 266.720 2.500 533.490 666.863
04+350.00
12.100 266.770 0.898 533.558 239.568
12.998 266.788 -2.998 533.613 -799.886
10.000 266.825 -5.000 533.629 -1,334.073
5.000 266.804 -5.000 533.623 -1,334.058
0.000 266.819 0.000 266.819 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -40.172

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+375.00 04+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-33.097 269.520 0.000 0.000 0.000
-29.045 269.836 0.000 267.864 0.000 272.000
-15.894 269.893 0.000 267.864 -1.000 537.599 -268.800
-0.990 269.735 -1.000 269.735 -14.894 539.628 -4,018.610 271.000
0.000 269.731 -15.894 269.893 -7.816 539.752 -2,109.351 270.000
10.357 269.694 -23.710 269.859 5.110 537.163 1,372.451 269.000
21.657 269.925 -18.600 267.304 1.600 534.576 427.661
268.000
22.405 268.772 -17.000 267.272 3.100 534.544 828.543
22.804 268.824 -13.900 267.272 0.300 534.544 80.182 267.000
24.203 270.202 -13.600 267.272 1.500 534.574 400.931 266.000
26.505 270.134 -12.100 267.302 2.500 534.654 668.318
265.000
29.451 270.170 -9.600 267.352 9.200 534.888 2,460.485
-0.400 267.536 0.250 535.075 66.884
-0.150 267.539 0.150 535.075 40.131
0.000 267.536 0.150 535.075 40.131 EXISTING DATA UKUR REALISASI
0.150 267.539 0.250 535.075 66.884
0.400 267.536 9.200 535.256 2,462.178
9.600 267.720 2.500 535.490 669.363
04+375.00
12.100 267.770 1.500 535.570 401.678
13.600 267.800 0.300 535.600 80.340
13.900 267.800 1.300 535.600 348.140
15.200 267.800 -1.000 535.687 -267.844
14.200 267.887 -4.200 535.716 -1,125.004
10.000 267.829 -5.000 535.641 -1,339.103
5.000 267.812 -5.000 535.676 -1,339.190
0.000 267.864 0.000 267.864 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -53.602

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+400.00 04+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.036 270.166 0.000 0.000 0.000
-30.739 270.619 0.000 268.986 0.000 273.000
-29.487 270.802 0.000 268.986 -1.000 540.166 -270.083
272.000
-28.940 271.175 -1.000 271.180 0.160 542.361 43.389
271.000
-15.387 271.121 -0.840 271.181 -14.547 542.302 -3,944.434
-0.840 271.181 -15.387 271.121 -8.918 542.278 -2,418.018 270.000
0.000 271.178 -24.305 271.157 5.705 539.461 1,538.813 269.000
13.058 271.130 -18.600 268.304 1.600 536.576 429.261 268.000
28.611 271.151 -17.000 268.272 3.100 536.544 831.643 267.000
32.909 271.373 -13.900 268.272 0.300 536.544 80.482
266.000
-13.600 268.272 1.500 536.574 402.431
265.000
-12.100 268.302 2.500 536.654 670.818
-9.600 268.352 9.200 536.888 2,469.685
-0.400 268.536 0.250 537.075 67.134
-0.150 268.539 0.150 537.075 40.281 EXISTING DATA UKUR REALISASI
0.000 268.536 0.150 537.075 40.281
0.150 268.539 0.250 537.075 67.134
0.400 268.536 9.200 537.256 2,471.378
04+400.00
9.600 268.720 2.500 537.509 671.886
12.100 268.789 0.926 537.577 248.898
13.026 268.788 -3.026 537.624 -813.425
10.000 268.836 -5.000 537.685 -1,344.213
5.000 268.849 -5.000 537.835 -1,344.588
0.000 268.986 0.000 268.986 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -61.248

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+425.00 04+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.662 273.207 0.000 272.089 0.000
-32.312 273.051 0.000 272.089 -0.710 544.713 -193.373
-26.757 273.079 -0.710 272.624 -5.751 545.681 -1,569.106 279.000
-26.212 272.560 -6.461 273.057 -0.650 546.235 -177.526
277.000
-9.464 272.626 -7.111 273.178 -1.500 546.072 -409.554
-8.611 272.894 -8.611 272.894 -0.853 545.520 -232.664 275.000
-7.111 273.178 -9.464 272.626 -15.657 545.190 -4,268.020 273.000
-6.461 273.057 -25.121 272.564 6.521 541.868 1,766.761
-0.710 272.624 -18.600 269.304 1.600 538.576 430.861 271.000
0.000 272.089 -17.000 269.272 3.100 538.544 834.743 269.000
5.000 271.905 -13.900 269.272 0.300 538.544 80.782
267.000
10.000 271.861 -13.600 269.272 1.500 538.574 403.931
14.100 271.788 -12.100 269.302 2.500 538.654 673.318
15.100 272.675 -9.600 269.352 9.200 538.888 2,478.885
21.141 272.696 -0.400 269.536 0.250 539.075 67.384 EXISTING DATA UKUR REALISASI
29.744 272.634 -0.150 269.539 0.150 539.075 40.431
34.448 272.752 0.000 269.536 0.150 539.075 40.431
0.150 269.539 0.250 539.075 67.384
04+425.00
0.400 269.536 9.200 539.256 2,480.578
9.600 269.720 2.500 539.490 674.363
12.100 269.770 1.500 539.570 404.678
13.600 269.800 0.300 539.600 80.940
13.900 269.800 3.100 539.600 836.380
17.000 269.800 1.600 539.632 431.706
18.600 269.832 5.683 542.505 1,541.528
24.283 272.673 -3.142 545.369 -856.775
21.141 272.696 -6.041 545.371 -1,647.293
15.100 272.675 -1.000 544.463 -272.232
14.100 271.788 -4.100 543.649 -1,114.480
10.000 271.861 -5.000 543.766 -1,359.415
5.000 271.905 -5.000 543.994 -1,359.985
0.000 272.089 0.000 272.089 0.000
AREA ( M2 ) -125.343

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+450.00 04+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-41.487 274.773 0.000 0.000 0.000
-32.333 274.648 0.000 272.652 0.000
-20.129 274.928 0.000 272.652 -1.000 547.057 -273.529 279.000
-15.177 274.536 -1.000 274.405 -14.177 548.941 -3,891.168
277.000
-1.000 274.405 -15.177 274.536 -4.952 549.464 -1,360.473
0.000 272.652 -20.129 274.928 -7.380 549.687 -2,028.345 275.000
5.000 272.559 -27.509 274.759 8.909 545.063 2,427.983
273.000
10.000 272.574 -18.600 270.304 1.600 540.576 432.461
14.100 272.504 -17.000 270.272 3.100 540.544 837.843 271.000
15.100 273.415 -13.900 270.272 0.300 540.544 81.082 269.000
16.913 273.401 -13.600 270.272 1.500 540.574 405.431
18.367 273.971 -12.100 270.302 2.500 540.654 675.818 267.000
30.113 273.594 -9.600 270.352 9.200 540.888 2,488.085
36.312 274.718 -0.400 270.536 0.250 541.075 67.634
-0.150 270.539 0.150 541.075 40.581 EXISTING DATA UKUR REALISASI
0.000 270.536 0.150 541.075 40.581
0.150 270.539 0.250 541.075 67.634
0.400 270.536 9.200 541.256 2,489.778
04+450.00
9.600 270.720 2.500 541.490 676.863
12.100 270.770 1.500 541.570 406.178
13.600 270.800 0.300 541.600 81.240
13.900 270.800 3.100 541.600 839.480
17.000 270.800 1.600 541.632 433.306
18.600 270.832 5.885 544.607 1,602.506
24.485 273.775 -6.118 547.746 -1,675.555
18.367 273.971 -1.454 547.372 -397.939
16.913 273.401 -1.813 546.816 -495.689
15.100 273.415 -1.000 545.919 -272.960
14.100 272.504 -4.100 545.078 -1,117.410
10.000 272.574 -5.000 545.133 -1,362.833
5.000 272.559 -5.000 545.211 -1,363.028
0.000 272.652 0.000 272.652 0.000
AREA ( M2 ) -144.446

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


Author:
STA. 04+475.00 ELEVASI CL 271.536
04+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak
DIREVISI Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.349 276.821 0.000 276.517 0.000
-32.752 276.735 0.000 276.517 -0.450 553.026 -124.431 280.000
-14.956 276.744 -0.450 276.509 -13.403 553.039 -3,706.191
-13.853 276.530 -13.853 276.530 -1.103 553.274 -305.131 278.000
-0.450 276.509 -14.956 276.744 -14.515 553.481 -4,016.888
276.000
0.000 276.517 -29.471 276.737 10.871 548.041 2,978.877
4.552 276.600 -18.600 271.304 1.600 542.576 434.061 274.000
5.798 275.820 -17.000 271.272 3.100 542.544 840.943
272.000
16.448 275.817 -13.900 271.272 0.300 542.544 81.382
17.850 275.612 -13.600 271.272 1.500 542.574 406.931 270.000
21.954 275.564 -12.100 271.302 2.500 542.654 678.318
268.000
22.703 275.099 -9.600 271.352 9.200 542.888 2,497.285
26.953 274.744 -0.400 271.536 0.250 543.075 67.884
27.652 274.894 -0.150 271.539 0.150 543.075 40.731
30.603 274.789 0.000 271.536 0.150 543.075 40.731 EXISTING DATA UKUR REALISASI
37.204 275.250 0.150 271.539 0.250 543.075 67.884
0.400 271.536 9.200 543.256 2,498.978
9.600 271.720 2.500 543.490 679.363
04+475.00
12.100 271.770 1.500 543.570 407.678
13.600 271.800 0.300 543.600 81.540
13.900 271.800 3.100 543.600 842.580
17.000 271.800 1.600 543.632 434.906
18.600 271.832 6.186 546.754 1,691.110
24.786 274.922 -2.083 550.021 -572.847
22.703 275.099 -0.749 550.663 -206.223
21.954 275.564 -4.104 551.176 -1,131.013
17.850 275.612 -1.402 551.429 -386.552
16.448 275.817 -10.650 551.637 -2,937.467
5.798 275.820 -1.246 552.420 -344.158
4.552 276.600 -4.552 553.117 -1,258.894
0.000 276.517 0.000 276.517 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -218.616

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+500.00 04+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.033 277.814 0.000 278.259 0.000
-32.635 277.886 0.000 278.259 -0.330 556.513 -91.825
280.000
-21.084 278.035 -0.330 278.254 -14.301 556.576 -3,979.797
279.000
-14.631 278.322 -14.631 278.322 -6.453 556.357 -1,795.086 278.000
-0.330 278.254 -21.084 278.035 -8.752 555.957 -2,432.868 277.000
0.000 278.259 -29.836 277.922 11.236 550.226 3,091.170 276.000
8.623 278.392 -18.600 272.304 1.600 544.576 435.661 275.000
10.024 278.028 -17.000 272.272 3.100 544.544 844.043 274.000
18.476 277.788 -13.900 272.272 0.300 544.544 81.682 273.000
19.726 277.133 -13.600 272.272 1.500 544.574 408.431 272.000
23.623 277.063 -12.100 272.302 2.500 544.654 680.818 271.000
24.577 276.511 -9.600 272.352 9.200 544.888 2,506.485 270.000
28.425 276.643 -0.400 272.536 0.250 545.075 68.134
29.073 276.195 -0.150 272.539 0.150 545.075 40.881
29.677 276.604 0.000 272.536 0.150 545.075 40.881 EXISTING DATA UKUR REALISASI
31.030 276.138 0.150 272.539 0.250 545.075 68.134
34.681 276.299 0.400 272.536 9.200 545.256 2,508.178
9.600 272.720 2.500 545.490 681.863
04+500.00
12.100 272.770 1.500 545.570 409.178
13.600 272.800 0.300 545.600 81.840
13.900 272.800 3.100 545.600 845.680
17.000 272.800 1.600 545.632 436.506
18.600 272.832 7.460 549.394 2,049.240
26.060 276.562 -1.483 553.073 -410.104
24.577 276.511 -0.954 553.574 -264.055
23.623 277.063 -3.897 554.196 -1,079.851
19.726 277.133 -1.250 554.921 -346.826
18.476 277.788 -8.452 555.816 -2,348.878
10.024 278.028 -1.401 556.420 -389.772
8.623 278.392 -8.623 556.651 -2,400.001
0.000 278.259 0.000 278.259 0.000
0.000 0.000 0.000
AREA ( M2 ) -260.261

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+525.00 04+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.022 279.011 0.000 0.000 0.000
-32.470 279.132 0.000 279.280 0.000
-25.868 279.100 0.000 279.280 -0.220 558.558 -61.441 282.000
-24.517 279.432 -0.220 279.278 -14.650 558.661 -4,092.192
280.000
-14.870 279.383 -14.870 279.383 -9.647 558.815 -2,695.444
-0.220 279.278 -24.517 279.432 -1.351 558.532 -377.288 278.000
0.000 279.280 -25.868 279.100 -1.436 558.207 -400.793
276.000
17.683 279.479 -27.304 279.107 8.704 552.411 2,404.093
18.330 279.077 -18.600 273.304 1.600 546.576 437.261 274.000
23.428 279.095 -17.000 273.272 3.100 546.544 847.143
272.000
24.274 278.649 -13.900 273.272 0.300 546.544 81.982
30.124 278.462 -13.600 273.272 1.500 546.574 409.931 270.000
31.169 277.921 -12.100 273.302 2.500 546.654 683.318
31.919 277.981 -9.600 273.352 9.200 546.888 2,515.685
36.222 278.535 -0.400 273.536 0.250 547.075 68.384 EXISTING DATA UKUR REALISASI
-0.150 273.539 0.150 547.075 41.031
0.000 273.536 0.150 547.075 41.031
0.150 273.539 0.250 547.075 68.384
04+525.00
0.400 273.536 9.200 547.256 2,517.378
9.600 273.720 2.500 547.490 684.363
12.100 273.770 1.500 547.570 410.678
13.600 273.800 0.300 547.600 82.140
13.900 273.800 3.100 547.600 848.780
17.000 273.800 1.600 547.632 438.106
18.600 273.832 7.155 552.434 1,976.333
25.755 278.602 -1.481 557.251 -412.644
24.274 278.649 -0.846 557.744 -235.926
23.428 279.095 -5.098 558.172 -1,422.780
18.330 279.077 -0.647 558.556 -180.693
17.683 279.479 -17.683 558.759 -4,940.268
0.000 279.280 0.000 279.280 0.000
0.000 0.000 0.000
AREA ( M2 ) -263.453

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+550.00 04+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.166 279.880 0.000 0.000 0.000
-32.671 279.984 0.000 280.493 0.000
285.000
-25.826 280.539 0.000 280.493 -0.120 560.984 -33.659
-20.279 280.579 -0.120 280.491 -9.001 561.232 -2,525.825 280.000
-14.978 281.072 -9.121 280.741 -0.950 561.678 -266.797
-13.325 280.533 -10.071 280.937 -3.254 561.470 -913.512 275.000
-10.071 280.937 -13.325 280.533 -1.653 561.605 -464.167 270.000
-9.121 280.741 -14.978 281.072 -5.301 561.651 -1,488.656
-0.120 280.491 -20.279 280.579 -5.547 561.118 -1,556.261 265.000
0.000 280.493 -25.826 280.539 -1.896 560.924 -531.756
260.000
14.982 280.721 -27.722 280.385 9.122 554.689 2,529.937
15.979 281.047 -18.600 274.304 1.600 548.576 438.861 255.000
24.477 280.861 -17.000 274.272 3.100 548.544 850.243
25.478 280.217 -13.900 274.272 0.300 548.544 82.282
32.178 280.239 -13.600 274.272 1.500 548.574 411.431 EXISTING DATA UKUR REALISASI
37.375 280.021 -12.100 274.302 2.500 548.654 685.818
-9.600 274.352 9.200 548.888 2,524.885
-0.400 274.536 0.250 549.075 68.634
04+550.00
-0.150 274.539 0.150 549.075 41.181
0.000 274.536 0.150 549.075 41.181
0.150 274.539 0.250 549.075 68.634
0.400 274.536 9.200 549.256 2,526.578
9.600 274.720 2.500 549.490 686.863
12.100 274.770 1.500 549.570 412.178
13.600 274.800 0.300 549.600 82.440
13.900 274.800 3.100 549.600 851.880
17.000 274.800 1.600 549.632 439.706
18.600 274.832 8.082 555.053 2,242.969
26.682 280.221 -1.204 560.438 -337.384
25.478 280.217 -1.001 561.078 -280.820
24.477 280.861 -8.498 561.908 -2,387.547
15.979 281.047 -0.997 561.768 -280.041
14.982 280.721 -14.982 561.214 -4,204.054
0.000 280.493 0.000 280.493 0.000
0.000 0.000 0.000
AREA ( M2 ) -284.780

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+575.00 04+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.961 281.223 0.000 281.967 0.000
-31.965 281.653 0.000 281.967 -0.020 563.932 -5.639 295.000
-28.369 281.806 -0.020 281.965 -21.046 564.077 -5,935.782
290.000
-21.816 282.409 -21.066 282.112 -0.750 564.521 -211.695
-21.066 282.112 -21.816 282.409 -5.431 564.318 -1,532.406 285.000
-0.020 281.965 -27.247 281.909 0.647 563.171 182.186 280.000
0.000 281.967 -26.600 281.262 2.000 562.566 562.566 275.000
1.179 282.088 -24.600 281.304 6.000 556.608 1,669.824 270.000
1.881 282.222 -18.600 275.304 1.600 550.576 440.461 265.000
2.428 282.103 -17.000 275.272 3.100 550.544 853.343
260.000
3.275 281.981 -13.900 275.272 0.300 550.544 82.582
255.000
3.980 282.533 -13.600 275.272 1.500 550.574 412.931
28.729 282.438 -12.100 275.302 2.500 550.654 688.318
29.533 281.974 -9.600 275.352 9.200 550.888 2,534.085
32.636 281.789 -0.400 275.536 0.250 551.075 68.884 EXISTING DATA UKUR REALISASI
-0.150 275.539 0.150 551.075 41.331
0.000 275.536 0.150 551.075 41.331
0.150 275.539 0.250 551.075 68.884
04+575.00
0.400 275.536 9.200 551.256 2,535.778
9.600 275.720 2.500 551.490 689.363
12.100 275.770 1.500 551.570 413.678
13.600 275.800 0.300 551.600 82.740
13.900 275.800 3.100 551.600 854.980
17.000 275.800 1.600 551.632 441.306
18.600 275.832 6.000 557.664 1,672.992
24.600 281.832 2.000 563.622 563.622
26.600 281.790 0.654 564.234 184.505
27.254 282.444 -23.274 564.977 -6,574.637
3.980 282.533 -0.705 564.514 -198.991
3.275 281.981 -0.847 564.084 -238.890
2.428 282.103 -0.547 564.325 -154.343
1.881 282.222 -0.702 564.310 -198.073
1.179 282.088 -1.179 564.055 -332.510
0.000 281.967 0.000 281.967 0.000
AREA ( M2 ) -297.281

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+600.00 04+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 283.286 0.000
0.000 283.286 -5.128 566.549 -1,452.632
-36.433 282.095 -5.128 283.263 -1.702 566.003 -481.669
-32.178 282.798 -6.830 282.740 -15.546 565.571 -4,396.183
300.000
-29.877 282.855 -22.376 282.831 -0.700 565.114 -197.790
295.000
-26.977 282.751 -23.076 282.283 -3.901 565.034 -1,102.099
290.000
-23.076 282.283 -26.977 282.751 -2.900 565.606 -820.129
285.000
-22.376 282.831 -29.877 282.855 -0.590 565.695 -166.880
280.000
-6.830 282.740 -30.467 282.840 0.867 565.102 244.972
275.000
-5.128 283.263 -29.600 282.262 2.000 564.566 564.566
270.000
0.000 283.286 -27.600 282.304 9.000 558.608 2,513.736
265.000
0.070 283.286 -18.600 276.304 1.600 552.576 442.061
15.467 283.178 -17.000 276.272 3.100 552.544 856.443 260.000
15.817 283.399 -13.900 276.272 0.300 552.544 82.882 255.000
16.921 283.040 -13.600 276.272 1.500 552.574 414.431
17.718 283.380 -12.100 276.302 2.500 552.664 690.830
25.732 283.093 -9.600 276.362 9.200 552.898 2,543.331 EXISTING DATA UKUR REALISASI
26.774 283.591 -0.400 276.536 0.250 553.075 69.134
32.475 283.332 -0.150 276.539 0.150 553.075 41.481
36.423 283.402 0.000 276.536 0.150 553.075 41.481
04+600.00
0.150 276.539 0.250 553.075 69.134
0.400 276.536 9.200 553.256 2,544.978
9.600 276.720 2.500 553.490 691.863
12.100 276.770 1.500 553.570 415.178
13.600 276.800 0.300 553.600 83.040
13.900 276.800 3.100 553.600 858.080
17.000 276.800 1.600 553.632 442.906
18.600 276.832 9.000 559.664 2,518.488
27.600 282.832 2.000 565.622 565.622
29.600 282.790 0.944 566.210 267.251
30.544 283.420 -3.770 567.011 -1,068.816
26.774 283.591 -1.042 566.684 -295.242
25.732 283.093 -8.014 566.473 -2,269.857
17.718 283.380 -0.797 566.420 -225.718
16.921 283.040 -1.104 566.439 -312.674
15.817 283.399 -0.350 566.577 -99.151
15.467 283.178 -15.397 566.464 -4,360.923
0.070 283.286 -0.070 566.572 -19.830
0.000 283.286 0.000 283.286 0.000
AREA ( M2 ) -307.708

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+625.00 04+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 284.477 0.000
-36.956 283.838 0.000 284.477 -2.494 569.102 -709.670
-32.402 284.209 -2.494 284.625 -0.405 568.668 -115.155
-31.402 284.578 -2.899 284.043 -9.401 568.000 -2,669.884
289.000
-30.198 284.058 -12.300 283.957 -17.898 568.015 -5,083.166
-12.300 283.957 -30.198 284.058 -0.348 568.266 -98.878 287.000
-2.899 284.043 -30.546 284.208 0.946 567.470 268.413 285.000
-2.494 284.625 -29.600 283.262 2.000 566.566 566.566 283.000
0.000 284.477 -27.600 283.304 9.000 560.608 2,522.736
281.000
0.160 284.468 -18.600 277.304 1.600 554.576 443.661
0.573 284.545 -17.000 277.272 3.100 554.544 859.543 279.000
1.424 284.342 -13.900 277.272 0.300 554.544 83.182 277.000
7.122 284.736 -13.600 277.272 1.500 554.574 415.931 275.000
8.072 284.191 -12.100 277.302 2.500 554.654 693.318
15.421 284.148 -9.600 277.352 9.200 554.888 2,552.485
32.617 284.591 -0.400 277.536 0.250 555.075 69.384 EXISTING DATA UKUR REALISASI
37.220 284.523 -0.150 277.539 0.150 555.075 41.631
0.000 277.536 0.150 555.075 41.631
0.150 277.539 0.250 555.075 69.384
04+625.00
0.400 277.536 9.200 555.256 2,554.178
9.600 277.720 2.500 555.490 694.363
12.100 277.770 1.500 555.570 416.678
13.600 277.800 0.300 555.600 83.340
13.900 277.800 3.100 555.600 861.180
17.000 277.800 1.600 555.632 444.506
18.600 277.832 9.000 561.664 2,527.488
27.600 283.832 2.000 567.622 567.622
29.600 283.790 1.128 568.332 320.539
30.728 284.542 -15.307 568.690 -4,352.469
15.421 284.148 -7.349 568.339 -2,088.362
8.072 284.191 -0.950 568.927 -270.240
7.122 284.736 -5.698 569.078 -1,621.303
1.424 284.342 -0.851 568.887 -242.061
0.573 284.545 -0.413 569.013 -117.501
0.160 284.468 -0.160 568.945 -45.516
0.000 284.477 0.000 284.477 0.000
AREA ( M2 ) -316.450

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+650.00 04+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.503 283.882 0.000 285.209 0.000
-32.305 284.400 0.000 285.209 -0.861 570.011 -245.390
-13.904 284.489 -0.861 284.802 -12.296 569.744 -3,502.786 289.000
-13.157 284.942 -13.157 284.942 -0.747 569.431 -212.682 287.000
-0.861 284.802 -13.904 284.489 -15.921 568.901 -4,528.736
285.000
0.000 285.209 -29.825 284.412 0.225 568.674 63.976
0.240 285.323 -29.600 284.262 2.000 568.566 568.566 283.000
11.242 285.778 -27.600 284.304 9.000 562.608 2,531.736 281.000
12.038 285.976 -18.600 278.304 1.600 556.576 445.261 279.000
32.890 285.970 -17.000 278.272 3.100 556.544 862.643
277.000
40.138 285.774 -13.900 278.272 0.300 556.544 83.482
-13.600 278.272 1.500 556.574 417.431 275.000
-12.100 278.302 2.500 556.654 695.818
-9.600 278.352 9.200 556.888 2,561.685
-0.400 278.536 0.250 557.075 69.634 EXISTING DATA UKUR REALISASI
-0.150 278.539 0.150 557.075 41.781
0.000 278.536 0.150 557.075 41.781
0.150 278.539 0.250 557.075 69.634
04+650.00
0.400 278.536 9.200 557.256 2,563.378
9.600 278.720 2.500 557.490 696.863
12.100 278.770 1.500 557.570 418.178
13.600 278.800 0.300 557.600 83.640
13.900 278.800 3.100 557.600 864.280
17.000 278.800 1.600 557.632 446.106
18.600 278.832 9.000 563.664 2,536.488
27.600 284.832 2.000 569.622 569.622
29.600 284.790 1.771 570.760 505.408
31.371 285.970 -19.333 571.946 -5,528.716
12.038 285.976 -0.796 571.754 -227.558
11.242 285.778 -11.002 571.101 -3,141.627
0.240 285.323 -0.240 570.532 -68.464
0.000 285.209 0.000 285.209 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -318.572

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+675.00 04+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.562 284.618 0.000 286.090 0.000
-32.611 284.575 0.000 286.090 -4.142 572.347 -1,185.331
-30.557 284.762 -4.142 286.257 -1.117 572.133 -319.536
287.000
-30.106 284.317 -5.259 285.876 -13.853 571.830 -3,960.780
-22.109 284.652 -19.112 285.954 -2.997 570.606 -855.053 285.000
-19.112 285.954 -22.109 284.652 -4.246 569.126 -1,208.254
283.000
-5.259 285.876 -26.355 284.474 7.755 563.778 2,186.049
-4.142 286.257 -18.600 279.304 1.600 558.576 446.861 281.000
0.000 286.090 -17.000 279.272 3.100 558.544 865.743 279.000
0.310 286.077 -13.900 279.272 0.300 558.544 83.782
2.211 286.162 -13.600 279.272 1.500 558.574 418.931 277.000
3.207 287.158 -12.100 279.302 2.500 558.654 698.318 275.000
16.261 286.878 -9.600 279.352 9.200 558.888 2,570.885
16.658 287.259 -0.400 279.536 0.250 559.075 69.884
16.908 286.926 -0.150 279.539 0.150 559.075 41.931 EXISTING DATA UKUR REALISASI
17.156 286.928 0.000 279.536 0.150 559.075 41.931
17.501 287.318 0.150 279.539 0.250 559.075 69.884
33.302 287.230 0.400 279.536 9.200 559.256 2,572.578
04+675.00
38.900 287.244 9.600 279.720 2.500 559.490 699.363
12.100 279.770 1.500 559.570 419.678
13.600 279.800 0.300 559.600 83.940
13.900 279.800 3.100 559.600 867.380
17.000 279.800 1.600 559.632 447.706
18.600 279.832 9.000 565.664 2,545.488
27.600 285.832 2.000 571.622 571.622
29.600 285.790 2.173 573.029 622.596
31.773 287.239 -14.272 574.557 -4,100.039
17.501 287.318 -0.345 574.246 -99.057
17.156 286.928 -0.248 573.854 -71.158
16.908 286.926 -0.250 574.185 -71.773
16.658 287.259 -0.397 574.137 -113.966
16.261 286.878 -13.054 574.036 -3,746.733
3.207 287.158 -0.996 573.320 -285.513
2.211 286.162 -1.901 572.239 -543.913
0.310 286.077 -0.310 572.167 -88.686
0.000 286.090 0.000 286.090 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -325.247

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+700.00 04+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.671 284.604 0.000 286.978 0.000
-32.670 284.595 0.000 286.978 -5.625 574.149 -1,614.794
-22.223 285.390 -5.625 287.171 -0.400 573.654 -114.731 289.000
-16.924 286.270 -6.025 286.483 -4.595 573.075 -1,316.640
287.000
-16.374 286.102 -10.620 286.592 -5.754 572.694 -1,647.641
-10.620 286.592 -16.374 286.102 -0.550 572.372 -157.402 285.000
-6.025 286.483 -16.924 286.270 -5.299 571.660 -1,514.613 283.000
-5.625 287.171 -22.223 285.390 -3.594 570.506 -1,025.199
0.000 286.978 -25.817 285.116 7.217 565.420 2,040.318 281.000
0.380 286.965 -18.600 280.304 1.600 560.576 448.461 279.000
4.726 287.229 -17.000 280.272 3.100 560.544 868.843
277.000
4.978 287.005 -13.900 280.272 0.300 560.544 84.082
5.232 287.030 -13.600 280.272 1.500 560.574 420.431
6.029 287.847 -12.100 280.302 2.500 560.654 700.818
13.978 287.781 -9.600 280.352 9.200 560.888 2,580.085 EXISTING DATA UKUR REALISASI
14.982 288.301 -0.400 280.536 0.250 561.075 70.134
15.832 288.398 -0.150 280.539 0.150 561.075 42.081
32.482 288.013 0.000 280.536 0.150 561.075 42.081
04+700.00
34.137 287.949 0.150 280.539 0.250 561.075 70.134
40.241 287.826 0.400 280.536 9.200 561.256 2,581.778
9.600 280.720 2.500 561.490 701.863
12.100 280.770 1.500 561.570 421.178
13.600 280.800 0.300 561.600 84.240
13.900 280.800 3.100 561.600 870.480
17.000 280.800 1.600 561.632 449.306
18.600 280.832 9.000 567.664 2,554.488
27.600 286.832 2.000 573.622 573.622
29.600 286.790 1.869 574.826 537.175
31.469 288.036 -15.637 576.434 -4,506.849
15.832 288.398 -0.850 576.699 -245.097
14.982 288.301 -1.004 576.082 -289.193
13.978 287.781 -7.949 575.628 -2,287.833
6.029 287.847 -0.797 574.877 -229.088
5.232 287.030 -0.254 574.035 -72.902
4.978 287.005 -0.252 574.234 -72.353
4.726 287.229 -4.346 574.194 -1,247.724
0.380 286.965 -0.380 573.943 -109.049
0.000 286.978 0.000 286.978 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -309.516

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+725.00 04+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.978 285.113 0.000 287.550 0.000
-33.581 285.063 0.000 287.550 -1.863 575.124 -535.728
-32.835 285.563 -1.863 287.574 -1.100 575.473 -316.510
289.000
-17.632 285.500 -2.963 287.899 -1.652 574.760 -474.752
-16.528 286.110 -4.615 286.861 -6.705 573.767 -1,923.554 287.000
-12.674 285.782 -11.320 286.906 -1.354 572.688 -387.710
285.000
-11.320 286.906 -12.674 285.782 -3.854 571.892 -1,102.036
-4.615 286.861 -16.528 286.110 -1.104 571.610 -315.529 283.000
-2.963 287.899 -17.632 285.500 -7.307 571.030 -2,086.258 281.000
-1.863 287.574 -24.939 285.530 6.339 566.834 1,796.580
0.000 287.550 -18.600 281.304 1.600 562.576 450.061 279.000
0.440 287.544 -17.000 281.272 3.100 562.544 871.943 277.000
6.841 287.602 -13.900 281.272 0.300 562.544 84.382
7.637 288.395 -13.600 281.272 1.500 562.574 421.931
15.535 288.303 -12.100 281.302 2.500 562.654 703.318
EXISTING DATA UKUR REALISASI
16.283 288.825 -9.600 281.352 9.200 562.888 2,589.285
34.979 288.694 -0.400 281.536 0.250 563.075 70.384
38.130 288.813 -0.150 281.539 0.150 563.075 42.231
04+725.00
0.000 281.536 0.150 563.075 42.231
0.150 281.539 0.250 563.075 70.384
0.400 281.536 9.200 563.256 2,590.978
9.600 281.720 2.500 563.490 704.363
12.100 281.770 1.500 563.570 422.678
13.600 281.800 0.300 563.600 84.540
13.900 281.800 3.100 563.600 873.580
17.000 281.800 1.600 563.632 450.906
18.600 281.832 9.000 569.664 2,563.488
27.600 287.832 2.000 575.622 575.622
29.600 287.790 1.398 576.512 402.982
30.998 288.722 -14.715 577.547 -4,249.302
16.283 288.825 -0.748 577.128 -215.846
15.535 288.303 -7.898 576.698 -2,277.380
7.637 288.395 -0.796 575.997 -229.247
6.841 287.602 -6.401 575.146 -1,840.755
0.440 287.544 -0.440 575.094 -126.521
0.000 287.550 0.000 287.550 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -269.263

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+750.00 04+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-38.508 285.979 0.000 287.150 0.000
-33.663 285.931 0.000 287.150 -3.357 574.495 -964.290
-23.012 286.091 -3.357 287.345 -1.300 574.170 -373.211 300.000
-11.209 285.933 -4.657 286.825 -6.097 573.756 -1,749.095 295.000
-10.754 286.931 -10.754 286.931 -0.455 572.864 -130.327 290.000
-4.657 286.825 -11.209 285.933 -11.803 572.024 -3,375.800 285.000
-3.357 287.345 -23.012 286.091 -1.240 572.163 -354.741 280.000
0.000 287.150 -24.252 286.072 5.652 568.376 1,606.231 275.000
0.490 287.122 -18.600 282.304 1.600 564.576 451.661 270.000
9.294 287.183 -17.000 282.272 3.100 564.544 875.043 265.000
9.546 287.740 -13.900 282.272 0.300 564.544 84.682 260.000
13.946 287.627 -13.600 282.272 1.500 564.574 423.431 255.000
14.796 288.559 -12.100 282.302 2.500 564.654 705.818
20.995 288.399 -9.600 282.352 9.200 564.888 2,598.485
21.646 289.115 -0.400 282.536 0.250 565.075 70.634
EXISTING DATA UKUR REALISASI
24.845 289.007 -0.150 282.539 0.150 565.075 42.381
25.799 289.625 0.000 282.536 0.150 565.075 42.381
33.849 289.482 0.150 282.539 0.250 565.075 70.634
04+750.00
38.553 289.451 0.400 282.536 9.200 565.256 2,600.178
9.600 282.720 2.500 565.490 706.863
12.100 282.770 1.500 565.570 424.178
13.600 282.800 0.300 565.600 84.840
13.900 282.800 3.100 565.600 876.680
17.000 282.800 1.600 565.632 452.506
18.600 282.832 9.000 571.664 2,572.488
27.600 288.832 2.000 577.622 577.622
29.600 288.790 1.121 578.328 324.153
30.721 289.538 -4.922 579.163 -1,425.320
25.799 289.625 -0.954 578.632 -276.007
24.845 289.007 -3.199 578.122 -924.706
21.646 289.115 -0.651 577.514 -187.981
20.995 288.399 -6.199 576.958 -1,788.281
14.796 288.559 -0.850 576.186 -244.879
13.946 287.627 -4.400 575.367 -1,265.807
9.546 287.740 -0.252 574.923 -72.440
9.294 287.183 -8.804 574.305 -2,528.091
0.490 287.122 -0.490 574.272 -140.697
0.000 287.150 0.000 287.150 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -210.788

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+775.00 04+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.995 284.593 0.000 286.673 0.000
-33.899 285.862 0.000 286.673 -18.860 573.645 -5,409.472
-27.351 285.961 -18.860 286.972 -0.796 573.037 -228.069 300.000
-25.102 286.047 -19.656 286.065 -4.437 572.115 -1,269.237 295.000
-19.656 286.065 -24.093 286.050 5.493 569.354 1,563.731 290.000
-18.860 286.972 -18.600 283.304 1.600 566.576 453.261 285.000
0.000 286.673 -17.000 283.272 3.100 566.544 878.143 280.000
0.540 286.664 -13.900 283.272 0.300 566.544 84.982 275.000
2.439 286.746 -13.600 283.272 1.500 566.574 424.931 270.000
3.336 287.845 -12.100 283.302 2.500 566.654 708.318
265.000
8.541 287.821 -9.600 283.352 9.200 566.888 2,607.685
260.000
8.992 288.144 -0.400 283.536 0.250 567.075 70.884
255.000
12.293 288.206 -0.150 283.539 0.150 567.075 42.531
12.596 288.616 0.000 283.536 0.150 567.075 42.531
16.145 288.618 0.150 283.539 0.250 567.075 70.884
EXISTING DATA UKUR REALISASI
16.490 289.047 0.400 283.536 9.200 567.256 2,609.378
26.045 288.882 9.600 283.720 2.500 567.490 709.363
26.497 289.391 12.100 283.770 1.500 567.570 425.678
04+775.00
30.593 289.339 13.600 283.800 0.300 567.600 85.140
30.988 289.700 13.900 283.800 3.100 567.600 879.780
30.994 289.705 17.000 283.800 1.600 567.632 454.106
34.336 289.569 18.600 283.832 11.038 573.183 3,163.397
40.785 289.986 29.638 289.351 -3.141 578.742 -908.914
26.497 289.391 -0.452 578.273 -130.690
26.045 288.882 -9.555 577.929 -2,761.056
16.490 289.047 -0.345 577.665 -99.647
16.145 288.618 -3.549 577.234 -1,024.302
12.596 288.616 -0.303 576.822 -87.389
12.293 288.206 -3.301 576.350 -951.266
8.992 288.144 -0.451 575.965 -129.880
8.541 287.821 -5.205 575.666 -1,498.171
3.336 287.845 -0.897 574.591 -257.704
2.439 286.746 -1.899 573.410 -544.453
0.540 286.664 -0.540 573.337 -154.801
0.000 286.673 0.000 286.673 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -180.331

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+800.00 04+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.813 284.909 0.000 0.000 0.000
-34.017 285.141 0.000 0.000 0.000
-31.319 285.442 0.000 287.181 0.000 300.000
-30.922 286.066 0.000 287.181 -6.170 574.628 -1,772.727 295.000
-29.517 286.072 -6.170 287.447 -0.495 574.382 -142.160 290.000
-19.814 285.993 -6.665 286.935 -7.752 573.978 -2,224.739 285.000
-15.113 287.356 -14.417 287.043 -0.696 574.399 -199.891 280.000
-14.417 287.043 -15.113 287.356 -4.701 573.349 -1,347.657 275.000
-6.665 286.935 -19.814 285.993 -2.200 572.004 -629.204 270.000
-6.170 287.447 -22.014 286.011 3.414 570.315 973.528
265.000
0.000 287.181 -18.600 284.304 1.600 568.576 454.861
260.000
0.580 287.156 -17.000 284.272 3.100 568.544 881.243
255.000
4.030 287.241 -13.900 284.272 0.300 568.544 85.282
5.476 287.831 -13.600 284.272 1.500 568.574 426.431
9.076 287.770 -12.100 284.302 2.500 568.654 710.818
EXISTING DATA UKUR REALISASI
9.375 288.331 -9.600 284.352 9.200 568.888 2,616.885
12.821 288.235 -0.400 284.536 0.250 569.075 71.134
13.167 289.004 -0.150 284.539 0.150 569.075 42.681
04+800.00
19.165 288.916 0.000 284.536 0.150 569.075 42.681
21.268 289.006 0.150 284.539 0.250 569.075 71.134
22.169 289.405 0.400 284.536 9.200 569.256 2,618.578
25.864 289.761 9.600 284.720 2.500 569.490 711.863
29.816 289.909 12.100 284.770 1.500 569.570 427.178
30.567 289.604 13.600 284.800 0.300 569.600 85.440
31.014 289.768 13.900 284.800 3.100 569.600 882.880
31.618 290.097 17.000 284.800 1.600 569.632 455.706
33.972 289.972 18.600 284.832 10.068 574.698 2,893.030
34.677 290.484 28.668 289.866 -2.804 579.627 -812.637
38.377 290.360 25.864 289.761 -3.695 579.166 -1,070.009
22.169 289.405 -0.901 578.411 -260.574
21.268 289.006 -2.103 577.922 -607.685
19.165 288.916 -5.998 577.920 -1,733.182
13.167 289.004 -0.346 577.239 -99.862
12.821 288.235 -3.446 576.566 -993.423
9.375 288.331 -0.299 576.101 -86.127
9.076 287.770 -3.600 575.601 -1,036.082
5.476 287.831 -1.446 575.072 -415.777
4.030 287.241 -3.450 574.397 -990.835
0.580 287.156 -0.580 574.337 -166.558
0.000 287.181 0.000 287.181 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -137.780

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+825.00 04+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-37.681 286.322 0.000 288.526 0.000
-33.336 286.341 0.000 288.526 -11.888 577.090 -3,430.223
-26.739 286.345 -11.888 288.564 -4.105 576.706 -1,183.689 292.000
-25.691 287.122 -15.993 288.142 -0.396 575.933 -114.035 291.000
-20.494 287.174 -16.389 287.791 -1.152 575.253 -331.346 290.000
-17.541 287.462 -17.541 287.462 -2.953 574.636 -848.450 289.000
-16.389 287.791 -20.494 287.174 -1.810 574.330 -519.769 288.000
-15.993 288.142 -22.304 287.156 3.704 572.460 1,060.196 287.000
-11.888 288.564 -18.600 285.304 1.600 570.576 456.461 286.000
0.000 288.526 -17.000 285.272 3.100 570.544 884.343 285.000
0.610 288.524 -13.900 285.272 0.300 570.544 85.582 284.000
7.412 288.720 -13.600 285.272 1.500 570.574 427.931 283.000
12.364 288.906 -12.100 285.302 2.500 570.654 713.318
22.768 289.402 -9.600 285.352 9.200 570.888 2,626.085
24.215 289.880 -0.400 285.536 0.250 571.075 71.384
EXISTING DATA UKUR REALISASI
27.662 290.513 -0.150 285.539 0.150 571.075 42.831
34.258 290.551 0.000 285.536 0.150 571.075 42.831
37.909 290.660 0.150 285.539 0.250 571.075 71.384
04+825.00
0.400 285.536 9.200 571.256 2,627.778
9.600 285.720 2.500 571.490 714.363
12.100 285.770 1.500 571.570 428.678
13.600 285.800 0.300 571.600 85.740
13.900 285.800 3.100 571.600 885.980
17.000 285.800 1.600 571.632 457.306
18.600 285.832 9.365 576.347 2,698.745
27.965 290.515 -0.303 581.028 -88.026
27.662 290.513 -3.447 580.393 -1,000.307
24.215 289.880 -1.447 579.282 -419.111
22.768 289.402 -10.404 578.308 -3,008.358
12.364 288.906 -4.952 577.626 -1,430.202
7.412 288.720 -6.802 577.244 -1,963.207
0.610 288.524 -0.610 577.050 -176.000
0.000 288.526 0.000 288.526 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -131.790

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+850.00 04+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.958 287.677 0.000 0.000 0.000
-32.456 287.396 0.000 0.000 0.000
-27.903 287.615 0.000 289.432 0.000 295.000
-27.354 288.174 0.000 289.432 -4.000 578.911 -1,157.822 294.000
-22.261 288.135 -4.000 289.479 -1.000 576.148 -288.074 293.000
-18.600 286.304 -5.000 286.669 -5.000 573.233 -1,433.083 292.000
-17.000 286.272 -10.000 286.564 -4.100 572.994 -1,174.638 291.000
-14.834 286.272 -14.100 286.430 -0.734 572.702 -210.182 290.000
-14.100 286.430 -14.834 286.272 0.934 572.544 267.378 289.000
-10.000 286.564 -13.900 286.272 0.300 572.544 85.882 288.000
-5.000 286.669 -13.600 286.272 1.500 572.574 429.431 287.000
286.000
-4.000 289.479 -12.100 286.302 2.500 572.654 715.818
285.000
0.000 289.432 -9.600 286.352 9.200 572.888 2,635.285
0.640 289.424 -0.400 286.536 0.250 573.075 71.634
11.592 289.828 -0.150 286.539 0.150 573.075 42.981
12.844 290.449 0.000 286.536 0.150 573.075 42.981 EXISTING DATA UKUR REALISASI
22.495 290.119 0.150 286.539 0.250 573.075 71.634
24.292 291.126 0.400 286.536 9.200 573.256 2,636.978
04+850.00
33.344 291.107 9.600 286.720 2.500 573.490 716.863
37.447 291.081 12.100 286.770 1.500 573.570 430.178
13.600 286.800 0.300 573.600 86.040
13.900 286.800 3.100 573.600 889.080
17.000 286.800 1.600 573.632 458.906
18.600 286.832 8.576 577.952 2,478.258
27.176 291.120 -2.884 582.246 -839.599
24.292 291.126 -1.797 581.245 -522.249
22.495 290.119 -9.651 580.568 -2,801.531
12.844 290.449 -1.252 580.277 -363.253
11.592 289.828 -10.952 579.252 -3,171.984
0.640 289.424 -0.640 578.856 -185.234
0.000 289.432 0.000 289.432 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -88.324

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+875.00 04+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.527 288.560 0.000 0.000 0.000
-30.631 288.458 0.000 0.000 0.000
-24.433 288.686 0.000 0.000 0.000 295.000
-23.982 289.047 0.000 0.000 0.000 294.000
-18.137 289.381 0.000 290.123 0.000 293.000
-17.842 288.963 0.000 290.123 -1.844 579.887 -534.656 292.000
-8.294 289.664 -1.844 289.764 -2.156 579.495 -624.696 291.000
-1.844 289.764 -4.000 289.731 -1.000 577.175 -288.588 290.000
0.000 290.123 -5.000 287.444 4.600 574.980 1,322.454 289.000
288.000
0.660 290.251 -0.400 287.536 0.250 575.075 71.884
287.000
12.856 290.397 -0.150 287.539 0.150 575.075 43.131
286.000
13.503 291.077 0.000 287.536 0.150 575.075 43.131
285.000
20.450 290.996 0.150 287.539 0.250 575.075 71.884
21.203 291.724 0.400 287.536 9.200 575.256 2,646.178
25.554 291.652 9.600 287.720 2.500 575.490 719.363
EXISTING DATA UKUR REALISASI
26.755 292.050 12.100 287.770 1.500 575.570 431.678
33.250 292.061 13.600 287.800 0.300 575.600 86.340
34.702 292.578 13.900 287.800 3.100 575.600 892.180
04+875.00
38.199 292.500 17.000 287.800 1.600 575.632 460.506
18.600 287.832 8.437 579.882 2,446.232
27.037 292.050 -0.282 584.100 -82.358
26.755 292.050 -1.201 583.702 -350.513
25.554 291.652 -4.351 583.376 -1,269.134
21.203 291.724 -0.753 582.720 -219.394
20.450 290.996 -6.947 582.073 -2,021.831
13.503 291.077 0.000 582.154 0.000
13.503 291.077 -0.647 581.474 -188.107
12.856 290.397 -12.196 580.648 -3,540.792
0.660 290.251 -0.660 580.374 -191.523
0.000 290.123 0.000 290.123 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -76.632

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+900.00 04+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.568 291.294 0.000 0.000 0.000
-30.220 291.874 0.000 293.176 0.000
-28.671 291.992 0.000 293.176 -4.000 586.402 -1,172.804 300.000
-25.170 292.051 -4.000 293.226 -1.000 582.172 -291.086 295.000
-24.473 292.386 -5.000 288.946 -5.000 577.286 -1,443.215 290.000
-14.072 292.315 -10.000 288.340 -4.200 576.861 -1,211.408 285.000
-13.477 293.346 -14.200 288.521 -1.900 577.348 -548.481 280.000
0.000 293.176 -16.100 288.827 -2.500 581.173 -726.466 275.000
0.670 293.168 -18.600 292.346 -5.873 584.732 -1,717.066 270.000
5.166 293.182 -24.473 292.386 -0.697 584.437 -203.676 265.000
6.720 293.969 -25.170 292.051 -0.894 584.087 -261.087 260.000
10.020 293.627 -26.064 292.036 7.464 580.340 2,165.829 255.000
15.166 293.553 -18.600 288.304 1.600 576.576 461.261
16.067 294.590 -17.000 288.272 3.100 576.544 893.643
25.968 294.559 -13.900 288.272 0.300 576.544 86.482
EXISTING DATA UKUR REALISASI
33.364 294.567 -13.600 288.272 1.500 576.574 432.431
35.259 295.813 -12.100 288.302 2.500 576.654 720.818
39.412 295.571 -9.600 288.352 9.200 576.888 2,653.685
04+900.00
-0.400 288.536 0.250 577.075 72.134
-0.150 288.539 0.150 577.075 43.281
0.000 288.536 0.150 577.075 43.281
0.150 288.539 0.250 577.075 72.134
0.400 288.536 9.200 577.256 2,655.378
9.600 288.720 2.500 577.490 721.863
12.100 288.770 1.500 577.570 433.178
13.600 288.800 0.300 577.600 86.640
13.900 288.800 3.100 577.600 895.280
17.000 288.800 1.600 577.632 462.106
18.600 288.832 11.463 583.395 3,343.728
30.063 294.563 -4.095 589.122 -1,206.227
25.968 294.559 -9.901 589.149 -2,916.582
16.067 294.590 -0.901 588.143 -264.958
15.166 293.553 -5.146 587.180 -1,510.814
10.020 293.627 -3.300 587.596 -969.533
6.720 293.969 -1.554 587.151 -456.216
5.166 293.182 -4.496 586.350 -1,318.115
0.670 293.168 -0.670 586.344 -196.425
0.000 293.176 0.000 293.176 0.000
AREA ( M2 ) -171.011

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+925.00 04+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-27.078 291.219 0.000 290.727 0.000
-24.578 291.221 0.000 290.727 -5.000 581.792 -1,454.480
-23.877 292.457 -5.000 291.065 -5.000 581.803 -1,454.508 300.000
-14.625 292.402 -10.000 290.738 -4.100 581.322 -1,191.710 295.000
-12.672 292.076 -14.100 290.584 -1.900 580.648 -551.616 290.000
-12.477 292.060 -16.000 290.064 -0.900 580.042 -261.019 285.000
-7.424 292.037 -16.900 289.978 -1.700 582.404 -495.043 280.000
-6.874 292.813 -18.600 292.426 -5.277 584.883 -1,543.214 275.000
0.000 292.998 -23.877 292.457 -0.218 584.529 -63.714 270.000
0.680 293.016 -24.095 292.072 5.495 581.376 1,597.331 265.000
9.578 293.112 -18.600 289.304 1.600 578.576 462.861 260.000
10.783 293.935 -17.000 289.272 3.100 578.544 896.743 255.000
15.087 293.963 -13.900 289.272 0.300 578.544 86.782
16.185 294.391 -13.600 289.272 1.500 578.574 433.931
21.586 294.234 -12.100 289.302 2.500 578.654 723.318
EXISTING DATA UKUR REALISASI
27.388 294.269 -9.600 289.352 9.200 578.888 2,662.885
28.543 294.632 -0.400 289.536 0.250 579.075 72.384
33.193 294.571 -0.150 289.539 0.150 579.075 43.431
04+925.00
35.141 294.513 0.000 289.536 0.150 579.075 43.431
0.150 289.539 0.250 579.075 72.384
0.400 289.536 9.200 579.256 2,664.578
9.600 289.720 2.500 579.490 724.363
12.100 289.770 1.500 579.570 434.678
13.600 289.800 0.300 579.600 86.940
13.900 289.800 3.100 579.600 898.380
17.000 289.800 1.600 579.632 463.706
18.600 289.832 9.020 584.174 2,634.625
27.620 294.342 -0.232 588.611 -68.279
27.388 294.269 -5.802 588.503 -1,707.247
21.586 294.234 -5.401 588.625 -1,589.582
16.185 294.391 -1.098 588.354 -323.006
15.087 293.963 -4.304 587.898 -1,265.156
10.783 293.935 -1.205 587.047 -353.696
9.578 293.112 -8.898 586.128 -2,607.683
0.680 293.016 -0.680 586.014 -199.245
0.000 292.998 0.000 292.998 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -126.451

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+950.00 04+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-31.313 292.768 0.000 291.944 0.000
-26.817 293.285 0.000 291.944 -5.000 583.500 -1,458.750
-17.620 293.122 -5.000 291.556 -5.000 582.374 -1,455.935 305.000
-17.071 293.859 -10.000 290.818 -4.100 581.572 -1,192.223 300.000
-9.275 294.142 -14.100 290.754 -0.777 581.026 -225.729 295.000
-8.525 294.530 -14.877 290.272 0.977 580.544 283.596 290.000
0.000 294.355 -13.900 290.272 0.300 580.544 87.082 285.000
0.680 294.341 -13.600 290.272 1.500 580.574 435.431 280.000
275.000
12.679 294.286 -12.100 290.302 2.500 580.654 725.818
270.000
17.530 294.420 -9.600 290.352 9.200 580.888 2,672.085
265.000
18.928 295.961 -0.400 290.536 0.250 581.075 72.634
260.000
29.677 295.726 -0.150 290.539 0.150 581.075 43.581
255.000
32.575 295.590 0.000 290.536 0.150 581.075 43.581
35.827 296.141 0.150 290.539 0.250 581.075 72.634
0.400 290.536 9.200 581.256 2,673.778
EXISTING DATA UKUR REALISASI
9.600 290.720 2.500 581.490 726.863
12.100 290.770 1.500 581.570 436.178
13.600 290.800 0.300 581.600 87.240
04+950.00
13.900 290.800 3.100 581.600 901.480
17.000 290.800 1.600 581.632 465.306
18.600 290.832 9.842 586.585 2,886.585
28.442 295.753 -9.514 591.714 -2,814.783
18.928 295.961 -1.398 590.381 -412.676
17.530 294.420 -4.851 588.706 -1,427.906
12.679 294.286 -11.679 588.626 -3,437.282
1.000 294.340 -1.000 586.284 -293.142
0.000 291.944 0.000 291.944 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -104.558

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 04+975.00 04+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-32.477 292.207 0.000 0.000 0.000
-27.230 292.754 0.000 292.396 0.000
-26.279 293.419 0.000 292.396 -5.000 584.796 -1,461.990 315.000
-19.027 293.306 -5.000 292.400 -5.000 584.606 -1,461.515 310.000
-18.600 293.717 -10.000 292.206 -3.600 584.538 -1,052.168 305.000
-16.600 291.587 -13.600 292.332 -2.200 584.010 -642.411 300.000
-15.800 291.678 -15.800 291.678 -0.800 583.265 -233.306 295.000
-13.600 292.332 -16.600 291.587 -2.000 585.304 -585.304 290.000
-10.000 292.206 -18.600 293.717 -0.427 587.023 -125.329 285.000
-5.000 292.400 -19.027 293.306 -3.692 586.670 -1,082.993 280.000
0.000 292.396 -22.719 293.364 4.119 584.668 1,204.124 275.000
1.000 295.130 -18.600 291.304 1.600 582.576 466.061 270.000
8.922 295.242 -17.000 291.272 3.100 582.544 902.943
9.824 295.948 -13.900 291.272 0.300 582.544 87.382
16.177 296.120 -13.600 291.272 1.500 582.574 436.931 EXISTING DATA UKUR REALISASI
17.932 296.595 -12.100 291.302 2.500 582.654 728.318
26.434 296.349 -9.600 291.352 9.200 582.888 2,681.285
31.837 296.320 -0.400 291.536 0.250 583.075 72.884
04+975.00
35.887 297.554 -0.150 291.539 0.150 583.075 43.731
0.000 291.536 0.150 583.075 43.731
0.150 291.539 0.250 583.075 72.884
0.400 291.536 9.200 583.256 2,682.978
9.600 291.720 2.500 583.490 729.363
12.100 291.770 1.500 583.570 437.678
13.600 291.800 0.300 583.600 87.540
13.900 291.800 3.100 583.600 904.580
17.000 291.800 1.600 583.632 466.906
18.600 291.832 9.021 588.175 2,652.963
27.621 296.343 -1.187 592.692 -351.763
26.434 296.349 -8.502 592.944 -2,520.605
17.932 296.595 -1.755 592.715 -520.107
16.177 296.120 -6.353 592.068 -1,880.704
9.824 295.948 -0.902 591.190 -266.627
8.922 295.242 -7.922 590.372 -2,338.463
1.000 295.130 -1.000 587.526 -293.763
0.000 292.396 0.000 292.396 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -114.770

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+000.00 05+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 294.765 0.000
-33.615 294.130 0.000 294.765 -0.841 589.226 -247.770
-29.668 294.588 -0.841 294.461 -6.500 588.856 -1,913.782 300.000
-26.667 294.651 -7.341 294.395 -1.047 589.453 -308.579 299.000
-26.171 295.550 -8.388 295.058 -5.737 590.323 -1,693.342 298.000
297.000
-17.773 295.504 -14.125 295.265 -1.298 591.221 -383.702
296.000
-17.070 295.912 -15.423 295.956 -1.647 591.868 -487.403
295.000
-15.423 295.956 -17.070 295.912 -0.703 591.416 -207.883
294.000
-14.125 295.265 -17.773 295.504 -7.307 591.048 -2,159.394 293.000
-8.388 295.058 -25.080 295.544 6.480 587.848 1,904.628 292.000
-7.341 294.395 -18.600 292.304 1.600 584.576 467.661 291.000
-0.841 294.461 -17.000 292.272 3.100 584.544 906.043 290.000
0.000 294.765 -13.900 292.272 0.300 584.544 87.682
0.660 295.004 -13.600 292.272 1.500 584.574 438.431
6.105 295.022 -12.100 292.302 2.500 584.654 730.818 EXISTING DATA UKUR REALISASI
12.708 295.404 -9.600 292.352 9.200 584.888 2,690.485
13.560 295.982 -0.400 292.536 0.250 585.075 73.134
16.357 296.073 -0.150 292.539 0.150 585.075 43.881
05+000.00
17.110 296.518 0.000 292.536 0.150 585.075 43.881
21.406 296.563 0.150 292.539 0.250 585.075 73.134
22.004 296.906 0.400 292.536 9.200 585.256 2,692.178
26.200 297.121 9.600 292.720 2.500 585.490 731.863
27.001 297.634 12.100 292.770 1.500 585.570 439.178
31.351 297.608 13.600 292.800 0.300 585.600 87.840
34.755 297.545 13.900 292.800 3.100 585.600 907.680
17.000 292.800 1.600 585.632 468.506
18.600 292.832 9.590 590.459 2,831.251
28.190 297.627 -1.189 595.261 -353.883
27.001 297.634 -0.801 594.755 -238.199
26.200 297.121 -4.196 594.027 -1,246.269
22.004 296.906 -0.598 593.469 -177.447
21.406 296.563 -4.296 593.081 -1,273.938
17.110 296.518 -0.753 592.591 -223.111
16.357 296.073 -2.797 592.055 -827.989
13.560 295.982 -0.852 591.386 -251.930
12.708 295.404 -6.603 590.426 -1,949.291
6.105 295.022 -5.445 590.026 -1,606.346
0.660 295.004 -0.660 589.769 -194.624
0.000 294.765 0.000 294.765 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -126.611

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+025.00 05+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 296.514 0.000
-35.898 294.791 0.000 296.514 -6.561 593.163 -1,945.871 300.000
-31.497 294.604 -6.561 296.649 -0.401 592.623 -118.821 299.000
298.000
-25.398 294.662 -6.962 295.974 -5.246 591.963 -1,552.719
297.000
-24.851 295.487 -12.208 295.989 -0.896 591.511 -264.997
296.000
-20.405 295.238 -13.104 295.522 -5.699 591.023 -1,684.120
295.000
-18.803 295.501 -18.803 295.501 -1.602 590.739 -473.182 294.000
-13.104 295.522 -20.405 295.238 -2.322 590.606 -685.694 293.000
-12.208 295.989 -22.727 295.368 4.127 588.672 1,214.725 292.000
-6.962 295.974 -18.600 293.304 1.600 586.576 469.261 291.000
-6.561 296.649 -17.000 293.272 3.100 586.544 909.143 290.000
0.000 296.514 -13.900 293.272 0.300 586.544 87.982
0.640 296.501 -13.600 293.272 1.500 586.574 439.931
2.040 297.234 -12.100 293.302 2.500 586.654 733.318 EXISTING DATA UKUR REALISASI
5.844 297.068 -9.600 293.352 9.200 586.888 2,699.685
6.794 297.677 -0.400 293.536 0.250 587.075 73.384
15.341 297.650 -0.150 293.539 0.150 587.075 44.031
25.094 297.617 0.000 293.536 0.150 587.075 44.031
05+025.00
27.194 298.603 0.150 293.539 0.250 587.075 73.384
27.995 298.701 0.400 293.536 9.200 587.256 2,701.378
31.092 298.732 9.600 293.720 2.500 587.490 734.363
31.638 298.666 12.100 293.770 1.500 587.570 440.678
32.184 297.791 13.600 293.800 0.300 587.600 88.140
33.129 297.870 13.900 293.800 3.100 587.600 910.780
33.529 298.440 17.000 293.800 1.600 587.632 470.106
33.827 298.349 18.600 293.832 9.745 592.536 2,887.132
28.345 298.704 -0.350 597.405 -104.546
27.995 298.701 -0.801 597.304 -239.220
27.194 298.603 -2.100 596.220 -626.031
25.094 297.617 -9.753 595.267 -2,902.820
15.341 297.650 -8.547 595.327 -2,544.130
6.794 297.677 -0.950 594.745 -282.504
5.844 297.068 -3.804 594.302 -1,130.362
2.040 297.234 -1.400 593.735 -415.615
0.640 296.501 -0.640 593.015 -189.765
0.000 296.514 0.000 296.514 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -138.948

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+050.00 05+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.084 0.000
-45.179 293.781 0.000 297.084 -10.542 594.228 -3,132.176
-32.183 293.757 -10.542 297.144 -1.404 593.486 -416.627 300.000
-27.633 294.103 -11.946 296.342 -7.246 592.358 -2,146.113 299.000
-26.888 294.567 -19.192 296.016 -0.497 591.218 -146.918 298.000
-22.985 295.271 -19.689 295.202 -0.738 590.419 -217.865
297.000
-19.689 295.202 -20.427 295.217 1.827 589.521 538.527
296.000
-19.192 296.016 -18.600 294.304 1.600 588.576 470.861
-11.946 296.342 -17.000 294.272 3.100 588.544 912.243 295.000
-10.542 297.144 -13.900 294.272 0.300 588.544 88.282 294.000
0.000 297.084 -13.600 294.272 1.500 588.574 441.431 293.000
0.610 297.081 -12.100 294.302 2.500 588.654 735.818 292.000
3.809 297.043 -9.600 294.352 9.200 588.888 2,708.885
9.331 297.417 -0.400 294.536 0.250 589.075 73.634
20.265 297.652 -0.150 294.539 0.150 589.075 44.181
EXISTING DATA UKUR REALISASI
21.211 298.581 0.000 294.536 0.150 589.075 44.181
24.409 298.784 0.150 294.539 0.250 589.075 73.634
25.411 298.775 0.400 294.536 9.200 589.256 2,710.578
05+050.00
25.964 297.963 9.600 294.720 2.500 589.490 736.863
26.759 298.008 12.100 294.770 1.500 589.570 442.178
27.263 298.739 13.600 294.800 0.300 589.600 88.440
29.759 298.454 13.900 294.800 3.100 589.600 913.880
31.761 298.488 17.000 294.800 1.600 589.632 471.706
18.600 294.832 7.084 593.206 2,101.136
25.684 298.374 -0.273 597.149 -81.511
25.411 298.775 -1.002 597.559 -299.377
24.409 298.784 -3.198 597.365 -955.187
21.211 298.581 -0.946 596.233 -282.018
20.265 297.652 -10.934 595.069 -3,253.242
9.331 297.417 -5.522 594.460 -1,641.304
3.809 297.043 -3.199 594.124 -950.301
0.610 297.081 -0.610 594.165 -181.220
0.000 297.084 0.000 297.084 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -107.404

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+075.00 05+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 296.975 0.000
0.000 296.975 -14.070 593.998 -4,178.776
-40.222 294.484 -14.070 297.023 -0.599 593.070 -177.624 300.000
-32.621 294.950 -14.669 296.047 -4.499 591.888 -1,331.452
299.000
-19.868 295.106 -19.168 295.841 -0.186 591.486 -55.008
-19.168 295.841 -19.354 295.645 0.754 590.912 222.774 298.000
-14.669 296.047 -18.600 295.267 1.600 590.502 472.402
297.000
-14.070 297.023 -17.000 295.235 3.100 590.470 915.229
0.000 296.975 -13.900 295.235 0.300 590.470 88.571 296.000
0.580 296.973 -13.600 295.235 1.500 590.500 442.875
1.883 297.468 -12.100 295.265 2.500 590.580 738.225 295.000
4.431 297.785 -9.600 295.315 9.200 590.814 2,717.744 294.000
8.480 298.069 -0.400 295.499 0.250 591.001 73.875
9.130 297.716 -0.150 295.502 0.150 591.001 44.325
9.626 297.655 0.000 295.499 0.150 591.001 44.325
EXISTING DATA UKUR REALISASI
10.572 298.420 0.150 295.502 0.250 591.001 73.875
19.869 298.323 0.400 295.499 9.200 591.182 2,719.437
20.315 298.624 9.600 295.683 2.500 591.416 739.270
05+075.00
20.568 298.538 12.100 295.733 1.500 591.497 443.623
21.116 298.434 13.600 295.764 0.300 591.528 88.729
21.766 299.416 13.900 295.764 3.100 591.528 916.868
22.514 298.566 17.000 295.764 1.600 591.560 473.248
23.310 298.516 18.600 295.796 6.739 594.962 2,004.724
23.709 299.428 25.339 299.166 -0.135 598.560 -40.403
25.204 299.394 25.204 299.394 -1.495 598.822 -447.619
25.703 298.555 23.709 299.428 -0.399 597.944 -119.290
26.606 298.741 23.310 298.516 -0.796 597.082 -237.639
27.157 299.389 22.514 298.566 -0.748 597.982 -223.645
28.603 299.132 21.766 299.416 -0.650 597.850 -194.301
31.054 299.116 21.116 298.434 -0.548 596.972 -163.570
20.568 298.538 -0.253 597.162 -75.541
20.315 298.624 -0.446 596.947 -133.119
19.869 298.323 -9.297 596.743 -2,773.960
10.572 298.420 -0.946 596.075 -281.943
9.626 297.655 -0.496 595.371 -147.652
9.130 297.716 -0.650 595.785 -193.630
8.480 298.069 -4.049 595.854 -1,206.306
4.431 297.785 -2.548 595.253 -758.352
1.883 297.468 -1.303 594.441 -387.278
0.580 296.973 -0.580 593.946 -172.244
0.000 296.973 0.000 296.973 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -79.236

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+100.00 05+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 296.113 0.000
-41.819 294.447 0.000 296.113 -8.363 592.540 -2,477.706
-32.615 295.190 -8.363 296.427 -0.552 592.391 -163.500
-23.414 295.467 -8.915 295.964 -0.450 591.959 -133.191 304.000
-15.661 295.307 -9.365 295.995 -1.051 592.470 -311.343 302.000
-14.264 296.352 -10.416 296.475 -3.848 592.827 -1,140.599
300.000
-10.416 296.475 -14.264 296.352 -0.181 592.494 -53.621
-9.365 295.995 -14.445 296.142 0.545 592.284 161.397 298.000
-8.915 295.964 -13.900 296.142 0.300 592.284 88.843 296.000
-8.363 296.427 -13.600 296.142 1.500 592.314 444.236 294.000
0.000 296.113 -12.100 296.172 2.500 592.394 740.493
292.000
0.540 296.093 -9.600 296.222 9.200 592.628 2,726.089
3.942 296.397 -0.400 296.406 0.250 592.815 74.102 290.000
4.290 296.953 -0.150 296.409 0.150 592.815 44.461
9.889 296.693 0.000 296.406 0.150 592.815 44.461
11.134 297.335 0.150 296.409 0.250 592.815 74.102 EXISTING DATA UKUR REALISASI
16.637 297.450 0.400 296.406 9.200 592.996 2,727.782
17.641 298.282 9.600 296.590 2.500 593.230 741.538
05+100.00
24.542 298.141 12.100 296.640 1.500 593.310 444.983
25.689 298.930 13.600 296.670 0.300 593.340 89.001
27.336 298.988 13.900 296.670 3.100 593.340 919.677
27.685 298.389 17.000 296.670 1.600 593.372 474.698
28.390 298.276 18.600 296.702 2.998 594.903 891.760
28.839 298.581 21.598 298.201 -3.957 596.483 -1,180.142
29.193 299.130 17.641 298.282 -1.004 595.732 -299.057
30.493 299.131 16.637 297.450 -5.503 594.785 -1,636.551
11.134 297.335 -1.245 594.028 -369.782
9.889 296.693 -5.599 593.646 -1,661.912
4.290 296.953 -0.348 593.350 -103.243
3.942 296.397 -3.402 592.490 -1,007.825
0.540 296.093 -0.540 592.206 -159.896
0.000 296.113 0.000 296.113 0.000
AREA ( M2 ) -10.748

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+125.00 05+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 296.660 0.000
-34.363 295.745 0.000 296.660 -4.513 593.396 -1,338.998
-32.318 295.768 -4.513 296.736 -0.995 593.138 -295.086 300.000
-30.968 295.756 -5.508 296.402 -6.153 592.876 -1,823.983 299.500
-30.115 295.623 -11.661 296.474 -0.350 592.535 -103.694 299.000
-29.111 295.307 -12.011 296.061 -3.641 592.177 -1,078.058 298.500
-27.757 295.767 -15.652 296.116 1.752 593.108 519.563 298.000
-19.426 295.766 -13.900 296.992 0.300 593.984 89.098 297.500
297.000
-19.209 296.170 -13.600 296.992 1.500 594.014 445.511
296.500
-12.011 296.061 -12.100 297.022 2.500 594.094 742.618
296.000
-11.661 296.474 -9.600 297.072 9.200 594.328 2,733.909
295.500
-5.508 296.402 -0.400 297.256 0.250 594.515 74.314
295.000
-4.513 296.736 -0.150 297.259 0.150 594.515 44.589
0.000 296.660 0.000 297.256 0.150 594.515 44.589
0.490 296.652 0.150 297.259 0.250 594.515 74.314
EXISTING DATA UKUR REALISASI
12.039 296.888 0.400 297.256 9.200 594.696 2,735.602
12.791 297.163 9.600 297.440 2.500 594.930 743.663
05+125.00
16.089 297.297 12.100 297.490 1.500 595.010 446.258
17.539 297.702 13.600 297.520 0.300 595.040 89.256
27.337 297.628 13.900 297.520 0.577 594.752 171.586
28.189 298.234 14.477 297.232 -1.686 594.395 -501.075
29.284 298.233 12.791 297.163 -0.752 594.051 -223.363
12.039 296.888 -11.549 593.540 -3,427.397
0.490 296.652 -0.490 593.312 -145.361
0.000 296.660 0.000 296.660 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 17.851

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+150.00 05+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-35.657 295.066 0.000 296.388 0.000
-32.208 295.464 0.000 296.388 -11.706 592.922 -3,470.372
300.000
-27.158 295.362 -11.706 296.534 -0.453 592.508 -134.203
299.500
-26.657 295.888 -12.159 295.974 -4.983 592.137 -1,475.309
299.000
-18.806 295.716 -17.142 296.163 3.242 593.947 962.788
298.500
-18.258 296.205 -13.900 297.784 0.300 595.568 89.335 298.000
-12.159 295.974 -13.600 297.784 1.500 595.598 446.699 297.500
-11.706 296.534 -12.100 297.814 2.500 595.678 744.598 297.000
0.000 296.388 -9.600 297.864 9.200 595.912 2,741.195 296.500
0.440 296.383 -0.400 298.048 0.250 596.099 74.512 296.000
9.285 296.385 -0.150 298.051 0.150 596.099 44.707 295.500
10.983 296.506 0.000 298.048 0.150 596.099 44.707 295.000
12.884 296.780 0.150 298.051 0.250 596.099 74.512
22.580 296.796 0.400 298.048 9.200 596.280 2,742.888
31.383 296.725 9.600 298.232 2.500 596.514 745.643 EXISTING DATA UKUR REALISASI
34.285 296.722 12.100 298.282 1.500 596.594 447.446
13.600 298.312 0.300 596.624 89.494
05+150.00
13.900 298.312 3.051 595.099 907.824
16.951 296.787 -4.067 593.567 -1,207.018
12.884 296.780 -1.901 593.286 -563.918
10.983 296.506 -1.698 592.891 -503.364
9.285 296.385 -8.845 592.768 -2,621.516
0.440 296.383 -0.440 592.771 -130.410
0.000 296.388 0.000 296.388 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 50.235

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+175.00 05+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-37.618 295.656 0.000 296.253 0.000 302.000
-32.418 295.713 0.000 296.253 -8.868 592.608 -2,627.624 301.000
-15.818 295.789 -8.868 296.355 -1.052 592.329 -311.565 300.000
-15.021 296.051 -9.920 295.974 -5.101 592.025 -1,509.960 299.000
-9.920 295.974 -15.021 296.051 -0.797 591.840 -235.848 298.000
-8.868 296.355 -15.818 295.789 -3.577 591.562 -1,058.009 297.000
0.000 296.253 -19.395 295.773 5.495 594.293 1,632.820 296.000
0.380 296.249 -13.900 298.520 0.300 597.040 89.556 295.000
9.225 296.385 -13.600 298.520 1.500 597.070 447.803 294.000
10.923 296.506 -12.100 298.550 2.500 597.150 746.438 293.000
12.824 296.780 -9.600 298.600 9.200 597.384 2,747.966
22.520 296.796 -0.400 298.784 0.250 597.571 74.696
31.323 296.725 -0.150 298.787 0.150 597.571 44.818
EXISTING DATA UKUR REALISASI
34.225 296.722 0.000 298.784 0.150 597.571 44.818
0.150 298.787 0.250 597.571 74.696
0.400 298.784 9.200 597.752 2,749.659
9.600 298.968 2.500 597.986 747.483
05+175.00
12.100 299.018 1.500 598.066 448.550
13.600 299.048 0.300 598.096 89.714
13.900 299.048 4.518 595.837 1,345.996
18.418 296.789 -5.594 593.569 -1,660.212
12.824 296.780 -1.901 593.286 -563.918
10.923 296.506 -1.698 592.891 -503.364
9.225 296.385 -8.845 592.634 -2,620.924
0.380 296.249 -0.380 592.502 -112.575
0.000 296.253 0.000 296.253 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 81.012

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+200.00 05+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-36.482 295.306 0.000 0.000 0.000 305.000
-33.334 294.941 0.000 295.628 0.000 303.000
-29.138 295.224 0.000 295.628 -10.938 591.359 -3,234.142
-28.687 295.668 -10.938 295.731 -0.545 591.822 -161.271 301.000
-14.088 295.611 -11.483 296.091 -1.852 592.081 -548.267
299.000
-13.335 295.990 -13.335 295.990 -0.753 591.601 -222.738
-11.483 296.091 -14.088 295.611 -6.934 591.249 -2,049.860 297.000
-10.938 295.731 -21.022 295.638 7.122 594.837 2,118.215
295.000
0.000 295.628 -13.900 299.199 0.300 598.398 89.760
0.310 295.625 -13.600 299.199 1.500 598.428 448.821 293.000
1.063 296.336 -12.100 299.229 2.500 598.508 748.135
20.160 296.318 -9.600 299.279 9.200 598.742 2,754.213
20.805 296.512 -0.400 299.463 0.250 598.929 74.866 EXISTING DATA UKUR REALISASI
29.807 296.740 -0.150 299.466 0.150 598.929 44.920
31.652 296.405 0.000 299.463 0.150 598.929 44.920
34.557 296.652 0.150 299.466 0.250 598.929 74.866
0.400 299.463 9.200 599.110 2,755.906
05+200.00
9.600 299.647 2.500 599.344 749.180
12.100 299.697 1.500 599.424 449.568
13.600 299.727 0.300 599.454 89.918
13.900 299.727 6.608 596.150 1,969.680
20.508 296.423 -0.348 592.741 -103.137
20.160 296.318 -19.097 592.654 -5,658.957
1.063 296.336 -0.753 591.961 -222.873
0.310 295.625 -0.310 591.253 -91.644
0.000 295.628 0.000 295.628 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 120.077

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+225.00 05+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-39.207 292.635 0.000 294.770 0.000
-34.761 292.754 0.000 294.770 -23.748 589.667 -7,001.706
-32.913 292.870 -23.748 294.897 9.848 594.718 2,928.391
304.000
-29.414 294.823 -13.900 299.821 0.300 599.642 89.946
-27.011 293.954 -13.600 299.821 1.500 599.672 449.754 302.000
-25.408 294.906 -12.100 299.851 2.500 599.752 749.690 300.000
0.000 294.770 -9.600 299.901 9.200 599.986 2,759.936 298.000
0.240 294.769 -0.400 300.085 0.250 600.173 75.022
296.000
2.639 295.185 -0.150 300.088 0.150 600.173 45.013
14.486 295.274 0.000 300.085 0.150 600.173 45.013 294.000
15.233 294.900 0.150 300.088 0.250 600.173 75.022 292.000
16.035 295.439 0.400 300.085 9.200 600.354 2,761.628 290.000
24.431 295.370 9.600 300.269 2.500 600.588 750.735
26.985 296.029 12.100 300.319 1.500 600.668 450.501
28.436 296.023 13.600 300.349 0.300 600.698 90.105
EXISTING DATA UKUR REALISASI
32.731 295.992 13.900 300.349 9.948 595.724 2,963.131
40.633 296.106 23.848 295.375 -7.813 590.814 -2,308.015
05+225.00
16.035 295.439 -0.802 590.339 -236.726
15.233 294.900 -0.747 590.174 -220.430
14.486 295.274 -11.847 590.459 -3,497.584
2.639 295.185 -2.399 589.954 -707.650
0.240 294.769 -0.240 589.539 -70.745
0.000 294.770 0.000 294.770 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 191.032

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+250.00 05+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 294.803 0.000
0.000 294.803 -3.935 589.670 -1,160.176
-3.935 294.867 -1.055 589.076 -310.738
-45.441 292.647 -4.990 294.209 -15.801 588.429 -4,648.883
-36.942 292.635 -20.791 294.220 -2.698 587.110 -792.011
-28.038 292.676 -23.489 292.890 -4.352 585.998 -1,275.132 304.000
-27.841 293.108 -27.841 293.108 -0.197 585.784 -57.700 302.000
-23.489 292.890 -28.038 292.676 -3.368 585.336 -985.706
300.000
-20.791 294.220 -31.406 292.660 3.806 587.236 1,117.510
-4.990 294.209 -27.600 294.576 2.000 589.112 589.112 298.000
-3.935 294.867 -25.600 294.536 11.700 594.922 3,480.294 296.000
0.000 294.803 -13.900 300.386 0.300 600.772 90.116 294.000
0.160 294.800 -13.600 300.386 1.500 600.802 450.602
292.000
18.911 294.816 -12.100 300.416 2.500 600.882 751.103
22.715 295.147 -9.600 300.466 9.200 601.116 2,765.134 290.000
23.467 295.620 -0.400 300.650 0.250 601.303 75.163
32.821 295.500 -0.150 300.653 0.150 601.303 45.098
35.822 295.380 0.000 300.650 0.150 601.303 45.098 EXISTING DATA UKUR REALISASI
0.150 300.653 0.250 601.303 75.163
0.400 300.650 9.200 601.484 2,766.826
05+250.00
9.600 300.834 2.500 601.718 752.148
12.100 300.884 1.500 601.798 451.349
13.600 300.914 0.300 601.828 90.274
13.900 300.914 10.615 596.521 3,166.035
24.515 295.607 -1.048 591.227 -309.803
23.467 295.620 -0.752 590.767 -222.128
22.715 295.147 -3.804 589.963 -1,122.110
18.911 294.816 -18.751 589.616 -5,527.945
0.160 294.800 -0.160 589.603 -47.168
0.000 294.803 0.000 294.803 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 251.523

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+275.00 05+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 293.649 0.000
-41.628 290.370 0.000 293.649 -2.385 586.564 -699.478 304.000
-39.377 290.463 -2.385 292.915 -17.705 585.751 -5,185.361
302.000
-38.378 291.209 -20.090 292.836 -0.845 584.897 -247.119
-30.128 291.127 -20.935 292.061 -7.847 584.389 -2,292.850 300.000
-28.782 292.328 -28.782 292.328 -1.346 583.455 -392.665 298.000
-20.935 292.061 -30.128 291.127 -5.228 582.306 -1,522.148 296.000
-20.090 292.836 -35.356 291.179 7.756 586.262 2,273.524
294.000
-2.385 292.915 -27.600 295.083 2.000 590.126 590.126
0.000 293.649 -25.600 295.043 11.700 595.936 3,486.226 292.000
0.070 293.671 -13.900 300.893 0.300 601.786 90.268 290.000
6.220 293.764 -13.600 300.893 1.500 601.816 451.362
7.715 295.181 -12.100 300.923 2.500 601.896 752.370
18.765 295.127 -9.600 300.973 9.200 602.130 2,769.798 EXISTING DATA UKUR REALISASI
21.963 295.690 -0.400 301.157 0.250 602.317 75.290
27.961 295.620 -0.150 301.160 0.150 602.317 45.174
33.106 295.728 0.000 301.157 0.150 602.317 45.174
38.155 295.635 0.150 301.160 0.250 602.317 75.290
05+275.00
0.400 301.157 9.200 602.498 2,771.491
9.600 301.341 2.500 602.732 753.415
12.100 301.391 1.500 602.812 452.109
13.600 301.421 0.300 602.842 90.426
13.900 301.421 11.543 597.070 3,445.990
25.443 295.649 -3.480 591.339 -1,028.930
21.963 295.690 -3.198 590.817 -944.716
18.765 295.127 -11.050 590.308 -3,261.452
7.715 295.181 -1.495 588.945 -440.236
6.220 293.764 -6.150 587.435 -1,806.363
0.070 293.671 -0.070 587.320 -20.556
0.000 293.649 0.000 293.649 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 326.157

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+300.00 05+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 292.681 -0.020 585.361 -5.854
-42.175 289.407 -0.020 292.680 -5.952 585.171 -1,741.469 305.000
-41.880 289.364 -5.972 292.491 -0.603 584.965 -176.367 303.000
-40.078 290.059 -6.575 292.474 -7.348 584.579 -2,147.743 301.000
-37.629 291.611 -13.923 292.105 -0.401 583.734 -117.039 299.000
297.000
-33.883 291.301 -14.324 291.629 -11.405 582.892 -3,323.942
295.000
-33.078 290.838 -25.729 291.263 -0.753 581.593 -218.970
293.000
-26.482 290.330 -26.482 290.330 -6.596 581.168 -1,916.692
291.000
-25.729 291.263 -33.078 290.838 -0.805 582.139 -234.311 289.000
-14.324 291.629 -33.883 291.301 -1.880 582.727 -547.763 287.000
-13.923 292.105 -35.763 291.426 8.163 586.960 2,395.677 285.000
-6.575 292.474 -27.600 295.534 2.000 591.028 591.028
-5.972 292.491 -25.600 295.494 11.700 596.838 3,491.502
-0.020 292.680 -13.900 301.344 0.300 602.688 90.403
EXISTING DATA UKUR REALISASI
0.000 292.681 -13.600 301.344 1.500 602.718 452.039
2.031 292.774 -12.100 301.374 2.500 602.798 753.498
3.330 293.339 -9.600 301.424 9.200 603.032 2,773.947
11.831 293.354 -0.400 301.608 0.250 603.219 75.402
05+300.00
20.533 293.346 -0.150 301.611 0.150 603.219 45.241
21.580 293.883 0.000 301.608 0.150 603.219 45.241
31.631 294.012 0.150 301.611 0.250 603.219 75.402
32.528 294.141 0.400 301.608 9.200 603.400 2,775.640
33.280 294.647 9.600 301.792 2.500 603.634 754.543
35.827 294.587 12.100 301.842 1.500 603.714 452.786
13.600 301.872 0.300 603.744 90.562
13.900 301.872 11.700 597.894 3,497.680
25.600 296.022 2.000 592.084 592.084
27.600 296.062 4.116 590.053 1,214.329
31.716 293.991 -0.085 588.003 -24.990
31.631 294.012 -10.051 587.895 -2,954.466
21.580 293.883 -1.047 587.229 -307.414
20.533 293.346 -8.702 586.700 -2,552.732
11.831 293.354 -8.501 586.693 -2,493.739
3.330 293.339 -1.299 586.113 -380.680
2.031 292.774 -2.031 585.455 -594.530
0.000 292.681 0.000 292.681 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 428.304

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR c


STA. 05+303.37 05+303.37
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-42.175 289.407 0.000 0.000 0.000 305.000
-41.880 289.364 0.000 0.000 0.000 303.000
-40.078 290.059 0.000 294.593 0.000 301.000
-37.629 291.611 0.000 294.593 -9.600 589.186 -2,828.093
299.000
-33.883 291.301 -9.600 294.593 -2.500 589.186 -736.483
297.000
-33.078 290.838 -12.100 294.593 -1.500 589.186 -441.890
-26.482 290.330 -13.600 294.593 -2.200 589.186 -648.105 295.000
-25.729 291.263 -15.800 294.593 0.000 595.949 0.000 293.000
-15.800 294.593 -15.800 301.356 2.200 602.756 663.032 291.000
-13.600 294.593 -13.600 301.400 1.500 602.830 452.123
289.000
-12.100 294.593 -12.100 301.430 2.500 602.910 753.638
287.000
-9.600 294.593 -9.600 301.480 9.200 603.144 2,774.462
0.000 294.593 -0.400 301.664 0.250 603.331 75.416 285.000
9.600 294.593 -0.150 301.667 0.150 603.331 45.250
12.100 294.593 0.000 301.664 0.150 603.331 45.250
13.600 294.593 0.150 301.667 0.250 603.331 75.416
15.800 294.593 0.400 301.664 9.200 603.512 2,776.155 EXISTING DATA UKUR REALISASI
20.533 293.346 9.600 301.848 2.500 603.746 754.683
21.580 293.883 12.100 301.898 1.500 603.826 452.870
31.631 294.012 13.600 301.928 2.200 603.900 664.290
32.528 294.141 15.800 301.972 0.000 596.565 0.000
05+303.37
33.280 294.647 15.800 294.593 -2.200 589.186 -648.105
35.827 294.587 13.600 294.593 -1.500 589.186 -441.890
12.100 294.593 -2.500 589.186 -736.483
9.600 294.593 -9.600 589.186 -2,828.093
0.000 294.593 0.000 294.593 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 223.445

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+325.00 05+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
296.000
0.000 0.000 0.000
0.000 0.000 0.000 295.000
-40.771 290.754 0.000 0.000 0.000
-36.573 290.911 0.000 0.000 0.000 294.000
-34.221 291.713 0.000 0.000 0.000 293.000
-19.275 292.188 0.000 0.000 0.000
-18.371 292.676 0.000 0.000 0.000 292.000
-5.770 293.345 0.000 0.000 0.000
291.000
-5.471 293.166 0.000 0.000 0.000
-0.120 293.113 0.000 0.000 0.000 290.000
0.000 293.157 0.000 0.000 0.000
1.779 293.814 0.000 0.000 0.000
10.024 293.628 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
10.419 294.598 0.000 0.000 0.000
21.021 294.384 0.000 0.000 0.000
21.918 295.518 0.000 0.000 0.000
31.665 295.444 0.000 0.000 0.000
05+325.00
35.217 295.492 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 0.000

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+344.32 05+344.32
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-37.242 295.316 0.000 0.000 0.000 304.000
-33.091 294.001 0.000 0.000 0.000
302.000
-29.887 292.797 0.000 0.000 0.000
-22.483 292.901 0.000 0.000 0.000 300.000
-15.800 295.195 0.000 0.000 0.000 298.000
-13.600 295.195 0.000 295.195 0.000 296.000
-12.100 295.195 0.000 295.195 -9.600 590.390 -2,833.872
294.000
-9.600 295.195 -9.600 295.195 -2.500 590.390 -737.988
0.000 295.195 -12.100 295.195 -1.500 590.390 -442.793 292.000
9.600 295.195 -13.600 295.195 -2.200 590.390 -649.429 290.000
12.100 295.195 -15.800 295.195 0.000 590.390 0.000
13.600 295.195 -15.800 295.195 0.000 597.152 0.000
15.800 295.195 -15.800 301.957 2.200 603.958 664.354 EXISTING DATA UKUR REALISASI
20.911 294.454 -13.600 302.001 1.500 604.032 453.024
24.860 294.834 -12.100 302.031 2.500 604.112 755.140
25.609 294.534 -9.600 302.081 9.200 604.346 2,779.992
29.957 295.515 -0.400 302.265 0.250 604.533 75.567
32.212 295.517 -0.150 302.268 0.150 604.533 45.340
34.716 295.606 0.000 302.265 0.150 604.533 45.340
0.150 302.268 0.250 604.533 75.567
05+344.32
0.400 302.265 9.200 604.714 2,781.684
9.600 302.449 2.500 604.948 756.185
12.100 302.499 1.500 605.028 453.771
13.600 302.529 2.200 605.102 665.612
15.800 302.573 0.000 597.768 0.000
15.800 295.195 -2.200 590.390 -649.429
13.600 295.195 -1.500 590.390 -442.793
12.100 295.195 -2.500 590.390 -737.988
9.600 295.195 -9.600 590.390 -2,833.872
0.000 295.195 0.000 295.195 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 223.413

DISETUJUI OLEH, DIPERIKSA OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. KONSULTAN SUPERVISI SUB KONTRAKTOR
PT. VIRAMA KARYA PT. GORGA MARGA MANDIRI

……………………… …………………………….. ……………………….


Quantity Officer Inspector Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+350.00 05+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-37.242 295.316 0.000 0.000 0.000
-33.091 294.001 0.000 293.181 0.000
-29.887 292.797 0.000 293.181 -0.230 586.337 -67.429 304.000
-22.483 292.901 -0.230 293.156 -5.505 585.235 -1,610.859 302.000
-13.035 291.834 -5.735 292.079 -1.047 584.510 -305.991 300.000
-6.782 292.431 -6.782 292.431 -6.253 584.265 -1,826.705
298.000
-5.735 292.079 -13.035 291.834 -9.448 584.735 -2,762.288
-0.230 293.156 -22.483 292.901 -7.404 585.698 -2,168.254 296.000
0.000 293.181 -29.887 292.797 -2.658 586.572 -779.554 294.000
4.020 293.615 -32.545 293.775 4.945 590.039 1,458.871 292.000
11.666 293.555 -27.600 296.264 2.000 592.488 592.488
290.000
12.412 294.465 -25.600 296.224 11.700 598.298 3,500.043
20.911 294.454 -13.900 302.074 0.300 604.148 90.622
24.860 294.534 -13.600 302.074 1.500 604.178 453.134
EXISTING DATA UKUR REALISASI
25.609 294.834 -12.100 302.104 2.500 604.258 755.323
29.957 295.515 -9.600 302.154 9.200 604.492 2,780.663
32.212 295.517 -0.400 302.338 0.250 604.679 75.585
05+350.00
34.716 295.606 -0.150 302.341 0.150 604.679 45.351
0.000 302.338 0.150 604.679 45.351
0.150 302.341 0.250 604.679 75.585
0.400 302.338 9.200 604.860 2,782.356
9.600 302.522 2.500 605.094 756.368
12.100 302.572 1.500 605.174 453.881
13.600 302.602 0.300 605.204 90.781
13.900 302.602 11.700 599.354 3,506.221
25.600 296.752 2.000 593.544 593.544
27.600 296.792 2.537 592.307 751.341
30.137 295.515 -0.180 591.030 -53.193
29.957 295.515 -4.348 590.049 -1,282.767
25.609 294.534 -0.749 589.368 -220.718
24.860 294.834 -3.949 589.288 -1,163.549
20.911 294.454 -8.499 588.919 -2,502.611
12.412 294.465 -0.746 588.020 -219.331
11.666 293.555 -7.646 587.170 -2,244.751
4.020 293.615 -4.020 586.796 -1,179.460
0.000 293.181 0.000 293.181 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 420.046

DISETUJUI OLEH, DIPERIKSA OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. KONSULTAN SUPERVISI SUB KONTRAKTOR
PT. VIRAMA KARYA PT. GORGA MARGA MANDIRI

……………………… …………………………….. ……………………….


Quantity Officer Inspector Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+375.00 05+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-32.549 295.310 0.000 296.173 0.000
-32.097 295.773 0.000 296.173 -0.340 592.307 -100.692
-29.092 295.776 -0.340 296.134 -18.901 592.474 -5,599.176
-19.645 295.815 -19.241 296.340 -0.404 592.155 -119.615 304.000
-19.241 296.340 -19.645 295.815 -9.447 591.591 -2,794.380 302.000
-0.340 296.134 -29.092 295.776 -0.032 591.552 -9.465
300.000
0.000 296.173 -29.124 295.776 1.524 592.319 451.347
3.114 296.528 -27.600 296.543 2.000 593.046 593.046 298.000
6.364 294.345 -25.600 296.503 11.700 598.856 3,503.308 296.000
24.509 294.481 -13.900 302.353 0.300 604.706 90.706 294.000
26.055 294.112 -13.600 302.353 1.500 604.736 453.552
292.000
29.005 294.841 -12.100 302.383 2.500 604.816 756.020
31.952 294.793 -9.600 302.433 9.200 605.050 2,783.230 290.000
35.099 294.839 -0.400 302.617 0.250 605.237 75.655
-0.150 302.620 0.150 605.237 45.393
0.000 302.617 0.150 605.237 45.393 EXISTING DATA UKUR REALISASI
0.150 302.620 0.250 605.237 75.655
0.400 302.617 9.200 605.418 2,784.923
05+375.00
9.600 302.801 2.500 605.652 757.065
12.100 302.851 1.500 605.732 454.299
13.600 302.881 0.300 605.762 90.864
13.900 302.881 11.700 599.912 3,509.485
25.600 297.031 2.000 594.102 594.102
27.600 297.071 4.521 591.866 1,337.913
32.121 294.795 -0.169 589.588 -49.820
31.952 294.793 -2.947 589.634 -868.826
29.005 294.841 -2.950 588.953 -868.706
26.055 294.112 -1.546 588.593 -454.982
24.509 294.481 -18.145 588.826 -5,342.124
6.364 294.345 -3.250 590.873 -960.169
3.114 296.528 -3.114 592.701 -922.835
0.000 296.173 0.000 296.173 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 311.165

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+400.00 05+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.245 0.000
-31.272 296.450 0.000 297.245 -0.460 594.444 -136.722
304.000
-27.567 296.411 -0.460 297.199 -2.704 594.632 -803.942
303.000
-24.363 296.939 -3.164 297.433 -0.396 594.251 -117.662
302.000
-12.910 296.767 -3.560 296.818 -9.350 593.585 -2,775.010
-3.560 296.818 -12.910 296.767 -11.453 593.706 -3,399.857 301.000
-3.164 297.433 -24.363 296.939 -1.222 593.673 -362.734 300.000
-0.460 297.199 -25.585 296.734 11.685 599.310 3,501.469 299.000
0.000 297.245 -13.900 302.576 0.300 605.152 90.773 298.000
4.844 297.731 -13.600 302.576 1.500 605.182 453.887 297.000
22.441 297.750 -12.100 302.606 2.500 605.262 756.578 296.000
24.090 296.360 -9.600 302.656 9.200 605.496 2,785.282 295.000
27.989 296.421 -0.400 302.840 0.250 605.683 75.710
30.539 297.511 -0.150 302.843 0.150 605.683 45.426
34.742 296.711 0.000 302.840 0.150 605.683 45.426 EXISTING DATA UKUR REALISASI
0.150 302.843 0.250 605.683 75.710
0.400 302.840 9.200 605.864 2,786.974
9.600 303.024 2.500 606.098 757.623
05+400.00
12.100 303.074 1.500 606.178 454.634
13.600 303.104 0.300 606.208 90.931
13.900 303.104 11.700 600.358 3,512.094
25.600 297.254 2.000 594.548 594.548
27.600 297.294 1.145 594.012 340.072
28.745 296.718 -0.756 593.139 -224.207
27.989 296.421 -3.899 592.781 -1,155.627
24.090 296.360 -1.649 594.110 -489.844
22.441 297.750 -17.597 595.481 -5,239.340
4.844 297.731 -4.844 594.976 -1,441.032
0.000 297.245 0.000 297.245 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 221.160

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+425.00 05+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.431 0.000
-32.538 296.421 0.000 297.431 -0.580 594.863 -172.510
305.000
-29.338 296.284 -0.580 297.432 -2.253 594.387 -669.577
304.000
-25.535 296.277 -2.833 296.955 -9.950 594.139 -2,955.842
303.000
-25.084 296.925 -12.783 297.184 -0.401 593.927 -119.082 302.000
-13.184 296.743 -13.184 296.743 -9.422 593.630 -2,796.591 301.000
-12.783 297.184 -22.606 296.887 8.706 599.628 2,610.181 300.000
-2.833 296.955 -13.900 302.741 0.300 605.482 90.822 299.000
-0.580 297.432 -13.600 302.741 1.500 605.512 454.134 298.000
0.000 297.431 -12.100 302.771 2.500 605.592 756.990 297.000
7.168 297.416 -9.600 302.821 9.200 605.826 2,786.800 296.000
7.265 297.437 -0.400 303.005 0.250 606.013 75.752 295.000
7.611 297.876 -0.150 303.008 0.150 606.013 45.451
21.360 297.656 0.000 303.005 0.150 606.013 45.451
21.858 297.649 0.150 303.008 0.250 606.013 75.752 EXISTING DATA UKUR REALISASI
26.057 298.359 0.400 303.005 9.200 606.194 2,788.492
31.559 298.119 9.600 303.189 2.500 606.428 758.035
34.005 298.202 12.100 303.239 1.500 606.508 454.881
05+425.00
13.600 303.269 0.300 606.538 90.981
13.900 303.269 10.411 601.333 3,130.239
24.311 298.064 -2.453 595.713 -730.642
21.858 297.649 -0.498 595.305 -148.231
21.360 297.656 -13.749 595.532 -4,093.985
7.611 297.876 -0.346 595.313 -102.989
7.265 297.437 -0.097 594.853 -28.850
7.168 297.416 -7.168 594.847 -2,131.932
0.000 297.431 0.000 297.431 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 213.7289

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+450.00 05+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.250 296.055 0.000 296.965 0.000
-31.454 295.973 0.000 296.965 -0.710 593.915 -210.840
305.000
-28.553 296.003 -0.710 296.950 -4.096 594.126 -1,216.770
304.000
-28.004 296.409 -4.806 297.176 -0.249 593.898 -73.940
303.000
-18.901 296.920 -5.055 296.722 -13.846 593.642 -4,109.784
302.000
-5.055 296.722 -18.901 296.920 -4.171 593.605 -1,237.963 301.000
-4.806 297.176 -23.072 296.685 9.172 599.535 2,749.468 300.000
-0.710 296.950 -13.900 302.850 0.300 605.700 90.855 299.000
0.000 296.965 -13.600 302.850 1.500 605.730 454.298 298.000
5.642 297.081 -12.100 302.880 2.500 605.810 757.263 297.000
6.138 297.759 -9.600 302.930 9.200 606.044 2,787.802 296.000
15.588 297.547 -0.400 303.114 0.250 606.231 75.779 295.000
15.888 297.970 -0.150 303.117 0.150 606.231 45.467
25.033 297.753 0.000 303.114 0.150 606.231 45.467
25.236 298.206 0.150 303.117 0.250 606.231 75.779 EXISTING DATA UKUR REALISASI
31.283 298.002 0.400 303.114 9.200 606.412 2,789.495
34.333 298.027 9.600 303.298 2.500 606.646 758.308
12.100 303.348 1.500 606.726 455.045
05+450.00
13.600 303.378 0.300 606.756 91.013
13.900 303.378 11.155 601.179 3,353.076
25.055 297.801 -0.022 595.554 -6.551
25.033 297.753 -9.145 595.723 -2,723.943
15.888 297.970 -0.300 595.517 -89.328
15.588 297.547 -9.450 595.306 -2,812.821
6.138 297.759 -0.496 594.840 -147.520
5.642 297.081 -5.642 594.046 -1,675.804
0.000 296.965 0.000 296.965 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 223.850

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+475.00 05+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 296.825 0.000
-32.850 295.430 0.000 296.825 -0.850 593.661 -252.306
305.000
-29.205 295.432 -0.850 296.836 -6.353 593.473 -1,885.167
304.000
-23.755 295.411 -7.203 296.637 -0.151 592.961 -44.769
303.000
-23.401 296.215 -7.354 296.324 -4.755 592.647 -1,409.018
302.000
-12.304 296.144 -12.109 296.323 -0.195 592.467 -57.766 301.000
-12.109 296.323 -12.304 296.144 -11.097 592.359 -3,286.704 300.000
-7.354 296.324 -23.401 296.215 -0.354 591.626 -104.718 299.000
-7.203 296.637 -23.755 295.411 -3.399 590.835 -1,004.124 298.000
-0.850 296.836 -27.154 295.424 2.554 592.551 756.688 297.000
0.000 296.825 -24.600 297.127 2.000 594.214 594.214 296.000
8.402 296.720 -22.600 297.087 8.700 600.024 2,610.104 295.000
8.756 297.210 -13.900 302.937 0.300 605.874 90.881
14.831 297.301 -13.600 302.937 1.500 605.904 454.428
17.677 296.900 -12.100 302.967 2.500 605.984 757.480 EXISTING DATA UKUR REALISASI
19.030 297.863 -9.600 303.017 9.200 606.218 2,788.603
30.233 297.740 -0.400 303.201 0.250 606.405 75.801
35.880 297.631 -0.150 303.204 0.150 606.405 45.480
05+475.00
0.000 303.201 0.150 606.405 45.480
0.150 303.204 0.250 606.405 75.801
0.400 303.201 9.200 606.586 2,790.296
9.600 303.385 2.500 606.820 758.525
12.100 303.435 1.500 606.900 455.175
13.600 303.465 0.300 606.930 91.040
13.900 303.465 11.340 601.260 3,409.144
25.240 297.795 -6.210 595.658 -1,849.518
19.030 297.863 -1.353 594.763 -402.357
17.677 296.900 -2.846 594.201 -845.548
14.831 297.301 -6.075 594.511 -1,805.827
8.756 297.210 -0.354 593.930 -105.126
8.402 296.720 -8.402 593.545 -2,493.483
0.000 296.825 0.000 296.825 0.000
AREA ( M2 ) 252.710

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+500.00 05+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.297 293.983 0.000 295.620 -1.000 591.205 -295.603
-31.648 293.853 -1.000 295.585 -1.302 591.383 -384.990 304.000
-25.144 293.745 -2.302 295.798 -0.297 590.580 -87.701
302.000
-24.395 294.627 -2.599 294.782 -10.196 589.706 -3,006.321
-13.147 294.423 -12.795 294.924 -0.352 589.347 -103.725 300.000
-12.795 294.924 -13.147 294.423 -11.248 589.050 -3,312.817 298.000
-2.599 294.782 -24.395 294.627 -0.749 588.372 -220.345 296.000
-2.302 295.798 -25.144 293.745 -4.548 587.566 -1,336.125
294.000
-1.000 295.585 -29.692 293.821 5.092 591.036 1,504.778
0.000 295.620 -24.600 297.215 2.000 594.390 594.390 292.000
11.247 296.015 -22.600 297.175 8.700 600.200 2,610.870 290.000
12.692 296.583 -13.900 303.025 0.300 606.050 90.908
23.390 296.186 -13.600 303.025 1.500 606.080 454.560
23.692 296.952 -12.100 303.055 2.500 606.160 757.700 EXISTING DATA UKUR REALISASI
26.146 296.787 -9.600 303.105 9.200 606.394 2,789.412
29.394 296.762 -0.400 303.289 0.250 606.581 75.823
-0.150 303.292 0.150 606.581 45.494
0.000 303.289 0.150 606.581 45.494
05+500.00
0.150 303.292 0.250 606.581 75.823
0.400 303.289 9.200 606.762 2,791.105
9.600 303.473 2.500 606.996 758.745
12.100 303.523 1.500 607.076 455.307
13.600 303.553 0.300 607.106 91.066
13.900 303.553 8.700 601.256 2,615.464
22.600 297.703 2.000 595.446 595.446
24.600 297.743 1.421 594.528 422.412
26.021 296.785 -2.329 593.737 -691.407
23.692 296.952 -0.302 593.138 -89.564
23.390 296.186 -10.698 592.769 -3,170.721
12.692 296.583 -1.445 592.598 -428.152
11.247 296.015 -11.247 591.635 -3,327.059
0.000 295.620 0.000 295.620 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 320.2635

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+525.00 05+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-35.210 293.035 0.000 293.715 0.000
-33.509 292.691 0.000 293.715 -1.150 587.482 -337.802 304.000
-20.810 292.613 -1.150 293.767 -8.104 587.529 -2,380.668
302.000
-20.508 293.041 -9.254 293.762 -0.750 586.592 -219.972
-10.004 292.830 -10.004 292.830 -10.504 585.871 -3,076.994 300.000
-9.254 293.762 -20.508 293.041 -0.302 585.654 -88.434 298.000
-1.150 293.767 -20.810 292.613 -10.725 585.292 -3,138.628 296.000
0.000 293.715 -31.535 292.679 6.935 589.981 2,045.759
294.000
1.746 293.635 -24.600 297.302 2.000 594.564 594.564
2.595 294.810 -22.600 297.262 8.700 600.374 2,611.627 292.000
16.744 294.585 -13.900 303.112 0.300 606.224 90.934 290.000
25.497 294.859 -13.600 303.112 1.500 606.254 454.691
27.251 294.645 -12.100 303.142 2.500 606.334 757.918
30.055 294.689 -9.600 303.192 9.200 606.568 2,790.213 EXISTING DATA UKUR REALISASI
-0.400 303.376 0.250 606.755 75.844
-0.150 303.379 0.150 606.755 45.507
0.000 303.376 0.150 606.755 45.507
0.150 303.379 0.250 606.755 75.844
05+525.00
0.400 303.376 9.200 606.936 2,791.906
9.600 303.560 2.500 607.170 758.963
12.100 303.610 1.500 607.250 455.438
13.600 303.640 0.300 607.280 91.092
13.900 303.640 8.700 601.430 2,616.221
22.600 297.790 2.000 595.620 595.620
24.600 297.830 4.728 592.508 1,400.689
29.328 294.678 -2.077 589.323 -612.012
27.251 294.645 -1.754 589.504 -516.995
25.497 294.859 -8.753 589.444 -2,579.702
16.744 294.585 -14.149 589.395 -4,169.675
2.595 294.810 -0.849 588.445 -249.795
1.746 293.635 -1.746 587.350 -512.757
0.000 293.715 0.000 293.715 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 414.900

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+550.00 05+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.178 292.701 0.000 294.552 0.000
-32.178 292.819 0.000 294.552 -1.130 589.096 -332.839
-31.530 292.681 -1.130 294.544 -7.150 589.285 -2,106.694 304.000
-31.227 293.719 -8.280 294.741 -0.154 588.959 -45.350
302.000
-24.128 293.633 -8.434 294.218 -15.345 588.525 -4,515.458
-23.779 294.307 -23.779 294.307 -0.349 587.940 -102.596 300.000
-8.434 294.218 -24.128 293.633 -5.998 587.339 -1,761.430 298.000
-8.280 294.741 -30.126 293.706 5.526 591.096 1,633.198 296.000
-1.130 294.544 -24.600 297.390 2.000 594.740 594.740
294.000
0.000 294.552 -22.600 297.350 8.700 600.550 2,612.393
292.000
5.316 294.591 -13.900 303.200 0.300 606.400 90.960
5.917 295.189 -13.600 303.200 1.500 606.430 454.823 290.000
15.716 295.299 -12.100 303.230 2.500 606.510 758.138
18.269 294.686 -9.600 303.280 9.200 606.744 2,791.022
25.071 294.886 -0.400 303.464 0.250 606.931 75.866 EXISTING DATA UKUR REALISASI
26.820 294.810 -0.150 303.467 0.150 606.931 45.520
32.273 295.150 0.000 303.464 0.150 606.931 45.520
0.150 303.467 0.250 606.931 75.866
05+550.00
0.400 303.464 9.200 607.112 2,792.715
9.600 303.648 2.500 607.346 759.183
12.100 303.698 1.500 607.426 455.570
13.600 303.728 0.300 607.456 91.118
13.900 303.728 8.700 601.606 2,616.986
22.600 297.878 2.000 595.796 595.796
24.600 297.918 4.453 592.867 1,320.018
29.053 294.949 -2.233 589.759 -658.466
26.820 294.810 -1.749 589.696 -515.689
25.071 294.886 -6.802 589.572 -2,005.134
18.269 294.686 -2.553 589.985 -753.116
15.716 295.299 -9.799 590.488 -2,893.096
5.917 295.189 -0.601 589.780 -177.229
5.316 294.591 -5.316 589.143 -1,565.942
0.000 294.552 0.000 294.552 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 376.393

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+575.00 05+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-36.206 293.012 0.000 0.000 0.000
-31.606 293.033 0.000 294.815 0.000
-22.608 293.295 0.000 294.815 -0.009 589.623 -2.653 304.000
-15.859 293.790 -0.009 294.808 -1.451 589.343 -427.568
-4.560 293.635 -1.460 294.535 -2.601 589.304 -766.390 302.000
-4.061 294.769 -4.061 294.769 -0.499 588.404 -146.807 300.000
-1.460 294.535 -4.560 293.635 -11.299 587.425 -3,318.658
298.000
-0.009 294.808 -15.859 293.790 -6.749 587.085 -1,981.118
0.000 294.815 -22.608 293.295 -8.642 586.338 -2,533.566 296.000
0.289 295.027 -31.250 293.043 6.650 590.520 1,963.479
294.000
18.042 294.864 -24.600 297.477 2.000 594.914 594.914
18.745 295.890 -22.600 297.437 8.700 600.724 2,613.149 292.000
25.949 295.931 -13.900 303.287 0.300 606.574 90.986
29.945 295.918 -13.600 303.287 1.500 606.604 454.953
-12.100 303.317 2.500 606.684 758.355 EXISTING DATA UKUR REALISASI
-9.600 303.367 9.200 606.918 2,791.823
-0.400 303.551 0.250 607.105 75.888
-0.150 303.554 0.150 607.105 45.533
05+575.00
0.000 303.551 0.150 607.105 45.533
0.150 303.554 0.250 607.105 75.888
0.400 303.551 9.200 607.286 2,793.516
9.600 303.735 2.500 607.520 759.400
12.100 303.785 1.500 607.600 455.700
13.600 303.815 0.300 607.630 91.145
13.900 303.815 8.700 601.780 2,617.743
22.600 297.965 2.000 595.970 595.970
24.600 298.005 3.119 593.930 926.234
27.719 295.925 -1.770 591.856 -523.793
25.949 295.931 -7.204 591.821 -2,131.739
18.745 295.890 -0.703 590.754 -207.650
18.042 294.864 -17.753 589.891 -5,236.167
0.289 295.027 -0.289 589.842 -85.232
0.000 294.815 0.000 294.815 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 388.866

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+600.00 05+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-43.887 291.781 0.000 0.000 0.000
-35.533 291.801 0.000 0.000 0.000
-34.780 292.356 0.000 293.185 0.000 304.000
-27.480 292.116 0.000 293.185 -1.630 586.363 -477.886
302.000
-27.081 292.745 -1.630 293.178 -7.499 586.485 -2,199.026
-9.679 292.484 -9.129 293.307 -0.550 585.791 -161.093 300.000
-9.129 293.307 -9.679 292.484 -17.402 585.229 -5,092.078 298.000
-1.630 293.178 -27.081 292.745 -0.399 584.861 -116.680 296.000
0.000 293.185 -27.480 292.116 -5.045 584.398 -1,474.144
294.000
0.024 293.185 -32.525 292.282 7.925 589.847 2,337.269
292.000
0.972 293.572 -24.600 297.565 2.000 595.090 595.090
6.270 293.597 -22.600 297.525 8.700 600.900 2,613.915 290.000
15.566 294.143 -13.900 303.375 0.300 606.750 91.013
16.914 293.730 -13.600 303.375 1.500 606.780 455.085
17.409 295.049 -12.100 303.405 2.500 606.860 758.575 EXISTING DATA UKUR REALISASI
27.557 295.006 -9.600 303.455 9.200 607.094 2,792.632
33.187 294.949 -0.400 303.639 0.250 607.281 75.910
-0.150 303.642 0.150 607.281 45.546
05+600.00
0.000 303.639 0.150 607.281 45.546
0.150 303.642 0.250 607.281 75.910
0.400 303.639 9.200 607.462 2,794.325
9.600 303.823 2.500 607.696 759.620
12.100 303.873 1.500 607.776 455.832
13.600 303.903 0.300 607.806 91.171
13.900 303.903 8.700 601.956 2,618.509
22.600 298.053 2.000 596.146 596.146
24.600 298.093 4.656 593.082 1,380.695
29.256 294.989 -1.699 589.995 -501.201
27.557 295.006 -10.148 590.055 -2,993.939
17.409 295.049 -0.495 588.779 -145.723
16.914 293.730 -1.348 587.873 -396.226
15.566 294.143 -9.296 587.740 -2,731.816
6.270 293.597 -5.298 587.169 -1,555.411
0.972 293.572 -0.948 586.757 -278.123
0.024 293.185 -0.024 586.370 -7.036
0.000 293.185 0.000 293.185 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 452.409

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+625.00 05+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-43.290 290.616 0.000 0.000 0.000
-37.393 291.352 0.000 291.864 0.000
-24.294 291.393 0.000 291.864 -1.790 583.706 -522.417 305.000
-12.294 291.549 -1.790 291.842 -6.551 583.781 -1,912.175
-10.549 290.429 -8.341 291.939 -0.703 582.466 -204.737 300.000
-9.044 290.527 -9.044 290.527 -1.505 580.956 -437.169
-8.341 291.939 -10.549 290.429 -1.745 581.978 -507.776
295.000
-1.790 291.842 -12.294 291.549 -12.000 582.942 -3,497.652
0.000 291.864 -24.294 291.393 -9.740 582.756 -2,838.022
1.913 292.643 -34.034 291.363 9.434 589.015 2,778.384 290.000
2.362 291.895 -24.600 297.652 2.000 595.264 595.264
10.465 292.418 -22.600 297.612 8.700 601.074 2,614.672 285.000
10.869 293.197 -13.900 303.462 0.300 606.924 91.039
29.067 293.098 -13.600 303.462 1.500 606.954 455.216
30.414 294.195 -12.100 303.492 2.500 607.034 758.793 EXISTING DATA UKUR REALISASI
39.269 294.310 -9.600 303.542 9.200 607.268 2,793.433
-0.400 303.726 0.250 607.455 75.932
-0.150 303.729 0.150 607.455 45.559
05+625.00
0.000 303.726 0.150 607.455 45.559
0.150 303.729 0.250 607.455 75.932
0.400 303.726 9.200 607.636 2,795.126
9.600 303.910 2.500 607.870 759.838
12.100 303.960 1.500 607.950 455.963
13.600 303.990 0.300 607.980 91.197
13.900 303.990 8.700 602.130 2,619.266
22.600 298.140 2.000 596.320 596.320
24.600 298.180 5.974 592.377 1,769.430
30.574 294.197 -0.160 588.392 -47.071
30.414 294.195 -1.347 587.293 -395.542
29.067 293.098 -18.198 586.295 -5,334.698
10.869 293.197 -0.404 585.615 -118.294
10.465 292.418 -8.103 584.313 -2,367.344
2.362 291.895 -0.449 584.538 -131.229
1.913 292.643 -1.913 584.507 -559.081
0.000 291.864 0.000 291.864 0.000
AREA ( M2 ) 543.713

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+650.00 05+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.229 294.006 0.000 0.000 0.000
-27.730 293.528 0.000 0.000 0.000
304.000
-21.326 294.408 0.000 292.810 0.000
302.000
-8.777 294.382 0.000 292.810 -1.920 586.480 -563.021
-6.573 293.847 -1.920 293.670 -4.653 587.517 -1,366.858 300.000
-1.920 293.670 -6.573 293.847 -2.204 588.229 -648.228 298.000
0.000 292.810 -8.777 294.382 -12.549 588.790 -3,694.363
296.000
0.781 292.461 -21.326 294.408 -6.404 587.936 -1,882.571
294.000
19.077 292.297 -27.730 293.528 -2.871 587.267 -843.022
23.522 292.796 -30.601 293.739 6.001 591.479 1,774.733 292.000
23.723 291.774 -24.600 297.740 2.000 595.440 595.440 290.000
29.119 291.791 -22.600 297.700 8.700 601.250 2,615.438
29.917 293.414 -13.900 303.550 0.300 607.100 91.065
36.664 293.253 -13.600 303.550 1.500 607.130 455.348 EXISTING DATA UKUR REALISASI
-12.100 303.580 2.500 607.210 759.013
-9.600 303.630 9.200 607.444 2,794.242
-0.400 303.814 0.250 607.631 75.954
-0.150 303.817 0.150 607.631 45.572
05+650.00
0.000 303.814 0.150 607.631 45.572
0.150 303.817 0.250 607.631 75.954
0.400 303.814 9.200 607.812 2,795.935
9.600 303.998 2.500 608.046 760.058
12.100 304.048 1.500 608.126 456.095
13.600 304.078 0.300 608.156 91.223
13.900 304.078 8.700 602.306 2,620.031
22.600 298.228 2.000 596.496 596.496
24.600 298.268 7.354 591.633 2,175.435
31.954 293.365 -2.037 586.779 -597.634
29.917 293.414 -0.798 585.205 -233.497
29.119 291.791 -5.396 583.565 -1,574.458
23.723 291.774 -0.201 584.570 -58.749
23.522 292.796 -4.445 585.093 -1,300.369
19.077 292.297 -18.296 584.758 -5,349.366
0.781 292.461 -0.781 585.271 -228.548
0.000 292.810 0.000 292.810 0.000
AREA ( M2 ) 482.917

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+675.00 05+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-33.496 291.907 0.000 0.000 0.000
-30.797 292.444 0.000 292.930 0.000
-27.450 292.541 0.000 292.930 -1.960 585.869 -574.152 304.000
-12.055 292.972 -1.960 292.939 -10.095 585.911 -2,957.386
302.000
-1.960 292.939 -12.055 292.972 -15.395 585.513 -4,506.986
0.000 292.930 -27.450 292.541 -3.347 584.985 -978.972 300.000
1.939 292.922 -30.797 292.444 -2.676 584.356 -781.868 298.000
2.536 293.289 -33.473 291.912 8.873 589.739 2,616.377 296.000
6.341 293.293 -24.600 297.827 2.000 595.614 595.614
294.000
6.844 293.680 -22.600 297.787 8.700 601.424 2,616.194
292.000
11.894 293.751 -13.900 303.637 0.300 607.274 91.091
12.498 294.301 -13.600 303.637 1.500 607.304 455.478 290.000
27.851 294.250 -12.100 303.667 2.500 607.384 759.230
33.900 294.588 -9.600 303.717 9.200 607.618 2,795.043
-0.400 303.901 0.250 607.805 75.976 EXISTING DATA UKUR REALISASI
-0.150 303.904 0.150 607.805 45.585
0.000 303.901 0.150 607.805 45.585
0.150 303.904 0.250 607.805 75.976
05+675.00
0.400 303.901 9.200 607.986 2,796.736
9.600 304.085 2.500 608.220 760.275
12.100 304.135 1.500 608.300 456.225
13.600 304.165 0.300 608.330 91.250
13.900 304.165 8.700 602.480 2,620.788
22.600 298.315 2.000 596.670 596.670
24.600 298.355 5.933 592.755 1,758.408
30.533 294.400 -2.682 588.650 -789.380
27.851 294.250 -15.353 588.551 -4,518.012
12.498 294.301 -0.604 588.052 -177.592
11.894 293.751 -5.050 587.431 -1,483.263
6.844 293.680 -0.503 586.973 -147.624
6.341 293.293 -3.805 586.582 -1,115.972
2.536 293.289 -0.597 586.211 -174.984
1.939 292.922 -1.939 585.852 -567.984
0.000 292.930 0.000 292.930 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 478.326

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+700.00 05+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.384 0.000
0.000 297.384 -1.880 594.861 -559.169
-36.637 293.741 -1.880 297.477 -2.502 593.858 -742.916
-33.036 293.597 -4.382 296.381 -4.097 592.460 -1,213.654
305.000
-29.583 294.057 -8.479 296.079 -3.053 591.070 -902.268
-29.031 294.433 -11.532 294.991 -11.654 590.060 -3,438.280
300.000
-24.232 294.524 -23.186 295.069 -1.046 589.593 -308.357
-23.186 295.069 -24.232 294.524 -4.799 588.957 -1,413.202 295.000
-11.532 294.991 -29.031 294.433 -0.552 588.490 -162.423
-8.479 296.079 -29.583 294.057 -1.005 587.980 -295.460 290.000
-4.382 296.381 -30.588 293.923 5.988 591.838 1,771.963
-1.880 297.477 -24.600 297.915 2.000 595.790 595.790 285.000
0.000 297.384 -22.600 297.875 8.700 601.600 2,616.960
10.466 296.869 -13.900 303.725 0.300 607.450 91.118 280.000
11.264 296.928 -13.600 303.725 1.500 607.480 455.610
23.217 296.779 -12.100 303.755 2.500 607.560 759.450
30.414 294.195 -9.600 303.805 9.200 607.794 2,795.852 EXISTING DATA UKUR REALISASI
39.269 294.310 -0.400 303.989 0.250 607.981 75.998
-0.150 303.992 0.150 607.981 45.599
0.000 303.989 0.150 607.981 45.599
05+700.00
0.150 303.992 0.250 607.981 75.998
0.400 303.989 9.200 608.162 2,797.545
9.600 304.173 2.500 608.396 760.495
12.100 304.223 1.500 608.476 456.357
13.600 304.253 0.300 608.506 91.276
13.900 304.253 8.700 602.656 2,621.554
22.600 298.403 2.000 596.846 596.846
24.600 298.443 6.361 592.645 1,884.907
30.961 294.202 -0.547 588.397 -160.927
30.414 294.195 -7.197 590.974 -2,126.620
23.217 296.779 -11.953 593.707 -3,548.290
11.264 296.928 -0.798 593.797 -236.925
10.466 296.869 -10.466 594.253 -3,109.726
0.000 297.384 0.000 297.384 0.000
AREA ( M2 ) 320.697

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+725.00 05+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-45.626 296.066 0.000 298.876 0.000
-36.574 296.608 0.000 298.876 -1.630 597.555 -487.007 309.000
-24.677 297.405 -1.630 298.679 -6.801 597.534 -2,031.914
307.000
-17.729 298.178 -8.431 298.855 -9.298 597.033 -2,775.606
-8.431 298.855 -17.729 298.178 -6.948 595.583 -2,069.055 305.000
-1.630 298.679 -24.677 297.405 -4.740 594.492 -1,408.946 303.000
0.000 298.876 -29.417 297.087 1.817 595.089 540.638 301.000
3.119 299.252 -27.600 298.002 2.000 595.964 595.964
299.000
14.671 299.647 -25.600 297.962 11.700 601.774 3,520.378
297.000
15.169 300.336 -13.900 303.812 0.300 607.624 91.144
25.019 300.726 -13.600 303.812 1.500 607.654 455.741 295.000
29.723 300.696 -12.100 303.842 2.500 607.734 759.668
-9.600 303.892 9.200 607.968 2,796.653
-0.400 304.076 0.250 608.155 76.019 EXISTING DATA UKUR REALISASI
-0.150 304.079 0.150 608.155 45.612
0.000 304.076 0.150 608.155 45.612
0.150 304.079 0.250 608.155 76.019
05+725.00
0.400 304.076 9.200 608.277 2,798.074
9.600 304.201 2.500 608.436 760.545
12.100 304.235 1.500 608.491 456.368
13.600 304.256 0.300 608.512 91.277
13.900 304.256 7.357 604.833 2,224.878
21.257 300.577 -6.088 600.913 -1,829.179
15.169 300.336 -0.498 599.983 -149.396
14.671 299.647 -11.552 598.899 -3,459.241
3.119 299.252 -3.119 598.128 -932.781
0.000 298.876 0.000 298.876 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 191.463

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+750.00 05+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-43.497 298.598 0.000 300.261 0.000
-36.774 299.175 0.000 300.261 -1.250 600.521 -375.326
-25.792 299.620 -1.250 300.260 -4.396 600.661 -1,320.253 309.000
-20.290 299.549 -5.646 300.401 -0.747 600.271 -224.201
-19.943 299.880 -6.393 299.870 -4.102 599.767 -1,230.122 307.000
-10.495 299.897 -10.495 299.897 -9.448 599.777 -2,833.347
-6.393 299.870 -19.943 299.880 -0.347 599.429 -104.001 305.000
-5.646 300.401 -20.290 299.549 -2.254 599.127 -675.216
-1.250 300.260 -22.544 299.578 8.644 603.478 2,608.232 303.000
0.000 300.261 -13.900 303.900 0.300 607.800 91.170
9.399 300.265 -13.600 303.900 1.500 607.830 455.873 301.000
10.103 300.893 -12.100 303.930 2.500 607.910 759.888
28.505 300.815 -9.600 303.980 9.200 608.144 2,797.462 299.000
29.454 301.640 -0.400 304.164 0.250 608.331 76.041
34.203 301.494 -0.150 304.167 0.150 608.331 45.625 297.000
37.505 301.529 0.000 304.164 0.150 608.331 45.625
41.105 301.650 0.150 304.167 0.250 608.331 76.041 295.000
0.400 304.164 9.200 608.361 2,798.461
9.600 304.197 2.500 608.403 760.504
12.100 304.206 1.500 608.418 456.314
13.600 304.212 0.300 608.424 91.264
13.900 304.212 6.726 605.060 2,034.817 EXISTING DATA UKUR REALISASI
20.626 300.848 -10.523 601.741 -3,166.060
10.103 300.893 -0.704 601.158 -211.608
9.399 300.265 -9.399 600.526 -2,822.172
05+750.00
0.000 300.261 0.000 300.261 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 135.010

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+775.00 05+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-42.991 298.691 0.000 300.291 0.000
-32.909 298.493 0.000 300.291 -0.830 600.509 -249.211 308.000
-30.014 299.407 -0.830 300.218 -5.852 600.462 -1,756.952
-15.717 299.382 -6.682 300.244 -0.504 599.983 -151.196 306.000
-15.382 299.803 -7.186 299.739 -8.196 599.542 -2,456.923 304.000
-7.186 299.739 -15.382 299.803 -0.335 599.185 -100.363
-6.682 300.244 -15.717 299.382 -7.381 598.777 -2,209.787 302.000
-0.830 300.218 -23.098 299.395 9.198 603.389 2,774.986
300.000
0.000 300.291 -13.900 303.994 0.300 607.988 91.198
1.071 300.386 -13.600 303.994 1.500 608.018 456.014 298.000
6.621 300.267 -12.100 304.024 2.500 608.098 760.123
7.267 300.869 -9.600 304.074 9.200 608.332 2,798.327 296.000
22.571 300.722 -0.400 304.258 0.250 608.519 76.065
294.000
24.267 301.094 -0.150 304.261 0.150 608.519 45.639
24.969 300.712 0.000 304.258 0.150 608.519 45.639 292.000
26.324 302.299 0.150 304.261 0.250 608.519 76.065
32.570 302.018 0.400 304.258 9.200 608.457 2,798.902 290.000
38.421 302.041 9.600 304.199 2.500 608.382 760.478
12.100 304.183 1.500 608.357 456.268
13.600 304.174 0.300 608.348 91.252
13.900 304.174 6.869 604.913 2,077.574
20.769 300.739 -13.502 601.608 -4,061.456 EXISTING DATA UKUR REALISASI
7.267 300.869 -0.646 601.136 -194.167
6.621 300.267 -5.550 600.653 -1,666.812
1.071 300.386 -1.071 600.677 -321.663
05+775.00
0.000 300.291 0.000 300.291 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 139.999

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+800.00 05+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 300.129 0.000
-46.251 295.235 0.000 300.129 -0.450 600.259 -135.058
-36.654 296.054 -0.450 300.130 -0.746 599.441 -223.591
-29.755 296.186 -1.196 299.311 -7.697 598.613 -2,303.762 304.000
-29.052 297.060 -8.893 299.302 -1.604 597.502 -479.197
-20.902 297.155 -10.497 298.200 -5.505 596.707 -1,642.436 302.000
-20.451 297.914 -16.002 298.507 -0.455 596.150 -135.624
-18.153 297.937 -16.457 297.643 -1.696 595.580 -505.052 300.000
-16.457 297.643 -18.153 297.937 -2.298 595.851 -684.633
-16.002 298.507 -20.451 297.914 -0.451 595.069 -134.188 298.000
-10.497 298.200 -20.902 297.155 -8.150 594.215 -2,421.426
-8.893 299.302 -29.052 297.060 -0.703 593.246 -208.526 296.000
-1.196 299.311 -29.755 296.186 -2.115 592.332 -626.391
-0.450 300.130 -31.870 296.146 4.270 594.441 1,269.132 294.000
0.000 300.129 -27.600 298.295 2.000 596.550 596.550
5.448 300.119 -25.600 298.255 11.700 602.360 3,523.806 292.000
6.053 300.690 -13.900 304.105 0.300 608.210 91.232
12.404 300.527 -13.600 304.105 1.500 608.240 456.180 290.000
22.056 300.984 -12.100 304.135 2.500 608.320 760.400
22.805 301.587 -9.600 304.185 9.200 608.554 2,799.348
32.803 301.352 -0.400 304.369 0.250 608.741 76.093
37.157 301.320 -0.150 304.372 0.150 608.741 45.656
0.000 304.369 0.150 608.741 45.656 EXISTING DATA UKUR REALISASI
0.150 304.372 0.250 608.741 76.093
0.400 304.369 9.200 608.587 2,799.500
9.600 304.218 2.500 608.395 760.494
05+800.00
12.100 304.177 1.500 608.330 456.248
13.600 304.153 0.300 608.306 91.246
13.900 304.153 6.494 605.058 1,964.623
20.394 300.905 -7.990 601.432 -2,402.721
12.404 300.527 -6.351 601.217 -1,909.165
6.053 300.690 -0.605 600.809 -181.745
5.448 300.119 -5.448 600.248 -1,635.076
0.000 300.129 0.000 300.129 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 183.664

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+825.00 05+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.473 0.000
-43.749 295.462 0.000 297.473 -0.190 594.952 -56.520
-43.254 295.991 -0.190 297.479 -1.305 594.203 -387.717
-42.249 295.815 -1.495 296.724 -12.352 593.512 -3,665.530 307.000
-21.649 295.860 -13.847 296.788 -1.750 592.328 -518.287
305.000
-20.748 295.959 -15.597 295.540 -4.101 591.055 -1,211.958
-19.698 295.515 -19.698 295.515 -1.050 591.474 -310.524
303.000
-15.597 295.540 -20.748 295.959 -0.901 591.819 -266.614
-13.847 296.788 -21.649 295.860 -10.905 591.696 -3,226.222 301.000
-1.495 296.724 -32.554 295.836 4.954 594.261 1,471.984
-0.190 297.479 -27.600 298.425 2.000 596.810 596.810 299.000
0.000 297.473 -25.600 298.385 11.700 602.620 3,525.327
11.062 297.150 -13.900 304.235 0.300 608.470 91.271 297.000
11.466 298.302 -13.600 304.235 1.500 608.500 456.375
18.912 298.147 -12.100 304.265 2.500 608.580 760.725 295.000
19.314 298.533 -9.600 304.315 9.200 608.814 2,800.544
35.617 298.381 -0.400 304.499 0.250 609.001 76.125
41.572 298.259 -0.150 304.502 0.150 609.001 45.675
0.000 304.499 0.150 609.001 45.675 EXISTING DATA UKUR REALISASI
0.150 304.502 0.250 609.001 76.125
0.400 304.499 9.200 608.814 2,800.544
9.600 304.315 2.500 608.580 760.725
05+825.00
12.100 304.265 1.500 608.500 456.375
13.600 304.235 0.300 608.470 91.271
13.900 304.235 11.518 602.711 3,471.013
25.418 298.476 -6.104 597.009 -1,822.071
19.314 298.533 -0.402 596.680 -119.933
18.912 298.147 -7.446 596.449 -2,220.580
11.466 298.302 -0.404 595.452 -120.281
11.062 297.150 -11.062 594.623 -3,288.860
0.000 297.473 0.000 297.473 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 311.465

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+850.00 05+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.008 -0.060 594.015 -17.820
-36.610 295.238 -0.060 297.007 -2.453 592.993 -727.306
-36.265 295.812 -2.513 295.986 -1.503 592.016 -444.900
-35.664 295.710 -4.016 296.030 -1.101 593.139 -326.523 305.000
-25.360 295.661 -5.117 297.109 -0.990 593.807 -293.934
-24.965 296.400 -6.107 296.698 -12.411 593.525 -3,683.119 300.000
-18.915 296.330 -18.518 296.827 -0.397 593.157 -117.742
-18.518 296.827 -18.915 296.330 -6.050 592.730 -1,793.008 295.000
-6.107 296.698 -24.965 296.400 -0.395 592.061 -116.932
-5.117 297.109 -25.360 295.661 -7.950 591.360 -2,350.656 290.000
-4.016 296.030 -33.310 295.699 5.710 594.272 1,696.647
-2.513 295.986 -27.600 298.573 2.000 597.106 597.106 285.000
-0.060 297.007 -25.600 298.533 11.700 602.916 3,527.059
0.000 297.008 -13.900 304.383 0.300 608.766 91.315
7.940 297.033 -13.600 304.383 1.500 608.796 456.597 EXISTING DATA UKUR REALISASI
17.940 297.033 -12.100 304.413 2.500 608.876 761.095
18.436 298.094 -9.600 304.463 9.200 609.110 2,801.906
35.737 298.243 -0.400 304.647 0.250 609.297 76.162
05+850.00
36.083 298.705 -0.150 304.650 0.150 609.297 45.697
40.985 298.640 0.000 304.647 0.150 609.297 45.697
0.150 304.650 0.250 609.297 76.162
0.400 304.647 9.200 609.110 2,801.906
9.600 304.463 2.500 608.876 761.095
12.100 304.413 1.500 608.796 456.597
13.600 304.383 0.300 608.766 91.315
13.900 304.383 12.442 602.545 3,748.432
26.342 298.162 -7.906 596.256 -2,357.000
18.436 298.094 -0.496 595.127 -147.591
17.940 297.033 -10.000 594.066 -2,970.330
7.940 297.033 -7.940 594.041 -2,358.343
0.000 297.008 0.000 297.008 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 329.583

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+875.00 05+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 296.480 0.000
-29.389 295.650 0.000 296.480 -1.051 592.991 -311.617
-28.939 296.402 -1.051 296.511 -0.899 594.182 -267.085 307.000
-20.639 296.378 -1.950 297.671 -1.397 594.896 -415.535 305.000
-20.343 296.804 -3.347 297.225 -3.649 594.599 -1,084.846
303.000
-7.493 296.771 -6.996 297.374 -0.497 594.145 -147.645
-6.996 297.374 -7.493 296.771 -12.850 593.575 -3,813.719 301.000
-3.347 297.225 -20.343 296.804 -0.296 593.182 -87.791
299.000
-1.950 297.671 -20.639 296.378 -7.469 592.778 -2,213.729
-1.051 296.511 -28.108 296.400 3.508 595.138 1,043.872 297.000
0.000 296.480 -24.600 298.738 2.000 597.436 597.436 295.000
1.200 297.568 -22.600 298.698 8.700 603.246 2,624.120
2.000 297.098 -13.900 304.548 0.300 609.096 91.364
9.704 297.292 -13.600 304.548 1.500 609.126 456.845
EXISTING DATA UKUR REALISASI
10.804 297.994 -12.100 304.578 2.500 609.206 761.508
24.357 297.903 -9.600 304.628 9.200 609.440 2,803.424
24.906 298.692 -0.400 304.812 0.250 609.627 76.203
31.753 298.611 -0.150 304.815 0.150 609.627 45.722
05+875.00
40.201 299.263 0.000 304.812 0.150 609.627 45.722
0.150 304.815 0.250 609.627 76.203
0.400 304.812 9.200 609.440 2,803.424
9.600 304.628 2.500 609.206 761.508
12.100 304.578 1.500 609.126 456.845
13.600 304.548 0.300 609.096 91.364
13.900 304.548 11.729 603.231 3,537.648
25.629 298.683 -0.723 597.375 -215.951
24.906 298.692 -0.549 596.595 -163.765
24.357 297.903 -13.553 595.897 -4,038.096
10.804 297.994 -1.100 595.286 -327.407
9.704 297.292 -7.704 594.390 -2,289.590
2.000 297.098 -0.800 594.666 -237.866
1.200 297.568 -1.200 594.048 -356.429
0.000 296.480 0.000 296.480 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 302.136

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+900.00 05+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 297.572 0.000
-29.138 296.244 0.000 297.572 -5.097 595.233 -1,516.951
-28.691 296.833 -5.097 297.661 -0.397 594.960 -118.100 307.000
-28.346 296.767 -5.494 297.299 -12.646 594.734 -3,760.503
-18.494 296.677 -18.140 297.435 -0.354 594.112 -105.158 305.000
-18.140 297.435 -18.494 296.677 -9.345 593.439 -2,772.844 303.000
-5.494 297.299 -27.839 296.762 3.239 595.684 964.710
301.000
-5.097 297.661 -24.600 298.922 2.000 597.804 597.804
0.000 297.572 -22.600 298.882 8.700 603.614 2,625.721 299.000
5.000 297.617 -13.900 304.732 0.300 609.464 91.420
297.000
5.755 298.233 -13.600 304.732 1.500 609.494 457.121
16.859 298.606 -12.100 304.762 2.500 609.574 761.968 295.000
18.813 297.014 -9.600 304.812 9.200 609.808 2,805.117
21.912 297.075 -0.400 304.996 0.250 609.995 76.249
22.515 298.485 -0.150 304.999 0.150 609.995 45.750 EXISTING DATA UKUR REALISASI
27.910 298.288 0.000 304.996 0.150 609.995 45.750
32.662 299.030 0.150 304.999 0.250 609.995 76.249
0.400 304.996 9.200 609.808 2,805.117
05+900.00
9.600 304.812 2.500 609.574 761.968
12.100 304.762 1.500 609.494 457.121
13.600 304.732 0.300 609.464 91.420
13.900 304.732 9.335 603.191 2,815.394
23.235 298.459 -0.720 596.944 -214.900
22.515 298.485 -0.603 595.560 -179.561
21.912 297.075 -3.099 594.089 -920.541
18.813 297.014 -1.954 595.620 -581.921
16.859 298.606 -11.104 596.839 -3,313.650
5.755 298.233 -0.755 595.850 -224.933
5.000 297.617 -5.000 595.189 -1,487.973
0.000 297.572 0.000 297.572 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 281.842

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+925.00 05+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 298.230 0.000
-34.510 296.280 0.000 298.230 -4.102 596.596 -1,223.618
-30.705 296.705 -4.102 298.366 -0.598 595.542 -178.067 309.000
-20.602 296.625 -4.700 297.176 -15.047 594.681 -4,474.083
307.000
-19.747 297.505 -19.747 297.505 -0.855 594.130 -253.991
-4.700 297.176 -20.602 296.625 -7.654 593.311 -2,270.601 305.000
-4.102 298.366 -28.256 296.686 3.656 595.809 1,089.139 303.000
0.000 298.230 -24.600 299.123 2.000 598.206 598.206 301.000
12.300 298.140 -22.600 299.083 8.700 604.016 2,627.470
299.000
12.854 299.186 -13.900 304.933 0.300 609.866 91.480
297.000
19.856 299.041 -13.600 304.933 1.500 609.896 457.422
22.102 299.667 -12.100 304.963 2.500 609.976 762.470 295.000
27.904 299.354 -9.600 305.013 9.200 610.210 2,806.966
33.257 299.418 -0.400 305.197 0.250 610.397 76.300
-0.150 305.200 0.150 610.397 45.780 EXISTING DATA UKUR REALISASI
0.000 305.197 0.150 610.397 45.780
0.150 305.200 0.250 610.397 76.300
0.400 305.197 9.200 610.210 2,806.966
05+925.00
9.600 305.013 2.500 609.976 762.470
12.100 304.963 1.500 609.896 457.422
13.600 304.933 0.300 609.866 91.480
13.900 304.933 7.935 604.526 2,398.457
21.835 299.593 -1.979 598.634 -592.348
19.856 299.041 -7.002 598.227 -2,094.393
12.854 299.186 -0.554 597.326 -165.459
12.300 298.140 -12.300 596.370 -3,667.676
0.000 298.230 0.000 298.230 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 273.870

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+950.00 05+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 298.078 0.000
-35.310 296.858 0.000 298.078 -11.305 596.171 -3,369.857
-31.856 296.028 -11.305 298.093 -0.499 595.294 -148.526 309.000
-31.059 296.902 -11.804 297.201 -12.152 594.704 -3,613.422
307.000
-24.510 296.780 -23.956 297.503 -0.554 594.283 -164.616
-23.956 297.503 -24.510 296.780 -3.828 593.631 -1,136.210 305.000
-11.804 297.201 -28.338 296.851 3.738 596.194 1,114.287 303.000
-11.305 298.093 -24.600 299.343 2.000 598.646 598.646 301.000
0.000 298.078 -22.600 299.303 8.700 604.456 2,629.384
299.000
1.153 298.860 -13.900 305.153 0.300 610.306 91.546
297.000
11.454 298.698 -13.600 305.153 1.500 610.336 457.752
11.803 299.143 -12.100 305.183 2.500 610.416 763.020 295.000
19.805 299.094 -9.600 305.233 9.200 610.650 2,808.990
20.101 299.515 -0.400 305.417 0.250 610.837 76.355
27.702 299.371 -0.150 305.420 0.150 610.837 45.813 EXISTING DATA UKUR REALISASI
28.800 299.966 0.000 305.417 0.150 610.837 45.813
33.102 299.929 0.150 305.420 0.250 610.837 76.355
0.400 305.417 9.200 610.650 2,808.990
05+950.00
9.600 305.233 2.500 610.416 763.020
12.100 305.183 1.500 610.336 457.752
13.600 305.153 0.300 610.306 91.546
13.900 305.153 8.446 604.625 2,553.331
22.346 299.472 -2.245 598.987 -672.363
20.101 299.515 -0.296 598.609 -88.594
19.805 299.094 -8.002 598.237 -2,393.546
11.803 299.143 -0.349 597.841 -104.323
11.454 298.698 -10.301 597.558 -3,077.722
1.153 298.860 -1.153 596.938 -344.135
0.000 298.078 0.000 298.078 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 269.284

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 05+975.00 05+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 298.916 0.000
-35.557 298.026 0.000 298.916 -5.852 597.934 -1,749.555
-33.452 298.007 -5.852 299.018 -0.350 597.776 -104.611 309.000
-33.003 298.664 -6.202 298.758 -10.150 597.631 -3,032.977
307.000
-32.251 298.471 -16.352 298.873 -0.450 597.227 -134.376
-16.802 298.354 -16.802 298.354 -13.038 596.807 -3,890.585 305.000
-16.352 298.873 -29.840 298.453 2.240 598.033 669.797 303.000
-6.202 298.758 -27.600 299.580 2.000 599.120 599.120 301.000
-5.852 299.018 -25.600 299.540 11.700 604.930 3,538.841
299.000
0.000 298.916 -13.900 305.390 0.300 610.780 91.617
297.000
21.454 299.076 -13.600 305.390 1.500 610.810 458.108
25.600 299.506 -12.100 305.420 2.500 610.890 763.613 295.000
27.652 298.574 -9.600 305.470 9.200 611.124 2,811.170
28.848 298.725 -0.400 305.654 0.250 611.311 76.414
29.597 299.612 -0.150 305.657 0.150 611.311 45.848 EXISTING DATA UKUR REALISASI
35.300 299.796 0.000 305.654 0.150 611.311 45.848
0.150 305.657 0.250 611.311 76.414
0.400 305.654 9.200 611.124 2,811.170
05+975.00
9.600 305.470 2.500 610.890 763.613
12.100 305.420 1.500 610.810 458.108
13.600 305.390 0.300 610.780 91.617
13.900 305.390 12.442 604.559 3,760.962
26.342 299.169 -0.742 598.675 -222.108
25.600 299.506 -4.146 598.582 -1,240.860
21.454 299.076 -21.454 597.992 -6,414.660
0.000 298.916 0.000 298.916 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 272.525

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+000.00 06+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 300.288 0.000
0.000 300.288 -8.799 600.705 -2,642.802
-8.799 300.417 -0.350 600.409 -105.072
-9.149 299.992 -11.198 600.069 -3,359.786
-37.599 298.480 -20.347 300.077 -0.453 599.429 -135.771
-33.103 298.502 -20.800 299.352 -2.699 598.768 -808.037 309.000
-32.550 298.352 -23.499 299.416 -0.300 598.264 -89.740
307.000
-32.202 299.031 -23.799 298.848 -5.523 597.816 -1,650.869
-23.799 298.848 -29.322 298.968 1.722 598.803 515.569 305.000
-23.499 299.416 -27.600 299.835 2.000 599.630 599.630 303.000
-20.800 299.352 -25.600 299.795 11.700 605.440 3,541.824 301.000
-20.347 300.077 -13.900 305.645 0.300 611.290 91.694
299.000
-9.149 299.992 -13.600 305.645 1.500 611.320 458.490
297.000
-8.799 300.417 -12.100 305.675 2.500 611.400 764.250
0.000 300.288 -9.600 305.725 9.200 611.634 2,813.516 295.000
1.398 300.268 -0.400 305.909 0.250 611.821 76.478
1.748 300.692 -0.150 305.912 0.150 611.821 45.887
14.353 300.561 0.000 305.909 0.150 611.821 45.887 EXISTING DATA UKUR REALISASI
28.800 300.561 0.150 305.912 0.250 611.821 76.478
33.702 300.556 0.400 305.909 9.200 611.634 2,813.516
9.600 305.725 2.500 611.400 764.250
06+000.00
12.100 305.675 1.500 611.320 458.490
13.600 305.645 0.300 611.290 91.694
13.900 305.645 10.168 606.206 3,081.951
24.068 300.561 -9.715 601.122 -2,919.950
14.353 300.561 -12.605 601.253 -3,789.397
1.748 300.692 -0.350 600.960 -105.168
1.398 300.268 -1.398 600.556 -419.789
0.000 300.288 0.000 300.288 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 213.223

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+025.00 06+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 300.975 0.000
-38.258 299.545 0.000 300.975 -6.007 602.013 -1,808.146
-32.156 299.565 -6.007 301.038 -0.598 601.872 -179.960 309.000
-27.852 299.515 -6.605 300.834 -4.251 601.836 -1,279.202
307.000
-27.502 300.096 -10.856 301.002 -0.250 601.531 -75.191
-18.053 299.972 -11.106 300.529 -6.547 601.244 -1,968.172 305.000
-17.653 300.715 -17.653 300.715 -0.400 600.687 -120.137 303.000
-11.106 300.529 -18.053 299.972 -7.543 600.043 -2,263.062 301.000
-10.856 301.002 -25.596 300.071 11.696 605.990 3,543.830
299.000
-6.605 300.834 -13.900 305.919 0.300 611.838 91.776
297.000
-6.007 301.038 -13.600 305.919 1.500 611.868 458.901
0.000 300.975 -12.100 305.949 2.500 611.948 764.935 295.000
4.105 301.027 -9.600 305.999 9.200 612.182 2,816.037
4.907 301.534 -0.400 306.183 0.250 612.369 76.546
17.110 301.506 -0.150 306.186 0.150 612.369 45.928 EXISTING DATA UKUR REALISASI
17.561 301.253 0.000 306.183 0.150 612.369 45.928
21.762 301.217 0.150 306.186 0.250 612.369 76.546
22.358 301.715 0.400 306.183 9.200 612.182 2,816.037
06+025.00
29.460 301.522 9.600 305.999 2.500 611.948 764.935
34.812 301.563 12.100 305.949 1.500 611.868 458.901
13.600 305.919 0.300 611.838 91.776
13.900 305.919 8.439 607.618 2,563.844
22.339 301.699 -0.577 602.916 -173.941
21.762 301.217 -4.201 602.470 -1,265.488
17.561 301.253 -0.451 602.759 -135.922
17.110 301.506 -12.203 603.040 -3,679.449
4.907 301.534 -0.802 602.561 -241.627
4.105 301.027 -4.105 602.002 -1,235.609
0.000 300.975 0.000 300.975 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 190.011

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+050.00 06+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-37.704 300.575 0.000 300.823 0.000
310.000
-33.204 300.580 0.000 300.823 -10.254 601.833 -3,085.598
309.000
-11.101 300.757 -10.254 301.010 -0.452 601.553 -135.951
308.000
-10.706 300.543 -10.706 300.543 -0.395 601.300 -118.757 307.000
-10.254 301.010 -11.101 300.757 -13.928 601.402 -4,188.164 306.000
0.000 300.823 -25.029 300.645 11.129 606.855 3,376.845 305.000
2.748 301.013 -13.900 306.210 0.300 612.420 91.863 304.000
12.194 300.742 -13.600 306.210 1.500 612.450 459.338 303.000
16.093 301.476 -12.100 306.240 2.500 612.530 765.663 302.000
18.145 301.795 -9.600 306.290 9.200 612.764 2,818.714 301.000
30.844 301.802 -0.400 306.474 0.250 612.947 76.618 300.000
35.947 301.786 -0.150 306.473 0.150 612.947 45.971
0.000 306.474 0.150 612.947 45.971
0.150 306.473 0.250 612.947 76.618 EXISTING DATA UKUR REALISASI
0.400 306.474 9.200 612.764 2,818.714
9.600 306.290 2.500 612.530 765.663
12.100 306.240 1.500 612.450 459.338
06+050.00
13.600 306.210 0.300 612.420 91.863
13.900 306.210 8.825 608.008 2,682.835
22.725 301.798 -4.580 603.593 -1,382.228
18.145 301.795 -2.052 603.271 -618.956
16.093 301.476 -3.899 602.218 -1,174.024
12.194 300.742 -9.446 601.755 -2,842.089
2.748 301.013 -2.748 601.836 -826.923
0.000 300.823 0.000 300.823 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 203.325

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+075.00 06+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 0.000 0.000 309.000
-37.140 298.916 0.000 0.000 0.000
307.000
-36.393 298.636 0.000 0.000 0.000
-24.895 298.737 0.000 0.000 0.000 305.000
-15.000 298.726 0.000 299.127 0.000 303.000
-14.354 299.359 0.000 299.127 -14.354 598.486 -4,295.334 301.000
0.000 299.127 -14.354 299.359 -0.646 598.085 -193.181
299.000
5.648 299.268 -15.000 298.726 -9.895 597.463 -2,955.948
6.694 299.984 -24.895 298.737 -6.741 597.415 -2,013.587 297.000
15.698 299.818 -31.636 298.678 4.036 599.387 1,209.563 295.000
17.202 300.594 -27.600 300.709 2.000 601.378 601.378
23.948 300.991 -25.600 300.669 11.700 607.188 3,552.050
25.399 300.415 -13.900 306.519 0.300 613.038 91.956 EXISTING DATA UKUR REALISASI
26.647 300.946 -13.600 306.519 1.500 613.068 459.801
28.548 301.750 -12.100 306.549 2.500 613.148 766.435
33.349 301.570 -9.600 306.599 9.200 613.382 2,821.557
39.698 301.489 -0.400 306.783 0.250 613.569 76.696
06+075.00
-0.150 306.786 0.150 613.569 46.018
0.000 306.783 0.150 613.569 46.018
0.150 306.786 0.250 613.569 76.696
0.400 306.783 9.200 613.382 2,821.557
9.600 306.599 2.500 613.148 766.435
12.100 306.549 1.500 613.068 459.801
13.600 306.519 0.300 613.038 91.956
13.900 306.519 11.882 607.097 3,606.763
25.782 300.578 -0.383 600.993 -115.090
25.399 300.415 -1.451 601.406 -436.320
23.948 300.991 -6.746 601.585 -2,029.146
17.202 300.594 -1.504 600.412 -451.510
15.698 299.818 -9.004 599.802 -2,700.309
6.694 299.984 -1.046 599.252 -313.409
5.648 299.268 -5.648 598.395 -1,689.867
0.000 299.127 0.000 299.127 0.000
AREA ( M2 ) 300.977

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+100.00 06+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.000 298.980 0.000 0.000 0.000
-25.000 298.980 0.000 299.702 0.000
309.000
-20.000 299.095 0.000 299.702 -5.000 599.205 -1,498.013
-15.000 299.331 -5.000 299.503 -5.000 599.075 -1,497.688 307.000
-10.000 299.572 -10.000 299.572 -5.000 598.903 -1,497.258 305.000
-5.000 299.503 -15.000 299.331 -5.000 598.426 -1,496.065
303.000
0.000 299.702 -20.000 299.095 -5.000 598.075 -1,495.188
3.000 299.732 -25.000 298.980 -6.687 597.960 -1,999.279 301.000
7.000 301.024 -31.687 298.980 4.087 600.017 1,226.135 299.000
10.000 300.989 -27.600 301.037 2.000 602.034 602.034
297.000
15.000 301.325 -25.600 300.997 11.700 607.844 3,555.887
20.000 301.139 -13.900 306.847 0.300 613.694 92.054 295.000
22.000 302.059 -13.600 306.847 1.500 613.724 460.293
25.000 302.036 -12.100 306.877 2.500 613.804 767.255
27.000 302.076 -9.600 306.927 9.200 614.038 2,824.575 EXISTING DATA UKUR REALISASI
33.000 301.930 -0.400 307.111 0.250 614.225 76.778
-0.150 307.114 0.150 614.225 46.067
0.000 307.111 0.150 614.225 46.067
06+100.00
0.150 307.114 0.250 614.225 76.778
0.400 307.111 9.200 614.038 2,824.575
9.600 306.927 2.500 613.804 767.255
12.100 306.877 1.500 613.724 460.293
13.600 306.847 0.300 613.694 92.054
13.900 306.847 9.599 608.895 2,922.392
23.499 302.048 -1.499 604.107 -452.778
22.000 302.059 -2.000 603.198 -603.198
20.000 301.139 -5.000 602.464 -1,506.160
15.000 301.325 -5.000 602.314 -1,505.785
10.000 300.989 -3.000 602.013 -903.020
7.000 301.024 -4.000 600.756 -1,201.512
3.000 299.732 -3.000 599.434 -899.151
0.000 299.702 0.000 299.702 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 285.399

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+125.00 06+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-38.000 299.242 0.000 300.895 0.000
310.000
-35.000 299.324 0.000 300.895 -5.000 601.544 -1,503.860
308.000
-30.000 299.553 -5.000 300.649 -5.000 600.732 -1,501.830
306.000
-25.000 300.032 -10.000 300.083 -5.000 600.287 -1,500.718
304.000
-20.000 300.214 -15.000 300.204 -5.000 600.418 -1,501.045 302.000
-15.000 300.204 -20.000 300.214 -5.000 600.246 -1,500.615 300.000
-10.000 300.083 -25.000 300.032 -5.000 599.585 -1,498.963 298.000
-5.000 300.649 -30.000 299.553 -1.357 599.044 -406.451 296.000
0.000 300.895 -31.357 299.491 3.757 600.873 1,128.740 294.000
5.000 300.955 -27.600 301.382 2.000 602.724 602.724 292.000
10.000 301.104 -25.600 301.342 11.700 608.534 3,559.924 290.000
15.000 301.134 -13.900 307.192 0.300 614.384 92.158
20.000 301.384 -13.600 307.192 1.500 614.414 460.811
25.000 301.402 -12.100 307.222 2.500 614.494 768.118 EXISTING DATA UKUR REALISASI
31.500 301.516 -9.600 307.272 9.200 614.728 2,827.749
33.000 302.486 -0.400 307.456 0.250 614.915 76.864
37.500 302.600 -0.150 307.459 0.150 614.915 46.119
06+125.00
0.000 307.456 0.150 614.915 46.119
0.150 307.459 0.250 614.915 76.864
0.400 307.456 9.200 614.728 2,827.749
9.600 307.272 2.500 614.494 768.118
12.100 307.222 1.500 614.414 460.811
13.600 307.192 0.300 614.384 92.158
13.900 307.192 11.564 608.602 3,518.937
25.464 301.410 -0.464 602.812 -139.852
25.000 301.402 -5.000 602.786 -1,506.965
20.000 301.384 -5.000 602.518 -1,506.295
15.000 301.134 -5.000 602.238 -1,505.595
10.000 301.104 -5.000 602.059 -1,505.148
5.000 300.955 -5.000 601.850 -1,504.625
0.000 300.895 0.000 300.895 0.000
AREA ( M2 ) 271.998

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+150.00 06+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-40.000 300.089 0.000 0.000 0.000
-35.000 300.104 0.000 301.300 0.000
-30.000 300.340 0.000 301.300 -5.000 602.259 -1,505.648 309.000
-25.000 299.781 -5.000 300.959 -5.000 601.559 -1,503.898
-20.000 300.015 -10.000 300.600 -5.000 600.928 -1,502.320 307.000
-15.000 300.328 -15.000 300.328 -5.000 600.343 -1,500.858 305.000
-10.000 300.600 -20.000 300.015 -5.000 599.796 -1,499.490
303.000
-5.000 300.959 -25.000 299.781 -5.000 600.121 -1,500.303
0.000 301.300 -30.000 300.340 -0.432 600.660 -129.743 301.000
5.000 301.523 -30.432 300.320 2.832 602.065 852.524
299.000
10.000 302.028 -27.600 301.745 2.000 603.450 603.450
15.000 302.290 -25.600 301.705 11.700 609.260 3,564.171 297.000
20.000 302.555 -13.900 307.555 0.300 615.110 92.267
25.000 302.910 -13.600 307.555 1.500 615.140 461.355
30.000 303.291 -12.100 307.585 2.500 615.220 769.025 EXISTING DATA UKUR REALISASI
35.000 303.562 -9.600 307.635 9.200 615.454 2,831.088
-0.400 307.819 0.250 615.641 76.955
-0.150 307.822 0.150 615.641 46.173
06+150.00
0.000 307.819 0.150 615.641 46.173
0.150 307.822 0.250 615.641 76.955
0.400 307.819 9.200 615.454 2,831.088
9.600 307.635 2.500 615.220 769.025
12.100 307.585 1.500 615.140 461.355
13.600 307.555 0.300 615.110 92.267
13.900 307.555 9.515 610.352 2,903.750
23.415 302.797 -3.415 605.352 -1,033.639
20.000 302.555 -5.000 604.845 -1,512.113
15.000 302.290 -5.000 604.318 -1,510.795
10.000 302.028 -5.000 603.551 -1,508.878
5.000 301.523 -5.000 602.823 -1,507.058
0.000 301.300 0.000 301.300 0.000
0.000 0.000 0.000
AREA ( M2 ) 262.882

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+175.00 06+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000
-44.000 300.251 0.000 301.464 -5.000 602.908 -1,507.270
310.000
-40.000 300.335 -5.000 301.444 -5.000 602.909 -1,507.273
-35.000 300.513 -10.000 301.465 -5.000 602.919 -1,507.298 308.000
-30.000 300.764 -15.000 301.454 -5.000 602.515 -1,506.288
-25.000 300.833 -20.000 301.061 -5.000 601.894 -1,504.735 306.000
-20.000 301.061 -25.000 300.833 -5.327 601.580 -1,602.308 304.000
-15.000 301.454 -30.327 300.747 2.727 602.867 822.009
-10.000 301.465 -27.600 302.120 2.000 604.200 604.200 302.000
-5.000 301.444 -25.600 302.080 11.700 610.010 3,568.559 300.000
0.000 301.464 -13.900 307.930 0.300 615.860 92.379
5.000 301.592 -13.600 307.930 1.500 615.890 461.918 298.000
10.000 301.690 -12.100 307.960 2.500 615.970 769.963
15.000 301.989 -9.600 308.010 9.200 616.204 2,834.538
20.000 302.164 -0.400 308.194 0.250 616.391 77.049 EXISTING DATA UKUR REALISASI
25.000 302.204 -0.150 308.197 0.150 616.391 46.229
34.000 302.204 0.000 308.194 0.150 616.391 46.229
0.150 308.197 0.250 616.391 77.049
06+175.00
0.400 308.194 9.200 616.204 2,834.538
9.600 308.010 2.500 615.970 769.963
12.100 307.960 1.500 615.890 461.918
13.600 307.930 0.300 615.860 92.379
13.900 307.930 11.452 610.134 3,493.627
25.352 302.204 -0.352 604.408 -106.376
25.000 302.204 -5.000 604.368 -1,510.920
20.000 302.164 -5.000 604.153 -1,510.383
15.000 301.989 -5.000 603.679 -1,509.198
10.000 301.690 -5.000 603.282 -1,508.205
5.000 301.592 -5.000 603.056 -1,507.640
0.000 301.464 0.000 301.464 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 264.655

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+200.00 06+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-43.000 300.719 0.000
-40.000 300.904 0.000 301.053 0.000
-35.000 301.059 0.000 301.053 -5.000 602.161 -1,505.403 Chart Title
-30.000 301.103 -5.000 301.108 -5.000 602.458 -1,506.145
-25.000 301.263 -10.000 301.350 -5.000 602.924 -1,507.310 309.000

-20.000 301.437 -15.000 301.574 -5.000 603.011 -1,507.528 307.000


-15.000 301.574 -20.000 301.437 -5.000 602.700 -1,506.750
305.000
-10.000 301.350 -25.000 301.263 -5.000 602.366 -1,505.915
-5.000 301.108 -30.000 301.103 -0.372 602.203 -112.010 303.000

0.000 301.053 -30.372 301.100 2.772 603.595 836.583 301.000


5.000 301.147 -27.600 302.495 2.000 604.950 604.950
299.000
10.000 300.995 -25.600 302.455 11.700 610.760 3,572.946
15.000 301.211 -13.900 308.305 0.300 616.610 92.492 297.000
5 3 41 39 37 35 33 31 29 27 25 23 21 19 17 15 13 11 -9 -7 -5 -3 -1 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45
20.000 301.251 -13.600 308.305 1.500 616.640 462.480 -4 -4 - - - - - - - - - - - - - - - -

25.000 301.005 -12.100 308.335 2.500 616.720 770.900 EXISTING DATA UKUR REALISASI
30.000 301.176 -9.600 308.385 9.200 616.954 2,837.988
35.000 301.186 -0.400 308.569 0.250 617.141 77.143
-0.150 308.572 0.150 617.141 46.286
06+200.00
0.000 308.569 0.150 617.141 46.286
0.150 308.572 0.250 617.141 77.143
0.400 308.569 9.200 616.954 2,837.988
9.600 308.385 2.500 616.720 770.900
12.100 308.335 1.500 616.640 462.480
13.600 308.305 0.300 616.610 92.492
13.900 308.305 11.700 610.760 3,572.946
25.600 302.455 2.000 604.950 604.950
27.600 302.495 2.619 603.612 790.430
30.219 301.117 -0.219 602.293 -65.951
30.000 301.176 -5.000 602.181 -1,505.453
25.000 301.005 -5.000 602.256 -1,505.640
20.000 301.251 -5.000 602.462 -1,506.155
15.000 301.211 -5.000 602.206 -1,505.515
10.000 300.995 -5.000 602.142 -1,505.355
5.000 301.147 -5.000 602.200 -1,505.500
0.000 301.053 0.000 301.053 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) 306.752

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+225.00 06+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-54.252 295.687 0.000 0.000 0.000 315.000
-49.899 295.652 0.000 301.147 0.000
-45.398 294.573 0.000 301.147 -2.996 602.394 -902.386 310.000
-44.448 293.931 -2.996 301.247 -0.697 602.207 -209.869
305.000
-40.850 293.985 -3.693 300.960 -2.754 601.390 -828.114
-37.152 298.695 -6.447 300.430 -0.849 600.081 -254.734
300.000
-20.633 298.400 -7.296 299.651 -13.098 599.566 -3,926.558
-20.394 299.915 -20.394 299.915 -0.239 598.315 -71.499 295.000
-7.296 299.651 -20.633 298.400 -15.305 597.073 -4,569.101
-6.447 300.430 -35.938 298.673 8.338 601.543 2,507.833 290.000
-3.693 300.960 -27.600 302.870 2.000 605.700 605.700
-2.996 301.247 -25.600 302.830 11.700 611.510 3,577.334
0.000 301.147 -13.900 308.680 0.300 617.360 92.604 EXISTING DATA UKUR REALISASI
6.354 300.998 -13.600 308.680 1.500 617.390 463.043
7.154 301.462 -12.100 308.710 2.500 617.470 771.838
13.002 301.502 -9.600 308.760 9.200 617.704 2,841.438
13.849 302.216 -0.400 308.944 0.250 617.891 77.236
06+225.00
20.449 301.954 -0.150 308.947 0.150 617.891 46.342
21.346 302.366 0.000 308.944 0.150 617.891 46.342
32.098 303.160 0.150 308.947 0.250 617.891 77.236
41.645 303.161 0.400 308.944 9.200 617.704 2,841.438
43.995 303.205 9.600 308.760 2.500 617.470 771.838
12.100 308.710 1.500 617.390 463.043
13.600 308.680 0.300 617.360 92.604
13.900 308.680 11.963 611.379 3,656.963
25.863 302.699 -4.517 605.065 -1,366.539
21.346 302.366 -0.897 604.320 -271.038
20.449 301.954 -6.600 604.170 -1,993.761
13.849 302.216 -0.847 603.718 -255.675
13.002 301.502 -5.848 602.964 -1,763.067
7.154 301.462 -0.800 602.460 -240.984
6.354 300.998 -6.354 602.145 -1,913.015
0.000 301.147 0.000 301.147 0.000
0.000 0.000 0.000
AREA ( M2 ) 366.492

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+250.00 06+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 301.126 0.000
-54.917 298.170 0.000 301.126 -5.267 602.286 -1,586.120
315.000
-51.319 298.161 -5.267 301.160 -0.550 601.823 -165.501
313.000
-47.964 298.913 -5.817 300.663 -9.704 601.600 -2,918.963
311.000
-43.163 298.957 -15.521 300.937 -0.395 601.314 -118.760
-42.261 299.248 -15.916 300.377 -8.848 600.971 -2,658.696 309.000
-36.961 299.053 -24.764 300.594 -0.653 600.315 -196.003 307.000
-36.514 299.792 -25.417 299.721 -9.069 599.500 -2,718.433 305.000
-25.417 299.721 -34.486 299.779 6.886 603.024 2,076.212 303.000
-24.764 300.594 -27.600 303.245 2.000 606.450 606.450 301.000
-15.916 300.377 -25.600 303.205 11.700 612.260 3,581.721 299.000
-15.521 300.937 -13.900 309.055 0.300 618.110 92.717 297.000
-5.817 300.663 -13.600 309.055 1.500 618.140 463.605
-5.267 301.160 -12.100 309.085 2.500 618.220 772.775
0.000 301.126 -9.600 309.135 9.200 618.454 2,844.888 EXISTING DATA UKUR REALISASI
0.130 301.125 -0.400 309.319 0.250 618.641 77.330
7.533 301.110 -0.150 309.322 0.150 618.641 46.398
8.187 301.423 0.000 309.319 0.150 618.641 46.398
06+250.00
13.038 301.515 0.150 309.322 0.250 618.641 77.330
13.238 301.938 0.400 309.319 9.200 618.454 2,844.888
27.036 301.815 9.600 309.135 2.500 618.220 772.775
27.835 302.340 12.100 309.085 1.500 618.140 463.605
33.940 302.363 13.600 309.055 0.300 618.110 92.717
34.239 302.126 13.900 309.055 11.700 612.260 3,581.721
34.936 302.151 25.600 303.205 2.000 606.450 606.450
35.486 302.498 27.600 303.245 1.786 605.591 540.793
44.734 302.637 29.386 302.346 -1.551 604.686 -468.934
48.433 302.689 27.835 302.340 -0.799 604.155 -241.360
27.036 301.815 -13.798 603.753 -4,165.292
13.238 301.938 -0.200 603.453 -60.345
13.038 301.515 -4.851 602.938 -1,462.426
8.187 301.423 -0.654 602.533 -197.028
7.533 301.110 -7.403 602.235 -2,229.173
0.130 301.125 -0.130 602.251 -39.146
0.000 301.126 0.000 301.126 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 362.592

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+275.00 06+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-55.470 298.105 0.000 0.000 0.000
315.000
-53.074 298.286 0.000 300.816 0.000
313.000
-51.227 298.611 0.000 300.816 -7.912 601.755 -2,380.543
311.000
-46.681 298.420 -7.912 300.939 -1.295 601.349 -389.373
-45.729 299.730 -9.207 300.410 -13.574 601.289 -4,080.948 309.000
-35.234 299.548 -22.781 300.879 -0.403 600.927 -121.087 307.000
-34.786 300.192 -23.184 300.048 -11.236 600.235 -3,372.120 305.000
-23.184 300.048 -34.420 300.187 6.820 603.807 2,058.982 303.000
-22.781 300.879 -27.600 303.620 2.000 607.198 607.198 301.000
-9.207 300.410 -25.600 303.578 11.700 613.008 3,586.097 299.000
-7.912 300.939 -13.900 309.430 0.300 618.860 92.829 297.000
0.000 300.816 -13.600 309.430 1.500 618.890 464.168
0.440 300.809 -12.100 309.460 2.500 618.970 773.713
3.189 300.838 -9.600 309.510 9.200 619.204 2,848.338 EXISTING DATA UKUR REALISASI
3.634 301.292 -0.400 309.694 0.250 619.391 77.424
18.384 301.125 -0.150 309.697 0.150 619.391 46.454
18.833 301.915 0.000 309.694 0.150 619.391 46.454
06+275.00
32.186 301.850 0.150 309.697 0.250 619.391 77.424
32.736 302.328 0.400 309.694 9.200 619.204 2,848.338
47.187 302.159 9.600 309.510 2.500 618.970 773.713
49.539 302.183 12.100 309.460 1.500 618.890 464.168
13.600 309.430 0.300 618.860 92.829
13.900 309.430 11.700 613.010 3,586.109
25.600 303.580 2.000 607.200 607.200
27.600 303.620 3.506 605.475 1,061.398
31.106 301.855 -12.273 603.770 -3,705.035
18.833 301.915 -0.449 603.040 -135.382
18.384 301.125 -14.750 602.417 -4,442.825
3.634 301.292 -0.445 602.130 -133.974
3.189 300.838 -2.749 601.647 -826.964
0.440 300.809 -0.440 601.625 -132.358
0.000 300.816 0.000 300.816 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 392.225

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+283.45 06+283.45
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-55.470 298.105 0.000 303.729 0.000
-53.074 298.286 0.000 303.729 -9.600 607.458 -2,915.798 315.000
-51.227 298.611 -9.600 303.729 -2.500 607.458 -759.323 313.000
-46.681 298.420 -12.100 303.729 -1.500 607.458 -455.594 311.000
-45.729 299.730 -13.600 303.729 -2.200 607.458 -668.204 309.000
-35.234 299.548 -15.800 303.729 0.000 612.882 0.000
307.000
-34.786 300.192 -15.800 309.153 2.200 618.710 680.581
305.000
-23.184 300.048 -13.600 309.557 1.500 619.144 464.358
-22.781 300.879 -12.100 309.587 2.500 619.224 774.030 303.000
-15.800 303.729 -9.600 309.637 9.200 619.458 2,849.507 301.000
-13.600 303.729 -0.400 309.821 0.250 619.645 77.456 299.000
-12.100 303.729 -0.150 309.824 0.150 619.645 46.473 297.000
-9.600 303.729 0.000 309.821 0.150 619.645 46.473
0.000 303.729 0.150 309.824 0.250 619.645 77.456
9.600 303.729 0.400 309.821 9.200 619.458 2,849.507
12.100 303.729 9.600 309.637 2.500 619.224 774.030 EXISTING DATA UKUR REALISASI
13.600 303.729 12.100 309.587 1.500 619.144 464.358
15.800 303.729 13.600 309.557 2.200 618.710 680.581
18.384 301.125 15.800 309.153 0.000 612.882 0.000
18.833 301.915 15.800 303.729 -2.200 607.458 -668.204
32.736 302.328 13.600 303.729 -1.500 607.458 -455.594
06+283.45
47.187 302.159 12.100 303.729 -2.500 607.458 -759.323
49.539 302.183 9.600 303.729 -9.600 607.458 -2,915.798
0.000 303.729 0.000 303.729 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 186.973

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+300.00 06+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-54.036 293.124 0.000 0.000 0.000
315.000
-39.883 294.184 0.000 0.000 0.000
-30.728 293.241 0.000 0.000 0.000
310.000
-27.881 295.543 0.000 0.000 0.000
-20.678 295.621 0.000 0.000 0.000 305.000
0.000 296.929 0.000 0.000 0.000
0.668 296.971 0.000 0.000 0.000 300.000
0.920 296.988 0.000 0.000 0.000
4.523 297.698 0.000 0.000 0.000 295.000
6.273 299.196 0.000 0.000 0.000
11.324 299.410 0.000 0.000 0.000 290.000
12.278 298.385 0.000 0.000 0.000
18.323 299.413 0.000 0.000 0.000
19.922 299.815 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
22.224 299.611 0.000 0.000 0.000
22.626 300.190 0.000 0.000 0.000
25.573 300.235 0.000 0.000 0.000
06+300.00
27.722 301.377 0.000 0.000 0.000
34.427 301.320 0.000 0.000 0.000
36.522 301.362 0.000 0.000 0.000
37.469 301.864 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 0.000

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+325.00 06+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000
0.000 0.000 0.000
320.000
0.000 0.000 0.000
0.000 0.000 0.000 315.000
0.000 0.000 0.000
0.000 0.000 0.000 310.000
0.000 0.000 0.000 305.000
0.000 0.000 0.000
0.000 0.000 0.000 300.000
0.000 0.000 0.000 295.000
0.000 0.000 0.000
0.000 0.000 0.000 290.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
06+325.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 0.000

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+350.00 06+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-55.102 299.522 0.000 0.000 0.000
-51.450 300.521 0.000 0.000 0.000
320.000
-41.147 300.584 0.000 0.000 0.000
-40.249 301.226 0.000 0.000 0.000 315.000
-29.398 300.753 0.000 0.000 0.000
-16.450 300.810 0.000 0.000 0.000 310.000
-14.952 302.050 0.000 0.000 0.000 305.000
-7.604 301.184 0.000 0.000 0.000
0.000 301.098 0.000 0.000 0.000 300.000
2.350 301.072 0.000 0.000 0.000 295.000
10.999 301.016 0.000 0.000 0.000
12.251 301.712 0.000 0.000 0.000 290.000
23.302 301.671 0.000 0.000 0.000
23.847 302.142 0.000 0.000 0.000
37.044 301.961 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
37.839 302.676 0.000 0.000 0.000
47.735 302.636 0.000 0.000 0.000
47.486 301.488 0.000 0.000 0.000
06+350.00
54.581 301.571 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 0.000

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+368.90 06+368.90
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-55.102 299.522 0.000 0.000 0.000
-51.450 300.521 0.000 305.692 0.000
-41.147 300.584 0.000 305.692 -9.600 611.384 -2,934.643 320.000
-40.249 301.226 -9.600 305.692 -2.500 611.384 -764.230
315.000
-29.398 300.753 -12.100 305.692 -1.500 611.384 -458.538
-16.450 300.810 -13.600 305.692 -2.200 611.384 -672.522 310.000
-15.800 305.692 -15.800 305.692 0.000 616.486 0.000
-13.600 305.692 -15.800 310.794 2.200 621.632 683.795 305.000
-12.100 305.692 -13.600 310.838 1.500 621.706 466.280
-9.600 305.692 -12.100 310.868 2.500 621.786 777.233 300.000
0.000 305.692 -9.600 310.918 9.200 622.020 2,861.292
295.000
9.600 305.692 -0.400 311.102 0.250 622.207 77.776
12.100 305.692 -0.150 311.105 0.150 622.207 46.666 290.000
13.600 305.692 0.000 311.102 0.150 622.207 46.666
15.800 305.692 0.150 311.105 0.250 622.207 77.776
23.302 301.671 0.400 311.102 9.200 622.020 2,861.292
23.847 302.142 9.600 310.918 2.500 621.786 777.233 EXISTING DATA UKUR REALISASI
37.044 301.961 12.100 310.868 1.500 621.706 466.280
37.839 302.676 13.600 310.838 2.200 621.632 683.795
46.735 302.636 15.800 310.794 0.000 616.486 0.000
47.486 301.488 15.800 305.692 -2.200 611.384 -672.522
54.581 301.571 13.600 305.692 -1.500 611.384 -458.538
06+368.90
12.100 305.692 -2.500 611.384 -764.230
9.600 305.692 -9.600 611.384 -2,934.643
0.000 305.692 0.000 305.692 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 166.214

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+375.00 06+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-51.613 301.007 0.000 301.896 0.000
320.000
-46.917 301.253 0.000 301.896 -20.469 603.957 -6,181.198
-20.867 301.215 -20.469 302.061 -0.398 603.276 -120.052 315.000
-20.469 302.061 -20.867 301.215 -14.449 602.451 -4,352.407
0.000 301.896 -35.316 301.236 7.716 606.356 2,339.321 310.000
3.180 301.870 -27.600 305.120 2.000 610.200 610.200 305.000
5.685 302.318 -25.600 305.080 11.700 616.010 3,603.659
10.383 302.544 -13.900 310.930 0.300 621.860 93.279 300.000
11.583 302.197 -13.600 310.930 1.500 621.890 466.418 295.000
13.681 303.597 -12.100 310.960 2.500 621.970 777.463
30.027 303.280 -9.600 311.010 9.200 622.204 2,862.138 290.000
30.776 304.007 -0.400 311.194 0.250 622.391 77.799
52.426 303.947 -0.150 311.197 0.150 622.391 46.679
56.372 304.649 0.000 311.194 0.150 622.391 46.679 EXISTING DATA UKUR REALISASI
0.150 311.197 0.250 622.391 77.799
0.400 311.194 9.200 622.204 2,862.138
9.600 311.010 2.500 621.970 777.463
06+375.00
12.100 310.960 1.500 621.890 466.418
13.600 310.930 0.300 621.860 93.279
13.900 310.930 11.700 616.010 3,603.659
25.600 305.080 2.000 610.200 610.200
27.600 305.120 2.846 608.807 866.332
30.446 303.687 -0.419 606.967 -127.160
30.027 303.280 -16.346 606.877 -4,960.006
13.681 303.597 -2.098 605.794 -635.478
11.583 302.197 -1.200 604.741 -362.845
10.383 302.544 -4.698 604.862 -1,420.821
5.685 302.318 -2.505 604.188 -756.745
3.180 301.870 -3.180 603.766 -959.988
0.000 301.896 0.000 301.896 0.000
0.000 0.000 0.000
AREA ( M2 ) 404.223

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+400.00 06+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-46.959 305.035 0.000 304.748 0.000
320.000
-40.306 305.039 0.000 304.748 -0.402 609.882 -122.586
-26.202 305.230 -0.402 305.134 -1.297 610.103 -395.652 315.000
-25.750 305.056 -1.699 304.969 -24.051 610.025 -7,335.856
-1.699 304.969 -25.750 305.056 -0.365 610.253 -111.371 310.000
-0.402 305.134 -26.115 305.197 12.215 616.502 3,765.286 305.000
0.000 304.748 -13.900 311.305 0.300 622.610 93.392
0.103 304.650 -13.600 311.305 1.500 622.640 466.980 300.000
4.000 304.673 -12.100 311.335 2.500 622.720 778.400 295.000
14.046 304.371 -9.600 311.385 9.200 622.954 2,865.588
23.548 304.261 -0.400 311.569 0.250 623.138 77.892 290.000
24.045 304.554 -0.150 311.569 0.150 623.138 46.735
50.591 304.512 0.000 311.569 0.150 623.138 46.735
0.150 311.569 0.250 623.138 77.892 EXISTING DATA UKUR REALISASI
0.400 311.569 9.200 622.954 2,865.588
9.600 311.385 2.500 622.720 778.400
12.100 311.335 1.500 622.640 466.980
06+400.00
13.600 311.305 0.300 622.610 93.392
13.900 311.305 11.700 616.760 3,608.046
25.600 305.455 2.000 610.950 610.950
27.600 305.495 1.884 610.040 574.658
29.484 304.545 -5.439 609.099 -1,656.445
24.045 304.554 -0.497 608.815 -151.291
23.548 304.261 -9.502 608.632 -2,891.611
14.046 304.371 -10.046 609.044 -3,059.228
4.000 304.673 -3.897 609.323 -1,187.266
0.103 304.650 -0.103 609.398 -31.384
0.000 304.748 0.000 304.748 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 274.226

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+425.00 06+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-21.486 310.970 0.000 307.882 0.000
-20.285 310.586 0.000 307.882 -3.392 615.930 -1,044.617 314.000
-17.586 310.555 -3.392 308.048 -2.146 617.301 -662.364
312.000
-17.139 311.154 -5.538 309.253 -3.747 617.619 -1,157.109
310.000
-15.586 310.974 -9.285 308.366 -6.173 619.287 -1,911.429
-9.285 308.366 -15.458 310.921 1.558 622.621 485.022 308.000
-5.538 309.253 -13.900 311.700 0.300 623.400 93.510 306.000
-3.392 308.048 -13.600 311.700 1.500 623.429 467.572
304.000
0.000 307.882 -12.100 311.729 2.500 623.509 779.386
302.000
4.760 307.649 -9.600 311.780 9.200 623.744 2,869.222
28.455 307.131 -0.400 311.964 0.250 623.928 77.991 300.000
29.110 307.565 -0.150 311.964 0.150 623.928 46.795
36.607 307.498 0.000 311.964 0.150 623.928 46.795
37.403 307.964 0.150 311.964 0.250 623.928 77.991 EXISTING DATA UKUR REALISASI
42.457 307.986 0.400 311.964 9.200 623.744 2,869.222
44.603 309.000 9.600 311.780 2.500 623.509 779.386
48.606 308.818 12.100 311.729 1.500 623.429 467.572
06+425.00
51.557 308.850 13.600 311.700 0.300 623.400 93.510
13.900 311.700 8.890 618.955 2,751.255
22.790 307.255 -18.030 614.904 -5,543.360
4.760 307.649 -4.760 615.531 -1,464.964
0.000 307.882 0.000 307.882 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) 121.386

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+450.00 06+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 313.181 0.000
-32.968 315.343 0.000 313.181 -3.059 626.460 -958.171 320.000
-28.763 315.062 -3.059 313.279 -2.999 627.524 -940.972
-24.563 315.312 -6.058 314.245 -7.355 628.832 -2,312.593 318.000
-16.959 315.508 -13.413 314.587 -3.546 630.095 -1,117.095
316.000
-13.413 314.587 -16.959 315.508 -7.604 630.820 -2,398.378
-6.058 314.245 -24.563 315.312 -0.434 630.598 -136.840
314.000
-3.059 313.279 -24.997 315.286 6.397 627.470 2,006.963
0.000 313.181 -18.600 312.184 1.600 624.336 499.469 312.000
5.390 313.009 -17.000 312.152 3.100 624.304 967.671
8.636 312.808 -13.900 312.152 0.300 624.304 93.646 310.000
10.382 312.117 -13.600 312.152 1.500 624.333 468.250
13.533 311.893 -12.100 312.181 2.500 624.413 780.516 308.000
15.384 310.959 -9.600 312.232 9.200 624.648 2,873.381
16.130 310.694 -0.400 312.416 0.250 624.832 78.104
18.178 310.628 -0.150 312.416 0.150 624.832 46.862
EXISTING DATA UKUR REALISASI
18.981 311.177 0.000 312.416 0.150 624.832 46.862
21.034 310.970 0.150 312.416 0.250 624.832 78.104
06+450.00
22.435 309.986 0.400 312.416 9.200 624.648 2,873.381
25.639 310.098 9.600 312.232 2.500 624.413 780.516
26.342 309.589 12.100 312.181 1.500 624.333 468.250
38.293 309.584 13.600 312.152 0.300 624.304 93.646
43.544 309.055 13.900 312.152 2.902 622.825 903.719
46.839 310.722 16.802 310.673 -0.672 621.367 -208.779
52.356 310.821 16.130 310.694 -0.746 621.653 -231.877
15.384 310.959 -1.851 622.852 -576.450
13.533 311.893 -3.151 624.010 -983.128
10.382 312.117 -1.746 624.925 -545.560
8.636 312.808 -3.246 625.817 -1,015.701
5.390 313.009 -5.390 626.190 -1,687.582
0.000 313.181 0.000 313.181 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -53.784

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+475.00 06+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-29.577 316.649 0.000 0.000 0.000
-25.425 316.636 0.000 0.000 0.000 320.000
-15.724 316.855 0.000 0.000 0.000 319.000
-7.277 316.945 0.000 0.000 0.000 318.000
0.000 316.818 0.000 0.000 0.000 317.000
5.820 316.716 0.000 0.000 0.000 316.000
8.717 316.631 0.000 0.000 0.000 315.000
8.865 316.496 0.000 0.000 0.000 314.000
11.769 315.744 0.000 0.000 0.000 313.000
312.000
30.366 315.553 0.000 316.818 0.000
311.000
36.514 315.216 0.000 316.818 -7.277 633.763 -2,305.947
310.000
42.764 315.743 -7.277 316.945 -8.447 633.800 -2,676.854
46.938 315.915 -15.724 316.855 -8.830 633.511 -2,796.951
-24.554 316.656 4.038 630.620 1,273.222
-20.516 313.964 10.702 627.445 3,357.458 EXISTING DATA UKUR REALISASI
-9.814 313.481 4.050 626.779 1,269.227
-5.764 313.298 5.764 626.487 1,805.536
06+475.00
0.000 313.189 8.949 626.171 2,801.802
8.949 312.982 7.318 626.827 2,293.560
16.267 313.845 4.395 627.848 1,379.696
20.662 314.003 0.614 628.028 192.805
21.276 314.025 3.177 629.639 1,000.182
24.453 315.614 -12.684 631.358 -4,004.072
11.769 315.744 -2.904 632.240 -918.012
8.865 316.496 -0.148 633.127 -46.851
8.717 316.631 -2.897 633.347 -917.403
5.820 316.716 -5.820 633.534 -1,843.584
0.000 316.818 0.000 316.818 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -136.188

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+500.00 06+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-26.134 317.611 0.000 0.000 0.000 320.000
-23.931 317.720 0.000 0.000 0.000 319.000
-20.678 318.040 0.000 0.000 0.000 318.000
317.000
-7.433 318.109 0.000 0.000 0.000
316.000
0.000 318.407 0.000 0.000 0.000
315.000
6.020 318.648 0.000 318.407 0.000
314.000
23.623 318.631 0.000 318.407 -7.433 636.516 -2,365.612 313.000
29.425 319.003 -7.433 318.109 -13.245 636.149 -4,212.897 312.000
36.922 319.405 -20.678 318.040 -2.487 635.835 -790.661 311.000
40.623 319.463 -23.165 317.795 3.982 631.608 1,257.532 310.000
-19.183 313.813 3.720 627.822 1,167.749
-15.463 314.009 3.677 628.212 1,154.968
-11.786 314.203 5.725 628.261 1,798.397 EXISTING DATA UKUR REALISASI
-6.061 314.058 6.061 628.181 1,903.703
0.000 314.123 11.256 627.875 3,533.681
11.256 313.752 7.881 627.516 2,472.727
19.137 313.764 4.855 631.374 1,532.660
23.992 317.610 4.188 635.631 1,331.011
06+500.00
28.180 318.021 2.052 637.067 653.631
30.232 319.046 -0.807 638.049 -257.453
29.425 319.003 -5.802 637.634 -1,849.776
23.623 318.631 -17.603 637.279 -5,609.011
6.020 318.648 -6.020 637.055 -1,917.536
0.000 318.407 0.000 318.407 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -196.887

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+525.00 06+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-26.066 318.723 0.000 0.000 0.000
-23.169 318.749 0.000 319.747 0.000 322.000
-19.020 318.793 0.000 319.747 -1.022 639.352 -326.709 320.000
-10.170 319.371 -1.022 319.605 -1.398 639.010 -446.668
318.000
-9.917 319.329 -2.420 319.405 -7.497 638.734 -2,394.294
-2.420 319.405 -9.917 319.329 -0.253 638.700 -80.796 316.000
-1.022 319.605 -10.170 319.371 -8.850 638.164 -2,823.876
314.000
0.000 319.747 -19.020 318.793 -4.149 637.542 -1,322.581
1.876 320.009 -23.169 318.749 -0.772 637.491 -246.072 312.000
5.980 319.989 -23.941 318.742 3.234 634.250 1,025.582 310.000
16.385 319.982 -20.707 315.508 6.947 631.098 2,192.119
17.381 320.101 -13.760 315.590 7.562 631.269 2,386.828
18.027 320.298 -6.198 315.679 6.198 631.468 1,956.919
EXISTING DATA UKUR REALISASI
18.276 320.330 0.000 315.789 5.159 632.241 1,630.866
28.477 320.578 5.159 316.452 7.239 632.887 2,290.734
28.830 320.692 12.398 316.435 6.202 632.766 1,962.207
30.176 320.939 18.600 316.331 5.012 634.566 1,590.222
31.578 320.808 23.612 318.235 5.162 636.723 1,643.382
35.224 320.814 28.774 318.488 1.826 637.889 582.393
39.072 320.798 30.600 319.401 2.000 638.760 638.760
32.600 319.359 2.907 640.172 930.490
35.507 320.813 -0.283 641.627 -90.790
35.224 320.814 -3.646 641.622 -1,169.677
31.578 320.808 -1.402 641.747 -449.865
30.176 320.939 -1.346 641.631 -431.818
28.830 320.692 -0.353 641.270 -113.184
28.477 320.578 -10.201 640.908 -3,268.951
18.276 320.330 -0.249 640.628 -79.758
18.027 320.298 -0.646 640.399 -206.849
06+525.00
17.381 320.101 -0.996 640.083 -318.761
16.385 319.982 -10.405 639.971 -3,329.449
5.980 319.989 -4.104 639.998 -1,313.276
1.876 320.009 -1.876 639.756 -600.091
0.000 319.747 0.000 319.747 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -182.961

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+550.00 06+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-26.856 320.961 0.000 0.000 0.000
325.000
-22.854 321.323 0.000 322.522 0.000
-15.504 321.918 0.000 322.522 -11.553 644.937 -3,725.479
-11.553 322.415 -11.553 322.415 -3.951 644.333 -1,272.880 320.000
0.000 322.522 -15.504 321.918 -7.350 643.241 -2,363.911
5.700 322.575 -22.854 321.323 -1.391 642.520 -446.873
315.000
26.355 322.777 -24.245 321.197 0.715 640.965 229.145
33.452 323.517 -23.530 319.768 2.000 639.577 639.577
37.453 323.553 -21.530 319.809 1.125 637.368 358.520 310.000
40.302 323.588 -20.405 317.559 1.978 635.118 628.132
46.029 323.658 -18.427 317.559 18.427 635.855 5,858.450
305.000
0.000 318.296 6.921 636.470 2,202.504
6.921 318.174 8.395 636.460 2,671.541
15.316 318.286 2.503 637.349 797.642 300.000
17.819 319.063 9.332 638.713 2,980.235
27.151 319.650 0.449 639.600 143.590
295.000
27.600 319.950 2.000 639.858 639.858
29.600 319.908 5.433 643.439 1,747.902
35.033 323.531 -1.581 647.048 -511.491 290.000
33.452 323.517 -7.097 646.294 -2,293.374
26.355 322.777 -20.655 645.352 -6,664.873
5.700 322.575 -5.700 645.097 -1,838.526
0.000 322.522 0.000 322.522 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
06+550.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -220.311

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+575.00 06+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-26.564 322.681 0.000 0.000 0.000
325.000
-23.314 322.914 0.000 323.391 0.000
-8.312 323.166 0.000 323.391 -8.312 646.557 -2,687.091 323.000
0.000 323.391 -8.312 323.166 -15.002 646.080 -4,846.246
5.190 323.532 -23.314 322.914 -1.491 645.721 -481.385 321.000
19.386 324.187 -24.805 322.807 1.317 642.981 423.403
319.000
35.634 323.984 -23.488 320.174 2.000 640.390 640.390
37.435 324.478 -21.488 320.216 1.167 638.098 372.330
317.000
40.133 324.448 -20.321 317.882 8.369 635.764 2,660.354
-11.952 317.882 6.130 636.949 1,952.249 315.000
-5.822 319.067 5.822 638.880 1,859.780
0.000 319.813 7.806 639.262 2,495.040 313.000
7.806 319.449 6.594 639.089 2,107.076
311.000
14.400 319.640 2.982 640.198 954.535
17.382 320.558 12.490 641.137 4,003.901 309.000
29.872 320.579 5.118 644.571 1,649.457
34.990 323.992 -15.604 648.179 -5,057.093 307.000
19.386 324.187 -14.196 647.719 -4,597.509
5.190 323.532 -5.190 646.923 -1,678.765 305.000
0.000 323.391 0.000 323.391 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
06+575.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -229.574

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+600.00 06+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-30.340 323.070 0.000 324.233 0.000 328.000
-24.641 323.196 0.000 324.233 -7.788 648.227 -2,524.196
326.000
-7.788 323.994 -7.788 323.994 -16.853 647.190 -5,453.547
0.000 324.233 -24.641 323.196 -0.105 646.390 -33.935 324.000
4.510 324.372 -24.746 323.194 1.310 643.768 421.668
13.708 324.834 -23.436 320.574 2.000 641.190 641.190 322.000
14.811 325.237 -21.436 320.616 0.583 640.066 186.579
320.000
23.556 325.457 -20.853 319.450 6.809 638.900 2,175.135
35.660 325.682 -14.044 319.450 10.157 638.219 3,241.195 318.000
36.260 325.854 -3.887 318.769 3.887 638.365 1,240.662
0.000 319.596 10.362 639.542 3,313.467 316.000
10.362 319.946 7.759 641.686 2,489.421
314.000
18.121 321.740 1.992 643.463 640.889
20.113 321.723 10.594 643.360 3,407.878 312.000
30.707 321.637 6.773 647.791 2,193.744
37.480 326.154 -1.220 652.008 -397.725 310.000
36.260 325.854 -0.600 651.536 -195.461
35.660 325.682 -12.104 651.139 -3,940.693
23.556 325.457 -8.745 650.694 -2,845.160
14.811 325.237 -1.103 650.071 -358.514
13.708 324.834 -9.198 649.206 -2,985.698 EXISTING DATA UKUR REALISASI
4.510 324.372 -4.510 648.605 -1,462.604
0.000 324.233 0.000 324.233 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
06+600.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -245.704

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+625.00 06+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
0.000 324.572 0.000 0.000 0.000 330.000
-2.131 324.424 0.000 0.000 0.000
-10.583 324.322 0.000 0.000 0.000 328.000
-12.132 323.783 0.000 324.572 0.000
326.000
-24.617 323.432 0.000 324.572 -2.131 648.996 -691.505
-23.387 320.971 -2.131 324.424 -8.452 648.746 -2,741.601 324.000
-21.387 321.013 -10.583 324.322 -1.549 648.105 -501.957
-19.247 316.733 -12.132 323.783 -12.485 647.215 -4,040.240 322.000

-17.000 316.688 -24.617 323.432 1.230 644.403 396.308


320.000
-13.900 316.688 -23.387 320.971 2.000 641.984 641.984
-13.600 316.688 -21.387 321.013 2.140 637.746 682.388 318.000
-12.100 316.718 -19.247 316.733 2.247 633.421 711.648
316.000
-9.600 316.768 -17.000 316.688 3.100 633.376 981.733
-5.726 316.845 -13.900 316.688 0.300 633.376 95.006 314.000
0.000 319.278 -13.600 316.688 1.500 633.406 475.055
4.945 319.594 -12.100 316.718 2.500 633.486 791.858 312.000
12.613 322.812 -9.600 316.768 3.874 633.613 1,227.308
310.000
17.856 322.578 -5.726 316.845 5.726 636.123 1,821.220
25.518 322.546 0.000 319.278 4.945 638.872 1,579.611
31.323 322.546 4.945 319.594 7.668 642.406 2,462.985
36.820 326.212 12.613 322.812 5.243 645.390 1,691.890
34.224 326.136 17.856 322.578 7.662 645.124 2,471.470
28.621 326.280 25.518 322.546 5.805 645.092 1,872.380
EXISTING DATA UKUR REALISASI
23.321 325.516 31.323 322.546 5.497 648.758 1,783.111
10.369 325.283 36.820 326.212 -2.596 652.348 -846.748
8.017 324.895 34.224 326.136 -5.603 652.416 -1,827.743
3.720 324.838 28.621 326.280 -5.300 651.796 -1,727.259
06+625.00
0.000 324.572 23.321 325.516 -12.952 650.799 -4,214.574
10.369 325.283 -2.352 650.178 -764.609
8.017 324.895 -4.297 649.733 -1,395.951
3.720 324.838 -3.720 649.410 -1,207.903
0.000 324.572 0.000 324.572 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -274.136

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+650.00 06+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-29.468 323.403 0.000 0.000 0.000
330.000
-26.765 323.412 0.000 0.000 0.000
-23.768 323.381 0.000 0.000 0.000 328.000
-19.918 323.793 0.000 0.000 0.000
326.000
-14.367 324.221 0.000 325.114 0.000
-8.516 324.290 0.000 325.114 -1.560 649.832 -506.869 324.000
-6.712 324.622 -1.560 324.718 -5.152 649.340 -1,672.700
-1.560 324.718 -6.712 324.622 -1.804 648.912 -585.319 322.000
0.000 325.114 -8.516 324.290 -5.851 648.511 -1,897.219
320.000
0.893 325.341 -14.367 324.221 -5.551 648.014 -1,798.563
2.890 325.233 -19.918 323.793 -3.850 647.174 -1,245.810 318.000
10.490 325.297 -23.768 323.381 -0.577 646.768 -186.593
12.140 326.035 -24.345 323.387 0.745 645.284 240.368 316.000

23.744 326.017 -23.600 321.897 2.000 643.816 643.816 314.000


25.944 326.968 -21.600 321.919 0.885 642.088 284.124
32.747 326.965 -20.715 320.169 9.920 640.338 3,176.076 312.000
34.851 327.002 -10.795 320.169 10.795 639.836 3,453.515
310.000
0.000 319.667 10.231 640.464 3,276.294
10.231 320.797 8.700 644.067 2,801.691
18.931 323.270 2.087 646.559 674.684
21.018 323.289 8.480 646.654 2,741.813
29.498 323.365 0.000 645.264 0.000
29.498 321.899 0.102 643.796 32.834
EXISTING DATA UKUR REALISASI
29.600 321.897 7.720 648.943 2,504.920
37.320 327.046 -2.469 654.048 -807.422
34.851 327.002 -2.104 653.967 -687.973
32.747 326.965 -6.803 653.933 -2,224.353
06+650.00
25.944 326.968 -2.200 652.985 -718.284
23.744 326.017 -11.604 652.052 -3,783.206
12.140 326.035 -1.650 651.332 -537.349
10.490 325.297 -7.600 650.530 -2,472.014
2.890 325.233 -1.997 650.574 -649.598
0.893 325.341 -0.893 650.455 -290.428
0.000 325.114 0.000 325.114 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -233.563

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+675.00 06+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-30.675 323.387 0.000 0.000 0.000
330.000
-27.263 323.359 0.000 324.778 0.000
-14.945 323.605 0.000 324.778 -0.539 649.427 -175.021 328.000
-11.521 324.019 -0.539 324.649 -9.488 649.240 -3,079.995
326.000
-10.027 324.591 -10.027 324.591 -1.494 648.610 -484.512
-0.539 324.649 -11.521 324.019 -3.424 647.624 -1,108.732 324.000
0.000 324.778 -14.945 323.605 -9.165 647.027 -2,965.001
2.070 325.273 -24.110 323.422 0.510 645.819 164.684 322.000
13.084 325.259 -23.600 322.397 2.000 644.836 644.836
320.000
14.587 326.038 -21.600 322.439 0.282 644.313 90.848
28.825 326.025 -21.318 321.874 4.195 643.748 1,350.261 318.000
31.902 326.950 -17.123 321.874 17.123 643.288 5,507.510
36.241 327.156 0.000 321.414 9.373 642.725 3,012.131 316.000

9.373 321.311 6.044 645.015 1,949.235 314.000


15.417 323.704 11.352 647.518 3,675.312
26.769 323.814 2.960 647.628 958.489 312.000
29.729 323.814 0.000 646.297 0.000
310.000
29.729 322.483 7.043 649.663 2,287.788
36.772 327.180 -0.531 654.336 -173.726
36.241 327.156 -4.339 654.106 -1,419.083
31.902 326.950 -3.077 652.975 -1,004.602
28.825 326.025 -14.238 652.063 -4,642.036
14.587 326.038 -1.503 651.297 -489.450
EXISTING DATA UKUR REALISASI
13.084 325.259 -11.014 650.532 -3,582.480
2.070 325.273 -2.070 650.051 -672.803
0.000 324.778 0.000 324.778 0.000
0.000 0.000 0.000
06+675.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -156.345

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+700.00 06+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-34.769 322.645 0.000 0.000 0.000 328.000
-30.071 323.504 0.000 0.000 0.000
-25.621 323.596 0.000 324.587 0.000 326.000
-24.073 323.977 0.000 324.587 -1.923 649.244 -624.248
-3.324 323.994 -1.923 324.657 -1.401 648.651 -454.380 324.000
-1.923 324.657 -3.324 323.994 -20.749 647.971 -6,722.375
322.000
0.000 324.587 -24.073 323.977 -1.548 647.573 -501.222
1.330 324.539 -25.621 323.596 -4.450 647.100 -1,439.798
320.000
7.681 324.774 -30.071 323.504 -1.184 646.791 -382.900
9.033 325.237 -31.255 323.287 1.435 645.618 463.231 318.000
19.187 325.523 -29.820 322.331 13.462 644.662 4,339.220
20.333 326.053 -16.358 322.331 16.358 643.899 5,266.450 316.000
22.632 326.042 0.000 321.568 13.262 643.495 4,267.015
23.387 326.338 13.262 321.927 4.022 646.100 1,299.307 314.000
29.942 326.291 17.284 324.173 11.217 648.258 3,635.755
312.000
30.844 326.690 28.501 324.085 2.599 650.769 845.674
35.199 326.588 31.100 326.684 -0.256 653.374 -83.632
310.000
30.844 326.690 -0.902 652.981 -294.494
29.942 326.291 -6.555 652.629 -2,138.992
23.387 326.338 -0.755 652.380 -246.273
22.632 326.042 -2.299 652.095 -749.583
20.333 326.053 -1.146 651.576 -373.353
19.187 325.523 -10.154 650.760 -3,303.909
EXISTING DATA UKUR REALISASI
9.033 325.237 -1.352 650.011 -439.407
7.681 324.774 -6.351 649.313 -2,061.893
1.330 324.539 -1.330 649.126 -431.669
0.000 324.587 0.000 324.587 0.000
06+700.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -131.476

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+725.00 06+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-37.255 322.606 0.000 0.000 0.000
330.000
-32.855 322.515 0.000 0.000 0.000
-19.054 322.564 0.000 0.000 0.000
325.000
-16.406 323.321 0.000 0.000 0.000
-5.909 323.226 0.000 0.000 0.000
320.000
-4.325 324.071 0.000 0.000 0.000
0.000 324.004 0.000 324.004 0.000
315.000
0.730 323.993 0.000 324.004 -4.325 648.075 -1,401.462
4.184 324.106 -4.325 324.071 -1.584 647.297 -512.659
310.000
5.682 324.564 -5.909 323.226 -10.497 646.547 -3,393.402
11.483 324.648 -16.406 323.321 -2.648 645.885 -855.152
305.000
12.281 325.037 -19.054 322.564 -8.396 645.098 -2,708.121
15.230 324.883 -27.450 322.534 2.037 643.710 655.619
300.000
16.532 325.321 -25.413 321.176 15.413 642.829 4,953.962
23.836 325.181 -10.000 321.653 5.000 643.394 1,608.485
25.385 325.712 -5.000 321.741 5.000 643.336 1,608.340 295.000

31.080 325.554 0.000 321.595 5.000 643.139 1,607.848


35.469 325.885 5.000 321.544 5.000 643.077 1,607.693 290.000

10.000 321.533 6.000 643.075 1,929.225


16.000 321.542 9.962 643.084 3,203.201
25.962 321.542 1.638 644.176 527.580
27.600 322.634 2.000 645.226 645.226
29.600 322.592 3.083 648.267 999.304
32.683 325.675 -1.603 651.229 -521.960 EXISTING DATA UKUR REALISASI

31.080 325.554 -5.695 651.266 -1,854.480


25.385 325.712 -1.549 650.893 -504.117
23.836 325.181 -7.304 650.502 -2,375.633
16.532 325.321 -1.302 650.204 -423.283
15.230 324.883 -2.949 649.920 -958.307
06+725.00
12.281 325.037 -0.798 649.685 -259.224
11.483 324.648 -5.801 649.212 -1,883.039
5.682 324.564 -1.498 648.670 -485.854
4.184 324.106 -3.454 648.099 -1,119.267
0.730 323.993 -0.730 647.997 -236.519
0.000 324.004 0.000 324.004 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -145.998

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+750.00 06+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-39.244 322.290 0.000 324.040 0.000
328.000
-35.590 322.527 0.000 324.040 -3.686 648.128 -1,194.500
-29.495 322.684 -3.686 324.088 -1.003 647.483 -324.713 326.000
-11.942 322.658 -4.689 323.395 -5.701 646.788 -1,843.669
-10.390 323.393 -10.390 323.393 -1.552 646.051 -501.336 324.000
-4.689 323.395 -11.942 322.658 -17.553 645.342 -5,663.844
-3.686 324.088 -29.495 322.684 -0.366 645.358 -118.101 322.000

0.000 324.040 -29.861 322.674 3.356 643.671 1,080.080


320.000
0.310 324.036 -26.505 320.997 21.505 642.717 6,910.815
1.414 324.057 -5.000 321.720 5.000 643.461 1,608.653
318.000
2.816 324.924 0.000 321.741 5.000 643.464 1,608.660
13.562 324.942 5.000 321.723 5.000 643.361 1,608.403 316.000
14.359 325.326 10.000 321.638 5.000 643.271 1,608.178
21.457 325.303 15.000 321.633 10.484 643.266 3,372.000 314.000
22.304 325.627 25.484 321.633 2.116 644.677 682.068
30.102 325.597 27.600 323.044 2.000 646.046 646.046 312.000

31.657 326.367 29.600 323.002 3.324 649.328 1,079.183


310.000
36.306 326.219 32.924 326.326 -1.267 652.693 -413.481
31.657 326.367 -1.555 651.964 -506.902
30.102 325.597 -7.798 651.224 -2,539.122
22.304 325.627 -0.847 650.930 -275.669
21.457 325.303 -7.098 650.629 -2,309.082
14.359 325.326 -0.797 650.268 -259.132
EXISTING DATA UKUR REALISASI
13.562 324.942 -10.746 649.866 -3,491.730
2.816 324.924 -1.402 648.981 -454.936
1.414 324.057 -1.104 648.093 -357.747
0.310 324.036 -0.310 648.076 -100.452
0.000 324.040 0.000 324.040 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
06+750.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -150.330

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
PAKET : PEMBANGUNAN JALAN TOL PANDAAN-MALANG
RUAS : STA 3+575 S/D 6+775
SUB. CONT. : PT. GORGA MARGA MANDIRI
MAIN CONT. : PT. PP (PERSERO) Tbk.

BACK UP DATA PENDUKUNG


0

EXISTING DATA UKUR REALISASI


STA. 06+775.00 06+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-44.030 321.896 0.000 0.000 0.000 328.000
-39.030 322.077 0.000 0.000 0.000
-29.130 322.483 0.000 324.755 0.000
326.000
-28.530 322.489 0.000 324.755 -2.230 649.506 -724.199
-27.130 322.683 -2.230 324.751 -1.600 648.731 -518.985
-20.530 323.016 -3.830 323.980 -0.400 647.973 -129.595 324.000
-19.930 322.858 -4.230 323.993 -5.600 647.406 -1,812.737
-19.630 322.858 -9.830 323.413 -6.700 646.428 -2,165.534 322.000
-16.530 323.015 -16.530 323.015 -3.100 645.873 -1,001.103
-9.830 323.413 -19.630 322.858 -0.300 645.716 -96.857
320.000
-4.230 323.993 -19.930 322.858 -0.600 645.874 -193.762
-3.830 323.980 -20.530 323.016 -6.600 645.699 -2,130.807
-2.230 324.751 -27.130 322.683 -1.400 645.172 -451.620 318.000
0.000 324.755 -28.530 322.489 -0.214 644.976 -69.012
0.070 324.755 -28.744 322.487 3.234 643.357 1,040.308 316.000
8.470 324.663 -25.510 320.870 20.510 642.390 6,587.709
9.270 324.996 -5.000 321.520 5.000 643.061 1,607.653
314.000
12.570 325.178 0.000 321.541 5.000 643.064 1,607.660
13.770 325.569 5.000 321.523 5.000 642.961 1,607.403
20.370 325.623 10.000 321.438 5.000 642.871 1,607.178
21.770 326.126 15.000 321.433 7.603 642.851 2,443.798
27.070 326.143 22.603 321.418 1.997 644.833 643.866
28.070 326.483 24.600 323.415 2.000 646.788 646.788
EXISTING DATA UKUR REALISASI
34.770 326.453 26.600 323.373 3.103 649.849 1,008.241
29.703 326.476 -1.633 652.959 -533.141
28.070 326.483 -1.000 652.626 -326.313
27.070 326.143 -5.300 652.269 -1,728.513
06+775.00
21.770 326.126 -1.400 651.749 -456.224
20.370 325.623 -6.600 651.192 -2,148.934
13.770 325.569 -1.200 650.747 -390.448
12.570 325.178 -3.300 650.174 -1,072.787
9.270 324.996 -0.800 649.659 -259.864
8.470 324.663 -8.400 649.418 -2,727.556
0.070 324.755 -0.070 649.510 -22.733
0.000 324.755 0.000 324.755 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) -160.121

DISETUJUI OLEH, DIAJUKAN OLEH,


PT. PP (PERSERO) Tbk. SUB KONTRAKTOR
PT. GORGA MARGA MANDIRI

……………………… ……………………….
Quantity Officer Quantity
REKAPITULASI
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : PROYEK JALUR LINTAS SELATAN LOT 6
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : Galian Biasa untuk Timbunan
No Item Pembayaran : 7
Satuan : m³

No. Lokasi Sat Volume Keterangan


a b c d e

1 14 + 900 s/d 14 + 100 m³ #REF!

A Jumlah s/d Periode Saat Ini #REF!


B Jumlah s/d Periode Saat Lalu -
C =(A-B) Jumlah Periode Ini #REF! MC.5

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk. PT.GORGA MARGA MANDIRI

.................. ........................
Site Manager Site Manager
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+900 L/R #REF!


25 - #REF!
2 14+875 L/R #REF!
25 - #REF!
3 14+850 L/R
25 - -
4 14+825 L/R
25 - #REF!
5 14+800 L/R #REF!
25 - #REF!
6 14+775 L/R #REF!
25 - #REF!
7 14+750 L/R #REF!
25 - #REF!
8 14+725 L/R #REF!
25 - #REF!
9 14+700 L/R #REF!
25 - #REF!
10 14+675 L/R #REF!
25 - #REF!
11 14+650 L/R #REF!
25 - #REF!
12 14+625 L/R
25 - -
13 14+600 L/R
25 - -
14 14+575 L/R
25 - -
15 14+550 L/R
25 - -
16 14+525 L/R
25 - -
17 14+500 L/R
25 - -
18 14+475 L/R

SUB T O T A L VOLUME 425 - #REF!


KOMULATIF T O T A L VOLUME 425 - #REF!
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+475 L/R -
25 #REF! -
2 14+450 L/R #REF!
25 #REF! -
3 14+425 L/R #REF!
25 #REF! -
4 14+400 L/R #REF!
25 #REF! -
5 14+375 L/R #REF!
25 #REF! -
6 14+350 L/R #REF!
25 #REF! -
7 14+325 L/R #REF!
25 #REF! -
8 14+300 L/R #REF!
25 #REF! -
9 14+275 L/R #REF!
25 #REF! -
10 14+250 L/R #REF!
25 #REF! -
11 14+225 L/R #REF!
25 #REF! -
12 14+200 L/R #REF!
25 #REF! -
13 14+175 L/R #REF!
25 #REF! -
14 14+150 L/R #REF!
25 #REF! -
15 14+125 L/R #REF!
25 #REF! -
16 14+100 L/R -
25 - -
17 14+075 L/R
25 #REF! -
18 14+050 L/R #REF!

SUB T O T A L VOLUME 425 #REF! -


KOMULATIF T O T A L VOLUME 850 #REF! #REF!
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+050 L/R #REF!


25 #REF! -
2 14+025 L/R #REF!
25 #REF! -
3 14+000 L/R #REF!
25 #REF! -
4 13+975 L/R Err:509
25 Err:509 -
5 13+950 L/R Err:509
25 Err:509 -
6 13+925 L/R Err:509
25 Err:509 -
7 13+900 L/R Err:509
25 Err:509 -
8 13+875 L/R Err:509
25 Err:509 -
9 13+850 L/R Err:509
25 Err:509 -
10 13+825 L/R Err:509
25 Err:509 -
11 13+800 L/R Err:509
25 Err:509 -
12 13+775 L/R Err:509
25 Err:509 -
13 13+750 L/R Err:509
25 Err:509 -
14 13+725 L/R Err:509
25 Err:509 -
15 13+700 L/R Err:509
25 Err:509 -
16 13+675 L/R Err:509
25 Err:509 -
17 13+650 L/R Err:509
25 Err:509 -
18 13+625 L/R Err:509 -

SUB T O T A L VOLUME 425 Err:509 -


KOMULATIF T O T A L VOLUME 1275 Err:509 #REF!
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 13+625 L/R Err:509


25 Err:509 -
2 13+600 L/R Err:509
25 Err:509 -
3 13+575 L/R Err:509
25 Err:509 -
4 13+550 L/R Err:509
25 Err:509 -
5 13+525 L/R Err:509
25 Err:509 -
6 13+500 L/R Err:509
25 Err:509 -
7 13+475 L/R Err:509
25 Err:509 -
8 13+450 L/R Err:509
25 Err:509 -
9 13+425 L/R Err:509
25 Err:509 -
10 13+400 L/R Err:509
25 Err:509 -
11 13+375 L/R Err:509
25 Err:509 -
12 13+350 L/R Err:509
25 Err:509 -
13 13+325 L/R Err:509
25 Err:509 -
14 13+300 L/R Err:509
25 Err:509 -
15 13+275 L/R Err:509
25 Err:509 -
16 13+250 L/R -
25 - -
17 13+225 L/R -
25 - -
18 13+200 L/R -

SUB T O T A L VOLUME 425 Err:509 -


KOMULATIF T O T A L VOLUME 1700 Err:509 #REF!
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 13+200 L/R -
25 - 663.10 -
2 13+175 L/R - 53.05
25 - 1,400.93
3 13+150 L/R - 59.03
25 - 737.83
4 13+125 L/R -
25 - 791.84
5 13+100 L/R - 63.35
25 - 1,196.91
6 13+075 L/R - 32.41
25 - 677.85
7 13+050 L/R - 21.82
25 - 448.34
8 13+025 L/R - 14.05
25 - 471.11
9 13+000 L/R - 23.64
25 - 428.56
10 12+975 L/R - 10.64
25 - 294.99
11 12+950 L/R - 12.96
25 - 161.98
12 12+925 L/R -
25 -
13 12+900 L/R -
25 -
14 12+875 L/R -
25 - 169.05
15 12+850 L/R - 13.52
25 - 282.76
16 12+825 L/R - 9.10
25 - 147.50
17 12+800 L/R - 2.70
25 - 155.33
18 12+775 L/R - 9.72

SUB T O T A L VOLUME 425 - 7,273.43 -


KOMULATIF T O T A L VOLUME 2125 Err:509 #REF!
CALCULATION SHEET OF VOLUME

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 12+775 L/R - 9.72


25 - 234.49 -
2 12+750 L/R - 9.04
25 - 224.34
3 12+725 L/R - 8.91
25 - 351.24
4 12+700 L/R - 19.19
25 - 378.15
5 12+675 L/R - 11.06
25 - 1,150.24
6 12+650 L/R - 80.96
25 - 2,233.25
7 12+625 L/R - 97.71
25 - 1,221.31
8 12+600 L/R
25 -
9 12+575 L/R -
25 -
10 12+550 L/R -
25 -
11 12+525 L/R -
25 -
12 12+500 L/R -
25 -
13 12+475 L/R
25 -
14 12+450 L/R
25 -
15 12+425 L/R
25 -
16 12+400 L/R
25 -
17 12+375 L/R
25 -
18 12+350 L/R

SUB T O T A L VOLUME 425 - 5,793.01 -


KOMULATIF T O T A L VOLUME 2550 Err:509 #REF!
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+900.00 14+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
6.510 22.154 72.111
60.000
12 -39.359 20.106 6.510 22.154 -0.501 44.412 -11.125
11 -37.963 19.949 6.009 22.258 -1.264 44.549 -28.155 55.000

10 -36.486 20.160 4.745 22.291 -4.534 44.592 -101.090 50.000

9 -27.315 20.890 0.211 22.301 -0.211 44.585 -4.704 45.000


8 -24.084 20.930 0.000 22.284 -0.110 44.559 -2.451 40.000
7 -17.729 23.119 -0.110 22.275 -0.661 44.630 -14.750 35.000
6 -17.426 23.143 -0.771 22.355 -3.734 44.943 -83.909 30.000
5 -17.162 23.083 -4.505 22.588 -6.488 45.293 -146.930 25.000
4 -10.993 22.705 -10.993 22.705 -1.150 45.480 -26.151
20.000
3 -4.505 22.588 -12.143 22.775 0.810 43.930 17.792
15.000
2 -0.771 22.355 -11.333 21.155 1.000 42.310 21.155 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
1 -0.110 22.275 -10.333 21.155 2.500 42.310 52.888
0 0.000 22.284 -7.833 21.155 4.083 42.514 86.792
a 0.211 22.301 -3.750 21.359 3.750 42.831 80.308 EXISTING DATA UKUR REALISASI
b 4.745 22.291 0.000 21.472 3.750 42.831 80.308
c 6.009 22.258 3.750 21.359 4.083 42.514 86.792
d 6.510 22.154 7.833 21.155 1.842 42.310 38.968
14+900.00
e 7.268 21.818 9.675 21.155 -2.407 42.973 -51.718
f 13.927 19.983 7.268 21.818 -0.758 43.972 -16.665
g 20.356 19.649 6.510 22.154 -6.510 22.154 -72.111
h 24.021 19.555
i 27.047 18.864 11.333 21.155 119.875
j 36.195 17.718 11.333 21.155 -1.000 42.310 -21.155
k 48.348 17.047 10.333 21.155 -0.658 42.310 -13.920
l 50.000 17.023 9.675 21.155 3.697 41.291 76.326
13.372 20.136 -2.039 41.291 -42.096
11.333 21.155 -11.333 21.155 -119.875

AREA ( M2 ) FILL -0.845


AREA ( M2 ) CUT -22.646

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+875.00 14+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
11.651 22.541 131.313
10 -32.133 22.339 11.651 22.541 -0.757 45.352 -17.166
9 -29.295 22.013 10.894 22.811 -3.867 45.715 -88.390 60.000

8 -26.300 22.439 7.027 22.904 -0.757 45.802 -17.336 55.000


7 -24.120 22.610 6.270 22.898 -0.703 45.793 -16.096 50.000
6 -14.871 21.842 5.567 22.895 -4.252 45.818 -97.409 45.000
5 -12.719 21.789 1.315 22.923 -1.230 45.894 -28.225 40.000
4 -6.292 21.838 0.085 22.971 -0.085 45.899 -1.951 35.000
3 -4.863 21.815 0.000 22.928 -1.399 45.145 -31.579 30.000
2 -3.836 22.085 -1.399 22.217 1.399 44.439 31.085
25.000
1 -2.449 21.683 0.000 22.222 3.750 44.331 83.121
20.000
0 0.000 22.928 3.750 22.109 4.083 44.014 89.855
15.000
a 0.085 22.971 7.833 21.905 2.500 43.810 54.763 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
b 1.315 22.923 10.333 21.905 1.000 43.810 21.905
c 5.567 22.895 11.333 21.905 0.318 44.446 7.067
d 6.270 22.898 11.651 22.541 -11.651 22.541 -131.313 EXISTING DATA UKUR REALISASI
e 7.027 22.904 0.000 0.000 0.000
f 10.894 22.811
14+875.00
g 12.806 22.130 -1.399 22.217 -15.541
h 20.347 20.604 -1.399 22.217 -2.351 44.426 -52.223
i 22.885 19.962 -3.750 22.209 -4.083 44.214 -90.263
j 24.966 19.701 -7.833 22.005 -2.500 44.010 -55.013
k 50.000 18.291 -10.333 22.005 -1.000 44.010 -22.005
-11.333 22.005 -0.417 43.801 -9.133
-11.750 21.796 5.458 43.634 119.077
-6.292 21.838 1.429 43.653 31.190
-4.863 21.815 1.027 43.900 22.543
-3.836 22.085 1.387 43.768 30.353
-2.449 21.683 1.050 43.900 23.048
-1.399 22.217 1.399 22.217 15.541

AREA ( M2 ) FILL -2.425


AREA ( M2 ) CUT -10.357

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+850.00 14+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
11.717 23.378 136.960
10 -26.181 24.783 11.717 23.378 -6.027 47.056 -141.803
9 -21.894 24.232 5.690 23.678 -1.008 47.367 -23.873 60.000

8 -21.265 24.318 4.682 23.689 -4.377 47.517 -103.991 55.000


7 -18.935 24.104 0.305 23.828 -0.305 47.502 -7.244 50.000
6 -12.703 23.175 0.000 23.674 -0.296 47.199 -6.985 45.000
5 -7.089 23.042 -0.296 23.525 -3.156 46.787 -73.830 40.000
4 -5.576 23.044 -3.452 23.262 -0.337 46.624 -7.856 35.000
3 -3.789 23.362 -3.789 23.362 -1.787 46.406 -41.464 30.000
2 -3.452 23.262 -5.576 23.044 -1.513 46.086 -34.864
25.000
1 -0.296 23.525 -7.089 23.042 -4.355 46.187 -100.572
20.000
0 0.000 23.674 -11.444 23.145 0.111 46.068 2.557
15.000
a 0.305 23.828 -11.333 22.923 1.000 45.846 22.923 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
b 4.682 23.689 -10.333 22.923 2.500 45.846 57.308
c 5.690 23.678 -7.833 22.923 4.083 46.051 94.013
d 15.081 23.211 -3.750 23.128 7.500 45.944 172.290 EXISTING DATA UKUR REALISASI
e 15.733 23.189 3.750 22.816 4.083 45.428 92.741
f 16.108 23.158 7.833 22.612 2.500 45.224 56.530
14+850.00
g 16.602 23.106 10.333 22.612 1.000 45.224 22.612
h 17.135 22.951 11.333 22.612 0.384 45.990 8.830
i 23.782 21.323 11.717 23.378 -11.717 23.378 -136.960
j 31.804 20.321
k 34.753 20.220
l 50.000 19.265

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -12.679

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+825.00 14+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.848 24.880 122.509
8 -25.293 27.343 9.848 24.880 -7.143 49.828 -177.961
7 -24.385 27.209 2.705 24.948 -2.265 49.995 -56.619 65.000

6 -16.276 26.393 0.440 25.047 -0.440 50.063 -11.014 60.000

5 -14.784 26.140 0.000 25.016 -0.291 50.012 -7.277 55.000


50.000
4 -6.490 25.256 -0.291 24.996 -4.504 50.267 -113.201
45.000
3 -5.226 25.202 -4.795 25.271 -0.431 50.473 -10.877
40.000
2 -4.795 25.271 -5.226 25.202 -1.264 50.458 -31.889
35.000
1 -0.291 24.996 -6.490 25.256 -5.732 51.123 -146.519
30.000
0 0.000 25.016 -12.222 25.867 0.889 49.957 22.206
25.000
a 0.440 25.047 -11.333 24.090 1.000 48.180 24.090
20.000
b 2.705 24.948 -10.333 24.090 2.500 48.180 60.225
15.000
c 9.848 24.880 -7.833 24.090 4.083 48.384 98.776 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
d 12.514 24.207 -3.750 24.294 7.500 48.138 180.518
e 14.914 23.030 3.750 23.844 4.083 47.484 96.939
f 17.595 22.194 7.833 23.640 2.500 47.280 59.100 EXISTING DATA UKUR REALISASI
g 21.592 21.787 10.333 23.640 1.000 47.280 23.640
h 26.064 21.293 11.333 23.640 0.385 48.048 9.249
14+825.00
i 27.125 21.187 11.718 24.408 -1.870 49.288 -46.084
j 29.143 21.082 9.848 24.880 -9.848 24.880 -122.509
k 30.597 21.021
l 33.480 20.910
m 35.568 20.833
n 37.535 20.563
o 42.705 20.357
p 50.000 19.837

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -26.699

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+800.00 14+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.503 26.285 111.751
8 -30.095 29.969 8.503 26.285 -1.732 52.611 -45.561
65.000
7 -20.804 28.020 6.771 26.326 -6.330 52.714 -166.840
6 -18.878 27.809 0.441 26.388 -0.441 52.388 -11.552
55.000
5 -12.780 26.641 0.000 26.000 -0.112 51.901 -2.906
4 -10.757 26.414 -0.112 25.901 3.862 51.571 99.584 45.000
3 -4.482 25.842 3.750 25.670 4.083 51.136 104.394
2 -1.312 25.835 7.833 25.466 2.050 50.932 52.205 35.000
1 -0.268 25.764 9.883 25.466 -1.380 51.751 -35.708
0 0.000 26.000 8.503 26.285 -8.503 26.285 -111.751 25.000

a 0.441 26.388
15.000
b 6.771 26.326 -10.757 26.414 -142.068 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
c 8.503 26.285 -10.757 26.414 -0.875 52.926 -23.155
d 13.114 23.547 -11.632 26.512 0.299 52.428 7.838
e 13.823 23.202 -11.333 25.916 1.000 51.832 25.916 EXISTING DATA UKUR REALISASI
f 14.645 22.947 -10.333 25.916 2.500 51.832 64.790
g 21.821 21.677 -7.833 25.916 1.645 51.914 42.699
h 22.924 21.566 -6.188 25.998 -4.569 52.412 -119.735
14+800.00
i 26.310 21.322 -10.757 26.414 10.757 26.414 142.068
j 41.246 20.560
k 41.779 20.556 -3.750 26.120 -48.975
l 44.034 20.556 -3.750 26.120 -2.438 52.118 -63.532
m 44.554 20.552 -6.188 25.998 1.706 51.840 44.220
n 47.213 20.474 -4.482 25.842 3.170 51.677 81.908
o 50.000 20.360 -1.312 25.835 1.044 51.599 26.935
-0.268 25.764 0.156 51.665 4.030
-0.112 25.901 -3.638 52.021 -94.626
-3.750 26.120 3.750 26.120 48.975
11.333 25.466 144.303
11.333 25.466 -1.000 50.932 -25.466
10.333 25.466 -0.450 50.932 -11.460
9.883 25.466 3.231 49.013 79.181
13.114 23.547 0.709 46.749 16.573
13.823 23.202 0.822 46.149 18.967
14.645 22.947 2.671 45.421 60.660
17.316 22.474 -5.983 47.940 -143.413
11.333 25.466 -11.333 25.466 -144.303

AREA ( M2 ) CUT -6.384


AREA ( M2 ) CUT -1.647
AREA ( M2 ) FILL -1.066
AREA ( M2 ) FILL -4.958
Diperiksa dan Disetujui Oleh Dibuat Oleh
Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI
............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+775.00 14+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-11.707 29.098 -170.325
8 -50.000 32.426 -11.707 29.098 0.374 57.448 10.743
7 -25.114 32.379 -11.333 28.350 1.000 56.700 28.350 75.000

6 -22.938 31.867 -10.333 28.350 2.149 56.700 60.924


65.000
5 -16.550 30.128 -8.184 28.350 -3.523 57.448 -101.195
4 -15.092 29.817 -11.707 29.098 11.707 29.098 170.325 55.000
3 -6.464 27.984
45.000
2 -5.011 27.828 7.468 28.062 104.784
1 -2.242 27.028 7.468 28.062 -1.426 56.163 -40.044 35.000
0 -1.498 27.018 6.042 28.101 -4.214 56.320 -118.666
a 0.000 27.944 1.828 28.219 1.922 56.323 54.126 25.000
b 0.272 28.113 3.750 28.104 3.987 56.009 111.654
15.000
c 0.441 28.258 7.737 27.905 -0.269 55.967 -7.528 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
d 6.042 28.101 7.468 28.062 -7.468 28.062 -104.784
e 7.468 28.062
f 12.476 25.125 0.441 28.258 6.231 EXISTING DATA UKUR REALISASI
g 13.531 24.486 0.441 28.258 1.387 56.477 39.167
h 17.718 23.135 1.828 28.219 -5.578 56.773 -158.340
14+775.00
i 19.424 22.819 -3.750 28.554 -4.083 56.904 -116.170
j 22.845 22.366 -7.833 28.350 -0.351 56.700 -9.951
k 26.701 22.152 -8.184 28.350 1.720 56.334 48.447
l 36.051 21.492 -6.464 27.984 1.453 55.812 40.547
m 48.640 20.692 -5.011 27.828 2.769 54.856 75.948
n 49.478 20.691 -2.242 27.028 0.744 54.046 20.105
o 50.000 20.691 -1.498 27.018 1.498 54.962 41.167
p 0.000 27.944 0.272 56.057 7.624
0.272 28.113 0.169 56.371 4.763
0.441 28.258 -0.441 28.258 -6.231
11.333 27.900 158.095
11.333 27.900 -1.000 55.800 -27.900
10.333 27.900 -2.500 55.800 -69.750
7.833 27.900 -0.096 55.805 -2.679
7.737 27.905 4.739 53.030 125.655
12.476 25.125 1.055 49.611 26.170
13.531 24.486 4.187 47.621 99.695
17.718 23.135 1.706 45.954 39.199
19.424 22.819 2.817 45.265 63.756
22.241 22.446 -10.908 50.346 -274.587
11.333 27.900 -11.333 27.900 -158.095

AREA ( M2 ) CUT -1.178


AREA ( M2 ) CUT -0.458
AREA ( M2 ) FILL -6.692
AREA ( M2 ) FILL -20.442
Diperiksa dan Disetujui Oleh Dibuat Oleh
Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+750.00 14+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-11.605 32.843 -190.572
8 -50.000 36.899 -11.605 32.843 -0.825 65.887 -27.178
7 -23.583 40.527 -12.430 33.044 1.097 63.894 35.046
75.000
6 -19.383 36.880 -11.333 30.850 1.000 61.700 30.850
5 -17.882 36.402 -10.333 30.850 2.500 61.700 77.125 65.000
4 -13.735 33.361 -7.833 30.850 3.406 61.870 105.365
55.000
3 -11.605 32.843 -4.427 31.020 -1.233 62.140 -38.309
2 -6.350 31.338 -5.660 31.120 -0.690 62.458 -21.548 45.000
1 -5.660 31.120 -6.350 31.338 -5.255 64.181 -168.636
35.000
0 0.000 30.662 -11.605 32.843 11.605 32.843 190.572
a 0.025 30.660 25.000
b 0.442 30.908 8.708 30.637 133.393
15.000
c 1.834 30.835 8.708 30.637 -6.874 61.472 -211.279 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
d 8.708 30.637 1.834 30.835 -1.392 61.743 -42.973
e 9.421 30.029 0.442 30.908 -0.161 61.720 -4.968
f 10.618 29.290 0.281 30.812 3.469 61.416 106.526 EXISTING DATA UKUR REALISASI
g 13.435 28.859 3.750 30.604 4.083 61.004 124.540
h 14.468 28.479 7.833 30.400 1.153 60.800 35.051
14+750.00
i 22.835 24.918 8.986 30.400 -0.278 61.037 -8.484
j 23.615 24.792 8.708 30.637 -8.708 30.637 -133.393
k 35.387 23.456
l 50.000 21.724 -3.750 31.054 -58.226
-3.750 31.054 -0.677 62.074 -21.012
-4.427 31.020 4.427 61.682 136.533
0.000 30.662 0.025 61.322 0.767
0.025 30.660 0.256 61.472 7.868
0.281 30.812 -4.031 61.866 -124.691
-3.750 31.054 3.750 31.054 58.226
11.333 30.400 172.262
11.333 30.400 -1.000 60.800 -30.400
10.333 30.400 -1.347 60.800 -40.949
8.986 30.400 0.435 60.429 13.143
9.421 30.029 1.197 59.319 35.502
10.618 29.290 2.817 58.149 81.903
13.435 28.859 1.033 57.338 29.615
14.468 28.479 4.752 54.935 130.526
19.220 26.456 -7.887 56.856 -224.212
11.333 30.400 -11.333 30.400 -172.262

AREA ( M2 ) CUT -7.286


AREA ( M2 ) CUT -1.588
AREA ( M2 ) FILL -0.535
AREA ( M2 ) FILL -4.871

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+725.00 14+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-8.969 35.890 -160.949
10 -50.000 43.306 -8.969 35.890 -1.270 72.185 -45.837
9 -27.448 42.038 -10.239 36.295 -2.878 73.213 -105.354
85.000
8 -20.667 39.757 -13.117 36.918 1.784 70.268 62.679
7 -19.683 38.889 -11.333 33.350 1.000 66.700 33.350 75.000

6 -18.638 38.114 -10.333 33.350 2.500 66.700 83.375 65.000


5 -10.239 36.295 -7.833 33.350 3.418 66.871 114.283 55.000
4 -8.969 35.890 -4.415 33.521 -4.554 69.411 -158.049
45.000
3 -4.433 33.530 -8.969 35.890 8.969 35.890 160.949
2 -3.052 33.388 35.000
1 -1.538 33.696 9.772 33.460 163.486 25.000
0 0.000 33.750 9.772 33.460 -7.559 67.129 -253.714
15.000
a 0.442 33.766 2.213 33.669 -1.771 67.435 -59.714 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
b 2.213 33.669 0.442 33.766 -0.442 67.516 -14.921
c 9.772 33.460 0.000 33.750 -1.538 67.446 -51.866
d 9.939 33.310 -1.538 33.696 -1.043 67.180 -35.034 EXISTING DATA UKUR REALISASI
e 12.763 31.388 -2.581 33.484 6.331 66.588 210.784
f 13.423 31.271 3.750 33.104 4.083 66.004 134.747
14+725.00
g 18.516 29.978 7.833 32.900 2.500 65.800 82.250
h 20.480 29.073 10.333 32.900 0.209 65.800 6.876
i 50.000 23.120 10.542 32.900 -0.603 66.210 -19.962
9.939 33.310 -0.167 66.770 -5.575
9.772 33.460 -9.772 33.460 -163.486
-2.581 33.484 -43.211
-2.581 33.484 -1.169 67.038 -39.184
-3.750 33.554 -0.616 67.077 -20.660
-4.366 33.523 1.314 66.911 43.961
-3.052 33.388 0.471 66.872 15.748
-2.581 33.484 2.581 33.484 43.211

11.333 32.900 186.428


11.333 32.900 -0.791 65.800 -26.024
10.542 32.900 2.221 64.288 71.392
12.763 31.388 0.660 62.659 20.677
13.423 31.271 2.374 61.939 73.522
15.797 30.668 -4.464 63.568 -141.884
11.333 32.900 -11.333 32.900 -186.428

AREA ( M2 ) CUT -15.553


AREA ( M2 ) CUT -6.129
AREA ( M2 ) FILL -0.135
AREA ( M2 ) FILL -2.317

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+700.00 14+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.426 37.199 -138.120
13 -50.000 46.546 -7.426 37.199 -5.446 76.026 -207.019
12 -42.590 46.358 -12.872 38.827 1.539 74.578 57.388
85.000
11 -35.043 47.730 -11.333 35.751 1.000 71.502 35.751
10 -25.373 41.506 -10.333 35.751 2.500 71.502 89.378 75.000

9 -23.804 40.977 -7.833 35.751 2.494 71.626 89.318 65.000


8 -16.740 39.851 -5.339 35.875 -1.015 72.498 -36.793 55.000
7 -14.749 39.388 -6.354 36.623 -1.072 73.822 -39.569
45.000
6 -7.426 37.199 -7.426 37.199 7.426 37.199 138.120
5 -6.354 36.623 35.000
4 -4.859 35.522 0.356 36.333 6.467 25.000
3 -3.146 36.320 0.356 36.333 -0.356 72.661 -12.934
15.000
2 -2.783 36.385 0.000 36.328 -0.111 72.655 -4.032 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
1 -0.111 36.327 -0.111 36.327 -2.672 72.712 -97.143
0 0.000 36.328 -2.783 36.385 -0.363 72.705 -13.196
a 0.356 36.333 -3.146 36.320 -0.805 72.265 -29.087 EXISTING DATA UKUR REALISASI
b 4.674 36.072 -3.951 35.945 0.201 71.900 7.226
c 6.512 35.982 -3.750 35.955 7.500 71.658 268.718
14+700.00
d 7.833 35.311 3.750 35.703 3.672 71.223 130.765
e 9.224 35.102 7.422 35.520 -0.910 71.502 -32.533
f 12.754 32.768 6.512 35.982 -1.838 72.054 -66.218
g 13.423 32.304 4.674 36.072 -4.318 72.405 -156.322
h 14.712 31.964 0.356 36.333 -0.356 36.333 -6.467
i 43.726 24.878
J 50.000 23.342 -3.951 35.945 -71.009
-3.951 35.945 -1.388 71.820 -49.843
-5.339 35.875 0.480 71.397 17.135
-4.859 35.522 0.908 71.467 32.446
-3.951 35.945 3.951 35.945 71.009
11.333 35.499 201.155
11.333 35.499 -1.000 70.998 -35.499
10.333 35.499 -2.500 70.998 -88.748
7.833 35.499 -0.411 71.019 -14.594
7.422 35.520 0.411 70.831 14.556
7.833 35.311 1.391 70.413 48.972
9.224 35.102 3.530 67.870 119.791
12.754 32.768 0.669 65.072 21.767
13.423 32.304 1.289 64.268 41.421
14.712 31.964 7.218 62.165 224.353
21.930 30.201 -10.597 65.700 -348.111
11.333 35.499 -11.333 35.499 -201.155

AREA ( M2 ) CUT -11.546


AREA ( M2 ) CUT -4.756
AREA ( M2 ) FILL -0.262
AREA ( M2 ) FILL -16.093

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+675.00 14+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-12.605 47.573 -299.829
12 -50.000 54.101 -12.605 47.573 -1.723 95.716 -82.459
11 -46.411 54.642 -14.328 48.143 -5.777 99.767 -288.177
65.000
10 -35.903 47.887 -20.105 51.624 -1.613 103.569 -83.528
9 -27.556 54.816 -21.718 51.945 -0.773 104.269 -40.300
55.000
8 -21.718 51.945 -22.491 52.324 2.158 100.334 108.260
7 -20.105 51.624 -20.333 48.010 2.000 96.056 96.056 45.000
6 -14.328 48.143 -18.333 48.046 2.500 91.092 113.865
5 -12.605 47.573 -15.833 43.046 2.000 86.128 86.128 35.000
4 -6.562 40.511 -13.833 43.082 2.500 81.164 101.455
3 -6.208 40.246 -11.333 38.082 1.000 76.164 38.082 25.000
2 -5.801 40.427 -10.333 38.082 2.500 76.164 95.205
15.000
1 -0.492 40.127 -7.833 38.082 4.083 76.368 155.905 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
0 0.000 40.109 -3.750 38.286 3.750 76.615 143.653
a 0.136 40.104 0.000 38.329 3.750 76.546 143.524
b 3.286 39.926 3.750 38.217 3.930 76.237 149.806 EXISTING DATA UKUR REALISASI
c 4.309 39.849 7.680 38.020 -3.046 77.700 -118.337
d 4.634 39.680 4.634 39.680 -0.325 79.529 -12.923
14+675.00
e 8.490 37.578 4.309 39.849 -1.023 79.775 -40.805
f 8.828 37.524 3.286 39.926 -3.150 80.030 -126.047
g 9.697 36.943 0.136 40.104 -0.136 80.213 -5.454
h 13.155 35.887 0.000 40.109 -0.492 80.236 -19.738
i 19.953 33.901 -0.492 40.127 -5.309 80.554 -213.831
J 32.507 30.117 -5.801 40.427 -0.407 80.673 -16.417
l 45.583 25.813 -6.208 40.246 -0.354 80.757 -14.294
m 49.310 25.783 -6.562 40.511 -6.043 88.084 -266.146
n 50.000 25.769 -12.605 47.573 12.605 47.573 299.829
11.333 38.012 215.395
11.333 38.012 -1.000 76.024 -38.012
10.333 38.012 -2.500 76.024 -95.030
7.833 38.012 -0.153 76.032 -5.816
7.680 38.020 0.810 75.598 30.617
8.490 37.578 0.338 75.102 12.692
8.828 37.524 0.869 74.467 32.356
9.697 36.943 3.458 72.830 125.923
13.155 35.887 5.845 70.066 204.768
19.000 34.179 -7.667 72.191 -276.744
11.333 38.012 -11.333 38.012 -215.395

AREA ( M2 ) CUT -96.518


AREA ( M2 ) FILL -9.246

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+650.00 14+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
5.258 43.893 115.395
15 -50.000 55.750 5.258 43.893 -0.926 88.292 -40.879 110.000
14 -49.379 55.352 4.332 44.399 -3.598 88.948 -160.017
100.000
13 -40.774 62.442 0.734 44.549 -0.734 89.140 -32.714
90.000
12 -36.196 63.194 0.000 44.591 -1.274 89.256 -56.856
80.000
11 -33.947 59.659 -1.274 44.665 -7.281 89.204 -324.747
70.000
10 -29.760 54.130 -8.555 44.539 -1.417 90.736 -64.286
60.000
9 -21.977 50.853 -9.972 46.197 -3.120 94.100 -146.796
50.000
8 -20.642 50.192 -13.092 47.903 -1.794 96.157 -86.253
40.000
7 -16.223 49.063 -14.886 48.254 -1.337 97.317 -65.056
30.000
6 -14.886 48.254 -16.223 49.063 -1.609 98.537 -79.273
20.000
5 -13.092 47.903 -17.832 49.474 1.999 94.950 94.903
-55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
4 -9.972 46.197 -15.833 45.476 2.000 90.988 90.988
3 -8.555 44.539 -13.833 45.512 0.600 89.823 26.947
2 -1.274 44.665 -13.233 44.311 0.756 87.976 33.255 EXISTING DATA UKUR REALISASI
1 -0.014 44.592 -12.477 43.665 3.739 86.112 160.986
0 0.000 44.591 -8.738 42.447 5.167 84.709 218.846
a 0.734 44.549 -3.571 42.262 3.589 84.417 151.486
14+650.00
b 4.332 44.399 0.018 42.155 3.381 84.282 142.479
c 5.258 43.893 3.399 42.127 3.134 84.166 131.888
d 9.889 41.022 6.533 42.039 1.701 84.087 71.516
e 10.729 40.764 8.234 42.048 -2.976 85.941 -127.880
f 13.318 39.406 5.258 43.893 -5.258 43.893 -115.395
g 14.971 38.921 0.000 0.000 0.000
h 25.923 34.860 0.000 0.000 0.000
i 30.170 33.458 0.000 0.000 0.000
J 30.804 33.451
l 37.431 33.296 11.333 40.543 229.737
m 50.000 32.130 11.333 40.543 -0.182 81.086 -7.379
11.151 40.543 2.167 79.949 86.625
13.318 39.406 0.699 78.607 27.473
14.017 39.201 -2.684 79.744 -107.016
11.333 40.543 -11.333 40.543 -229.737

AREA ( M2 ) CUT -61.466


AREA ( M2 ) FILL -0.297

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+625.00 14+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-5.602 49.706 -139.227
13 -50.000 67.205 -5.602 49.706 -1.669 99.344 -82.903
12 -43.331 68.534 -7.271 49.638 -0.755 99.667 -37.624 110.000
11 -38.945 61.511 -8.026 50.029 -8.499 104.162 -442.636 100.000
10 -38.164 60.462 -16.525 54.133 -0.391 108.329 -21.178 90.000
9 -29.378 56.161 -16.916 54.196 -0.997 108.616 -54.145
80.000
8 -27.782 55.517 -17.913 54.420 -3.385 109.216 -184.848
70.000
7 -17.913 54.420 -21.298 54.796 0.965 107.663 51.947
60.000
6 -16.916 54.196 -20.333 52.867 2.000 105.770 105.770
50.000
5 -16.525 54.133 -18.333 52.903 2.500 100.806 126.008
40.000
4 -8.026 50.029 -15.833 47.903 2.000 95.842 95.842
30.000
3 -7.271 49.638 -13.833 47.939 0.221 95.436 10.546
20.000
2 -5.602 49.706 -13.612 47.497 2.707 91.504 123.851 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
1 -0.321 48.942 -10.905 44.007 1.978 88.466 87.493
0 0.000 48.966 -8.927 44.459 8.927 88.885 396.738
a 2.314 49.140 0.000 44.426 11.758 88.587 520.803 EXISTING DATA UKUR REALISASI
b 3.186 49.122 11.758 44.161 1.056 90.433 47.749
c 3.896 49.569 12.814 46.272 -0.398 92.740 -18.455
14+625.00
d 6.593 49.274 12.416 46.468 -4.693 95.073 -223.089
e 7.723 48.605 7.723 48.605 -1.130 97.879 -55.302
f 12.416 46.468 6.593 49.274 -2.697 98.843 -133.290
g 13.064 46.147 3.896 49.569 -0.710 98.691 -35.035
h 19.231 42.710 3.186 49.122 -0.872 98.262 -42.842
i 22.020 41.741 2.314 49.140 -2.314 98.106 -113.509
J 23.462 41.754 0.000 48.966 -0.321 97.908 -15.714
l 50.000 40.051 -0.321 48.942 -5.281 98.648 -260.480
-5.602 49.706 5.602 49.706 139.227
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -154.305

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+600.00 14+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
13.833 50.887 351.960
14 -50.000 70.832 13.833 50.887 2.000 101.738 101.738
13 -45.421 72.057 15.833 50.851 1.228 104.159 63.954 110.000
12 -42.748 67.792 17.061 53.308 -0.971 107.056 -51.976
100.000
11 -40.401 67.289 16.090 53.748 -1.469 108.200 -79.473
90.000
10 -33.293 64.202 14.621 54.452 -2.825 108.987 -153.944
9 -31.132 63.337 11.796 54.535 -1.676 108.514 -90.935 80.000

8 -25.340 63.221 10.120 53.979 -1.121 108.404 -60.760 70.000


7 -23.086 63.204 8.999 54.425 -4.100 108.754 -222.946 60.000
6 -19.684 62.008 4.899 54.329 -0.639 108.699 -34.729 50.000
5 -14.981 59.409 4.260 54.370 -0.173 108.624 -9.396
40.000
4 -13.042 58.606 4.087 54.254 -3.957 108.622 -214.909
30.000
3 -5.862 54.344 0.130 54.368 -0.130 108.719 -7.067 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
2 -4.654 54.226 0.000 54.351 -0.486 108.640 -26.400
1 -0.486 54.289 -0.486 54.289 -4.168 108.515 -226.145
0 0.000 54.351 -4.654 54.226 -1.208 108.570 -65.576 EXISTING DATA UKUR REALISASI
a 0.130 54.368 -5.862 54.344 -7.180 112.950 -405.491
b 4.087 54.254 -13.042 58.606 -1.939 118.015 -114.416
14+600.00
c 4.260 54.370 -14.981 59.409 -4.703 121.417 -285.512
d 4.899 54.329 -19.684 62.008 -3.402 125.212 -212.986
e 8.999 54.425 -23.086 63.204 -2.263 126.425 -143.050
f 10.120 53.979 -25.349 63.221 1.113 125.483 69.831
g 11.796 54.535 -24.236 62.262 2.091 124.333 129.990
h 14.621 54.452 -22.145 62.071 3.279 118.993 195.089
i 16.090 53.748 -18.866 56.922 1.589 113.604 90.258
J 23.016 50.606 -17.277 56.682 1.996 109.640 109.421
l 35.535 50.727 -15.281 52.958 1.725 105.689 91.157
m 37.286 50.622 -13.556 52.731 4.431 98.996 219.326
n 50.000 49.352 -9.125 46.265 1.978 93.257 92.231
-7.147 46.992 7.147 93.862 335.416
0.000 46.870 11.938 93.967 560.889
11.938 47.097 1.895 97.984 92.840
13.833 50.887 -13.833 50.887 -351.960
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -253.569

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+575.00 14+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
17.406 56.095 488.195
15 -50.000 73.559 17.406 56.095 -2.009 113.662 -114.173
14 -43.907 75.512 15.397 57.567 -1.864 115.444 -107.594 130.000

13 -43.411 74.770 13.533 57.877 -0.663 115.754 -38.372 120.000


12 -42.818 74.713 12.870 57.877 -0.405 115.608 -23.411 110.000
11 -41.211 74.189 12.465 57.731 -5.973 115.678 -345.472 100.000
10 -28.307 70.358 6.492 57.947 -0.955 115.840 -55.314 90.000
9 -26.815 70.473 5.537 57.893 -5.083 115.227 -292.849 80.000
8 -20.622 69.090 0.454 57.334 -0.454 114.668 -26.030 70.000
7 -19.754 68.857 0.000 57.334 -0.454 114.668 -26.030
60.000
6 -18.638 68.334 -0.454 57.334 -1.029 114.621 -58.973
50.000
5 -14.551 67.330 -1.483 57.287 -6.492 122.161 -396.535
40.000
4 -9.740 65.747 -7.975 64.874 -1.765 130.621 -115.273 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
3 -7.975 64.874 -9.740 65.747 -4.811 133.077 -320.117
2 -1.483 57.287 -14.551 67.330 -4.087 135.664 -277.229
1 -0.454 57.334 -18.638 68.334 -1.116 137.191 -76.553 EXISTING DATA UKUR REALISASI
0 0.000 57.334 -19.754 68.857 -0.868 137.947 -59.869
a 0.454 57.334 -20.622 69.090 -6.193 139.563 -432.157
14+575.00
b 5.537 57.893 -26.815 70.473 -1.493 140.831 -105.130
c 6.492 57.947 -28.308 70.358 1.291 138.858 89.633
d 12.465 57.731 -27.017 68.500 2.435 136.937 166.721
e 12.870 57.877 -24.582 68.437 6.401 128.721 411.972
f 13.533 57.877 -18.181 60.284 1.745 120.114 104.799
g 15.397 57.567 -16.436 59.830 2.108 116.530 122.823
h 18.782 55.086 -14.328 56.700 0.428 112.563 24.088
i 20.397 54.388 -13.900 55.863 0.818 111.714 45.691
J 36.364 53.052 -13.082 55.851 1.978 108.102 106.913
k 50.000 47.217 -11.104 52.251 0.675 104.502 35.269
-10.429 52.251 1.979 100.777 99.719
-8.450 48.526 2.186 97.607 106.684
-6.264 49.081 6.264 98.113 307.290
0.000 49.032 0.918 98.057 45.008
0.918 49.025 0.179 98.277 8.796
1.097 49.252 11.070 98.906 547.445
12.167 49.654 1.666 102.640 85.499
13.833 52.986 2.000 105.936 105.936
15.833 52.950 1.573 109.045 85.764
17.406 56.095 -17.406 56.095 -488.195
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -371.030
Diperiksa dan Disetujui Oleh Dibuat Oleh
Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+550.00 14+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
1.040 61.921 32.199
14 -50.000 76.399 1.040 61.921 -1.040 123.705 -64.327
13 -43.838 78.496 0.000 61.784 -0.139 123.550 -8.587 110.000

12 -41.418 78.508 -0.139 61.766 -1.604 125.353 -100.533 100.000

11 -38.767 77.717 -1.743 63.587 -12.141 134.077 -813.914 90.000


80.000
10 -35.853 79.185 -13.884 70.490 -1.211 141.350 -85.587
70.000
9 -32.383 78.305 -15.095 70.860 -1.050 141.954 -74.526
60.000
8 -28.915 76.836 -16.145 71.094 -6.884 145.936 -502.312
50.000
7 -24.654 75.154 -23.029 74.842 -1.625 149.996 -121.872
40.000
6 -23.029 74.842 -24.654 75.154 -4.261 151.990 -323.815
30.000
5 -16.145 71.094 -28.915 76.836 -3.468 155.141 -269.014
20.000
4 -15.095 70.860 -32.383 78.305 -3.470 157.490 -273.245
10.000
3 -13.884 70.490 -35.853 79.185 -0.288 158.225 -22.784 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
2 -1.743 63.587 -36.141 79.040 2.622 156.028 204.553
1 -0.139 61.766 -33.519 76.988 1.680 154.158 129.493
0 0.000 61.784 -31.839 77.170 1.816 151.195 137.285 EXISTING DATA UKUR REALISASI
a 1.040 61.921 -30.023 74.025 1.771 147.412 130.533
b 6.770 60.320 -28.252 73.387 2.324 143.233 166.437
14+550.00
c 8.136 60.287 -25.928 69.846 0.984 139.583 68.675
d 15.173 59.732 -24.944 69.737 6.674 138.733 462.952
e 15.599 59.665 -18.270 68.996 15.469 125.118 967.725
f 16.362 59.114 -2.801 56.122 2.436 111.255 135.509
g 23.038 33.835 -0.365 55.133 0.362 110.205 19.947
h 32.206 28.884 -0.003 55.072 12.072 110.604 667.606
i 50.000 30.555 12.069 55.532 4.149 110.884 230.029
16.218 55.352 0.573 111.373 31.908
16.791 56.021 0.254 112.550 14.294
17.045 56.529 -0.683 115.643 -39.492
16.362 59.114 -0.763 118.779 -45.314
15.599 59.665 -0.426 119.397 -25.432
15.173 59.732 -7.037 120.019 -422.287
8.136 60.287 -1.366 120.607 -82.375
6.770 60.320 -5.730 122.241 -350.220
1.040 61.921 -1.040 61.921 -32.199
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -258.691

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+525.00 14+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
13.035 61.817 402.892
16 -50.000 79.775 13.035 61.817 -1.658 123.764 -102.600
15 -44.074 81.794 11.377 61.947 -10.021 124.473 -623.672 110.000

14 -37.996 81.827 1.356 62.526 -1.356 125.430 -85.042 100.000

13 -37.342 81.632 0.000 62.904 -2.686 127.244 -170.889 90.000


80.000
12 -34.497 79.894 -2.686 64.340 -2.816 130.148 -183.248
70.000
11 -33.775 80.257 -5.502 65.808 -0.804 132.073 -53.093
60.000
10 -31.307 78.396 -6.306 66.265 2.321 129.819 150.655
50.000
9 -30.464 78.042 -3.985 63.554 3.985 122.454 243.990
40.000
8 -25.864 76.051 0.000 58.900 4.961 116.148 288.105
30.000
7 -24.825 75.643 4.961 57.248 1.033 114.474 59.126
20.000
6 -21.145 74.458 5.994 57.226 0.065 114.519 3.722
10.000
5 -19.470 73.549 6.059 57.293 8.636 114.538 494.575 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
4 -15.755 72.435 14.695 57.245 -1.660 119.062 -98.821
3 -8.421 67.468 13.035 61.817 -13.035 61.817 -402.892
2 -5.502 65.808 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
1 -2.686 64.340 -30.464 78.042 -1,188.736
0 0.000 62.904 -30.464 78.042 -0.843 156.438 -65.939
14+525.00
a 1.356 62.526 -31.307 78.396 -2.468 158.653 -195.778
b 11.377 61.947 -33.775 80.257 -0.722 160.151 -57.815
c 13.035 61.817 -34.497 79.894 -2.845 161.526 -229.771
d 21.891 37.427 -37.342 81.632 -0.654 163.459 -53.451
e 23.459 31.490 -37.996 81.827 -1.402 163.646 -114.716
f 29.247 34.018 -39.398 81.819 1.016 161.605 82.095
g 50.000 35.983 -38.382 79.786 0.551 159.484 43.938
-37.831 79.698 1.478 159.423 117.814
-36.353 79.725 0.029 159.432 2.312
-36.324 79.707 0.991 157.432 78.008
-35.333 77.725 0.491 154.938 38.037
-34.842 77.213 1.542 153.966 118.708
-33.300 76.753 0.032 153.438 2.455
-33.268 76.685 0.148 153.250 11.341
-33.120 76.565 1.370 151.709 103.921
-31.750 75.144 8.490 149.546 634.823
-23.260 74.402 5.529 143.850 397.673
-17.731 69.448 7.770 137.959 535.971
-9.961 68.511 -5.794 140.946 -408.321
-15.755 72.435 -3.715 145.984 -271.165
-19.470 73.549 -1.675 148.007 -123.956
-21.145 74.458 -3.680 150.101 -276.186
-24.825 75.643 -1.039 151.694 -78.805
-25.864 76.051 -4.600 154.093 -354.414
-30.464 78.042 30.464 78.042 1,188.736
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -140.414

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+500.00 14+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.194 62.121 223.449
16 -50.000 83.577 7.194 62.121 -2.347 124.376 -145.955
15 -46.341 84.720 4.847 62.255 -3.061 126.485 -193.585
110.000
14 -45.934 84.508 1.786 64.230 -1.656 128.751 -106.606
13 -45.560 84.921 0.130 64.521 -0.130 129.111 -8.392
90.000
12 -44.478 85.286 0.000 64.590 -0.507 129.452 -32.816
11 -43.017 85.288 -0.507 64.862 -5.792 129.840 -376.017 70.000
10 -42.250 84.820 -6.299 64.978 -0.685 130.312 -44.632
9 -41.580 84.317 -6.984 65.334 -1.763 131.858 -116.233 50.000
8 -18.579 75.808 -8.747 66.524 -6.909 141.278 -488.045
7 -17.470 75.323 -15.656 74.754 -0.916 149.786 -68.602 30.000
6 -16.572 75.032 -16.572 75.032 -0.898 150.355 -67.509
10.000
5 -15.656 74.754 -17.470 75.323 -1.109 151.131 -83.802 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
4 -8.747 66.524 -18.579 75.808 -0.361 151.750 -27.391
3 -6.984 65.334 -18.940 75.942 6.163 145.050 446.972
2 -6.299 64.978 -12.777 69.108 3.691 134.123 247.524 EXISTING DATA UKUR REALISASI
1 -0.507 64.862 -9.086 65.015 4.024 129.604 260.763
0 0.000 64.590 -5.062 64.589 8.745 122.703 536.519
14+500.00
a 0.130 64.521 3.683 58.114 2.833 116.041 164.372
b 1.786 64.230 6.516 57.927 3.776 115.606 218.264
c 4.847 62.255 10.292 57.679 4.390 115.480 253.479
d 7.194 62.121 14.682 57.801 -2.505 116.713 -146.183
e 10.075 60.160 12.177 58.912 -2.102 119.072 -125.145
f 12.177 58.912 10.075 60.160 -2.881 122.281 -176.146
g 16.300 57.084 7.194 62.121 -7.194 62.121 -223.449
h 18.310 51.535 0.000 0.000 0.000
i 22.406 34.409 0.000 0.000 0.000
j 27.702 31.052 0.000 0.000 0.000
k 29.755 37.292 0.000 0.000 0.000
l 35.523 39.788 0.000 0.000 0.000
m 50.000 41.068 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -79.166

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+475.00 14+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.878 64.323 253.368
7 -50.000 90.939 7.878 64.323 -0.686 129.131 -44.292
6 -44.407 96.306 7.192 64.808 -2.085 129.964 -135.487
110.000
5 -26.521 86.380 5.107 65.156 -0.715 130.790 -46.757
4 -21.176 84.137 4.392 65.634 -3.543 131.635 -233.191
90.000
3 -10.178 68.296 0.849 66.001 -0.400 132.077 -26.415
2 -8.547 66.357 0.449 66.076 -0.449 132.165 -29.671 70.000
1 -0.872 66.115 0.000 66.089 -0.872 132.204 -57.641
0 0.000 66.089 -0.872 66.115 -7.675 132.472 -508.361 50.000
a 0.449 66.076 -8.547 66.357 -1.631 134.653 -109.810
b 0.849 66.001 -10.178 68.296 -10.998 152.433 -838.229 30.000
c 4.392 65.634 -21.176 84.137 -5.345 170.517 -455.707
10.000
d 5.107 65.156 -26.521 86.380 -1.099 173.370 -95.267 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
e 7.192 64.808 -27.620 86.990 3.692 169.990 313.802
f 7.878 64.323 -23.928 83.000 -0.007 165.715 -0.580
g 11.493 62.233 -23.935 82.715 16.443 146.974 1,208.347 EXISTING DATA UKUR REALISASI
h 11.977 61.932 -7.492 64.259 2.245 123.615 138.758
i 15.294 59.641 -5.247 59.356 5.247 119.234 312.810
14+475.00
j 16.225 59.207 0.000 59.878 3.439 118.859 204.378
k 19.241 40.464 3.439 58.981 9.533 117.465 559.897
l 20.182 36.600 12.972 58.484 3.293 115.913 190.851
m 23.660 30.644 16.265 57.429 0.186 115.230 10.716
n 25.410 33.032 16.451 57.801 -0.226 117.008 -13.222
o 30.058 30.072 16.225 59.207 -0.931 118.848 -55.324
p 33.980 42.264 15.294 59.641 -3.317 121.573 -201.629
q 38.358 44.012 11.977 61.932 -0.484 124.165 -30.048
r 50.000 44.545 11.493 62.233 -3.615 126.556 -228.750
7.878 64.323 -7.878 64.323 -253.368
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -170.823

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+450.00 14+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-39.149 97.558 -1,909.649
-39.149 97.558 -4.617 197.816 -456.658
9 -56.484 100.373 -43.766 100.258 -6.257 200.631 -627.674 120.000

8 -50.023 100.373 -50.023 100.373 -0.300 200.746 -30.112 110.000

7 -43.766 100.258 -50.323 100.373 0.385 199.021 38.312 100.000


90.000
6 -39.149 97.558 -49.938 98.648 0.105 197.298 10.358
80.000
5 -22.001 88.637 -49.833 98.650 1.213 194.873 118.190
70.000
4 -14.389 72.522 -48.620 96.223 3.433 192.214 329.935
60.000
3 -11.878 68.946 -45.187 95.991 29.353 166.702 2,446.602
50.000
2 -4.657 68.885 -15.834 70.711 4.346 138.431 300.811
40.000
1 -2.853 68.783 -11.488 67.720 3.823 129.863 248.233
30.000
0 0.000 67.936 -7.665 62.143 2.761 123.247 170.142
20.000
a 0.477 67.794 -4.904 61.104 4.904 121.067 296.856 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
b 3.388 66.009 0.000 59.963 13.430 117.599 789.677
c 4.217 65.921 13.430 57.636 0.843 116.957 49.297
d 4.735 65.831 14.273 59.321 -0.779 119.170 -46.417 EXISTING DATA UKUR REALISASI
e 8.374 63.086 13.494 59.849 -1.908 120.680 -115.129
f 9.260 62.584 11.586 60.831 -2.326 123.415 -143.532
14+450.00
g 11.586 60.831 9.260 62.584 -0.886 125.670 -55.672
h 13.494 59.849 8.374 63.086 -3.639 128.917 -234.564
i 14.290 59.310 4.735 65.831 -0.518 131.752 -34.124
j 19.735 31.188 4.217 65.921 -0.829 131.930 -54.685
k 20.426 26.948 3.388 66.009 -2.911 133.803 -194.750
l 21.291 25.567 0.477 67.794 -0.477 135.730 -32.372
m 25.129 30.895 0.000 67.936 -2.853 136.719 -195.030
n 27.957 29.181 -2.853 68.783 -1.804 137.668 -124.177
o 33.676 46.512 -4.657 68.885 -7.221 137.831 -497.639
p 37.062 47.642 -11.878 68.946 -2.511 141.468 -177.613
q 50.000 47.478 -14.389 72.522 -7.612 161.159 -613.371
-22.001 88.637 -17.148 186.195 -1,596.436
-39.149 97.558 39.149 97.558 1,909.649
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -431.539

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+425.00 14+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-15.972 77.407 -618.172
-15.972 77.407 -9.274 159.825 -741.109
11 -50.000 91.372 -25.246 82.418 -3.715 166.636 -309.526 120.000

10 -46.769 89.880 -28.961 84.218 -3.846 169.658 -326.252 110.000

9 -28.961 84.218 -32.807 85.440 12.131 159.334 966.440 100.000


90.000
8 -25.246 82.418 -20.676 73.894 0.973 147.506 71.762
80.000
7 -15.972 77.407 -19.703 73.612 0.661 146.045 48.268
70.000
6 -14.299 73.850 -19.042 72.433 2.022 143.433 145.011
60.000
5 -10.152 73.282 -17.020 71.000 4.361 141.894 309.400
50.000
4 -9.193 73.734 -12.659 70.894 1.738 143.381 124.598
40.000
3 -7.517 73.676 -10.921 72.487 2.395 144.847 173.454
30.000
2 -6.691 73.415 -8.526 72.360 0.328 145.451 23.854
20.000
1 -5.954 72.958 -8.198 73.091 1.378 146.547 100.971 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
0 0.000 62.654 -6.820 73.456 -0.697 147.132 -51.276
a 15.950 35.052 -7.517 73.676 -1.676 147.410 -123.530
b 16.773 34.540 -9.193 73.734 -0.959 147.016 -70.494 EXISTING DATA UKUR REALISASI
c 17.319 34.202 -10.152 73.282 -4.147 147.132 -305.078
d 17.773 34.033 -14.299 73.850 -1.673 151.257 -126.526
14+425.00
e 19.125 27.133 -15.972 77.407 15.972 77.407 618.172
f 20.030 28.364 0.000 0.000 0.000
g 20.564 28.060 0.000 0.000 0.000
h 28.792 51.851 0.000 0.000 0.000
i 30.909 52.451 0.000 0.000 0.000
j 50.000 51.536 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
11.333 56.012 317.392
11.333 56.012 -1.000 112.024 -56.012
10.333 56.012 -2.500 112.024 -140.030
7.833 56.012 -4.083 112.229 -229.116
3.750 56.217 -0.030 112.434 -1.687
3.720 56.217 12.230 91.269 558.110
15.950 35.052 0.823 69.592 28.637
16.773 34.540 0.546 68.742 18.767
17.319 34.202 0.454 68.235 15.489
17.773 34.033 1.352 61.166 41.348
19.125 27.133 0.905 55.497 25.112
20.030 28.364 0.534 56.424 15.065
20.564 28.060 7.187 76.900 276.340
27.751 48.840 -4.418 99.888 -220.653
23.333 51.048 -2.000 102.060 -102.060
21.333 51.012 -10.000 107.024 -535.120
11.333 56.012 -11.333 56.012 -317.392

AREA ( M2 ) CUT -90.033


AREA ( M2 ) FILL -305.808

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+400.00 14+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
-11.750 79.380 -466.358
8 -50.000 107.211 -11.750 79.380 -0.225 158.654 -17.849 120.000

7 -32.699 82.779 -11.975 79.274 -0.977 158.684 -77.517 110.000

6 -28.598 81.492 -12.952 79.410 -6.543 159.147 -520.649 100.000


90.000
5 -21.665 80.903 -19.495 79.737 -2.170 160.640 -174.294
80.000
4 -19.495 79.737 -21.665 80.903 -6.933 162.395 -562.942
70.000
3 -12.952 79.410 -28.598 81.492 -2.003 163.613 -163.858
60.000
2 -11.975 79.274 -30.601 82.121 11.012 154.960 853.210
50.000
1 -11.750 79.380 -19.589 72.839 1.984 145.727 144.561
40.000
0 0.000 71.798 -17.605 72.888 0.295 146.828 21.657
30.000
a 14.160 62.660 -17.310 73.940 4.399 144.773 318.428
20.000
b 19.374 53.648 -12.911 70.833 1.206 141.600 85.385 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
c 21.062 58.507 -11.705 70.767 3.221 139.776 225.109
d 21.408 58.604 -8.484 69.009 2.098 138.836 145.639
e 40.894 57.622 -6.386 69.827 6.332 139.217 440.761 EXISTING DATA UKUR REALISASI
f 50.000 57.299 -0.054 69.390 4.165 138.535 288.499
4.111 69.145 -4.111 140.943 -289.708
14+400.00
0.000 71.798 -11.750 151.178 -888.171
-11.750 79.380 11.750 79.380 466.358
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -171.740

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+375.00 14+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.483 80.124 -299.784
-7.483 80.124 -6.451 164.411 -530.308
7 -50.000 116.614 -13.934 84.287 -1.629 168.655 -137.369 120.000

6 -31.898 91.423 -15.563 84.368 -9.699 168.758 -818.392 110.000


5 -27.026 84.542 -25.262 84.390 19.090 155.220 1,481.575 100.000
4 -25.235 84.390 -6.172 70.830 6.172 140.923 434.888 90.000
3 -15.563 84.368 0.000 70.093 3.951 139.789 276.153 80.000
2 -13.934 84.287 3.951 69.696 4.401 139.252 306.424 70.000
1 -7.483 80.124 8.352 69.556 4.709 139.123 327.565 60.000
0 0.000 76.279 13.061 69.567 -13.061 145.846 -952.447
50.000
a 20.476 65.758 0.000 76.279 -7.483 156.403 -585.182
40.000
b 50.000 64.711 -7.483 80.124 7.483 80.124 299.784
30.000
0.000 0.000 0.000 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
0.000 0.000 0.000
0.000 0.000 0.000
14+375.00
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -197.093

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+350.00 14+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 84.564 0.000
0.000 84.564 -8.276 173.563 -718.204
10 -50.000 116.934 -8.276 88.999 -7.444 178.571 -664.641
130.000
9 -49.634 116.627 -15.720 89.572 -1.827 179.146 -163.650
8 -46.944 114.452 -17.547 89.574 12.027 169.597 1,019.872
110.000
7 -43.261 111.700 -5.520 80.023 5.520 157.579 434.918
6 -37.201 103.252 0.000 77.556 13.137 155.080 1,018.643 90.000
5 -33.892 100.158 13.137 77.524 -13.137 162.088 -1,064.675
4 -32.417 98.113 0.000 84.564 0.000 84.564 0.000 70.000
3 -18.103 89.575 0.000 0.000 0.000
2 -15.720 89.572 -46.490 114.112 -2,652.533 50.000
1 -8.276 88.999 -46.490 114.112 -0.454 228.564 -51.884
30.000
0 0.000 84.564 -46.944 114.452 -2.690 231.079 -310.801 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 14.818 76.623 -49.634 116.627 -0.366 233.561 -42.742
b 21.618 73.129 -50.000 116.934 -8.224 233.868 -961.665
c 35.415 72.640 -58.224 116.934 1.891 230.086 217.546 EXISTING DATA UKUR REALISASI
d 50.000 71.102 -56.333 113.152 2.000 226.340 226.340
-54.333 113.188 0.319 225.737 36.005
14+350.00
-54.014 112.549 1.133 222.832 126.234
-52.881 110.283 1.054 218.531 115.166
-51.827 108.248 0.460 216.445 49.782
-51.367 108.197 1.534 216.421 165.995
-49.833 108.224 1.066 214.316 114.230
-48.767 106.092 0.158 211.993 16.747
-48.609 105.901 3.165 211.824 335.211
-45.444 105.923 2.127 209.675 222.989
-43.317 103.752 5.698 207.586 591.413
-37.619 103.834 -5.642 215.534 -608.021
-43.261 111.700 -3.229 225.812 -364.573
-46.490 114.112 46.490 114.112 2,652.533
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL
AREA ( M2 ) CUT -259.764

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+325.00 14+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
6.884 88.241 303.726
6.884 88.241 -5.505 179.432 -493.887
18 -50.000 119.486 1.379 91.191 -1.379 183.122 -126.263 130.000
17 -49.797 119.316 0.000 91.931 -1.311 184.565 -120.982
110.000
16 -46.423 117.564 -1.311 92.634 -1.180 185.773 -109.606
15 -45.776 117.041 -2.491 93.139 -3.222 186.440 -300.355
90.000
14 -43.355 115.403 -5.713 93.301 -5.826 186.090 -542.080
13 -42.470 114.741 -11.539 92.789 -1.864 185.722 -173.093 70.000
12 -39.859 112.873 -13.403 92.933 13.403 176.074 1,179.960
11 -37.995 111.729 0.000 83.141 7.279 165.446 602.141 50.000
10 -37.205 110.990 7.279 82.305 8.806 164.396 723.836
9 -35.032 109.572 16.085 82.091 -9.201 170.332 -783.612 30.000
-60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
8 -34.679 109.083 6.884 88.241 -6.884 88.241 -303.726
7 -31.316 107.769 0.000 0.000 0.000
6 -27.896 105.729 -39.859 112.873 -2,249.502 EXISTING DATA UKUR REALISASI
5 -13.313 92.926 -39.859 112.873 -2.611 227.614 -297.150
4 -11.539 92.789 -42.470 114.741 -0.886 230.144 -101.954
3 -5.713 93.301 -43.356 115.403 -2.420 232.444 -281.257
14+325.00
2 -2.490 93.139 -45.776 117.041 -0.647 234.605 -75.895
1 -1.311 92.634 -46.423 117.564 -3.374 236.880 -399.617
0 0.000 91.931 -49.797 119.316 -0.203 238.802 -24.238
a 1.379 91.191 -50.000 119.486 -8.251 238.972 -985.879
b 6.885 88.241 -58.251 119.486 1.638 235.697 193.036
c 24.880 76.212 -56.613 116.211 6.733 231.158 778.193
d 37.002 74.933 -49.880 114.947 5.864 224.508 658.257
e 50.000 69.846 -44.016 109.561 7.588 219.315 832.081
-36.428 109.754 23.025 202.687 2,333.434
-13.403 92.933 0.089 185.859 8.271
-13.314 92.926 -14.582 198.655 -1,448.394
-27.896 105.729 -3.421 213.498 -365.188
-31.317 107.769 -3.363 216.852 -364.637
-34.680 109.083 -0.352 218.655 -38.483
-35.032 109.572 -2.173 220.562 -239.641
-37.205 110.990 -0.791 222.719 -88.085
-37.996 111.729 -1.863 224.602 -209.217
-39.859 112.873 39.859 112.873 2,249.502
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -260.303

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+300.00 14+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-41.339 116.571 -2,409.464
16 -50.000 113.478 -41.339 116.571 -0.421 233.401 -49.131
15 -43.663 118.020 -41.760 116.830 -0.591 234.083 -69.172
130.000
14 -42.899 117.624 -42.351 117.253 -0.548 234.877 -64.356
13 -42.351 117.253 -42.899 117.624 -0.764 235.644 -90.016
110.000
12 -41.760 116.830 -43.663 118.020 -5.298 232.242 -615.209
11 -41.339 116.571 -48.961 114.222 2.935 228.050 334.663 90.000
10 -35.216 113.135 -46.026 113.828 4.801 225.814 542.067
9 -34.720 112.811 -41.225 111.986 0.001 223.972 0.112 70.000
8 -33.952 112.511 -41.224 111.986 -4.801 225.814 -542.067
7 -20.144 99.877 -46.025 113.828 0.000 227.656 0.000 50.000
6 -16.746 96.893 -46.025 113.828 4.801 225.814 542.067
30.000
5 -10.693 96.268 -41.224 111.986 9.824 221.756 1,089.265 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
4 -9.324 96.389 -31.400 109.770 5.555 214.457 595.654
3 -8.567 96.351 -25.845 104.687 5.476 204.343 559.491
2 -8.289 96.232 -20.369 99.656 3.471 196.264 340.616 EXISTING DATA UKUR REALISASI
1 -7.657 95.893 -16.898 96.608 0.404 193.174 39.021
0 12.489 85.134 -16.494 96.566 7.659 184.035 704.762
14+300.00
a 19.472 68.506 -8.835 87.469 7.413 174.059 645.150
b 23.861 65.572 -1.422 86.590 1.397 172.409 120.428
c 33.691 61.725 -0.025 85.819 2.480 171.503 212.664
d 50.000 58.941 2.455 85.684 -2.455 173.847 -213.397
0.000 88.163 -7.657 184.056 -704.658
-7.657 95.893 -0.632 192.125 -60.712
-8.289 96.232 -0.278 192.583 -26.769
-8.567 96.351 -0.757 192.740 -72.952
-9.324 96.389 -1.369 192.657 -131.874
-10.693 96.268 -6.053 193.161 -584.602
-16.746 96.893 -3.398 196.770 -334.312
-20.144 99.877 -13.808 212.388 -1,466.327
-33.952 112.511 -0.768 225.322 -86.524
-34.720 112.811 -0.496 225.946 -56.035
-35.216 113.135 -6.123 229.706 -703.245
-41.339 116.571 41.339 116.571 2,409.464
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -145.396
AREA ( M2 ) CUT

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+275.00 14+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-2.671 91.794 -122.591
11 -50.000 119.707 -2.671 91.794 -10.413 191.824 -998.732
10 -49.459 120.155 -13.084 100.030 -1.937 200.770 -194.446
130.000
9 -42.852 118.004 -15.021 100.740 -1.258 201.568 -126.786
8 -39.925 116.352 -16.279 100.828 -7.317 201.604 -737.568
110.000
7 -38.952 115.812 -23.596 100.776 4.179 198.174 414.085
6 -29.483 103.149 -19.417 97.398 5.549 194.815 540.514 90.000
5 -27.016 100.751 -13.868 97.417 9.028 185.624 837.907
4 -16.279 100.828 -4.840 88.207 4.840 176.052 426.046 70.000
3 -15.021 100.740 0.000 87.845 1.401 175.622 123.023
2 -13.084 100.030 1.401 87.777 -1.401 176.936 -123.944 50.000
1 -2.671 91.794 0.000 89.159 -2.671 180.953 -241.663
30.000
0 0.000 89.159 -2.671 91.794 2.671 91.794 122.591 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 5.549 87.876
b 20.319 60.793 -42.852 118.004 -2,528.354
c 27.943 59.345 -42.852 118.004 -6.607 238.159 -786.758 EXISTING DATA UKUR REALISASI
d 28.918 59.447 -49.459 120.155 -0.541 239.862 -64.883
e 50.000 42.636 -50.000 119.707 -3.864 239.414 -462.548
14+275.00
-53.864 119.707 0.729 237.955 86.735
-53.135 118.248 6.700 234.592 785.883
-46.435 116.344 7.694 231.873 892.015
-38.741 115.529 -0.211 231.341 -24.406
-38.952 115.812 -0.973 232.164 -112.948
-39.925 116.352 -2.927 234.356 -342.980
-42.852 118.004 42.852 118.004 2,528.354

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -111.454
AREA ( M2 ) CUT

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+250.00 14+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-0.388 92.960 -18.034
12 -50.000 120.444 -0.388 92.960 -15.749 200.816 -1,581.326
11 -42.648 117.588 -16.137 107.856 -0.411 215.785 -44.344
130.000
10 -40.657 116.569 -16.548 107.929 -4.077 216.041 -440.400
9 -34.409 110.421 -20.625 108.112 -2.271 212.614 -241.423
110.000
8 -32.052 108.643 -22.896 104.502 -2.233 208.707 -233.021
7 -28.463 104.254 -25.129 104.205 -2.082 208.441 -216.987 90.000
6 -25.129 104.205 -27.211 104.236 14.984 198.761 1,489.117
5 -22.896 104.502 -12.227 94.525 1.334 187.885 125.319 70.000
4 -20.625 108.112 -10.893 93.360 10.893 185.801 1,011.965
3 -16.548 107.929 0.000 92.441 2.053 184.721 189.616 50.000
2 -16.137 107.856 2.053 92.280 -2.024 184.850 -187.068
30.000
1 -0.388 92.960 0.029 92.570 -0.029 185.157 -2.685 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
0 -0.015 92.590 0.000 92.587 -0.008 185.179 -0.741
a -0.008 92.592 -0.008 92.592 -0.007 185.182 -0.648
b 0.000 92.587 -0.015 92.590 -0.373 185.550 -34.605 EXISTING DATA UKUR REALISASI
c 0.029 92.570 -0.388 92.960 0.388 92.960 18.034
d 6.317 91.670
14+250.00
e 6.602 91.460 -42.648 117.588 -2,507.447
f 7.607 85.200 -42.648 117.588 -7.352 238.032 -875.006
g 14.344 60.859 -50.000 120.444 0.000 237.510 0.000
h 15.725 57.855 -50.000 117.066 10.247 232.745 1,192.469
i 20.231 53.867 -39.753 115.679 -0.904 232.248 -104.976
j 23.054 80.335 -40.657 116.569 -1.991 234.157 -233.103
k 27.318 77.794 -42.648 117.588 42.648 117.588 2,507.447
l 35.206 71.208 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT
AREA ( M2 ) CUT -187.846

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+225.00 14+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-14.090 110.129 -775.859
9 -50.000 120.444 -14.090 110.129 -2.622 219.070 -287.201
8 -40.529 116.827 -16.712 108.941 -1.083 217.898 -117.992
130.000
7 -29.454 111.538 -17.795 108.957 -4.477 217.649 -487.207
6 -23.870 107.671 -22.272 108.692 -0.524 216.490 -56.720
110.000
5 -22.796 107.799 -22.796 107.798 -1.074 215.469 -115.707
4 -22.272 108.692 -23.870 107.671 -5.584 219.209 -612.032 90.000
3 -17.795 108.958 -29.454 111.538 -11.075 228.365 -1,264.571
2 -16.712 108.942 -40.529 116.827 -9.399 237.243 -1,114.923 70.000
1 -14.090 110.129 -49.928 120.416 1.113 238.606 132.784
0 0.000 100.141 -48.815 118.190 2.290 236.316 270.582 50.000
a 1.809 103.753 -46.525 118.126 3.149 235.424 370.675
30.000
b 10.545 81.309 -43.376 117.298 1.179 234.438 138.201 -110 -105 -100 -95 -90 -85 -80 -75 -70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
c 12.497 77.879 -42.197 117.140 1.549 233.689 180.992
d 18.084 64.401 -40.648 116.549 11.042 227.824 1,257.816
e 19.464 62.284 -29.606 111.275 5.658 218.633 618.513 EXISTING DATA UKUR REALISASI
f 20.118 60.985 -23.948 107.358 1.335 214.874 143.428
g 33.412 80.930 -22.613 107.516 0.518 215.916 55.922
14+225.00
-22.095 108.400 0.438 216.826 47.485
-21.657 108.426 7.628 210.690 803.572
-14.029 102.264 14.029 202.105 1,417.666
0.000 99.841 3.414 199.471 340.497
3.414 99.630 -1.605 203.382 -163.214
1.809 103.752 -1.809 203.893 -184.421
0.000 100.141 -14.090 210.270 -1,481.352
-14.090 110.129 14.090 110.129 775.859
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL
AREA ( M2 ) CUT
AREA ( M2 ) CUT -107.207

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+200.00 14+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.114 111.129 -506.415
9 -50.000 120.444 -9.114 111.129 -8.940 222.467 -994.427
8 -29.716 114.728 -18.054 111.338 -0.537 222.382 -59.710
130.000
7 -23.053 112.552 -18.591 111.044 -1.163 221.940 -129.058
6 -19.754 110.896 -19.754 110.896 -3.299 223.448 -368.577
110.000
5 -18.591 111.044 -23.053 112.552 -6.663 227.280 -757.183
4 -18.054 111.338 -29.716 114.728 -19.387 234.919 -2,277.187 90.000
3 -9.114 111.129 -49.103 120.191 1.770 236.842 209.605
2 -0.061 106.174 -47.333 116.651 2.000 233.338 233.338 70.000
1 -0.037 106.196 -45.333 116.687 0.009 233.357 1.050
0 0.000 106.184 -45.324 116.670 3.527 232.981 410.862 50.000
a 0.012 106.180 -41.797 116.311 4.877 231.277 563.969
30.000
b 5.405 106.963 -36.920 114.966 8.572 228.931 981.198 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
c 9.013 104.510 -28.348 113.965 4.273 226.535 483.992
d 11.851 102.494 -24.075 112.570 0.154 225.028 17.327
e 12.792 101.757 -23.921 112.458 8.638 218.605 944.155 EXISTING DATA UKUR REALISASI
f 16.514 96.560 -15.283 106.147 3.988 211.388 421.508
g 24.178 83.813 -11.295 105.241 13.703 210.165 1,439.945
14+200.00
h 27.363 79.617 2.408 104.924 6.061 209.803 635.808
i 34.611 90.688 8.469 104.879 -3.064 211.842 -324.542
j 50.000 71.437 5.405 106.963 -5.472 213.131 -583.126
-0.067 106.168 0.006 212.342 0.637
-0.061 106.174 -9.053 217.303 -983.622
-9.114 111.129 9.114 111.129 506.415
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL
AREA ( M2 ) CUT
AREA ( M2 ) CUT -134.039

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+175.00 14+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
1.322 112.873 74.609
11 -50.000 115.478 1.322 112.873 -1.322 225.834 -149.276
10 -47.652 116.558 0.000 112.961 -0.540 225.958 -61.009
130.000
9 -44.044 119.288 -0.540 112.997 -1.001 226.193 -113.210
8 -44.032 119.286 -1.541 113.196 -0.467 225.870 -52.741
110.000
7 -37.065 117.581 -2.008 112.674 -11.359 224.905 -1,277.348
6 -16.733 112.699 -13.367 112.231 -2.297 224.471 -257.805 90.000
5 -15.664 112.240 -15.664 112.240 -1.069 224.939 -120.230
4 -13.367 112.231 -16.733 112.699 -20.332 230.280 -2,341.026 70.000
3 -2.008 112.674 -37.065 117.581 -6.967 236.867 -825.126
2 -1.541 113.196 -44.032 119.286 -0.012 238.574 -1.431 50.000
1 -0.540 112.997 -44.044 119.288 -1.529 237.420 -181.508
30.000
0 0.000 112.961 -45.573 118.132 0.137 235.991 16.165 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 1.322 112.873 -45.436 117.859 1.460 236.823 172.881
b 5.981 105.939 -43.976 118.964 6.840 236.254 807.989
c 31.575 75.060 -37.136 117.290 4.851 233.415 566.148 EXISTING DATA UKUR REALISASI
50.000 74.678 -32.285 116.125 2.421 231.048 279.684
-29.864 114.923 5.206 229.216 596.649
14+175.00
-24.658 114.293 7.830 226.706 887.554
-16.828 112.413 1.102 224.353 123.619
-15.726 111.940 2.408 223.871 269.541
-13.318 111.931 6.386 221.588 707.530
-6.932 109.657 11.011 218.428 1,202.555
4.079 108.771 -2.757 221.644 -305.536
1.322 112.873 -1.322 112.873 -74.609
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT 0.000
AREA ( M2 ) CUT 0.000
AREA ( M2 ) CUT -55.931

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+150.00 14+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-34.709 121.533 -2,109.144
11 -50.000 123.004 -34.709 121.533 -3.672 244.185 -448.324
10 -48.407 123.776 -38.381 122.652 -3.091 246.037 -380.250
130.000
9 -42.668 122.508 -41.472 123.385 -1.196 245.893 -147.044
8 -41.472 123.385 -42.668 122.508 -5.739 246.284 -706.712
110.000
7 -38.381 122.652 -48.407 123.776 -1.313 246.916 -162.100
6 -34.709 121.533 -49.720 123.140 1.357 243.566 165.260 90.000
5 -25.034 116.137 -48.363 120.426 3.031 240.829 364.976
4 -19.768 114.891 -45.332 120.403 11.665 240.104 1,400.407 70.000
3 -10.387 114.014 -33.667 119.701 3.908 238.130 465.306
2 -7.604 114.132 -29.759 118.429 4.615 234.283 540.608 50.000
1 -0.009 114.519 -25.144 115.854 5.327 230.449 613.801
30.000
0 0.000 114.519 -19.817 114.595 2.577 228.949 295.001 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 0.436 114.491 -17.240 114.354 1.087 228.354 124.110
b 23.810 85.918 -16.153 114.000 1.749 227.934 199.328
c 29.394 79.260 -14.404 113.934 1.947 227.841 221.803 EXISTING DATA UKUR REALISASI
d 50.000 79.110 -12.457 113.907 2.063 227.621 234.791
-10.394 113.714 2.893 227.551 329.153
14+150.00
-7.501 113.837 8.571 227.552 975.174
1.070 113.715 -0.634 228.206 -72.341
0.436 114.491 -0.445 229.010 -50.955
-0.009 114.519 -7.595 228.651 -868.302
-7.604 114.132 -2.783 228.146 -317.465
-10.387 114.014 -9.381 228.905 -1,073.679
-19.768 114.891 -5.266 231.028 -608.297
-25.034 116.137 -9.675 237.670 -1,149.729
-34.709 121.533 34.709 121.533 2,109.144
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -55.480

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+125.00 14+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-27.002 118.451 -1,599.207
14 -50.000 125.604 -27.002 118.451 -7.577 238.234 -902.550
13 -48.298 125.456 -34.579 119.783 -1.451 239.997 -174.118
130.000
12 -46.333 123.294 -36.030 120.214 -2.768 242.044 -334.989
11 -44.747 123.146 -38.798 121.830 -1.207 243.941 -147.218
110.000
10 -42.205 122.589 -40.005 122.111 -2.200 244.700 -269.170
9 -40.005 122.111 -42.205 122.589 -2.542 245.735 -312.329 90.000
8 -38.798 121.830 -44.747 123.146 -1.586 246.440 -195.427
7 -36.030 120.214 -46.333 123.294 -0.002 246.591 -0.247 70.000
6 -34.579 119.783 -46.335 123.297 -1.963 248.753 -244.151
5 -27.002 118.451 -48.298 125.456 -1.702 251.060 -213.652 50.000
4 -23.589 116.547 -50.000 125.604 -2.323 251.208 -291.778
30.000
3 -17.831 115.290 -52.323 125.604 0.490 250.228 61.306 -70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
2 -14.794 115.004 -51.833 124.624 2.000 249.284 249.284
1 -1.662 103.871 -49.833 124.660 1.047 247.224 129.422
0 0.000 104.010 -48.786 122.564 2.653 244.024 323.698 EXISTING DATA UKUR REALISASI
a 0.343 104.039 -46.133 121.460 9.489 241.686 1,146.679
b 6.346 100.000 -36.644 120.226 0.001 240.451 0.120
14+125.00
c 8.709 99.284 -36.643 120.225 0.494 240.162 59.320
d 14.364 92.470 -36.149 119.937 1.502 239.427 179.810
e 35.697 92.244 -34.647 119.490 0.230 238.939 27.478
f 46.530 82.561 -34.417 119.449 4.295 236.265 507.379
g 50.000 83.781 -30.122 116.816 6.588 233.332 768.596
-23.534 116.516 -3.468 234.967 -407.433
-27.002 118.451 27.002 118.451 1,599.207
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -39.970

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+100.00 14+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
11 -50.000 120.216 0.000 0.000 0.000
10 -48.096 121.053 0.000 0.000 0.000
130.000
9 -41.573 119.621 0.000 0.000 0.000
8 -40.498 119.011 0.000 0.000 0.000
110.000
7 -33.361 116.171 0.000 0.000 0.000
6 -29.088 114.150 0.000 0.000 0.000 90.000
5 -26.474 113.822 0.000 0.000 0.000
4 -20.511 112.264 0.000 0.000 0.000 70.000
3 -18.587 111.908 0.000 0.000 0.000
2 -9.730 104.225 0.000 0.000 0.000 50.000
1 -2.426 101.742 0.000 0.000 0.000
30.000
0 0.000 99.808 0.000 0.000 0.000 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 0.894 99.095 0.000 0.000 0.000
b 3.159 99.116 0.000 0.000 0.000
c 4.725 98.182 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
d 9.605 101.134 0.000 0.000 0.000
e 10.259 100.881 0.000 0.000 0.000
14+100.00
f 15.291 102.357 0.000 0.000 0.000
g 26.677 102.669 0.000 0.000 0.000
h 37.763 99.894 0.000 0.000 0.000
i 50.000 85.476 0.000 0.000 0.000
j 50.000 83.781 0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT 0.000

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+075.00 14+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
10 -50.000 109.381 0.000 0.000 0.000
9 -41.152 105.611 0.000 0.000 0.000
130.000
8 -39.197 105.092 0.000 0.000 0.000
7 -30.537 104.727 0.000 0.000 0.000
110.000
6 -29.536 104.368 0.000 0.000 0.000
5 -27.911 104.129 0.000 0.000 0.000 90.000
4 -12.828 107.052 0.000 0.000 0.000
3 -10.337 104.563 0.000 0.000 0.000 70.000
2 -5.052 105.114 0.000 0.000 0.000
1 -1.091 105.544 0.000 0.000 0.000 50.000
0 0.000 105.304 0.000 0.000 0.000
30.000
a 0.908 105.104 0.000 0.000 0.000 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
b 1.616 105.098 0.000 0.000 0.000
c 3.242 105.849 0.000 0.000 0.000
d 11.770 106.637 0.000 0.000 0.000 EXISTING DATA UKUR REALISASI
e 13.346 106.930 0.000 0.000 0.000
f 19.670 107.971 0.000 0.000 0.000
14+075.00
g 31.719 107.503 0.000 0.000 0.000
h 33.386 107.272 0.000 0.000 0.000
i 35.192 106.393 0.000 0.000 0.000
i 50.000 86.875 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT 0.000

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+050.00 14+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
11 -50.000 116.538 12.848 111.884 718.743
10 -47.369 115.881 12.848 111.884 -4.392 223.850 -491.575
130.000
9 -42.161 118.069 8.456 111.966 -2.506 223.974 -280.639
8 -38.559 116.534 5.950 112.008 -5.042 223.953 -564.586
110.000
7 -26.977 116.707 0.908 111.945 -0.908 223.887 -101.645
6 -25.062 116.431 0.000 111.942 -0.185 223.883 -20.709 90.000
5 -20.784 116.420 -0.185 111.941 -6.223 224.417 -698.273
4 -12.880 113.423 -6.408 112.476 -1.544 224.966 -173.674 70.000
3 -7.952 112.490 -7.952 112.490 -2.864 225.522 -322.948
2 -6.408 112.476 -10.816 113.032 0.318 225.422 35.842 50.000
1 -0.185 111.941 -10.498 112.390 9.014 223.900 1,009.117
30.000
0 0.000 111.942 -1.484 111.510 2.019 222.094 224.204 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
a 0.908 111.945 0.535 110.584 11.193 221.084 1,237.297
b 5.950 112.008 11.728 110.500 1.120 222.384 124.535
c 8.456 111.966 12.848 111.884 -12.848 111.884 -718.743 EXISTING DATA UKUR REALISASI
d 12.848 111.884 0.000 0.000 0.000
e 14.939 112.007 0.000 0.000 0.000
14+050.00
f 20.051 112.398 0.000 0.000 0.000
g 23.862 112.173 0.000 0.000 0.000
h 26.570 111.904 0.000 0.000 0.000
i 31.291 110.527 0.000 0.000 0.000
j 34.882 109.123 0.000 0.000 0.000
k 35.981 108.777 0.000 0.000 0.000
l 39.250 106.691 0.000 0.000 0.000
m 44.751 99.489 0.000 0.000 0.000
n 49.539 86.586 0.000 0.000 0.000
o 50.000 86.018 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -23.053

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+025.00 14+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
14 -50.000 126.492 15.034 116.595 876.445
13 -49.589 126.541 15.034 116.595 -1.733 233.231 -202.095
130.000
12 -45.621 131.686 13.301 116.636 -3.954 234.859 -464.316
11 -42.472 130.564 9.347 118.223 -1.332 236.634 -157.598
110.000
10 -41.072 130.986 8.015 118.411 -1.235 236.957 -146.321
9 -33.803 129.705 6.780 118.546 -5.872 239.057 -701.871 90.000
8 -30.958 129.290 0.908 120.511 -0.908 241.190 -109.500
7 -22.759 127.183 0.000 120.679 -0.743 241.496 -89.716 70.000
6 -19.746 126.038 -0.743 120.817 2.919 237.002 345.904
5 -17.570 124.956 2.176 116.185 4.992 232.083 579.279 50.000
4 -9.309 123.061 7.168 115.898 2.779 230.037 319.636
30.000
3 -8.058 122.621 9.947 114.139 7.669 228.409 875.834 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
2 -3.547 121.423 17.616 114.270 1.462 229.722 167.927
1 -1.709 120.996 19.078 115.452 -0.273 231.004 -31.532
0 0.000 120.679 18.805 115.552 -3.771 232.147 -437.713 EXISTING DATA UKUR REALISASI
a 0.908 120.511 15.034 116.595 -15.034 116.595 -876.445
b 6.780 118.546 0.000 0.000 0.000
14+025.00
c 8.015 118.411 0.000 0.000 0.000
d 9.347 118.223 0.000 0.000 0.000
e 13.301 116.636 0.000 0.000 0.000
f 15.034 116.595 0.000 0.000 0.000
g 18.805 115.552 0.000 0.000 0.000
h 23.345 113.887 0.000 0.000 0.000
i 24.462 113.778 0.000 0.000 0.000
j 28.035 111.798 0.000 0.000 0.000
k 29.852 111.244 0.000 0.000 0.000
l 33.642 109.259 0.000 0.000 0.000
m 34.859 108.786 0.000 0.000 0.000
n 38.308 106.260 0.000 0.000 0.000
o 39.369 105.638 0.000 0.000 0.000
p 41.812 102.554 0.000 0.000 0.000
q 47.146 91.207 0.000 0.000 0.000
r 48.685 87.326 0.000 0.000 0.000
s 50.000 84.080 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
AREA ( M2 ) FILL 0.000
AREA ( M2 ) CUT -52.082

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BACK UP QUANTITY
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : GALIAN BIASA UNTUK TIMBUNAN
No Item Pembayaran : 1
Satuan : m3

GALIAN BIASA UNTUK TIMBUNAN

EXISTING DATA UKUR REALISASI


STA. 14+000.00 14+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi p
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.000 0.000 0.000
9 -50.000 127.734 2.673 116.918 156.261
8 -42.747 128.531 2.673 116.918 -1.838 234.393 -215.407
130.000
7 -41.873 129.723 0.835 117.475 -0.780 235.085 -91.683
6 -32.776 128.345 0.055 117.610 -0.055 235.247 -6.469
110.000
5 -27.468 128.903 0.000 117.637 -12.551 241.512 -1,515.609
4 -24.704 128.592 -12.551 123.875 5.008 238.675 597.642 90.000
3 -21.646 127.419 -7.543 114.800 10.465 229.878 1,202.837
2 -13.541 124.169 2.922 115.078 3.076 227.071 349.235 70.000
1 -12.776 123.987 5.998 111.993 20.421 221.487 2,261.493
0 0.000 117.637 26.419 109.494 0.731 220.449 80.574 50.000
a 0.055 117.610 27.150 110.955 -1.207 222.234 -134.118
30.000
b 0.835 117.475 25.943 111.279 -1.661 223.402 -185.535 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55
c 2.673 116.918 24.282 112.123 -1.704 224.801 -191.530
d 12.988 113.291 22.578 112.678 -6.990 225.357 -787.623
e 14.178 112.922 15.588 112.679 -1.410 225.601 -159.049 EXISTING DATA UKUR REALISASI
f 15.588 112.679 14.178 112.922 -1.190 226.213 -134.597
g 22.578 112.678 12.988 113.291 -10.315 230.209 -1,187.303
14+000.00
h 24.282 112.123 2.673 116.918 -2.673 116.918 -156.261
i 25.943 111.279 0.000 0.000 0.000
j 29.848 110.232 0.000 0.000 0.000
k 31.782 109.263 0.000 0.000 0.000
l 35.554 105.840 0.000 0.000 0.000
m 37.468 104.582 0.000 0.000 0.000
n 41.588 100.247 0.000 0.000 0.000
o 45.789 92.183 0.000 0.000 0.000
p 49.048 88.850 0.000 0.000 0.000
q 50.000 86.384 0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

AREA ( M2 ) FILL 0.000


AREA ( M2 ) CUT -117.142

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO) Tbk PT.GORGA MARGA MANDIRI

............................. ,,,,,,,,,,,,,,,,,,,,,,,,
Quantity Surveyor Quantity Surveyor
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO

PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -


Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA

Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A

No. Mata Pembayaran : 5.1.(1)

NO. TANGGAL LOKASI R/L SAT. VOLUME KETERANGAN

1 13+900.00 - 14+900.00 L M3 23.25

2 14+337.50 14+503.00 R M3 89.64

3 14+337.50 14+503.00 L M3 81.21

4 14+897.00 15+057.00 L M3 397.83

5 14+886.00 15+055.00 R M3 339.56

6 15+903.00 15+050.00 R M3 277.22

7 15+903.00 15+050.00 L M3 279.91

8 38+975.00 39+354.00 L M3 90.97

9 39+454.00 39+594.00 L M3 40.14

10 39+634.00 40+040.00 L M3 106.47

11 40+125.00 40+723.00 L M3 143.59

12 40+768.00 41+125.00 L M3 80.95

13 41+175.00 41+800.00 L M3 152.25

14 35+450.00 36+300.00 L M3 188.91

15 37+200.00 37+500.00 L M3 65.70

16 42+500.00 43+000.00 L M3 154.02

17 42+500.00 43+000.00 R M3 162.51

18 37+700.00 37+850.00 R M3 36.70

19 35+050.00 35+365.00 R M3 52.70


20 41+500.00 41+800.00 R M3 58.37

11+275.00 11+325.00 L M3 16.93

JUMLAH M3 2838.82
VOLUME KONTRAK M3 5869.50
VOLUME S/D SERTIFIKAT BULAN LALU M3 0.00
VOLUME S/D SERTIFIKAT BULAN INI M3 2838.82
VOLUME SERTIFIKAT BULAN INI M3 2838.82

DIBAYAR S/D SERTIFIKAT BULAN LALU M3 0.00


DIBAYAR S/D SERTIFIKAT BULAN INI M3 2838.82
DIBAYAR SERTIFIKAT BULAN INI M3 2838.82

SISA YANG BELUM DIBAYAR M3 3030.68


SISA VOLUME KONTRAK M3 3030.68

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Ayudi Persada - PT. Multi
PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya
(Persero) Cabang Semarang - PT. Buana Archicon Bangun Indonesia, KSO
Cabang Surabaya

SUKMA INDRAWAN, ST. TOTO HADIYANTO, ST EDY SUDIARTO, ST.


NIP. 19860615201012 1 005 Quantity Engineer Manager Teknik
-12.5 89.495
-8 89.437
-7.5 89.467
-5 89.519
-3 89.562
-1 89.717
0 89.787
0 90.046
1.1 90.019
1.1 89.725
2.1 89.695
4.6 89.642
8.6 89.627
9.1 89.629
11.1 89.779
12.574 89.695
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 11+275.00 11+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.75 89.94 -348.53
91.000
1 -12.20 89.859 -7.75 89.942 -2.00 179.80 -179.80
2 -8.00 89.762 -9.75 89.862 0.00 179.66 0.00
3 -7.50 89.804 -9.75 89.802 1.75 179.56 157.12 90.000
4 -5.00 89.862 -8.00 89.762 0.25 179.55 22.44
5 -3.00 89.928 -7.75 89.783 0.00 179.73 0.00
89.000
6 -1.00 90.008 -7.75 89.942 7.75 89.94 348.53
7 0.00 90.092 0.00 0.00 0.00
8 0.00 90.339 0.00 0.00 0.00 88.000
9 1.10 90.356 0.00 0.00 0.00
10 1.10 90.062 0.00 0.00 0.00
87.000
11 2.10 90.056 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
12 3.90 90.099 0.00 0.00 0.00
13 5.70 90.127 0.00 0.00 0.00
14 7.50 90.159 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 8.60 90.157 0.00 0.00 0.00
16 11.10 90.195 0.00 0.00 0.00
17 13.49 90.168 0.00 0.00 0.00
11+275.00
18 14.02 90.168 0.00 0.00 0.00
19 14.17 89.359 0.00 0.00 0.00
20 14.97 89.359 0.00 0.00 0.00
21 15.12 90.168
22 15.52 90.168

LuasanL (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 11+300.00 11+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.75 90.02 -348.84
91.000
1 -11.45 89.977 -7.75 90.022 0.00 180.15 0.00
2 -7.45 89.857 -7.75 90.132 -2.00 180.18 -180.18 90.000
3 -6.95 89.837 -9.75 90.052 0.00 179.98 0.00
4 -4.45 89.817 -9.75 89.926 2.00 179.79 179.79 89.000
5 -2.45 89.806 -7.75 89.866 0.00 179.89 0.00
88.000
6 -0.45 89.795 -7.75 90.022 7.75 90.02 348.84
8 0.55 89.812 87.000
10 0.55 89.797
12 2.35 89.752 86.000
14 4.15 89.657
85.000
16 5.95 89.552 -20 -15 -10 -5 0 5 10 15 20
18 7.05 89.517
20 7.55 89.449
22 9.56 89.488 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 13.25 89.487

11+300.00

LuasanL (M2) 0.39

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 11+325.00 11+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.75 89.65 -347.40
91.000
1 -12.50 89.495 -7.75 89.652 -2.00 179.22 -179.22
2 -8.00 89.437 -9.75 89.572 0.00 179.04 0.00 90.000
3 -7.50 89.467 -9.75 89.472 0.00 178.93 0.00
4 -5.00 89.519 -9.75 89.460 1.75 178.90 156.53 89.000
5 -3.00 89.562 -8.00 89.437 0.25 178.89 22.36
88.000
6 -1.00 89.717 -7.75 89.452 0.00 178.96 0.00
8 0.00 89.787 -7.75 89.512 0.00 179.16 0.00 87.000
10 0.00 90.046 -7.75 89.652 7.75 89.65 347.40
12 1.10 90.019 0.00 0.00 0.00 86.000
14 1.10 89.725 0.00 0.00 0.00
85.000
16 2.10 89.695 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 4.60 89.642 0.00 0.00 0.00
20 8.60 89.627
22 9.10 89.629 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 11.10 89.779
26 12.57 89.695

11+325.00

LuasanL (M2) 0.33

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 13+900.00 13+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -12.13 99.326 0.00 0.00 0.00
2 -11.80 99.326 0.00 0.00 0.00
3 -8.80 99.435 0.00 0.00 0.00 101.000
4 -8.50 99.437 0.00 0.00 0.00
5 -6.30 99.538 0.00 0.00 0.00
100.000
6 -4.50 99.639 0.00 0.00 0.00
7 -2.70 99.695 0.00 0.00 0.00
8 -0.55 99.754 0.00 0.00 0.00 99.000
9 -0.55 100.019 0.00 0.00 0.00
10 0.55 100.039 0.00 0.00 0.00
98.000
11 0.55 99.608 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
12 2.70 99.608 0.00 0.00 0.00
13 4.50 99.579 0.00 0.00 0.00
14 6.30 99.596 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 8.10 99.591 0.00 0.00 0.00
16 9.90 99.578 0.00 0.00 0.00
17 11.70 99.563 0.00 0.00 0.00
13+900.00
18 13.60 99.578 0.00 0.00 0.00
19 13.60 99.578 0.00 0.00 0.00
20 13.90 99.574 0.00 0.00 0.00
21 13.90 99.574
22 15.60 99.756
23 15.60 98.756
24 16.80 98.756
25 16.80 99.756

LuasanL (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 13+925.00 13+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-14.15 98.97 -700.23
102.000
1 -15.40 99.020 -14.15 98.973 0.00 197.80 0.00
2 -10.90 99.009 -14.15 98.822 2.00 197.72 197.72
3 -10.60 98.983 -12.15 98.902 0.00 197.91 0.00 101.000
4 -9.50 99.037 -12.15 99.012 0.00 198.07 0.00
5 -8.00 99.084 -12.15 99.053 -2.00 198.03 -198.03
100.000
6 -7.50 99.186 -14.15 98.973 14.15 98.97 700.23
8 -6.00 99.276
10 -4.50 99.343 99.000
12 -3.00 99.440 0.00 0.00 0.00
14 -1.50 99.449 0.00 0.00 0.00
98.000
16 0.00 99.589 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 1.50 99.607 0.00 0.00 0.00
20 3.00 99.599 0.00 0.00 0.00
22 4.50 99.689 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.00 99.739 0.00 0.00 0.00
26 7.50 99.780 0.00 0.00 0.00
28 8.00 99.833 0.00 0.00 0.00
13+925.00
30 10.60 99.843 0.00 0.00 0.00
32 10.60 99.843 0.00 0.00 0.00
34 10.90 99.772 0.00 0.00 0.00
36 10.90 99.772 0.00 0.00 0.00
38 15.40 99.737
39 15.40 98.737
40 16.60 98.737
41 16.60 99.737

LuasanL (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 13+950.00 13+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-11.45 99.15 -567.63
102.000
1 -16.60 98.938 -11.45 99.150 0.00 198.08 0.00
2 -10.90 98.926 -11.45 98.927 -2.00 197.86 -197.86
3 -10.60 98.983 -13.45 98.931 0.00 198.00 0.00 101.000
4 -8.40 99.010 -13.45 99.070 2.00 198.22 198.22
5 -7.00 99.016 -11.45 99.150 11.45 99.15 567.63
100.000
6 -5.60 99.106 0.00 0.00 0.00
8 -4.20 99.183 0.00 0.00 0.00
10 -2.80 99.257 0.00 0.00 0.00 99.000
12 -1.40 99.360 0.00 0.00 0.00
14 0.00 99.568 0.00 0.00 0.00
98.000
16 1.40 99.630 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 2.80 99.616 0.00 0.00 0.00
20 4.20 99.720
22 5.60 99.808 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 7.00 99.884
26 8.40 99.926
28 9.60 99.979
13+950.00
30 10.60 100.003
32 10.90 99.966
34 15.40 99.946

LuasanL (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 13+975.00 13+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-11.30 99.19 -560.41
102.000
1 -13.65 99.000 -11.30 99.187 0.00 198.27 0.00
2 -11.65 99.008 -11.30 99.080 -0.05 198.16 -4.95
3 -11.35 99.080 -11.35 99.080 -0.23 198.11 -22.29 101.000
4 -8.55 99.097 -11.58 99.026 -0.49 198.03 -48.52
5 -6.55 99.138 -12.07 99.006 -1.24 198.01 -122.27
100.000
6 -4.55 99.197 -13.30 99.001 0.00 198.11 0.00
8 -2.55 99.333 -13.30 99.107 2.00 198.29 198.29
10 -0.55 99.449 -11.30 99.187 11.30 99.19 560.41 99.000
12 -0.55 100.070
14 0.55 100.073
98.000
16 0.55 99.736 -20 -15 -10 -5 0 5 10 15 20
18 2.05 99.778
20 3.55 99.866
22 5.05 99.906 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.55 99.946
26 8.05 99.986
28 9.55 99.983
13+975.00
30 11.35 99.979
32 11.65 99.980
34 15.85 99.978
36 17.05 99.978

LuasanL (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+000.00 14+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -13.65 99.470 0.00 0.00 0.00
2 -11.65 99.458 0.00 0.00 0.00
3 -11.35 99.270 0.00 0.00 0.00 101.000
4 -7.55 99.416 0.00 0.00 0.00
5 -4.05 99.580 0.00 0.00 0.00
100.000
6 -0.55 99.790 0.00 0.00 0.00
8 -0.55 100.053 0.00 0.00 0.00
10 0.55 100.130 0.00 0.00 0.00 99.000
12 0.55 99.910 0.00 0.00 0.00
14 4.05 100.070 0.00 0.00 0.00
98.000
16 7.55 100.246 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 11.25 100.378 0.00 0.00 0.00
20 11.55 100.366 0.00 0.00 0.00
22 11.55 100.366 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 15.75 100.410
26 15.75 99.410
28 16.95 99.410
14+000.00
30 16.95 100.410

LuasanL (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+350.00 14+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.79 -513.93
102.000
1 -14.75 99.662 -10.30 99.793 0.00 199.49 0.00
2 -14.75 98.662 -10.30 99.698 4.75 199.46 473.72
3 -12.25 98.662 -5.55 99.762 5.00 199.60 499.00 101.000
4 -12.25 99.662 -0.55 99.838 0.00 199.83 0.00
5 -11.05 99.688 -0.55 99.988 -9.75 199.78 -973.93
100.000
6 -11.05 99.688 -10.30 99.793 10.30 99.79 513.93
7 -5.55 99.762
8 -0.55 99.838 99.000
9 -0.55 100.042 0.55 99.93 27.48
10 0.55 100.009 0.55 99.932 0.00 199.71 0.00
98.000
11 0.55 99.782 0.55 99.782 1.80 199.48 179.53 -20 -15 -10 -5 0 5 10 15 20
12 2.35 99.697 2.35 99.697 1.80 199.32 179.39
13 4.15 99.627 4.15 99.627 1.80 199.21 179.29
14 5.95 99.587 5.95 99.587 1.90 199.24 189.28 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 7.85 99.652 7.85 99.652 2.40 198.85 238.62
16 10.30 99.202 10.25 99.202 0.05 198.40 4.96
17 11.95 99.202 10.30 99.202 0.00 198.94 0.00
14+350.00
18 10.30 99.737 -9.75 199.67 -973.39
19 0.55 99.932 -0.55 99.93 -27.48
20
21
22
23
24
25

Luasan L (M2) 1.21


Luasan R (M2) 2.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+375.00 14+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-0.55 100.31 -27.58
102.000
1 -14.85 100.325 -0.55 100.308 0.00 200.74 0.00
2 -14.85 99.325 -0.55 100.429 -6.76 200.72 -678.04
3 -12.35 99.325 -7.31 100.294 1.76 200.59 176.12 101.000
4 -12.35 100.325 -5.55 100.295 2.50 200.57 250.72
5 -8.25 100.324 -3.05 100.277 2.50 200.59 250.73
100.000
6 -8.05 100.311 -0.55 100.308 0.55 100.31 27.58
8 -5.55 100.312
10 -3.05 100.294 99.000
12 -0.55 100.325 0.55 100.37 27.60
14 -0.55 100.405 0.55 100.367 0.00 200.68 0.00
98.000
16 0.55 100.395 0.55 100.311 1.80 200.58 180.52 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.311 2.35 100.265 1.80 200.50 180.45
20 2.35 100.265 4.15 100.235 1.80 200.46 180.41
22 4.15 100.235 5.95 100.225 1.00 200.40 100.20 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 5.95 100.225 6.95 100.178 1.00 200.38 100.19
26 6.95 100.178 7.95 100.203 0.20 200.36 20.04
28 7.95 100.203 8.15 100.158 2.15 200.31 215.33
14+375.00
30 8.15 100.158 10.30 100.148 0.00 200.32 0.00
32 11.35 100.143 10.30 100.172 -2.00 200.38 -200.38
34 8.30 100.212 -7.75 200.58 -777.24
36 0.55 100.367 -0.55 100.37 -27.60
38
39
40
41
42

Luasan L (M2) 0.48


Luasan R (M2) 0.49

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+400.00 14+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -12.35 101.154 0.00 0.00 0.00
2 -8.25 101.005 0.00 0.00 0.00
3 -8.05 100.964 0.00 0.00 0.00 101.000
4 -6.95 100.965 0.00 0.00 0.00
5 -5.15 100.992 0.00 0.00 0.00
100.000
6 -3.35 101.012 0.00 0.00 0.00
8 -1.55 101.028 0.00 0.00 0.00
10 -0.55 101.055 0.00 0.00 0.00 99.000
12 -0.55 101.283 0.00 0.00 0.00
14 0.55 101.284 0.00 0.00 0.00
98.000
16 0.55 101.053 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 1.55 100.975 0.00 0.00 0.00
20 3.35 100.901
22 5.15 100.841 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.95 100.832
26 7.95 100.783
28 8.15 100.691
14+400.00
30 11.35 100.713
32
34
36
38
39
40
41

Luasan L (M2) 0.00


Luasan R (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+425.00 14+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -14.35 100.653 0.00 0.00 0.00
2 -14.35 99.653 0.00 0.00 0.00
3 -12.05 99.653 0.00 0.00 0.00 101.000
4 -12.05 100.653 0.00 0.00 0.00
5 -8.25 100.668 0.00 0.00 0.00
100.000
6 -7.95 100.714 0.00 0.00 0.00
8 -6.95 100.728 0.00 0.00 0.00
10 -5.15 100.738 0.00 0.00 0.00 99.000
12 -3.35 100.743 0.00 0.00 0.00
14 -1.55 100.794 0.00 0.00 0.00
98.000
16 -0.55 100.837 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.064 0.00 0.00 0.00
20 0.55 101.065 0.00 0.00 0.00
22 0.55 100.778 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.55 100.744
26 3.35 100.699
28 5.15 100.674
14+425.00
30 6.95 100.644
32 8.05 100.642
34 8.35 100.621
36 13.05 100.701

Luasan L (M2) 0.00


Luasan R (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+450.00 14+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -14.35 100.443 0.00 0.00 0.00
2 -14.35 99.443 0.00 0.00 0.00
3 -12.05 99.443 0.00 0.00 0.00 101.000
4 -12.05 100.443 0.00 0.00 0.00
5 -8.25 100.414 0.00 0.00 0.00
100.000
6 -7.95 100.442 0.00 0.00 0.00
8 -6.95 100.445 0.00 0.00 0.00
10 -5.15 100.484 0.00 0.00 0.00 99.000
12 -3.35 100.495 0.00 0.00 0.00
14 -1.55 100.544 0.00 0.00 0.00
98.000
16 -0.55 100.608 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.861 0.00 0.00 0.00
20 0.55 100.765 0.00 0.00 0.00
22 0.55 100.520 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.55 100.471
26 5.55 100.468
28 8.05 100.401
14+450.00
30 8.35 100.404
32 13.05 100.451

Luasan L (M2) 0.00


Luasan R (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+475.00 14+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-0.55 100.47 -27.63
102.000
1 -14.20 100.183 -0.55 100.472 0.00 200.85 0.00
2 -14.20 99.183 -0.55 100.378 -1.00 200.72 -100.36
3 -11.90 99.183 -1.55 100.338 -1.00 200.64 -100.32 101.000
4 -11.90 100.184 -2.55 100.305 -1.80 200.60 -180.54
5 -8.35 100.163 -4.35 100.295 -0.20 200.58 -20.06
100.000
6 -8.05 100.194 -4.55 100.289 -0.60 200.56 -60.17
8 -6.95 100.204 -5.15 100.270 -1.80 200.47 -180.43
10 -5.15 100.270 -6.95 100.204 -1.10 200.40 -110.22 99.000
12 -4.35 100.295 -8.05 100.194 -0.25 200.36 -25.05
14 -2.55 100.305 -8.30 100.168 -0.05 200.33 -5.01
98.000
16 -1.55 100.338 -8.35 100.163 -1.95 200.34 -195.33 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.378 -10.30 100.174 0.00 200.45 0.00
20 -0.55 100.634 -10.30 100.277 9.75 200.75 978.65
22 0.55 100.605 -0.55 100.472 0.55 100.47 27.63 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.352 0.00 0.00 0.00
26 1.55 100.292 0.55 100.35 27.60
28 3.35 100.244 0.55 100.352 0.00 200.80 0.00
14+475.00
30 5.15 100.218 0.55 100.444 9.75 200.69 978.38
32 6.95 100.175 10.30 100.249 0.00 200.41 0.00
34 8.05 100.172 10.30 100.165 -1.95 200.30 -195.30
36 8.35 100.138 8.35 100.138 -0.30 200.31 -30.05
38 11.55 100.183 8.05 100.172 -1.10 200.35 -110.19
39 11.55 99.183 6.95 100.175 -1.80 200.39 -180.35
40 12.85 99.183 5.15 100.218 -0.60 200.45 -60.13
12.85 100.183 4.55 100.227 -1.20 200.47 -120.28
3.35 100.244 -1.80 200.54 -180.48
1.55 100.292 -1.00 200.64 -100.32
0.55 100.352 -0.55 100.35 -27.60
0.00 0.00 0.00

Luasan L (M2) 1.18


Luasan R (M2) 1.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+500.00 14+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-2.35 100.05 -117.56
102.000
1 -14.20 99.933 -2.35 100.052 0.80 200.16 80.06
2 -14.20 98.933 -1.55 100.105 1.00 200.28 100.14
3 -11.90 98.933 -0.55 100.178 0.00 200.51 0.00 101.000
4 -11.90 99.933 -0.55 100.328 -9.75 200.46 -977.25
5 -11.75 99.933 -10.30 100.133 0.00 200.08 0.00
100.000
6 -8.35 99.963 -10.30 99.946 1.95 199.91 194.91
8 -8.05 99.961 -8.35 99.963 0.30 199.92 29.99
10 -6.95 99.995 -8.05 99.961 1.10 199.96 109.98 99.000
12 -5.15 100.023 -6.95 99.995 1.80 200.02 180.02
14 -3.35 100.033 -5.15 100.023 1.80 200.06 180.05
98.000
16 -2.35 100.052 -3.35 100.033 1.00 200.09 100.04 -20 -15 -10 -5 0 5 10 15 20
18 -1.55 100.105 -2.35 100.052 2.35 100.05 117.56
20 -0.55 100.178
22 -0.55 100.443 0.55 100.33 27.59 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.422 0.55 100.325 0.00 200.50 0.00
26 0.55 100.175 0.55 100.176 0.00 200.35 0.00
28 3.35 100.124 0.55 100.175 2.80 200.30 280.42
14+500.00
30 5.15 100.078 3.35 100.124 1.80 200.20 180.18
32 6.95 100.044 5.15 100.078 1.80 200.12 180.11
34 8.05 99.991 6.95 100.044 1.10 200.04 110.02
36 8.35 99.993 8.05 99.991 0.30 199.98 30.00
38 11.55 100.003 8.35 99.993 1.95 199.99 194.99
10.30 99.999 0.00 200.13 0.00
10.30 100.130 -9.75 200.46 -977.22
0.55 100.325 -0.55 100.33 -27.59

Luasan L (M2) 2.06


Luasan R (M2) 1.50

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+900.00 14+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.53 -512.59
100.000
1 -15.45 99.432 -10.30 99.532 0.00 198.93 0.00
2 -14.95 98.425 -10.30 99.400 0.00 198.80 0.00
3 -13.95 98.425 -10.30 99.400 0.00 198.80 0.00
4 -13.45 99.425 -10.30 99.400 1.85 198.79 183.88
5 -8.45 99.386 -8.45 99.386 0.15 198.78 14.91
99.000
6 -8.15 99.406 -8.30 99.396 0.15 198.80 14.91
7 -6.55 99.383 -8.15 99.406 1.60 198.79 159.03
8 -5.05 99.403 -6.55 99.383 1.50 198.79 149.09
9 -3.55 99.467 -5.05 99.403 1.50 198.87 149.15
10 -2.05 99.495 -3.55 99.467 1.50 198.96 149.22
98.000
11 -0.55 99.577 -2.05 99.495 1.50 199.07 149.30 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 99.690 -0.55 99.577 0.00 199.30 0.00
13 0.55 99.706 -0.55 99.727 -9.75 199.26 -971.39
14 0.55 99.541 -10.30 99.532 10.30 99.53 512.59 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 2.05 99.505 0.00 0.00 0.00
16 3.55 99.373
17 5.05 99.452
14+900.00
18 6.55 99.410
19 8.05 99.395
20 8.35 99.436
21 12.35 99.490
22 12.50 98.690
23 13.30 98.690
24 13.45 99.490
25 15.15 99.490

Luasan L1 (M2) 1.89

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+925.00 14+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.56 -512.70
100.000
1 -15.35 99.411 -10.30 99.563 0.00 198.94 0.00
2 -15.05 98.361 -10.30 99.377 0.00 198.75 0.00
3 -14.25 98.361 -10.30 99.377 0.00 198.75 0.00
4 -13.95 99.361 -10.30 99.377 1.95 198.78 193.72
5 -11.75 99.354 -8.35 99.407 0.30 198.84 29.83
99.000
6 -8.35 99.407 -8.05 99.432 1.50 198.87 148.85
8 -8.05 99.432 -6.55 99.433 1.50 198.88 149.46
10 -6.55 99.433 -5.05 99.447 1.50 198.94 149.21
12 -5.05 99.447 -3.55 99.497 1.50 199.01 149.26
14 -3.55 99.497 -2.05 99.514 1.50 199.09 149.32
98.000
16 -2.05 99.514 -0.55 99.576 0.00 199.33 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.576 -0.55 99.758 -9.75 199.32 -971.59
20 -0.55 99.696 -10.30 99.563 10.30 99.56 512.70
22 0.55 99.702 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.527
26 2.05 99.463
28 3.55 99.394
14+925.00
30 5.05 99.372
32 6.55 99.333
34 8.05 99.319
36 8.35 99.322
38 12.05 99.435
39 12.20 98.635
40 13.00 98.635
41 13.15 99.435
42 14.85 99.435

Luasan L1 (M2) 1.96

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+950.00 14+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-0.55 99.59 -27.39
100.000
1 -15.04 99.354 -0.55 99.585 0.00 199.35 0.00
2 -14.75 98.354 -0.55 99.767 -9.75 199.34 -971.78
3 -13.95 98.354 -10.30 99.572 0.00 198.95 0.00
4 -13.65 99.354 -10.30 99.378 0.00 198.76 0.00
5 -8.35 99.392 -10.30 99.378 1.95 198.77 193.80
99.000
6 -8.05 99.402 -8.35 99.392 0.30 198.79 29.92
8 -6.55 99.405 -8.05 99.402 1.50 198.81 149.01
10 -5.05 99.436 -6.55 99.405 1.50 198.84 149.13
12 -3.55 99.494 -5.05 99.436 1.50 198.93 149.20
14 -2.05 99.530 -3.55 99.494 1.50 199.02 149.27
98.000
16 -0.55 99.585 -2.05 99.530 1.50 199.12 149.34 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.696 -0.55 99.585 0.55 99.59 27.39
20 0.55 99.683
22 0.55 99.527 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.363
26 3.55 99.394
28 5.05 99.355
14+950.00
30 6.55 99.313
32 8.05 99.287
34 8.35 99.293
36 12.15 99.363
38 12.30 98.563
39 13.10 98.563
40 13.25 99.363
41 14.95 99.363

Luasan L1 (M2) 2.12

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+975.00 14+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.63 -513.07
100.000
1 -14.79 99.346 -10.30 99.625 0.00 199.25 0.00
2 -14.50 98.345 -10.30 99.625 0.00 198.94 0.00
3 -13.70 98.345 -10.30 99.313 0.00 198.63 0.00
4 -13.40 99.345 -10.30 99.313 1.95 198.61 193.64
5 -8.35 99.293 -8.35 99.293 0.30 198.59 29.79
99.000
6 -8.05 99.292 -8.05 99.292 1.30 198.61 129.19
8 -6.75 99.313 -6.75 99.313 1.40 198.65 138.95
10 -5.35 99.333 -5.35 99.333 1.20 198.73 119.24
12 -4.15 99.393 -4.15 99.393 1.20 198.84 119.30
14 -2.95 99.443 -2.95 99.443 1.20 198.93 119.36
98.000
16 -1.75 99.486 -1.75 99.486 1.20 199.04 119.42 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.555 -0.55 99.555 0.00 199.38 0.00
20 -0.55 99.663 -0.55 99.820 -9.75 199.45 -972.29
22 0.55 99.675 -10.30 99.625 10.30 99.63 513.07 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.505
26 2.05 99.453
28 3.55 99.407
14+975.00
30 5.05 99.404
32 6.55 99.385
34 8.05 99.365
36 8.35 99.362
38 12.75 99.723
39 12.90 98.923
40 13.70 98.923
41 13.85 99.723
42 15.55 99.723

Luasan L1 (M2) 3.40

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+000.00 15+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.66 -513.23
100.000
1 -14.39 99.586 -10.30 99.657 9.75 199.51 972.61
2 -14.10 98.586 -0.55 99.852 0.00 199.40 0.00
3 -13.30 98.586 -0.55 99.546 -1.50 199.05 -149.28
4 -13.00 99.586 -2.05 99.500 -1.50 198.94 -149.21
5 -8.35 99.379 -3.55 99.444 -1.50 198.89 -149.17
99.000
6 -8.05 99.389 -5.05 99.450 -1.50 198.83 -149.13
8 -6.55 99.384 -6.55 99.384 -1.50 198.77 -149.08
10 -5.05 99.450 -8.05 99.389 -0.25 198.77 -24.85
12 -3.55 99.444 -8.30 99.381 -0.05 198.76 -4.97
14 -2.05 99.500 -8.35 99.379 -1.95 198.85 -193.87
98.000
16 -0.55 99.546 -10.30 99.467 0.00 198.93 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.714 -10.30 99.467 0.00 198.93 0.00
20 0.55 99.719 -10.30 99.467 0.00 199.12 0.00
22 0.55 99.568 -10.30 99.657 10.30 99.66 513.23 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.519
26 3.55 99.487
28 5.05 99.454
15+000.00
30 6.55 99.394
32 8.05 99.329
34 8.35 99.619
36 12.75 99.614
38 12.90 98.814
39 13.70 98.814
40 13.85 99.614
41 15.35 99.614

Luasan L1 (M2) 3.05

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+025.00 15+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.69 -513.39
102.000
1 -14.44 99.416 -10.30 99.688 0.00 199.08 0.00
2 -14.15 98.411 -10.30 99.391 0.00 198.78 0.00
3 -13.35 98.411 -10.30 99.391 1.95 198.77 193.80 101.000
4 -13.05 99.411 -8.35 99.377 0.30 198.77 29.82
5 -8.35 99.377 -8.05 99.396 1.50 198.80 149.00
100.000
6 -8.05 99.396 -6.55 99.400 1.50 198.88 149.26
8 -6.55 99.400 -5.05 99.477 1.50 199.01 149.26
10 -5.05 99.477 -3.55 99.536 1.50 199.09 149.32 99.000
12 -3.55 99.536 -2.05 99.557 1.50 199.19 149.39
14 -2.05 99.557 -0.55 99.636 0.00 199.52 0.00
98.000
16 -0.55 99.636 -0.55 99.883 -4.50 199.68 -449.27 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.788 -5.05 99.793 -5.25 199.48 -523.64
20 0.55 99.781 -10.30 99.688 10.30 99.69 513.39
22 0.55 99.602 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.575
26 3.55 99.557
28 5.05 99.547
15+025.00
30 6.55 99.528
32 8.05 99.530
34 8.35 99.546
36 11.05 99.632
38 11.05 100.832
39 10.64 100.832
40 11.80 101.491

Luasan L1 (M2) 3.06

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+050.00 15+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.72 -513.55
102.000
1 -14.19 99.556 -10.30 99.719 0.00 199.26 0.00
2 -13.90 98.551 -10.30 99.544 2.00 199.09 199.09
3 -13.10 98.551 -8.30 99.541 0.25 199.08 24.89 101.000
4 -12.80 99.551 -8.05 99.539 0.30 199.07 29.86
5 -12.15 99.549 -7.75 99.528 1.20 199.05 119.43
100.000
6 -8.05 99.539 -6.55 99.517 1.50 199.08 149.31
8 -7.75 99.528 -5.05 99.558 1.51 199.20 150.19
10 -6.55 99.517 -3.54 99.639 1.49 199.34 148.71 99.000
12 -5.05 99.558 -2.05 99.699 1.50 199.46 149.60
14 -3.55 99.639 -0.55 99.764 0.00 199.68 0.00
98.000
16 -2.05 99.699 -0.55 99.914 -7.75 199.67 -773.73 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.764 -8.30 99.759 -2.00 199.48 -199.48
20 -0.55 99.920 -10.30 99.719 10.30 99.72 513.55
22 0.55 99.938 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.739
26 2.05 99.721
28 3.55 99.720
15+050.00
30 5.05 99.700
32 6.55 99.664
34 8.05 99.649
36 8.35 99.624
38 14.05 99.651
40 14.10 98.651
42 14.90 98.651
44 14.95 99.651
46 15.88 99.651

Luasan L1 (M2) 2.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+075.00 15+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.81 -514.02
102.000
1 -13.97 99.476 -10.30 99.809 0.00 199.41 0.00
2 -13.47 98.470 -10.30 99.597 0.45 199.23 44.83
3 -12.47 98.470 -9.85 99.632 1.50 199.38 149.53 101.000
4 -11.97 99.470 -8.35 99.747 0.05 199.49 4.99
5 -8.35 99.747 -8.30 99.747 0.00 199.64 0.00
100.000
6 -8.05 99.745 -8.30 99.889 -2.00 199.70 -199.70
8 -5.95 99.805 -10.30 99.809 10.30 99.81 514.02
10 -4.15 99.905 99.000
12 -2.35 99.946
14 -0.55 100.048
98.000
16 -0.55 100.155 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.158
20 0.55 100.052
22 2.35 99.958 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 4.15 99.959
26 5.95 99.962
28 8.05 99.957
15+075.00
30 8.35 99.877
32 11.55 99.857
34 11.60 98.857
36 12.40 98.857
38 12.45 99.857
40 13.38 99.857

Luasan (M2) 0.35

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+100.00 15+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -15.15 99.864
2 -14.65 98.857
3 -13.65 98.857 101.000
4 -13.15 99.857
5 -8.55 99.874
100.000
6 -8.25 99.975
8 -6.55 100.039
10 -5.05 100.072 99.000
12 -3.55 100.162 -10.30 100.05 -515.23
14 -2.05 100.267 -10.30 100.045 2.00 200.17 200.17
98.000
16 -0.55 100.357 -8.30 100.125 0.00 200.08 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.355 -8.30 99.958 -0.25 199.83 -24.98
20 0.55 100.256 -8.55 99.874 -1.75 199.74 -174.77
22 0.55 100.196 -10.30 99.868 0.00 199.91 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.147 -10.30 100.045 10.30 100.05 515.23
26 3.55 100.117
28 5.05 100.072
15+100.00
30 6.55 100.057
32 8.05 100.067
34 8.45 99.946
36 11.55 99.935
38 11.80 98.935
40 12.80 98.935
42 13.05 99.935
44 13.38 99.935

Luasan (M2) 0.42

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+125.00 15+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.25 99.883
2 -13.75 98.876
3 -12.75 98.876 101.000
4 -12.75 99.957
5 -8.55 99.957
100.000
6 -8.25 100.075
8 -6.55 100.099
10 -5.05 100.132 99.000
12 -3.55 100.212 -10.30 99.92 -514.58
14 -2.05 100.285 -10.30 99.919 1.75 199.88 174.89
98.000
16 -0.55 100.349 -8.55 99.957 0.25 200.01 25.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.508 -8.30 100.055 0.00 200.27 0.00
20 0.55 100.498 -8.30 100.217 -2.00 200.35 -200.35
22 0.55 100.232 -10.30 100.137 0.00 200.06 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.156 -10.30 99.919 10.30 99.92 514.58
26 3.55 100.115
28 5.05 100.075
15+125.00
30 6.55 100.046
32 7.50 100.038
34 7.80 100.072
36 11.55 100.013
38 11.80 99.013
40 12.80 99.013
42 13.05 100.013
13.38 100.013

Luasan (M2) 0.46

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+150.00 15+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.78 -513.85
102.000
1 -14.95 99.754 -10.30 99.777 1.75 199.57 174.63
2 -14.45 98.747 -8.55 99.797 0.25 199.74 24.97
3 -13.45 98.747 -8.30 99.946 0.00 200.08 0.00 101.000
4 -12.95 99.747 -8.30 100.130 -2.00 200.18 -200.18
5 -8.55 99.797 -10.30 100.050 0.00 199.83 0.00
100.000
6 -8.55 99.797 -10.30 99.777 10.30 99.78 513.85
8 -8.25 99.976
10 -6.55 99.994 99.000
12 -5.05 100.008
14 -3.55 100.095
98.000
16 -2.05 100.180 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.300
20 -0.55 100.441
22 0.55 100.445 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.189
26 2.05 100.144
28 3.55 100.128
15+150.00
30 5.05 100.102
32 6.55 100.044
34 7.50 100.044
36 7.80 99.963
38 13.05 100.110
40 13.30 99.110
42 14.30 99.110
14.55 100.110
14.88 100.110

Luasan (M2) 0.58

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+175.00 15+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-10.30 99.84 -514.20
102.000
1 -14.85 99.879 -10.30 99.844 1.75 199.67 174.71
2 -14.35 98.872 -8.55 99.824 0.25 199.65 24.96
3 -13.35 98.872 -8.30 99.827 0.00 199.83 0.00 101.000
4 -12.85 99.872 -8.30 100.005 -2.00 199.93 -199.93
5 -8.55 99.824 -10.30 99.925 0.00 199.77 0.00
100.000
6 -8.15 99.828 -10.30 99.844 10.30 99.84 514.20
8 -6.55 99.862 0.00 0.00 0.00
10 -5.05 99.922 99.000
12 -3.55 100.022
14 -2.05 100.112
98.000
16 -0.55 100.277 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.409
20 0.55 100.435
22 0.55 100.169 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.112
26 3.55 100.125
28 5.05 100.107
15+175.00
30 6.55 100.087
32 7.50 100.086
34 7.80 100.104
36 10.30 100.011
38 12.05 100.318
40 12.30 99.318
42 13.30 99.318
44 13.55 100.318
46 13.88 100.318

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+200.00 15+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -15.05 99.963
2 -14.55 98.956
3 -13.55 98.956 101.000
4 -13.05 99.956
5 -8.45 99.928
100.000
6 -8.15 99.954
8 -6.55 99.966
10 -5.05 100.022 99.000
12 -3.55 100.087 -10.30 99.94 -514.69
14 -2.05 100.185 -10.30 99.939 1.85 199.87 184.88
98.000
16 -0.55 100.307 -8.45 99.928 0.15 199.87 14.99 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.477 -8.30 99.941 0.00 200.01 0.00
20 0.55 100.457 -8.30 100.066 -2.00 200.05 -200.05
22 0.55 100.214 -10.30 99.986 0.00 199.93 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.35 100.158 -10.30 99.939 10.30 99.94 514.69
26 4.15 100.165
28 5.75 100.147
15+200.00
30 7.50 100.135
32 7.80 100.125
34 12.05 100.197
36 12.30 99.197
38 13.30 99.197
40 13.55 100.197
42 13.88 100.197

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+225.00 15+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.95 100.059
2 -14.45 99.053
3 -13.45 99.053 101.000
4 -12.95 100.053
5 -8.55 100.079
100.000
6 -8.25 100.115
8 -6.35 100.163
10 -4.35 100.188 99.000
12 -2.45 100.248 -8.30 100.27 -416.11
14 -0.55 100.348 -8.30 100.268 0.00 200.38 0.00
98.000
16 -0.55 100.509 -8.30 100.109 -0.25 200.19 -25.02 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.508 -8.55 100.079 -1.75 200.15 -175.13
20 0.55 100.238 -10.30 100.069 0.00 200.26 0.00
22 1.75 100.188 -10.30 100.188 2.00 200.46 200.46 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.95 100.167 -8.30 100.268 8.30 100.27 416.11
26 4.15 100.180
28 5.35 100.165
15+225.00
30 6.55 100.136
32 7.50 100.128
34 7.80 100.135
36 12.05 100.205
38 12.30 99.205
40 13.30 99.205
42 13.55 100.205
13.88 100.205

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+250.00 15+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -13.25 100.266
2 -12.75 99.259
3 -11.75 99.259 101.000
4 -11.25 100.259
5 -8.55 100.219
100.000
6 -8.25 100.200
8 -7.35 100.205
10 -5.85 100.243 99.000
12 -4.35 100.283 -8.30 100.39 -416.60
14 -2.05 100.346 -8.30 100.385 0.00 200.59 0.00
98.000
16 -0.55 100.440 -8.30 100.203 -0.25 200.42 -25.05 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.661 -8.55 100.219 -1.75 200.46 -175.41
20 0.55 100.641 -10.30 100.245 0.00 200.55 0.00
22 0.55 100.342 -10.30 100.305 2.00 200.69 200.69 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.276 -8.30 100.385 8.30 100.39 416.60
26 3.55 100.249
28 5.05 100.240
15+250.00
30 6.55 100.226
32 7.50 100.266
34 7.80 100.261
36 12.05 100.259
38
40
42

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+275.00 15+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.05 101.243
2 -13.80 100.243
3 -12.80 100.243 101.000
4 -12.55 101.243
5 -8.55 100.746
100.000
6 -8.25 100.749
8 -6.55 100.726
10 -5.05 100.748 99.000
12 -3.55 100.757 -8.30 100.88 -418.66
14 -2.05 100.784 -8.30 100.882 0.00 201.61 0.00
98.000
16 -0.55 100.853 -8.30 100.732 -0.25 201.45 -25.18 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.037 -8.55 100.722 -1.75 201.37 -176.20
20 0.55 100.930 -10.30 100.652 0.00 201.45 0.00
22 0.55 100.697 -10.30 100.802 2.00 201.68 201.68 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.652 -8.30 100.882 8.30 100.88 418.66
26 3.55 100.623
28 5.05 100.569
15+275.00
30 6.55 100.543
32 7.50 100.572
34 7.90 100.503
36 13.55 100.590
38
40
42

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+300.00 15+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.01 101.548
2 -13.85 101.548
3 -13.70 100.548 101.000
4 -12.70 100.548
5 -12.55 101.548
100.000
6 -8.55 101.613
8 -8.25 101.656
10 -6.55 101.614 99.000
12 -5.05 101.593 -8.30 101.81 -422.52
14 -3.55 101.539 -8.30 101.812 0.00 203.46 0.00
98.000
16 -2.05 101.492 -8.30 101.649 -0.25 203.26 -25.41 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.508 -8.55 101.613 -1.75 203.20 -177.80
20 -0.55 101.706 -10.30 101.582 0.00 203.31 0.00
22 0.55 101.676 -10.30 101.732 2.00 203.54 203.54 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.232 -8.30 101.812 8.30 101.81 422.52
26 2.05 101.236
28 3.55 101.135
15+300.00
30 5.05 101.072
32 6.55 100.992
34 7.50 100.943
36 7.80 100.923
38 13.85 100.893
40 14.15 99.893
42 14.65 99.893
14.95 100.893
15.95 100.893

Luasan (M2) 0.34

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+325.00 15+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.01 102.484
2 -13.85 102.484
104.000
3 -13.70 101.484
4 -12.70 101.484
103.000
5 -12.55 102.484
6 -8.35 102.467
102.000
8 -8.05 102.453
10 -6.55 102.394
101.000
12 -5.05 102.366 -8.30 102.64 -425.95
14 -3.55 102.264 -8.30 102.638 0.00 205.10 0.00
100.000
16 -2.05 102.199 -8.30 102.465 -0.05 204.93 -5.12 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 102.193 -8.35 102.467 -1.95 204.94 -199.82
20 -0.55 102.394 -10.30 102.475 0.00 205.03 0.00
22 0.55 102.406 -10.30 102.558 2.00 205.20 205.20 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 102.102 -8.30 102.638 8.30 102.64 425.95
26 2.05 101.964
28 3.55 101.864
15+325.00
30 5.05 101.804
32 6.55 101.714
34 7.50 101.696
36 7.80 101.582
38 13.25 101.639
40 13.55 100.639
42 14.05 100.639
14.35 101.639
14.85 101.639

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+350.00 15+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.51 103.285
2 -14.35 103.285
104.000
3 -14.20 102.285
4 -13.20 102.285
103.000
5 -13.05 103.285
6 -8.35 103.307
102.000
8 -8.05 103.333
10 -6.55 103.243
101.000
12 -5.05 103.151 -8.30 103.53 -429.65
14 -3.55 103.077 -8.30 103.530 0.00 206.84 0.00
100.000
16 -1.55 103.043 -8.30 103.311 -0.05 206.62 -5.17 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 103.054 -8.35 103.307 -1.95 206.61 -201.44
20 -0.55 103.305 -10.30 103.298 0.00 206.75 0.00
22 0.55 103.320 -10.30 103.450 2.00 206.98 206.98 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.105 -8.30 103.530 8.30 103.53 429.65
26 1.55 102.969
28 3.55 102.873
15+350.00
30 5.05 102.828
32 6.55 102.765
34 7.50 102.732
36 7.80 102.677
38 13.25 102.592
40 13.55 101.592
42 14.05 101.592
14.35 102.592
14.85 102.592

Luasan (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+375.00 15+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.31 104.333
2 -12.15 104.333
104.000
3 -12.00 103.333
4 -11.00 103.333
103.000
5 -10.85 104.333
6 -8.35 104.292
102.000
8 -8.05 104.276
10 -6.55 104.226
101.000
12 -5.05 104.155 -8.30 104.42 -433.36
14 -3.55 104.041 -8.30 104.423 0.00 208.70 0.00
100.000
16 -1.55 103.960 -8.30 104.273 -0.05 208.54 -5.21 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.012 -8.35 104.271 -1.95 208.46 -203.25
20 -0.55 104.250 -10.30 104.193 0.00 208.54 0.00
22 0.55 104.221 -10.30 104.343 2.00 208.77 208.77 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.994 -8.30 104.423 8.30 104.42 433.36
26 1.55 103.854
28 3.55 103.757
15+375.00
30 5.05 103.702
32 6.55 103.711
34 7.50 103.571
36 7.80 103.526
38 11.94 103.437
40 12.25 102.409
42 12.75 102.409
13.05 103.409
13.55 103.409

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+400.00 15+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 104.351
2 -13.35 104.351
104.000
3 -13.20 103.351
4 -12.20 103.351
103.000
5 -12.05 104.351
6 -8.35 104.308
102.000
8 -8.05 104.349
10 -6.55 104.339
101.000
12 -5.05 104.302 -8.30 104.52 -433.74
14 -3.55 104.207 -8.30 104.516 0.00 208.83 0.00
100.000
16 -1.55 104.185 -8.30 104.315 -0.05 208.62 -5.22 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.221 -8.35 104.308 -1.95 208.64 -203.42
20 -0.55 104.437 -10.30 104.331 0.00 208.77 0.00
22 0.55 104.457 -10.30 104.436 2.00 208.95 208.95 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 104.211 -8.30 104.516 8.30 104.52 433.74
26 1.55 104.127
28 3.55 104.067
15+400.00
30 5.05 104.011
32 6.55 103.952
34 7.50 103.929
36 7.80 103.795
38 12.55 103.636
40 12.86 102.608
42 13.36 102.608
13.66 103.608
14.05 103.636

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+425.00 15+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.30 103.554
2 -14.14 103.554
104.000
3 -13.99 102.554
4 -12.99 102.554
103.000
5 -12.84 103.554
6 -11.88 103.554
102.000
8 -8.45 103.576
10 -8.05 103.607
101.000
12 -6.55 103.602 -8.30 103.91 -431.23
14 -5.05 103.563 -8.30 103.911 0.00 207.50 0.00
100.000
16 -3.55 103.570 -8.30 103.588 -0.15 207.16 -15.54 -20 -15 -10 -5 0 5 10 15 20
18 -1.55 103.561 -8.45 103.576 -1.85 207.14 -191.60
20 -0.55 103.616 -10.30 103.564 0.00 207.40 0.00
22 -0.55 103.817 -10.30 103.831 2.00 207.74 207.74 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.839 -8.30 103.911 8.30 103.91 431.23
26 0.55 103.598
28 1.55 103.552
15+425.00
30 3.55 103.526
32 5.05 103.521
34 6.55 103.481
36 7.70 103.483
38 7.90 103.350
40 12.75 103.250
42 13.06 102.222
44 13.56 102.222
46 13.86 103.222
48 14.25 103.250

Luasan (M2) 0.60

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+450.00 15+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.51 102.316
2 -12.35 102.316
104.000
3 -12.20 101.316
4 -11.20 101.316
103.000
5 -11.05 102.319
6 -8.35 102.326
102.000
8 -8.05 102.316
10 -6.05 102.392
101.000
12 -4.75 102.440 -8.30 102.55 -425.58
14 -4.15 102.451 -8.30 102.549 0.00 204.87 0.00
100.000
16 -2.95 102.501 -8.30 102.324 -0.05 204.65 -5.12 -20 -15 -10 -5 0 5 10 15 20
18 -1.75 102.526 -8.35 102.326 -1.95 204.65 -199.53
20 -0.55 102.571 -10.30 102.321 0.00 204.79 0.00
22 -0.55 102.800 -10.30 102.469 2.00 205.02 205.02 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 102.795 -8.30 102.549 8.30 102.55 425.58
26 0.55 102.571
28 1.85 102.536
15+450.00
30 3.15 102.511
32 4.45 102.471
34 5.75 102.436
36 7.05 102.411
38 7.70 102.399
40 8.00 102.336
42 13.05 102.311
44 13.36 101.283
46 13.86 101.283
48 14.16 102.283
14.55 102.283

Luasan (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+475.00 15+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 101.676
2 -13.35 101.676
104.000
3 -13.20 100.676
4 -12.20 100.676
103.000
5 -12.05 101.676
6 -8.35 101.467
102.000
8 -8.05 101.480
10 -6.55 101.476
101.000
12 -5.05 101.514 -8.30 101.65 -421.86
14 -3.55 101.527 -8.30 101.654 0.00 203.16 0.00
100.000
16 -2.05 101.534 -8.30 101.504 -0.41 202.99 -41.41 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.591 -8.71 101.487 -1.59 202.91 -161.52
20 -0.55 101.846 -10.30 101.426 0.00 203.00 0.00
22 0.55 101.866 -10.30 101.574 2.00 203.23 203.23 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.651 -8.30 101.654 8.30 101.65 421.86
26 2.05 101.585
28 3.55 101.557
15+475.00
30 5.05 101.510
32 6.55 101.463
34 7.70 101.471
36 8.00 101.409
38 11.95 101.386
40 12.25 100.379
42 12.75 100.379
44 13.05 101.379
46 13.55 101.379

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+500.00 15+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.984
2 -13.35 100.984
102.000
3 -13.20 99.984
4 -12.20 99.984
101.000
5 -12.05 100.984
6 -8.45 100.918
100.000
8 -8.05 100.983
10 -6.55 100.945
99.000
12 -5.05 100.964 -8.30 101.06 -419.41
14 -3.55 100.966 -8.30 101.063 0.00 201.98 0.00
98.000
16 -2.05 100.976 -8.30 100.913 -0.15 201.82 -15.14 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.061 -8.45 100.907 -1.85 201.74 -186.61
20 -0.55 101.277 -10.30 100.833 0.00 201.82 0.00
22 0.55 101.241 -10.30 100.983 2.00 202.05 202.05 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.997 -8.30 101.063 8.30 101.06 419.41
26 2.05 100.931
28 3.55 100.926
15+500.00
30 5.05 100.921
32 6.55 100.886
34 7.70 100.901
36 8.00 100.761
38 10.95 100.855
40 11.95 100.843
42 12.25 99.835
44 12.75 99.835
46 13.05 100.835
13.26 100.843

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+525.00 15+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.655
2 -13.35 100.655
102.000
3 -13.20 99.655
4 -12.20 99.655
101.000
5 -12.05 100.655
6 -8.45 100.646
100.000
8 -8.05 100.631
10 -6.55 100.611
99.000
12 -5.05 100.603 -8.30 100.83 -418.42
14 -3.55 100.577 -8.30 100.825 0.00 201.47 0.00
98.000
16 -2.05 100.565 -8.30 100.640 -0.15 201.29 -15.10 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.645 -8.45 100.646 -1.85 201.30 -186.20
20 -0.55 100.871 -10.30 100.651 0.00 201.40 0.00
22 0.55 100.873 -10.30 100.745 2.00 201.57 201.57 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.643 -8.30 100.825 8.30 100.83 418.42
26 2.05 100.579
28 3.55 100.565
15+525.00
30 5.05 100.533
32 6.55 100.491
34 7.50 100.486
36 7.90 100.416
38 10.95 100.437
40 11.25 99.430
42 11.75 99.430
44 12.05 100.430
46 12.20 100.437

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+550.00 15+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.31 100.486
2 -13.15 100.486
102.000
3 -13.00 99.486
4 -12.00 99.486
101.000
5 -11.85 100.486
6 -8.35 100.526
100.000
8 -8.05 100.536
10 -6.55 100.511
99.000
12 -5.05 100.509 -8.30 100.77 -418.20
14 -3.55 100.477 -8.30 100.771 0.00 201.30 0.00
98.000
16 -2.05 100.466 -8.30 100.528 -0.05 201.05 -5.03 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.471 -8.35 100.526 -1.95 201.03 -196.00
20 -0.55 100.651 -10.30 100.504 0.00 201.20 0.00
22 0.55 100.658 -10.30 100.691 2.00 201.46 201.46 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.421 -8.30 100.771 8.30 100.77 418.20
26 2.05 100.366
28 3.55 100.331
15+550.00
30 5.05 100.286
32 5.55 100.231
34 7.50 100.246
36 7.80 100.238
38 13.05 100.303
40 13.35 99.296
42 13.85 99.296
44 14.15 100.296
46 15.25 100.305

Luasan (M2) 0.43

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+575.00 15+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -12.05 100.228
2 -8.35 100.224
102.000
3 -8.05 100.243
4 -6.55 100.262
101.000
5 -5.05 100.282
6 -3.55 100.292
100.000
8 -2.05 100.282
10 -0.55 100.296
99.000
12 -0.55 100.532 -8.30 100.40 -416.66
14 0.55 100.522 -8.30 100.400 0.00 200.63 0.00
98.000
16 0.55 100.281 -8.30 100.227 -0.05 200.45 -5.01 -20 -15 -10 -5 0 5 10 15 20
18 2.05 100.239 -8.35 100.224 -1.95 200.45 -195.44
20 3.55 100.222 -10.30 100.226 0.00 200.55 0.00
22 5.05 100.197 -10.30 100.320 2.00 200.72 200.72 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.55 100.161 -8.30 100.400 8.30 100.40 416.66
26 7.70 100.167
28 8.00 100.166
15+575.00
30 10.85 100.210
32 11.15 99.204
34 11.65 99.204
36 11.95 100.204
38 13.05 100.214

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+600.00 15+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.25 100.097
2 -14.00 99.097
102.000
3 -12.50 99.097
4 -12.25 100.097
101.000
5 -8.45 99.857
6 -8.05 100.087
100.000
8 -6.55 100.102
10 -5.05 100.142
99.000
12 -3.55 100.177 -8.30 100.22 -415.92
14 -2.05 100.177 -8.30 100.222 0.00 200.17 0.00
98.000
16 -0.55 100.202 -8.30 99.943 -0.15 199.80 -14.98 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.484 -8.45 99.857 -1.85 199.83 -184.84
20 0.55 100.480 -10.30 99.974 0.00 200.12 0.00
22 0.55 100.243 -10.30 100.142 2.00 200.36 200.36 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.174 -8.30 100.222 8.30 100.22 415.92
26 3.55 100.187
28 5.05 100.133
15+600.00
30 6.55 100.112
32 7.70 100.106
34 8.00 100.090
36 12.25 100.022
38 12.55 99.016
40 13.05 99.016
42 13.35 100.016
44 14.45 100.026

Luasan (M2) 0.54

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+625.00 15+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.15 99.910
2 -12.90 98.910
102.000
3 -11.40 98.910
4 -11.15 99.910
101.000
5 -8.45 99.867
6 -8.05 99.987
100.000
8 -6.55 100.012
10 -5.05 100.059
99.000
12 -3.55 100.087 -8.30 100.16 -415.68
14 -2.05 100.097 -8.30 100.163 0.00 200.08 0.00
98.000
16 -0.55 100.187 -8.30 99.912 -0.15 199.78 -14.98 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.421 -8.45 99.867 -1.85 199.76 -184.78
20 0.55 100.399 -10.30 99.896 0.00 199.98 0.00
22 0.55 100.200 -10.30 100.083 2.00 200.25 200.25 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.132 -8.30 100.163 8.30 100.16 415.68
26 3.55 100.107 0.00 0.00 0.00
28 5.05 100.076
15+625.00
30 6.55 100.047
32 8.00 100.080
34 12.25 100.044
36 12.55 99.038
38 13.05 99.038
40 13.35 100.038
42 14.45 100.048

Luasan (M2) 0.48

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+650.00 15+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.35 100.194
2 -12.85 100.194
102.000
3 -12.70 99.194
4 -11.70 99.194
101.000
5 -11.55 100.194
6 -8.45 100.100
100.000
8 -8.05 100.142
10 -6.55 100.127
99.000
12 -5.15 100.142 -8.30 100.28 -416.16
14 -3.55 100.113 -8.30 100.279 0.00 200.40 0.00
98.000
16 -2.05 100.139 -8.30 100.116 -0.15 200.22 -15.02 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.237 -8.45 100.100 -1.85 200.26 -185.24
20 0.00 100.237 -10.30 100.156 0.00 200.36 0.00
22 0.55 100.167 -10.30 100.199 2.00 200.48 200.48 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.147 -8.30 100.279 8.30 100.28 416.16
26 4.35 100.131
28 6.25 100.117
15+650.00
30 8.00 100.101
32 14.55 100.108
34 14.55 100.108
36 14.65 99.108
38 15.15 99.108
40 15.25 100.108
42 16.09 100.108

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+675.00 15+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -15.35 100.232
2 -14.85 100.232
102.000
3 -14.70 99.232
4 -13.70 99.232
101.000
5 -13.55 100.232
6 -8.35 100.231
100.000
8 -8.05 100.272
10 -6.55 100.280
99.000
12 -5.05 100.313 -8.30 100.38 -416.59
14 -3.55 100.232 -8.30 100.384 0.00 200.62 0.00
98.000
16 -2.05 100.312 -8.30 100.238 -0.05 200.47 -5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.349 -8.35 100.231 -1.95 200.46 -195.45
20 -0.55 100.597 -10.30 100.231 0.00 200.54 0.00
22 0.55 100.532 -10.30 100.304 2.00 200.69 200.69 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.282 -8.30 100.384 8.30 100.38 416.59
26 1.85 100.204
28 3.15 100.200
15+675.00
30 4.45 100.192
32 5.75 100.172
34 7.05 100.147
36 8.00 100.122
38 11.75 100.131
40 11.85 99.131
42 12.35 99.131
44 12.45 100.108
46 13.45 100.108

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+700.00 15+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.95 100.572
2 -14.45 100.572
102.000
3 -14.30 99.572
4 -13.30 99.572
101.000
5 -13.15 100.572
6 -8.45 100.514
100.000
8 -8.15 100.573
10 -5.25 100.587
99.000
12 -4.35 100.612 -9.75 100.64 -490.62
14 -2.45 100.562 -9.75 100.639 2.00 201.35 201.35
98.000
16 -0.55 100.650 -7.75 100.714 0.00 201.28 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.871 -7.75 100.561 -2.00 201.04 -201.04
20 0.55 100.797 -9.75 100.481 0.00 201.12 0.00
22 0.55 100.552 -9.75 100.639 9.75 100.64 490.62 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.482
26 4.35 100.437
28 5.25 100.357
15+700.00
30 8.00 100.242
32 11.75 100.202
34 11.85 99.202
36 12.35 99.202
38 12.45 100.179
40 12.95 100.179

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+725.00 15+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.75 100.859
2 -13.25 100.859
102.000
3 -13.10 99.859
4 -12.10 99.859
101.000
5 -11.95 100.859
6 -8.55 100.771
100.000
8 -8.25 100.763
10 -6.55 100.718
99.000
12 -5.05 100.743 -9.75 100.90 -491.88
14 -3.55 100.738 -9.75 100.899 2.00 201.78 201.78
98.000
16 -2.05 100.732 -7.75 100.884 0.00 201.64 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.793 -7.75 100.754 -2.00 201.43 -201.43
20 -0.55 101.008 -9.75 100.674 0.00 201.57 0.00
22 0.55 100.933 -9.75 100.899 9.75 100.90 491.88 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.718
26 1.55 100.642
28 3.55 100.573
15+725.00
30 5.05 100.503
32 6.55 100.462
34 7.90 100.413
36 13.25 100.233

Luasan (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+750.00 15+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -15.15 100.919
2 -14.65 100.919
102.000
3 -14.50 99.919
4 -13.50 99.919
101.000
5 -13.35 100.919
6 -8.45 100.881
100.000
8 -8.15 100.871
10 -6.55 100.840
99.000
12 -5.05 100.841 -9.75 100.96 -492.16
14 -3.55 100.858 -9.75 100.955 2.00 201.98 201.98
98.000
16 -2.05 100.875 -7.75 101.025 0.00 201.91 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.881 -7.75 100.881 -2.00 201.68 -201.68
20 -0.55 101.212 -9.75 100.801 0.00 201.76 0.00
22 0.55 101.226 -9.75 100.955 9.75 100.96 492.16 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.924
26 2.05 100.863
28 3.55 100.816
15+750.00
30 5.05 100.738
32 6.55 100.673
34 8.00 100.588
36 13.15 100.512
38 13.25 99.512
40 13.75 99.512
42 13.85 100.489
44 14.35 100.489

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+775.00 15+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 101.010
2 -13.55 101.010
102.000
3 -13.40 100.010
4 -12.40 100.010
101.000
5 -12.25 101.010
6 -7.75 101.022
100.000
8 -7.45 101.020
10 -6.15 101.009
99.000
12 -4.75 101.024 -9.75 101.07 -492.73
14 -3.35 101.015 -9.75 101.073 2.00 202.25 202.25
98.000
16 -1.95 100.996 -7.75 101.173 0.00 202.18 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.060 -7.75 101.010 -2.00 201.94 -201.94
20 -0.55 101.258 -9.75 100.930 0.00 202.00 0.00
22 0.55 101.268 -9.75 101.073 9.75 101.07 492.73 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.050
26 2.05 100.990
28 3.55 100.937
15+775.00
30 5.05 100.884
32 6.55 100.883
34 8.00 100.743
36 14.75 100.677
38 14.85 99.677
40 15.35 99.677
42 15.45 100.654
44 15.95 100.654

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+800.00 15+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.995
2 -13.55 100.995
102.000
3 -13.40 99.995
4 -12.40 99.995
101.000
5 -12.25 100.995
6 -7.75 100.962
100.000
8 -7.45 100.972
10 -6.15 100.973
99.000
12 -4.75 100.990 -9.75 101.03 -492.53
14 -3.35 100.962 -9.75 101.032 2.00 202.20 202.20
98.000
16 -1.95 100.903 -7.75 101.164 0.00 202.14 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.967 -7.75 100.979 -2.00 201.88 -201.88
20 -0.55 101.164 -9.75 100.899 0.00 201.93 0.00
22 0.55 101.183 -9.75 101.032 9.75 101.03 492.53 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.968
26 2.05 100.884
28 3.55 100.858
15+800.00
30 5.05 100.820
32 6.55 100.791
34 8.00 100.753
36 14.75 100.715
38 14.85 99.715
40 15.35 99.715
42 15.45 100.692
44 15.95 100.692
46

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+825.00 15+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.841
2 -13.55 100.841
102.000
3 -13.40 99.841
4 -12.40 99.841
101.000
5 -12.25 100.848
6 -7.75 100.831
100.000
8 -7.45 100.835
10 -6.15 100.814
99.000
12 -4.75 100.829 -9.75 100.86 -491.71
14 -3.35 100.851 -9.75 100.864 2.00 201.83 201.83
98.000
16 -1.95 100.826 -7.75 100.964 0.00 201.81 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.878 -7.75 100.848 -2.00 201.62 -201.62
20 -0.55 101.138 -9.75 100.768 0.00 201.63 0.00
22 0.55 101.138 -9.75 100.864 9.75 100.86 491.71 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.908
26 2.05 100.823
28 3.55 100.759
15+825.00
30 5.05 100.718
32 6.55 100.681
34 8.00 100.609
36 11.25 100.523
38 11.35 99.523
40 11.85 99.523
42 11.95 100.500
44 12.45 100.500
46

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+850.00 15+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -12.65 100.883
2 -12.50 99.883
102.000
3 -11.50 99.883
4 -11.35 100.859
101.000
5 -7.75 100.793
6 -7.45 100.833
100.000
8 -6.15 100.773
10 -4.75 100.791
99.000
12 -3.35 100.813 -9.75 100.92 -492.00
14 -1.95 100.788 -9.75 100.924 2.00 201.93 201.93
98.000
16 -0.55 100.907 -7.75 101.002 0.00 201.80 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.022 -7.75 100.793 -2.00 201.51 -201.51
20 0.55 101.036 -9.75 100.713 0.00 201.64 0.00
22 0.55 100.833 -9.75 100.924 9.75 100.92 492.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.765
26 3.55 100.688
28 5.05 100.673
15+850.00
30 6.55 100.661
32 8.00 100.628
34 14.75 100.563
36 14.85 99.563
38 15.35 99.563
40 15.45 100.540
42 15.95 100.540

Luasan (M2) 0.42

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+875.00 15+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.999
2 -13.00 100.999
102.000
3 -12.85 99.999
4 -11.85 99.999
101.000
5 -11.70 100.976
6 -7.95 100.838
100.000
8 -7.55 100.837
10 -6.15 100.824 0.00 0.00 0.00
99.000
12 -4.75 100.847 -9.75 100.93 -492.05
14 -3.35 100.844 -9.75 100.934 2.00 201.90 201.90
98.000
16 -1.95 100.895 -7.75 100.966 0.00 201.81 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.976 -7.75 100.841 -2.00 201.60 -201.60
20 -0.55 101.052 -9.75 100.761 0.00 201.67 0.00
22 0.55 101.067 -9.75 100.911 9.75 100.91 491.94 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.882
26 2.05 100.822
28 3.55 100.808
15+875.00
30 5.05 100.788
32 6.55 100.753
34 8.00 100.675
36 13.75 100.657
38 13.85 99.657
40 14.35 99.657
42 14.45 100.634
44 14.95 100.634

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+903.00 15+903.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.75 101.18 -493.27
1 -14.11 100.861 -9.75 101.184 0.00 202.27 0.00
2 -13.60 100.861 -9.75 101.087 0.25 202.21 25.28
102.000
3 -13.45 99.861 -9.50 101.118 1.75 202.26 176.98
4 -12.45 99.861 -7.75 101.141 0.00 202.37 0.00
5 -9.75 100.837 -7.75 101.224 -2.00 202.41 -202.41
6 -9.50 101.118 -9.75 101.184 9.75 101.18 493.27
100.000
8 -7.95 101.146 0.00 0.00 0.00
10 -7.55 101.196
12 -6.15 101.215
14 -4.75 101.276
98.000
16 -3.35 101.302 -20 -15 -10 -5 0 5 10 15 20
18 -1.95 101.350
20 -0.55 101.407
22 -0.55 101.533 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.546
26 0.55 101.419
28 2.05 101.365
15+903.00
30 3.55 101.338
32 5.05 101.295
34 6.55 101.187
36 8.00 101.078
38 13.75 100.919
40 13.85 99.919
42 14.35 99.919
44 14.45 100.896
14.95 100.896

Luasan (M2) 0.16

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+900.00 14+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.69 27.42
100.000
1 -15.45 99.432 0.55 99.691 0.00 199.23 0.00
2 -14.95 98.425 0.55 99.541 1.50 199.05 149.28
3 -13.95 98.425 2.05 99.505 1.50 198.88 149.16
4 -13.45 99.425 3.55 99.373 1.00 198.80 99.40
5 -8.45 99.386 4.55 99.426 0.50 198.88 49.72
99.000
6 -8.15 99.406 5.05 99.452 1.50 198.86 149.15
7 -6.55 99.383 6.55 99.410 1.50 198.81 149.10
8 -5.05 99.403 8.05 99.395 0.30 198.83 29.82
9 -3.55 99.467 8.35 99.436 1.95 198.90 193.93
10 -2.05 99.495 10.30 99.462 0.00 198.96 0.00
98.000
11 -0.55 99.577 10.30 99.496 -9.75 199.19 -971.04 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 99.690 0.55 99.691 -0.55 99.69 -27.42
13 0.55 99.706
14 0.55 99.541 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 2.05 99.505
16 3.55 99.373
17 5.05 99.452
14+900.00
18 6.55 99.410
19 8.05 99.395
20 8.35 99.436
21 12.35 99.490
22 12.50 98.690
23 13.30 98.690
24 13.45 99.490
25 15.15 99.490

Luasan R (M2) 1.47

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+925.00 14+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.72 27.42
100.000
1 -15.35 99.411 0.55 99.724 0.00 199.25 0.00
2 -15.05 98.361 0.55 99.527 1.50 198.99 149.24
3 -14.25 98.361 2.05 99.463 1.50 198.86 149.14
4 -13.95 99.361 3.55 99.394 1.00 198.77 99.39
5 -11.75 99.354 4.55 99.379 0.50 198.75 49.69
99.000
6 -8.35 99.407 5.05 99.372 1.50 198.71 149.03
8 -8.05 99.432 6.55 99.333 1.50 198.65 148.99
10 -6.55 99.433 8.05 99.319 0.30 198.64 29.80
12 -5.05 99.447 8.35 99.322 1.95 198.70 193.74
14 -3.55 99.497 10.30 99.382 0.00 198.76 0.00
98.000
16 -2.05 99.514 10.30 99.382 0.00 198.91 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.576 10.30 99.529 0.00 199.06 0.00
20 -0.55 99.696 10.30 99.529 -9.75 199.25 -971.36
22 0.55 99.702 0.55 99.724 -0.55 99.72 -27.42 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.527
26 2.05 99.463
28 3.55 99.394
14+925.00
30 5.05 99.372
32 6.55 99.333
34 8.05 99.319
36 8.35 99.322
38 12.05 99.435
39 12.20 98.635
40 13.00 98.635
41 13.15 99.435
42 14.85 99.435

Luasan R (M2) 2.35

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+950.00 14+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.76 27.43
100.000
1 -15.04 99.354 0.55 99.757 9.75 199.32 971.68
2 -14.75 98.354 10.30 99.562 0.00 199.12 0.00
3 -13.95 98.354 10.30 99.562 0.00 198.89 0.00
4 -13.65 99.354 10.30 99.329 0.00 198.66 0.00
5 -8.35 99.392 10.30 99.329 -1.95 198.62 -193.66
99.000
6 -8.05 99.402 8.35 99.293 -0.05 198.59 -4.96
8 -6.55 99.405 8.30 99.292 -0.25 198.58 -24.82
10 -5.05 99.436 8.05 99.287 -1.50 198.60 -148.95
12 -3.55 99.494 6.55 99.313 -1.50 198.67 -149.00
14 -2.05 99.530 5.05 99.355 -0.50 198.72 -49.68
98.000
16 -0.55 99.585 4.55 99.368 -1.00 198.76 -99.38 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.696 3.55 99.394 -1.50 198.76 -148.77
20 0.55 99.683 2.05 99.363 -1.50 198.89 -149.47
22 0.55 99.527 0.55 99.527 0.00 199.28 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.363 0.55 99.757 -0.55 99.76 -27.43
26 3.55 99.394
28 5.05 99.355
14+950.00
30 6.55 99.313
32 8.05 99.287
34 8.35 99.293
36 12.15 99.363
38 12.30 98.563
39 13.10 98.563
40 13.25 99.363
41 14.95 99.363

Luasan R (M2) 2.99

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+975.00 14+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.79 27.44
100.000
1 -14.79 99.346 0.55 99.790 9.75 199.39 972.00
2 -14.50 98.345 10.30 99.595 0.00 199.12 0.00
3 -13.70 98.345 10.30 99.522 -1.95 198.88 -193.91
4 -13.40 99.345 8.35 99.362 -0.05 198.73 -4.97
5 -8.35 99.293 8.30 99.363 -0.25 198.73 -24.84
99.000
6 -8.05 99.292 8.05 99.365 -1.50 198.75 -149.06
8 -6.75 99.313 6.55 99.385 -1.50 198.79 -149.09
10 -5.35 99.333 5.05 99.404 -0.50 198.81 -49.70
12 -4.15 99.393 4.55 99.405 -1.00 198.81 -99.41
14 -2.95 99.443 3.55 99.407 -1.50 198.86 -149.15
98.000
16 -1.75 99.486 2.05 99.453 -1.50 198.96 -149.22 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.555 0.55 99.505 0.00 199.30 0.00
20 -0.55 99.663 0.55 99.790 -0.55 99.79 -27.44
22 0.55 99.675 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.505
26 2.05 99.453
28 3.55 99.407
14+975.00
30 5.05 99.404
32 6.55 99.385
34 8.05 99.365
36 8.35 99.362
38 12.75 99.723
39 12.90 98.923
40 13.70 98.923
41 13.85 99.723
42 15.55 99.723

Luasan R (M2) 2.65

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+000.00 15+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.57 27.38
100.000
1 -14.39 99.586 0.55 99.568 1.50 199.09 149.32
2 -14.10 98.586 2.05 99.519 1.50 199.01 149.25
3 -13.30 98.586 3.55 99.487 1.00 198.95 99.48
4 -13.00 99.586 4.55 99.465 0.50 198.92 49.73
5 -8.35 99.379 5.05 99.454 1.50 198.85 149.14
99.000
6 -8.05 99.389 6.55 99.394 1.50 198.72 149.04
8 -6.55 99.384 8.05 99.329 0.30 198.95 29.84
10 -5.05 99.450 8.35 99.619 1.95 199.24 194.26
12 -3.55 99.444 10.30 99.617 0.00 199.25 0.00
14 -2.05 99.500 10.30 99.628 -2.00 199.30 -199.30
98.000
16 -0.55 99.546 8.30 99.668 -7.75 199.49 -773.03 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.714 0.55 99.823 0.00 199.39 0.00
20 0.55 99.719 0.55 99.568 -0.55 99.57 -27.38
22 0.55 99.568 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.519
26 3.55 99.487
28 5.05 99.454
15+000.00
30 6.55 99.394
32 8.05 99.329
34 8.35 99.619
36 12.75 99.614
38 12.90 98.814
39 13.70 98.814
40 13.85 99.614
41 15.35 99.614

Luasan R (M2) 2.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+025.00 15+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.60 27.39
102.000
1 -14.44 99.416 0.55 99.602 1.50 199.18 149.38
2 -14.15 98.411 2.05 99.575 1.50 199.13 149.35
3 -13.35 98.411 3.55 99.557 1.00 199.11 99.55 101.000
4 -13.05 99.411 4.55 99.550 0.50 199.10 49.77
5 -8.35 99.377 5.05 99.547 1.50 199.08 149.21
100.000
6 -8.05 99.396 6.55 99.528 1.50 199.06 149.39
8 -6.55 99.400 8.05 99.530 0.30 199.08 29.86
10 -5.05 99.477 8.35 99.546 1.95 199.15 194.18 99.000
12 -3.55 99.536 10.30 99.608 0.00 199.27 0.00
14 -2.05 99.557 10.30 99.661 -2.00 199.36 -199.36
98.000
16 -0.55 99.636 8.30 99.701 -7.75 199.56 -773.28 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.788 0.55 99.856 0.00 199.46 0.00
20 0.55 99.781 0.55 99.602 -0.55 99.60 -27.39
22 0.55 99.602 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.575
26 3.55 99.557
28 5.05 99.547
15+025.00
30 6.55 99.528
32 8.05 99.530
34 8.35 99.546
36 11.05 99.632
38 11.05 100.832
39 10.64 100.832
40 11.80 101.491

Luasan R2 (M2) 1.95

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+050.00 15+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.74 27.43
102.000
1 -14.19 99.556 0.55 99.739 1.50 199.46 149.60
2 -13.90 98.551 2.05 99.721 1.50 199.44 149.58
3 -13.10 98.551 3.55 99.720 1.00 199.43 99.71 101.000
4 -12.80 99.551 4.55 99.707 0.50 199.41 49.85
5 -12.15 99.549 5.05 99.700 1.50 199.36 149.52
100.000
6 -8.05 99.539 6.55 99.664 1.50 199.31 149.48
8 -7.75 99.528 8.05 99.649 0.30 199.27 29.89
10 -6.55 99.517 8.35 99.624 1.95 199.26 194.28 99.000
12 -5.05 99.558 10.30 99.633 0.00 199.33 0.00
14 -3.55 99.639 10.30 99.694 -2.00 199.43 -199.43
98.000
16 -2.05 99.699 8.30 99.734 -7.75 199.62 -773.54 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.764 0.55 99.889 0.00 199.63 0.00
20 -0.55 99.920 0.55 99.739 -0.55 99.74 -27.43
22 0.55 99.938 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.739
26 2.05 99.721
28 3.55 99.720
15+050.00
30 5.05 99.700
32 6.55 99.664
34 8.05 99.649
36 8.35 99.624
38 14.05 99.651
40 14.10 98.651
42 14.90 98.651
44 14.95 99.651
46 15.88 99.651

Luasan R (M2) 1.05

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+075.00 15+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.30 100.04 415.15
102.000
1 -13.97 99.476 8.30 100.037 2.00 199.99 199.99
2 -13.47 98.470 10.30 99.957 0.00 199.82 0.00
3 -12.47 98.470 10.30 99.865 -1.95 199.74 -194.75 101.000
4 -11.97 99.470 8.35 99.877 -0.05 199.77 -4.99
5 -8.35 99.747 8.30 99.890 0.00 199.93 0.00
100.000
6 -8.05 99.745 8.30 100.037 -8.30 100.04 -415.15
8 -5.95 99.805 0.00 0.00 0.00
10 -4.15 99.905 0.00 0.00 0.00 99.000
12 -2.35 99.946 0.00 0.00 0.00
14 -0.55 100.048 0.00 0.00 0.00
98.000
16 -0.55 100.155 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.158 0.00 0.00 0.00
20 0.55 100.052 0.00 0.00 0.00
22 2.35 99.958 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 4.15 99.959 0.00 0.00 0.00
26 5.95 99.962 0.00 0.00 0.00
28 8.05 99.957 0.00 0.00 0.00
15+075.00
30 8.35 99.877 0.00 0.00 0.00
32 11.55 99.857 0.00 0.00 0.00
34 11.60 98.857 0.00 0.00 0.00
36 12.40 98.857 0.00 0.00 0.00
38 12.45 99.857 0.00 0.00 0.00
40 13.38 99.857 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+100.00 15+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.30 100.18 415.75
102.000
1 -15.15 99.864 8.30 100.181 0.00 200.17 0.00
2 -14.65 98.857 8.30 99.991 0.15 199.94 15.00
3 -13.65 98.857 8.45 99.946 1.85 199.89 184.89 101.000
4 -13.15 99.857 10.30 99.939 0.00 200.04 0.00
5 -8.55 99.874 10.30 100.101 -2.00 200.28 -200.28
100.000
6 -8.25 99.975 8.30 100.181 0.00 200.17 0.00
8 -6.55 100.039 8.30 99.991 -8.30 99.99 -414.96
10 -5.05 100.072 0.00 0.00 0.00 99.000
12 -3.55 100.162 0.00 0.00 0.00
14 -2.05 100.267 0.00 0.00 0.00
98.000
16 -0.55 100.357 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.355 0.00 0.00 0.00
20 0.55 100.256 0.00 0.00 0.00
22 0.55 100.196 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.147 0.00 0.00 0.00
26 3.55 100.117 0.00 0.00 0.00
28 5.05 100.072 0.00 0.00 0.00
15+100.00
30 6.55 100.057 0.00 0.00 0.00
32 8.05 100.067 0.00 0.00 0.00
34 8.45 99.946 0.00 0.00 0.00
36 11.55 99.935 0.00 0.00 0.00
38 11.80 98.935 0.00 0.00 0.00
40 12.80 98.935 0.00 0.00 0.00
42 13.05 99.935 0.00 0.00 0.00
44 13.38 99.935 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.40

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+125.00 15+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.25 99.883
2 -13.75 98.876
3 -12.75 98.876 101.000
4 -12.75 99.957
5 -8.55 99.957
100.000
6 -8.25 100.075
8 -6.55 100.099
10 -5.05 100.132 99.000
12 -3.55 100.212 7.75 100.21 388.30
14 -2.05 100.285 7.75 100.207 0.00 200.27 0.00
98.000
16 -0.55 100.349 7.75 100.066 0.05 200.14 5.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.508 7.80 100.072 1.95 200.11 195.11
20 0.55 100.498 9.75 100.036 0.00 200.17 0.00
22 0.55 100.232 9.75 100.131 -2.00 200.34 -200.34 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.156 7.75 100.207 -7.75 100.21 -388.30
26 3.55 100.115
28 5.05 100.075
15+125.00
30 6.55 100.046
32 7.50 100.038
34 7.80 100.072
36 11.55 100.013
38 11.80 99.013
40 12.80 99.013
42 13.05 100.013
13.38 100.013

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+150.00 15+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.95 99.754
2 -14.45 98.747
3 -13.45 98.747 101.000
4 -12.95 99.747
5 -8.55 99.797
100.000
6 -8.55 99.797
8 -8.25 99.976
10 -6.55 99.994 99.000
12 -5.05 100.008 7.75 100.23 388.40
14 -3.55 100.095 7.75 100.233 0.00 200.21 0.00
98.000
16 -2.05 100.180 7.75 99.976 0.05 199.94 5.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.300 7.80 99.963 1.95 199.99 194.99
20 -0.55 100.441 9.75 100.024 0.00 200.24 0.00
22 0.55 100.445 9.75 100.211 -2.00 200.44 -200.44 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.189 7.75 100.233 -7.75 100.23 -388.40
26 2.05 100.144
28 3.55 100.128
15+150.00
30 5.05 100.102
32 6.55 100.044
34 7.50 100.044
36 7.80 99.963
38 13.05 100.110
40 13.30 99.110
42 14.30 99.110
14.55 100.110
14.88 100.110

Luasan (M2) 0.46

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+175.00 15+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.85 99.879
2 -14.35 98.872
3 -13.35 98.872 101.000
4 -12.85 99.872
5 -8.55 99.824
100.000
6 -8.15 99.828
8 -6.55 99.862
10 -5.05 99.922 99.000
12 -3.55 100.022 7.75 100.32 388.74
14 -2.05 100.112 7.75 100.319 0.00 200.42 0.00
98.000
16 -0.55 100.277 7.75 100.101 0.05 200.21 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.409 7.80 100.104 1.95 200.12 195.11
20 0.55 100.435 9.75 100.011 0.00 200.36 0.00
22 0.55 100.169 9.75 100.351 -2.00 200.67 -200.67 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.112 7.75 100.319 -7.75 100.32 -388.74
26 3.55 100.125
28 5.05 100.107
15+175.00
30 6.55 100.087
32 7.50 100.086
34 7.80 100.104
36 10.30 100.011
38 12.05 100.318
40 12.30 99.318
42 13.30 99.318
44 13.55 100.318
46 13.88 100.318

Luasan (M2) 0.55

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+200.00 15+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -15.05 99.963
2 -14.55 98.956
3 -13.55 98.956 101.000
4 -13.05 99.956
5 -8.45 99.928
100.000
6 -8.15 99.954
8 -6.55 99.966
10 -5.05 100.022 99.000
12 -3.55 100.087 7.75 100.33 388.77
14 -2.05 100.185 7.75 100.328 0.00 200.46 0.00
98.000
16 -0.55 100.307 7.75 100.127 0.05 200.25 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.477 7.80 100.125 1.95 200.29 195.28
20 0.55 100.457 9.75 100.163 0.00 200.44 0.00
22 0.55 100.214 9.75 100.280 -2.00 200.61 -200.61 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.35 100.158 7.75 100.328 -7.75 100.33 -388.77
26 4.15 100.165
28 5.75 100.147
15+200.00
30 7.50 100.135
32 7.80 100.125
34 12.05 100.197
36 12.30 99.197
38 13.30 99.197
40 13.55 100.197
42 13.88 100.197

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+225.00 15+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.95 100.059
2 -14.45 99.053
3 -13.45 99.053 101.000
4 -12.95 100.053
5 -8.55 100.079
100.000
6 -8.25 100.115
8 -6.35 100.163
10 -4.35 100.188 99.000
12 -2.45 100.248 7.75 100.13 388.02
14 -0.55 100.348 7.75 100.134 0.05 200.27 5.01
98.000
16 -0.55 100.509 7.80 100.135 1.95 200.31 195.30 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.508 9.75 100.172 0.00 200.42 0.00
20 0.55 100.238 9.75 100.252 -2.00 200.55 -200.55
22 1.75 100.188 7.75 100.300 0.00 200.43 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.95 100.167 7.75 100.134 -7.75 100.13 -388.02
26 4.15 100.180
28 5.35 100.165
15+225.00
30 6.55 100.136
32 7.50 100.128
34 7.80 100.135
36 12.05 100.205
38 12.30 99.205
40 13.30 99.205
42 13.55 100.205
13.88 100.205

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+250.00 15+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -13.25 100.266
2 -12.75 99.259
3 -11.75 99.259 101.000
4 -11.25 100.259
5 -8.55 100.219
100.000
6 -8.25 100.200
8 -7.35 100.205
10 -5.85 100.243 99.000
12 -4.35 100.283 7.75 100.26 388.52
14 -2.05 100.346 7.75 100.262 0.05 200.52 5.01
98.000
16 -0.55 100.440 7.80 100.261 1.95 200.52 195.51 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.661 9.75 100.260 0.00 200.65 0.00
20 0.55 100.641 9.75 100.388 -2.00 200.80 -200.80
22 0.55 100.342 7.75 100.416 0.00 200.68 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.276 7.75 100.262 -7.75 100.26 -388.52
26 3.55 100.249
28 5.05 100.240
15+250.00
30 6.55 100.226
32 7.50 100.266
34 7.80 100.261
36 12.05 100.259
38
40
42

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+275.00 15+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.05 101.243
2 -13.80 100.243
3 -12.80 100.243 101.000
4 -12.55 101.243
5 -8.55 100.746
100.000
6 -8.25 100.749
8 -6.55 100.726
10 -5.05 100.748 99.000
12 -3.55 100.757 7.75 100.78 390.51
14 -2.05 100.784 7.75 100.776 0.00 201.31 0.00
98.000
16 -0.55 100.853 7.75 100.529 0.15 201.03 15.08 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.037 7.90 100.503 1.85 201.04 185.96
20 0.55 100.930 9.75 100.535 0.00 201.26 0.00
22 0.55 100.697 9.75 100.726 -2.00 201.50 -201.50 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.652 7.75 100.776 -7.75 100.78 -390.51
26 3.55 100.623
28 5.05 100.569
15+275.00
30 6.55 100.543
32 7.50 100.572
34 7.90 100.503
36 13.55 100.590
38
40
42

Luasan (M2) 0.46

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+300.00 15+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.01 101.548
2 -13.85 101.548
3 -13.70 100.548 101.000
4 -12.70 100.548
5 -12.55 101.548
100.000
6 -8.55 101.613
8 -8.25 101.656
10 -6.55 101.614 99.000
12 -5.05 101.593 7.75 100.93 391.09
14 -3.55 101.539 7.75 100.926 0.00 202.06 0.00
98.000
16 -2.05 101.492 7.75 101.136 2.00 202.20 202.20 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.508 9.75 101.064 0.00 201.98 0.00
20 -0.55 101.706 9.75 100.912 -1.95 201.84 -196.79
22 0.55 101.676 7.80 100.923 -0.05 201.85 -5.05 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.232 7.75 100.926 -7.75 100.93 -391.09
26 2.05 101.236
28 3.55 101.135
15+300.00
30 5.05 101.072
32 6.55 100.992
34 7.50 100.943
36 7.80 100.923
38 13.85 100.893
40 14.15 99.893
42 14.65 99.893
14.95 100.893
15.95 100.893

Luasan (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+325.00 15+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.01 102.484
2 -13.85 102.484
104.000
3 -13.70 101.484
4 -12.70 101.484
103.000
5 -12.55 102.484
6 -8.35 102.467
102.000
7 -8.05 102.453
8 -6.55 102.394
101.000
9 -5.05 102.366 7.75 101.90 394.87
10 -3.55 102.264 7.75 101.902 0.00 203.50 0.00
100.000
11 -2.05 102.199 7.75 101.601 0.05 203.18 5.08 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 102.193 7.80 101.582 1.95 203.19 198.11
13 -0.55 102.394 9.75 101.605 0.00 203.34 0.00
14 0.55 102.406 9.75 101.738 -2.00 203.57 -203.57 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 0.55 102.102 7.75 101.834 -7.75 101.83 -394.61
16 2.05 101.964
17 3.55 101.864
15+325.00
18 5.05 101.804
19 6.55 101.714
20 7.50 101.696
21 7.80 101.582
22 13.25 101.639
23 13.55 100.639
24 14.05 100.639
25 14.35 101.639
26 14.85 101.639

Luasan (M2) 0.12

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+350.00 15+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d h

105.000
1 -14.51 103.285
2 -14.35 103.285
104.000
3 -14.20 102.285
4 -13.20 102.285
103.000
5 -13.05 103.285
6 -8.35 103.307
102.000
8 -8.05 103.333
10 -6.55 103.243
101.000
12 -5.05 103.151 7.75 102.89 398.68
14 -3.55 103.077 7.75 102.886 0.00 205.57 0.00
100.000
16 -1.55 103.043 7.75 102.686 0.05 205.36 5.13 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 103.054 7.80 102.677 1.95 205.32 200.19
20 -0.55 103.305 9.75 102.643 0.00 205.44 0.00
22 0.55 103.320 9.75 102.794 -2.00 205.68 -205.68 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.105 7.75 102.886 -7.75 102.89 -398.68
26 1.55 102.969
28 3.55 102.873
15+350.00
30 5.05 102.828
32 6.55 102.765
34 7.50 102.732
36 7.80 102.677
38 13.25 102.592
40 13.55 101.592
42 14.05 101.592
14.35 102.592
14.85 102.592

Luasan (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+375.00 15+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.31 104.333
2 -12.15 104.333
104.000
3 -12.00 103.333
4 -11.00 103.333
103.000
5 -10.85 104.333
6 -8.35 104.292
102.000
8 -8.05 104.276
10 -6.55 104.226
101.000
12 -5.05 104.155 7.75 103.73 401.97
14 -3.55 104.041 7.75 103.734 0.00 207.27 0.00
100.000
16 -1.55 103.960 7.75 103.534 0.05 207.06 5.18 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.012 7.80 103.526 1.95 207.00 201.83
20 -0.55 104.250 9.75 103.477 0.00 207.13 0.00
22 0.55 104.221 9.75 103.651 -2.00 207.39 -207.39 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.994 7.75 103.734 -7.75 103.73 -401.97
26 1.55 103.854
28 3.55 103.757
15+375.00
30 5.05 103.702
32 6.55 103.711
34 7.50 103.571
36 7.80 103.526
38 11.94 103.437
40 12.25 102.409
42 12.75 102.409
13.05 103.409
13.55 103.409

Luasan (M2) 0.38

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+400.00 15+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 104.351
2 -13.35 104.351
104.000
3 -13.20 103.351
4 -12.20 103.351
103.000
5 -12.05 104.351
6 -8.35 104.308
102.000
8 -8.05 104.349
10 -6.55 104.339
101.000
12 -5.05 104.302 7.75 104.08 403.29
14 -3.55 104.207 7.75 104.076 0.00 207.89 0.00
100.000
16 -1.55 104.185 7.75 103.817 0.05 207.61 5.19 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.221 7.80 103.795 1.95 207.52 202.33
20 -0.55 104.437 9.75 103.721 0.00 207.67 0.00
22 0.55 104.457 9.75 103.946 -2.00 208.02 -208.02 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 104.211 7.75 104.076 -7.75 104.08 -403.29
26 1.55 104.127
28 3.55 104.067
15+400.00
30 5.05 104.011
32 6.55 103.952
34 7.50 103.929
36 7.80 103.795
38 12.55 103.636
40 12.86 102.608
42 13.36 102.608
13.66 103.608
14.05 103.636

Luasan (M2) 0.50

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+425.00 15+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.30 103.554
2 -14.14 103.554
104.000
3 -13.99 102.554
4 -12.99 102.554
103.000
5 -12.84 103.554
6 -11.88 103.554
102.000
8 -8.45 103.576
10 -8.05 103.607
101.000
12 -6.55 103.602 7.75 103.57 401.33
14 -5.05 103.563 7.75 103.569 0.00 207.02 0.00
100.000
16 -3.55 103.570 7.75 103.450 0.15 206.80 15.51 -20 -15 -10 -5 0 5 10 15 20
18 -1.55 103.561 7.90 103.350 1.85 206.66 191.16
20 -0.55 103.616 9.75 103.307 0.00 206.81 0.00
22 -0.55 103.817 9.75 103.503 -2.00 207.07 -207.07 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.839 7.75 103.569 -7.75 103.57 -401.33
26 0.55 103.598
28 1.55 103.552
15+425.00
30 3.55 103.526
32 5.05 103.521
34 6.55 103.481
36 7.70 103.483
38 7.90 103.350
40 12.75 103.250
42 13.06 102.222
44 13.56 102.222
46 13.86 103.222
48 14.25 103.250

Luasan (M2) 0.40

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+450.00 15+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.51 102.316
2 -12.35 102.316
104.000
3 -12.20 101.316
4 -11.20 101.316
103.000
5 -11.05 102.319
6 -8.35 102.326
102.000
8 -8.05 102.316
10 -6.05 102.392
101.000
12 -4.75 102.440 7.75 102.53 397.30
14 -4.15 102.451 7.75 102.530 0.00 204.92 0.00
100.000
16 -2.95 102.501 7.75 102.389 0.25 204.73 25.59 -20 -15 -10 -5 0 5 10 15 20
18 -1.75 102.526 8.00 102.336 1.75 204.66 179.08
20 -0.55 102.571 9.75 102.326 0.00 204.78 0.00
22 -0.55 102.800 9.75 102.452 -2.00 204.98 -204.98 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 102.795 7.75 102.530 -7.75 102.53 -397.30
26 0.55 102.571
28 1.85 102.536
15+450.00
30 3.15 102.511
32 4.45 102.471
34 5.75 102.436
36 7.05 102.411
38 7.70 102.399
40 8.00 102.336
42 13.05 102.311
44 13.36 101.283
46 13.86 101.283
48 14.16 102.283
14.55 102.283

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+475.00 15+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 101.676
2 -13.35 101.676
104.000
3 -13.20 100.676
4 -12.20 100.676
103.000
5 -12.05 101.676
6 -8.35 101.467
102.000
8 -8.05 101.480
10 -6.55 101.476
101.000
12 -5.05 101.514 7.75 101.58 393.63
14 -3.55 101.527 7.75 101.583 0.00 203.04 0.00
100.000
16 -2.05 101.534 7.75 101.461 0.25 202.87 25.36 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.591 8.00 101.409 1.75 202.81 177.25
20 -0.55 101.846 9.75 101.397 0.00 202.93 0.00
22 0.55 101.866 9.75 101.530 -2.00 203.11 -202.91 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.651 7.75 101.583 -7.75 101.58 -393.63
26 2.05 101.585
28 3.55 101.557
15+475.00
30 5.05 101.510
32 6.55 101.463
34 7.70 101.471
36 8.00 101.409
38 11.95 101.386
40 12.25 100.379
42 12.75 100.379
44 13.05 101.379
46 13.55 101.379

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+500.00 15+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.984
2 -13.35 100.984
102.000
3 -13.20 99.984
4 -12.20 99.984
101.000
5 -12.05 100.984
6 -8.45 100.918
100.000
8 -8.05 100.983
10 -6.55 100.945
99.000
12 -5.05 100.964 7.75 100.99 391.34
14 -3.55 100.966 7.75 100.992 0.00 201.87 0.00
98.000
16 -2.05 100.976 7.75 100.878 0.25 201.64 25.20 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.061 8.00 100.761 1.75 201.59 176.39
20 -0.55 101.277 9.75 100.830 0.00 201.78 0.00
22 0.55 101.241 9.75 100.952 -2.00 201.94 -201.94 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.997 7.75 100.992 -7.75 100.99 -391.34
26 2.05 100.931
28 3.55 100.926
15+500.00
30 5.05 100.921
32 6.55 100.886
34 7.70 100.901
36 8.00 100.761
38 10.95 100.855
40 11.95 100.843
42 12.25 99.835
44 12.75 99.835
46 13.05 100.835
13.26 100.843

Luasan (M2) 0.35

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+525.00 15+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.655
2 -13.35 100.655
102.000
3 -13.20 99.655
4 -12.20 99.655
101.000
5 -12.05 100.655
6 -8.45 100.646
100.000
8 -8.05 100.631
10 -6.55 100.611
99.000
12 -5.05 100.603 7.75 100.55 389.63
14 -3.55 100.577 7.75 100.550 0.00 200.99 0.00
98.000
16 -2.05 100.565 7.75 100.442 0.15 200.86 15.06 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.645 7.90 100.416 1.85 200.85 185.78
20 -0.55 100.871 9.75 100.432 0.00 200.92 0.00
22 0.55 100.873 9.75 100.490 -2.00 201.04 -201.04 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.643 7.75 100.550 -7.75 100.55 -389.63
26 2.05 100.579
28 3.55 100.565
15+525.00
30 5.05 100.533
32 6.55 100.491
34 7.50 100.486
36 7.90 100.416
38 10.95 100.437
40 11.25 99.430
42 11.75 99.430
44 12.05 100.430
46 12.20 100.437

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+550.00 15+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.31 100.486
2 -13.15 100.486
102.000
3 -13.00 99.486
4 -12.00 99.486
101.000
5 -11.85 100.486
6 -8.35 100.526
100.000
8 -8.05 100.536
10 -6.55 100.511
99.000
12 -5.05 100.509 7.75 100.36 388.89
14 -3.55 100.477 7.75 100.359 0.00 200.60 0.00
98.000
16 -2.05 100.466 7.75 100.239 0.05 200.48 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.471 7.80 100.238 1.95 200.50 195.49
20 -0.55 100.651 9.75 100.265 0.00 200.65 0.00
22 0.55 100.658 9.75 100.389 -2.00 200.75 -200.75 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.421 7.75 100.359 -7.75 100.36 -388.89
26 2.05 100.366
28 3.55 100.331
15+550.00
30 5.05 100.286
32 5.55 100.231
34 7.50 100.246
36 7.80 100.238
38 13.05 100.303
40 13.35 99.296
42 13.85 99.296
44 14.15 100.296
46 15.25 100.305

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+575.00 15+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M
a b c d h
7.75 100.29 388.63
103.000
1 -12.05 100.228 7.75 100.291 0.00 200.46 0.00
2 -8.35 100.224 7.75 100.167 0.25 200.33 25.04
102.000
3 -8.05 100.243 8.00 100.166 1.75 200.37 175.32
4 -6.55 100.262 9.75 100.199 0.00 200.48 0.00
101.000
5 -5.05 100.282 9.75 100.281 -2.00 200.57 -200.57
6 -3.55 100.292 7.75 100.291 -7.75 100.29 -388.63
100.000
8 -2.05 100.282
10 -0.55 100.296
99.000
12 -0.55 100.532
14 0.55 100.522
98.000
16 0.55 100.281 -20 -15 -10 -5 0 5 10 15 20
18 2.05 100.239
20 3.55 100.222
22 5.05 100.197 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.55 100.161
26 7.70 100.167
28 8.00 100.166
15+575.00
30 10.85 100.210
32 11.15 99.204
34 11.65 99.204
36 11.95 100.204
38 13.05 100.214

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+600.00 15+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.25 100.097
2 -14.00 99.097
102.000
3 -12.50 99.097
4 -12.25 100.097
101.000
5 -8.45 99.857
6 -8.05 100.087
100.000
8 -6.55 100.102
10 -5.05 100.142
99.000
12 -3.55 100.177 7.75 100.22 388.36
14 -2.05 100.177 7.75 100.222 0.00 200.33 0.00
98.000
16 -0.55 100.202 7.75 100.103 0.25 200.19 25.02 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.484 8.00 100.090 1.75 200.15 175.13
20 0.55 100.480 9.75 100.058 0.00 200.21 0.00
22 0.55 100.243 9.75 100.149 -2.00 200.37 -200.37 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.174 7.75 100.222 -7.75 100.22 -388.36
26 3.55 100.187
28 5.05 100.133
15+600.00
30 6.55 100.112
32 7.70 100.106
34 8.00 100.090
36 12.25 100.022
38 12.55 99.016
40 13.05 99.016
42 13.35 100.016
44 14.45 100.026

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+625.00 15+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.15 99.910
2 -12.90 98.910
102.000
3 -11.40 98.910
4 -11.15 99.910
101.000
5 -8.45 99.867
6 -8.05 99.987
100.000
8 -6.55 100.012
10 -5.05 100.059
99.000
12 -3.55 100.087 7.75 100.18 388.19
14 -2.05 100.097 7.75 100.178 0.00 200.25 0.00
98.000
16 -0.55 100.187 7.75 100.069 0.25 200.15 25.02 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.421 8.00 100.080 1.75 200.14 175.13
20 0.55 100.399 9.75 100.063 0.00 200.20 0.00
22 0.55 100.200 9.75 100.141 -2.00 200.32 -200.32 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.132 7.75 100.178 -7.75 100.18 -388.19
26 3.55 100.107
28 5.05 100.076
15+625.00
30 6.55 100.047
32 8.00 100.080
34 12.25 100.044
36 12.55 99.038
38 13.05 99.038
40 13.35 100.038
42 14.45 100.048

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+650.00 15+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.35 100.194
2 -12.85 100.194
102.000
3 -12.70 99.194
4 -11.70 99.194
101.000
5 -11.55 100.194
6 -8.45 100.100
100.000
8 -8.05 100.142
10 -6.55 100.127
99.000
12 -5.15 100.142 7.75 100.26 388.50
14 -3.55 100.113 7.75 100.259 2.00 200.43 200.43
98.000
16 -2.05 100.139 9.75 100.169 0.00 200.27 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.237 9.75 100.103 -1.75 200.20 -175.18
20 0.00 100.237 8.00 100.101 -0.25 200.22 -25.03
22 0.55 100.167 7.75 100.119 0.00 200.38 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.147 7.75 100.259 -7.75 100.26 -388.50
26 4.35 100.131
28 6.25 100.117
15+650.00
30 8.00 100.101
32 14.55 100.108
34 14.55 100.108
36 14.65 99.108
38 15.15 99.108
40 15.25 100.108
42 16.09 100.108

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+675.00 15+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.75 100.15 388.09
101.000
1 -15.35 100.232 7.75 100.151 0.00 200.48 0.00
2 -14.85 100.232 7.75 100.324 2.00 200.57 200.57
3 -14.70 99.232 9.75 100.249 0.00 200.38 0.00
4 -13.70 99.232 9.75 100.127 -1.75 200.25 -175.22 100.000
5 -13.55 100.232 8.00 100.122 -0.25 200.27 -25.03
6 -8.35 100.231 7.75 100.151 -7.75 100.15 -388.09
7 -8.05 100.272 99.000
8 -6.55 100.280
9 -5.05 100.313
10 -3.55 100.232
98.000
11 -2.05 100.312 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 100.349
13 -0.55 100.597
14 0.55 100.532 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 0.55 100.282
16 1.85 100.204
17 3.15 100.200
15+675.00
18 4.45 100.192
19 5.75 100.172
20 7.05 100.147
21 7.70 100.157
22 8.00 100.122
23 11.75 100.131
24 11.85 99.131
25 12.35 99.131
26 12.45 100.108
27 13.45 100.108

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+700.00 15+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.95 100.572
2 -14.45 100.572
102.000
3 -14.30 99.572
4 -13.30 99.572
101.000
5 -13.15 100.572
6 -8.45 100.514
100.000
8 -8.15 100.573
10 -5.25 100.587
99.000
12 -4.35 100.612 7.75 100.42 389.12
14 -2.45 100.562 7.75 100.419 0.00 200.71 0.00
98.000
16 -0.55 100.650 7.75 100.292 0.25 200.53 25.07 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.871 8.00 100.242 1.75 200.46 175.40
20 0.55 100.797 9.75 100.220 0.00 200.66 0.00
22 0.55 100.552 9.75 100.439 -2.00 200.86 -200.86 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.482 7.75 100.419 -7.75 100.42 -389.12
26 4.35 100.437
28 5.25 100.357
15+700.00
30 8.00 100.242
32 11.75 100.202
34 11.85 99.202
36 12.35 99.202
38 12.45 100.179
40 12.95 100.179

Luasan (M2) 0.39

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+725.00 15+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.75 100.859
2 -13.25 100.859
102.000
3 -13.10 99.859
4 -12.10 99.859
101.000
5 -11.95 100.859
6 -8.55 100.771
100.000
8 -8.25 100.763
10 -6.55 100.718
99.000
12 -5.05 100.743 7.75 100.58 389.73
14 -3.55 100.738 7.75 100.575 0.00 201.00 0.00
98.000
16 -2.05 100.732 7.75 100.428 0.15 200.84 15.06 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.793 7.90 100.413 1.85 200.76 185.70
20 -0.55 101.008 9.75 100.344 0.00 200.90 0.00
22 0.55 100.933 9.75 100.559 -2.00 201.13 -201.13 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.718 7.75 100.575 -7.75 100.58 -389.73
26 1.55 100.642
28 3.55 100.573
15+725.00
30 5.05 100.503
32 6.55 100.462
34 7.90 100.413
36 13.25 100.233

Luasan (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+750.00 15+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -15.15 100.919
2 -14.65 100.919
102.000
3 -14.50 99.919
4 -13.50 99.919
101.000
5 -13.35 100.919
6 -8.45 100.881
100.000
8 -8.15 100.871
10 -6.55 100.840
99.000
12 -5.05 100.841 7.75 100.83 390.70
14 -3.55 100.858 7.75 100.827 0.00 201.47 0.00
98.000
16 -2.05 100.875 7.75 100.641 0.25 201.23 25.15 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.881 8.00 100.588 1.75 201.15 176.00
20 -0.55 101.212 9.75 100.559 0.00 201.37 0.00
22 0.55 101.226 9.75 100.809 -2.00 201.64 -201.64 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.924 7.75 100.827 -7.75 100.83 -390.70
26 2.05 100.863
28 3.55 100.816
15+750.00
30 5.05 100.738
32 6.55 100.673
34 8.00 100.588
36 13.15 100.512
38 13.25 99.512
40 13.75 99.512
42 13.85 100.489
44 14.35 100.489

Luasan (M2) 0.48

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+775.00 15+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 101.010
2 -13.55 101.010
102.000
3 -13.40 100.010
4 -12.40 100.010
101.000
5 -12.25 101.010
6 -7.75 101.022
100.000
8 -7.45 101.020
10 -6.15 101.009
99.000
12 -4.75 101.024 7.75 100.98 391.29
14 -3.35 101.015 7.75 100.978 2.00 201.81 201.81
98.000
16 -1.95 100.996 9.75 100.829 0.00 201.55 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.060 9.75 100.724 -1.75 201.47 -176.28
20 -0.55 101.258 8.00 100.743 -0.25 201.60 -25.20
22 0.55 101.268 7.75 100.859 0.00 201.84 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.050 7.75 100.978 -7.75 100.98 -391.29
26 2.05 100.990
28 3.55 100.937
15+775.00
30 5.05 100.884
32 6.55 100.883
34 8.00 100.743
36 14.75 100.677
38 14.85 99.677
40 15.35 99.677
42 15.45 100.654
44 15.95 100.654

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+800.00 15+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.995
2 -13.55 100.995
102.000
3 -13.40 99.995
4 -12.40 99.995
101.000
5 -12.25 100.995
6 -7.75 100.962
100.000
8 -7.45 100.972
10 -6.15 100.973
99.000
12 -4.75 100.990 7.75 100.95 391.17
14 -3.35 100.962 7.75 100.946 2.00 201.79 201.79
98.000
16 -1.95 100.903 9.75 100.839 0.00 201.58 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.967 9.75 100.742 -1.75 201.50 -176.31
20 -0.55 101.164 8.00 100.753 -0.25 201.52 -25.19
22 0.55 101.183 7.75 100.770 0.00 201.72 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.968 7.75 100.946 -7.75 100.95 -391.17
26 2.05 100.884
28 3.55 100.858
15+800.00
30 5.05 100.820
32 6.55 100.791
34 8.00 100.753
36 14.75 100.715
38 14.85 99.715
40 15.35 99.715
42 15.45 100.692
44 15.95 100.692
46

Luasan (M2) 0.29

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+825.00 15+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.841
2 -13.55 100.841
102.000
3 -13.40 99.841
4 -12.40 99.841
101.000
5 -12.25 100.848
6 -7.75 100.831
100.000
8 -7.45 100.835
10 -6.15 100.814
99.000
12 -4.75 100.829 7.75 100.79 390.57
14 -3.35 100.851 7.75 100.791 2.00 201.56 201.56
98.000
16 -1.95 100.826 9.75 100.764 0.00 201.32 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.878 9.75 100.553 -1.75 201.16 -176.02
20 -0.55 101.138 8.00 100.609 -0.25 201.25 -25.16
22 0.55 101.138 7.75 100.637 0.00 201.43 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.908 7.75 100.791 -7.75 100.79 -390.57
26 2.05 100.823
28 3.55 100.759
15+825.00
30 5.05 100.718
32 6.55 100.681
34 8.00 100.609
36 11.25 100.523
38 11.35 99.523
40 11.85 99.523
42 11.95 100.500
44 12.45 100.500
46

Luasan (M2) 0.38

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+850.00 15+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -12.65 100.883
2 -12.50 99.883
102.000
3 -11.50 99.883
4 -11.35 100.859
101.000
5 -7.75 100.793
6 -7.45 100.833
100.000
8 -6.15 100.773
10 -4.75 100.791
99.000
12 -3.35 100.813 7.75 100.78 390.51
14 -1.95 100.788 7.75 100.776 0.00 201.40 0.00
98.000
16 -0.55 100.907 7.75 100.624 0.25 201.25 25.16 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.022 8.00 100.628 1.75 201.24 176.08
20 0.55 101.036 9.75 100.610 0.00 201.39 0.00
22 0.55 100.833 9.75 100.776 -2.00 201.55 -201.55 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.765 7.75 100.776 -7.75 100.78 -390.51
26 3.55 100.688
28 5.05 100.673
15+850.00
30 6.55 100.661
32 8.00 100.628
34 14.75 100.563
36 14.85 99.563
38 15.35 99.563
40 15.45 100.540
42 15.95 100.540

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+875.00 15+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.999
2 -13.00 100.999
102.000
3 -12.85 99.999
4 -11.85 99.999
101.000
5 -11.70 100.976
6 -7.95 100.838
100.000
8 -7.55 100.837
10 -6.15 100.824
99.000
12 -4.75 100.847 7.75 100.91 391.04
14 -3.35 100.844 7.75 100.914 2.00 201.82 201.82
98.000
16 -1.95 100.895 9.75 100.909 0.00 201.58 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.976 9.75 100.669 -1.75 201.34 -176.18
20 -0.55 101.052 8.00 100.675 -0.25 201.41 -25.18
22 0.55 101.067 7.75 100.734 0.00 201.65 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.882 7.75 100.914 -7.75 100.91 -391.04
26 2.05 100.822
28 3.55 100.808
15+875.00
30 5.05 100.788
32 6.55 100.753
34 8.00 100.675
36 13.75 100.657
38 13.85 99.657
40 14.35 99.657
42 14.45 100.634
44 14.95 100.634

Luasan (M2) 0.47

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+903.00 15+903.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

1 -14.11 100.861
2 -13.60 100.861
102.000
3 -13.45 99.861
4 -12.45 99.861
5 -12.30 100.837
6 -10.05 101.118 9.75 101.19 493.28
100.000
8 -7.95 101.146 9.75 101.186 0.00 202.21 0.00
10 -7.55 101.196 9.75 101.024 -1.75 202.10 -176.84
12 -6.15 101.215 8.00 101.078 -0.25 202.29 -25.29
14 -4.75 101.276 7.75 101.216 0.00 202.46 0.00
98.000
16 -3.35 101.302 7.75 101.248 2.00 202.43 202.43 -20 -15 -10 -5 0 5 10 15 20
18 -1.95 101.350 9.75 101.186 -9.75 101.19 -493.28
20 -0.55 101.407
22 -0.55 101.533 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.546
26 0.55 101.419
28 2.05 101.365
15+903.00
30 3.55 101.338
32 5.05 101.295
34 6.55 101.187
36 8.00 101.078
38 13.75 100.919
40 13.85 99.919
42 14.35 99.919
44 14.45 100.896
14.95 100.896

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+900.00 14+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.54 27.37
100.000
1 -15.45 99.432 0.55 99.541 1.50 199.05 149.28
2 -14.95 98.425 2.05 99.505 1.50 198.88 149.16
3 -13.95 98.425 3.55 99.373 1.00 198.80 99.40
4 -13.45 99.425 4.55 99.426 0.00 199.04 0.00
5 -8.45 99.386 4.55 99.611 -4.00 199.31 -398.61
99.000
6 -8.15 99.406 0.55 99.694 0.00 199.24 0.00
7 -6.55 99.383 0.55 99.541 -0.55 99.54 -27.37
8 -5.05 99.403
9 -3.55 99.467 4.55 99.43 226.19
10 -2.05 99.495 4.55 99.426 0.00 199.04 0.00
98.000
11 -0.55 99.577 4.55 99.611 5.75 199.11 572.43 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 99.690 10.30 99.496 0.00 198.96 0.00
13 0.55 99.706 10.30 99.462 -1.95 198.90 -193.93
14 0.55 99.541 8.35 99.436 -0.05 198.87 -4.97 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 2.05 99.505 8.30 99.429 -0.25 198.82 -24.85
16 3.55 99.373 8.05 99.395 -1.50 198.81 -149.10
17 5.05 99.452 6.55 99.410 -1.50 198.86 -149.15
14+900.00
18 6.55 99.410 5.05 99.452 -0.50 198.88 -49.72
19 8.05 99.395 4.55 99.426 -4.55 99.43 -226.19
20 8.35 99.436 0.00 0.00 0.00
21 12.35 99.490
22 12.50 98.690
23 13.30 98.690
24 13.45 99.490
25 15.15 99.490

Luasan R1 (M2) 0.77


Luasan R2 (M2) 0.71

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+925.00 14+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.69 27.41
100.000
1 -15.35 99.411 0.55 99.688 0.00 199.22 0.00
2 -15.05 98.361 0.55 99.527 1.50 198.99 149.24
3 -14.25 98.361 2.05 99.463 1.50 198.86 149.14
4 -13.95 99.361 3.55 99.394 1.00 198.77 99.39
5 -11.75 99.354 4.55 99.379 0.00 199.00 0.00
99.000
6 -8.35 99.407 4.55 99.621 -4.00 199.31 -398.62
8 -8.05 99.432 0.55 99.688 -0.55 99.69 -27.41
10 -6.55 99.433
12 -5.05 99.447
14 -3.55 99.497
98.000
16 -2.05 99.514 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.576
20 -0.55 99.696
22 0.55 99.702 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.527
26 2.05 99.463
28 3.55 99.394
14+925.00
30 5.05 99.372
32 6.55 99.333
34 8.05 99.319
36 8.35 99.322
38 12.05 99.435
39 12.20 98.635
40 13.00 98.635
41 13.15 99.435
42 14.85 99.435

Luasan R1 (M2) 0.85

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+950.00 14+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.72 27.42
100.000
1 -15.04 99.354 0.55 99.717 0.00 199.24 0.00
2 -14.75 98.354 0.55 99.527 1.50 198.89 149.47
3 -13.95 98.354 2.05 99.363 1.50 198.76 148.87
4 -13.65 99.354 3.55 99.394 1.00 198.76 99.28
5 -8.35 99.392 4.55 99.368 0.00 199.00 0.00
99.000
6 -8.05 99.402 4.55 99.627 -4.00 199.34 -398.69
8 -6.55 99.405 0.55 99.717 -0.55 99.72 -27.42
10 -5.05 99.436
12 -3.55 99.494
14 -2.05 99.530
98.000
16 -0.55 99.585 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.696
20 0.55 99.683
22 0.55 99.527 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.363
26 3.55 99.394
28 5.05 99.355
14+950.00
30 6.55 99.313
32 8.05 99.287
34 8.35 99.293
36 12.15 99.363
38 12.30 98.563
39 13.10 98.563
40 13.25 99.363
41 14.95 99.363

Luasan R1 (M2) 1.07

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 14+975.00 14+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.51 27.36
100.000
1 -14.79 99.346 0.55 99.505 0.00 199.22 0.00
2 -14.50 98.345 0.55 99.719 4.00 199.39 398.78
3 -13.70 98.345 4.55 99.669 0.00 199.07 0.00
4 -13.40 99.345 4.55 99.405 -1.00 198.81 -99.41
5 -8.35 99.293 3.55 99.407 -1.50 198.86 -149.15
99.000
6 -8.05 99.292 2.05 99.453 -1.50 198.96 -149.22
8 -6.75 99.313 0.55 99.505 -0.55 99.51 -27.36
10 -5.35 99.333
12 -4.15 99.393
14 -2.95 99.443
98.000
16 -1.75 99.486 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.555
20 -0.55 99.663
22 0.55 99.675 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.505
26 2.05 99.453
28 3.55 99.407
14+975.00
30 5.05 99.404
32 6.55 99.385
34 8.05 99.365
36 8.35 99.362
38 12.75 99.723
39 12.90 98.923
40 13.70 98.923
41 13.85 99.723
42 15.55 99.723

Luasan R1 (M2) 1.01

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+000.00 15+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.57 27.38
100.000
1 -14.39 99.586 0.55 99.568 1.50 199.09 149.32
2 -14.10 98.586 2.05 99.519 1.50 199.01 149.25
3 -13.30 98.586 3.55 99.487 1.00 198.95 99.48
4 -13.00 99.586 4.55 99.465 0.00 199.16 0.00
5 -8.35 99.379 4.55 99.692 -4.00 199.43 -398.86
99.000
6 -8.05 99.389 0.55 99.737 0.00 199.31 0.00
8 -6.55 99.384 0.55 99.568 -0.55 99.57 -27.38
10 -5.05 99.450
12 -3.55 99.444
14 -2.05 99.500
98.000
16 -0.55 99.546 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.714
20 0.55 99.719
22 0.55 99.568 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.519
26 3.55 99.487
28 5.05 99.454
15+000.00
30 6.55 99.394
32 8.05 99.329
34 8.35 99.619
36 12.75 99.614
38 12.90 98.814
39 13.70 98.814
40 13.85 99.614
41 15.35 99.614

Luasan R1 (M2) 0.81

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+025.00 15+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.85 27.46
102.000
1 -14.44 99.416 0.55 99.849 0.00 199.45 0.00
2 -14.15 98.411 0.55 99.602 1.50 199.18 149.38
3 -13.35 98.411 2.05 99.575 1.50 199.13 149.35 101.000
4 -13.05 99.411 3.55 99.557 1.00 199.11 99.55
5 -8.35 99.377 4.55 99.550 0.00 199.30 0.00
100.000
6 -8.05 99.396 4.55 99.748 -4.00 199.60 -399.19
8 -6.55 99.400 0.55 99.849 -0.55 99.85 -27.46
10 -5.05 99.477 99.000
12 -3.55 99.536
14 -2.05 99.557
98.000
16 -0.55 99.636 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.788
20 0.55 99.781
22 0.55 99.602 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 99.575
26 3.55 99.557
28 5.05 99.547
15+025.00
30 6.55 99.528
32 8.05 99.530
34 8.35 99.546
36 11.05 99.632
38 11.05 100.832
39 10.64 100.832
40 11.80 101.491

Luasan R1 (M2) 0.91

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+050.00 15+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.55 99.88 27.47
102.000
1 -14.19 99.556 0.55 99.879 0.00 199.62 0.00
2 -13.90 98.551 0.55 99.739 1.50 199.46 149.60
3 -13.10 98.551 2.05 99.721 1.50 199.44 149.58 101.000
4 -12.80 99.551 3.55 99.720 1.00 199.43 99.71
5 -12.15 99.549 4.55 99.707 0.00 199.46 0.00
100.000
6 -8.05 99.539 4.55 99.753 -4.00 199.63 -399.26
8 -7.75 99.528 0.55 99.879 -0.55 99.88 -27.47
10 -6.55 99.517 99.000
12 -5.05 99.558
14 -3.55 99.639
98.000
16 -2.05 99.699 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 99.764
20 -0.55 99.920
22 0.55 99.938 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 99.739
26 2.05 99.721
28 3.55 99.720
15+050.00
30 5.05 99.700
32 6.55 99.664
34 8.05 99.649
36 8.35 99.624
38 14.05 99.651
40 14.10 98.651
42 14.90 98.651
44 14.95 99.651
46 15.88 99.651

Luasan R1 (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+075.00 15+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -13.97 99.476 0.00 0.00 0.00
2 -13.47 98.470 0.00 0.00 0.00
3 -12.47 98.470 0.00 0.00 0.00 101.000
4 -11.97 99.470 0.00 0.00 0.00
5 -8.35 99.747 0.00 0.00 0.00
100.000
6 -8.05 99.745 0.00 0.00 0.00
8 -5.95 99.805 0.00 0.00 0.00
10 -4.15 99.905 0.00 0.00 0.00 99.000
12 -2.35 99.946 0.00 0.00 0.00
14 -0.55 100.048 0.00 0.00 0.00
98.000
16 -0.55 100.155 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.158 0.00 0.00 0.00
20 0.55 100.052 0.00 0.00 0.00
22 2.35 99.958 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 4.15 99.959 0.00 0.00 0.00
26 5.95 99.962 0.00 0.00 0.00
28 8.05 99.957 0.00 0.00 0.00
15+075.00
30 8.35 99.877 0.00 0.00 0.00
32 11.55 99.857 0.00 0.00 0.00
34 11.60 98.857 0.00 0.00 0.00
36 12.40 98.857 0.00 0.00 0.00
38 12.45 99.857 0.00 0.00 0.00
40 13.38 99.857 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+100.00 15+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -15.15 99.864 0.00 0.00 0.00
2 -14.65 98.857 0.00 0.00 0.00
3 -13.65 98.857 0.00 0.00 0.00 101.000
4 -13.15 99.857 0.00 0.00 0.00
5 -8.55 99.874 0.00 0.00 0.00
100.000
6 -8.25 99.975 0.00 0.00 0.00
8 -6.55 100.039 0.00 0.00 0.00
10 -5.05 100.072 0.00 0.00 0.00 99.000
12 -3.55 100.162 0.00 0.00 0.00
14 -2.05 100.267 0.00 0.00 0.00
98.000
16 -0.55 100.357 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.355 0.00 0.00 0.00
20 0.55 100.256 0.00 0.00 0.00
22 0.55 100.196 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.147 0.00 0.00 0.00
26 3.55 100.117 0.00 0.00 0.00
28 5.05 100.072 0.00 0.00 0.00
15+100.00
30 6.55 100.057 0.00 0.00 0.00
32 8.05 100.067 0.00 0.00 0.00
34 8.45 99.946 0.00 0.00 0.00
36 11.55 99.935 0.00 0.00 0.00
38 11.80 98.935 0.00 0.00 0.00
40 12.80 98.935 0.00 0.00 0.00
42 13.05 99.935 0.00 0.00 0.00
44 13.38 99.935 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+125.00 15+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.25 99.883
2 -13.75 98.876
3 -12.75 98.876 101.000
4 -12.75 99.957
5 -8.55 99.957
100.000
6 -8.25 100.075
8 -6.55 100.099
10 -5.05 100.132 99.000
12 -3.55 100.212 7.75 100.21 388.30
14 -2.05 100.285 7.75 100.207 0.00 200.27 0.00
98.000
16 -0.55 100.349 7.75 100.066 0.05 200.14 5.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.508 7.80 100.072 1.95 200.11 195.11
20 0.55 100.498 9.75 100.036 0.00 200.17 0.00
22 0.55 100.232 9.75 100.131 -2.00 200.34 -200.34 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.156 7.75 100.207 -7.75 100.21 -388.30
26 3.55 100.115
28 5.05 100.075
15+125.00
30 6.55 100.046
32 7.50 100.038
34 7.80 100.072
36 11.55 100.013
38 11.80 99.013
40 12.80 99.013
42 13.05 100.013
13.38 100.013

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+150.00 15+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.95 99.754
2 -14.45 98.747
3 -13.45 98.747 101.000
4 -12.95 99.747
5 -8.55 99.797
100.000
6 -8.55 99.797
8 -8.25 99.976
10 -6.55 99.994 99.000
12 -5.05 100.008 7.75 100.23 388.40
14 -3.55 100.095 7.75 100.233 0.00 200.21 0.00
98.000
16 -2.05 100.180 7.75 99.976 0.05 199.94 5.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.300 7.80 99.963 1.95 199.99 194.99
20 -0.55 100.441 9.75 100.024 0.00 200.24 0.00
22 0.55 100.445 9.75 100.211 -2.00 200.44 -200.44 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.189 7.75 100.233 -7.75 100.23 -388.40
26 2.05 100.144
28 3.55 100.128
15+150.00
30 5.05 100.102
32 6.55 100.044
34 7.50 100.044
36 7.80 99.963
38 13.05 100.110
40 13.30 99.110
42 14.30 99.110
14.55 100.110
14.88 100.110

Luasan (M2) 0.46

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+175.00 15+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.85 99.879
2 -14.35 98.872
3 -13.35 98.872 101.000
4 -12.85 99.872
5 -8.55 99.824
100.000
6 -8.15 99.828
8 -6.55 99.862
10 -5.05 99.922 99.000
12 -3.55 100.022 7.75 100.32 388.74
14 -2.05 100.112 7.75 100.319 0.00 200.42 0.00
98.000
16 -0.55 100.277 7.75 100.101 0.05 200.21 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.409 7.80 100.104 1.95 200.12 195.11
20 0.55 100.435 9.75 100.011 0.00 200.36 0.00
22 0.55 100.169 9.75 100.351 -2.00 200.67 -200.67 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.112 7.75 100.319 -7.75 100.32 -388.74
26 3.55 100.125
28 5.05 100.107
15+175.00
30 6.55 100.087
32 7.50 100.086
34 7.80 100.104
36 10.30 100.011
38 12.05 100.318
40 12.30 99.318
42 13.30 99.318
44 13.55 100.318
46 13.88 100.318

Luasan (M2) 0.55

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+200.00 15+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -15.05 99.963
2 -14.55 98.956
3 -13.55 98.956 101.000
4 -13.05 99.956
5 -8.45 99.928
100.000
6 -8.15 99.954
8 -6.55 99.966
10 -5.05 100.022 99.000
12 -3.55 100.087 7.75 100.33 388.77
14 -2.05 100.185 7.75 100.328 0.00 200.46 0.00
98.000
16 -0.55 100.307 7.75 100.127 0.05 200.25 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.477 7.80 100.125 1.95 200.29 195.28
20 0.55 100.457 9.75 100.163 0.00 200.44 0.00
22 0.55 100.214 9.75 100.280 -2.00 200.61 -200.61 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.35 100.158 7.75 100.328 -7.75 100.33 -388.77
26 4.15 100.165
28 5.75 100.147
15+200.00
30 7.50 100.135
32 7.80 100.125
34 12.05 100.197
36 12.30 99.197
38 13.30 99.197
40 13.55 100.197
42 13.88 100.197

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+225.00 15+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.95 100.059
2 -14.45 99.053
3 -13.45 99.053 101.000
4 -12.95 100.053
5 -8.55 100.079
100.000
6 -8.25 100.115
8 -6.35 100.163
10 -4.35 100.188 99.000
12 -2.45 100.248 7.75 100.13 388.02
14 -0.55 100.348 7.75 100.134 0.05 200.27 5.01
98.000
16 -0.55 100.509 7.80 100.135 1.95 200.31 195.30 -20 -15 -10 -5 0 5 10 15 20
18 0.55 100.508 9.75 100.172 0.00 200.42 0.00
20 0.55 100.238 9.75 100.252 -2.00 200.55 -200.55
22 1.75 100.188 7.75 100.300 0.00 200.43 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.95 100.167 7.75 100.134 -7.75 100.13 -388.02
26 4.15 100.180
28 5.35 100.165
15+225.00
30 6.55 100.136
32 7.50 100.128
34 7.80 100.135
36 12.05 100.205
38 12.30 99.205
40 13.30 99.205
42 13.55 100.205
13.88 100.205

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+250.00 15+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -13.25 100.266
2 -12.75 99.259
3 -11.75 99.259 101.000
4 -11.25 100.259
5 -8.55 100.219
100.000
6 -8.25 100.200
8 -7.35 100.205
10 -5.85 100.243 99.000
12 -4.35 100.283 7.75 100.26 388.52
14 -2.05 100.346 7.75 100.262 0.05 200.52 5.01
98.000
16 -0.55 100.440 7.80 100.261 1.95 200.52 195.51 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.661 9.75 100.260 0.00 200.65 0.00
20 0.55 100.641 9.75 100.388 -2.00 200.80 -200.80
22 0.55 100.342 7.75 100.416 0.00 200.68 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.276 7.75 100.262 -7.75 100.26 -388.52
26 3.55 100.249
28 5.05 100.240
15+250.00
30 6.55 100.226
32 7.50 100.266
34 7.80 100.261
36 12.05 100.259
38
40
42

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+275.00 15+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -14.05 101.243 0.00 0.00 0.00
2 -13.80 100.243 0.00 0.00 0.00
3 -12.80 100.243 0.00 0.00 0.00 101.000
4 -12.55 101.243 0.00 0.00 0.00
5 -8.55 100.746 0.00 0.00 0.00
100.000
6 -8.25 100.749 0.00 0.00 0.00
8 -6.55 100.726 0.00 0.00 0.00
10 -5.05 100.748 0.00 0.00 0.00 99.000
12 -3.55 100.757 7.75 100.78 390.51
14 -2.05 100.784 7.75 100.776 0.00 201.31 0.00
98.000
16 -0.55 100.853 7.75 100.529 0.15 201.03 15.08 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.037 7.90 100.503 1.85 201.04 185.96
20 0.55 100.930 9.75 100.535 0.00 201.26 0.00
22 0.55 100.697 9.75 100.726 -2.00 201.50 -201.50 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.652 7.75 100.776 -7.75 100.78 -390.51
26 3.55 100.623 0.00 0.00 0.00
28 5.05 100.569 0.00 0.00 0.00
15+275.00
30 6.55 100.543 0.00 0.00 0.00
32 7.50 100.572 0.00 0.00 0.00
34 7.90 100.503 0.00 0.00 0.00
36 13.55 100.590 0.00 0.00 0.00
38 0.00 0.00 0.00
40 0.00 0.00 0.00
42 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.46

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+300.00 15+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -14.01 101.548
2 -13.85 101.548
3 -13.70 100.548 101.000
4 -12.70 100.548
5 -12.55 101.548
100.000
6 -8.55 101.613
8 -8.25 101.656
10 -6.55 101.614 99.000
12 -5.05 101.593 7.75 100.93 391.09
14 -3.55 101.539 7.75 100.926 0.00 202.06 0.00
98.000
16 -2.05 101.492 7.75 101.136 2.00 202.20 202.20 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.508 9.75 101.064 0.00 201.98 0.00
20 -0.55 101.706 9.75 100.912 -1.95 201.84 -196.79
22 0.55 101.676 7.80 100.923 -0.05 201.85 -5.05 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.232 7.75 100.926 -7.75 100.93 -391.09
26 2.05 101.236
28 3.55 101.135
15+300.00
30 5.05 101.072
32 6.55 100.992
34 7.50 100.943
36 7.80 100.923
38 13.85 100.893
40 14.15 99.893
42 14.65 99.893
14.95 100.893
15.95 100.893

Luasan (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+325.00 15+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.01 102.484
2 -13.85 102.484
104.000
3 -13.70 101.484
4 -12.70 101.484
103.000
5 -12.55 102.484
6 -8.35 102.467
102.000
7 -8.05 102.453
8 -6.55 102.394
101.000
9 -5.05 102.366 7.75 101.90 394.87
10 -3.55 102.264 7.75 101.902 0.00 203.50 0.00
100.000
11 -2.05 102.199 7.75 101.601 0.05 203.18 5.08 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 102.193 7.80 101.582 1.95 203.19 198.11
13 -0.55 102.394 9.75 101.605 0.00 203.34 0.00
14 0.55 102.406 9.75 101.738 -2.00 203.57 -203.57 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 0.55 102.102 7.75 101.834 -7.75 101.83 -394.61
16 2.05 101.964
17 3.55 101.864
15+325.00
18 5.05 101.804
19 6.55 101.714
20 7.50 101.696
21 7.80 101.582
22 13.25 101.639
23 13.55 100.639
24 14.05 100.639
25 14.35 101.639
26 14.85 101.639

Luasan (M2) 0.12

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+350.00 15+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d h

105.000
1 -14.51 103.285
2 -14.35 103.285
104.000
3 -14.20 102.285
4 -13.20 102.285
103.000
5 -13.05 103.285
6 -8.35 103.307
102.000
8 -8.05 103.333
10 -6.55 103.243
101.000
12 -5.05 103.151 7.75 102.89 398.68
14 -3.55 103.077 7.75 102.886 0.00 205.57 0.00
100.000
16 -1.55 103.043 7.75 102.686 0.05 205.36 5.13 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 103.054 7.80 102.677 1.95 205.32 200.19
20 -0.55 103.305 9.75 102.643 0.00 205.44 0.00
22 0.55 103.320 9.75 102.794 -2.00 205.68 -205.68 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.105 7.75 102.886 -7.75 102.89 -398.68
26 1.55 102.969
28 3.55 102.873
15+350.00
30 5.05 102.828
32 6.55 102.765
34 7.50 102.732
36 7.80 102.677
38 13.25 102.592
40 13.55 101.592
42 14.05 101.592
14.35 102.592
14.85 102.592

Luasan (M2) 0.36

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+375.00 15+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.31 104.333
2 -12.15 104.333
104.000
3 -12.00 103.333
4 -11.00 103.333
103.000
5 -10.85 104.333
6 -8.35 104.292
102.000
8 -8.05 104.276
10 -6.55 104.226
101.000
12 -5.05 104.155 7.75 103.73 401.97
14 -3.55 104.041 7.75 103.734 0.00 207.27 0.00
100.000
16 -1.55 103.960 7.75 103.534 0.05 207.06 5.18 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.012 7.80 103.526 1.95 207.00 201.83
20 -0.55 104.250 9.75 103.477 0.00 207.13 0.00
22 0.55 104.221 9.75 103.651 -2.00 207.39 -207.39 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.994 7.75 103.734 -7.75 103.73 -401.97
26 1.55 103.854
28 3.55 103.757
15+375.00
30 5.05 103.702
32 6.55 103.711
34 7.50 103.571
36 7.80 103.526
38 11.94 103.437
40 12.25 102.409
42 12.75 102.409
13.05 103.409
13.55 103.409

Luasan (M2) 0.38

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+400.00 15+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 104.351
2 -13.35 104.351
104.000
3 -13.20 103.351
4 -12.20 103.351
103.000
5 -12.05 104.351
6 -8.35 104.308
102.000
8 -8.05 104.349
10 -6.55 104.339
101.000
12 -5.05 104.302 7.75 104.08 403.29
14 -3.55 104.207 7.75 104.076 0.00 207.89 0.00
100.000
16 -1.55 104.185 7.75 103.817 0.05 207.61 5.19 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 104.221 7.80 103.795 1.95 207.52 202.33
20 -0.55 104.437 9.75 103.721 0.00 207.67 0.00
22 0.55 104.457 9.75 103.946 -2.00 208.02 -208.02 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 104.211 7.75 104.076 -7.75 104.08 -403.29
26 1.55 104.127
28 3.55 104.067
15+400.00
30 5.05 104.011
32 6.55 103.952
34 7.50 103.929
36 7.80 103.795
38 12.55 103.636
40 12.86 102.608
42 13.36 102.608
13.66 103.608
14.05 103.636

Luasan (M2) 0.50

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+425.00 15+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -14.30 103.554
2 -14.14 103.554
104.000
3 -13.99 102.554
4 -12.99 102.554
103.000
5 -12.84 103.554
6 -11.88 103.554
102.000
8 -8.45 103.576
10 -8.05 103.607
101.000
12 -6.55 103.602 7.75 103.57 401.33
14 -5.05 103.563 7.75 103.569 0.00 207.02 0.00
100.000
16 -3.55 103.570 7.75 103.450 0.15 206.80 15.51 -20 -15 -10 -5 0 5 10 15 20
18 -1.55 103.561 7.90 103.350 1.85 206.66 191.16
20 -0.55 103.616 9.75 103.307 0.00 206.81 0.00
22 -0.55 103.817 9.75 103.503 -2.00 207.07 -207.07 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 103.839 7.75 103.569 -7.75 103.57 -401.33
26 0.55 103.598
28 1.55 103.552
15+425.00
30 3.55 103.526
32 5.05 103.521
34 6.55 103.481
36 7.70 103.483
38 7.90 103.350
40 12.75 103.250
42 13.06 102.222
44 13.56 102.222
46 13.86 103.222
48 14.25 103.250

Luasan (M2) 0.40

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+450.00 15+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -12.51 102.316
2 -12.35 102.316
104.000
3 -12.20 101.316
4 -11.20 101.316
103.000
5 -11.05 102.319
6 -8.35 102.326
102.000
8 -8.05 102.316
10 -6.05 102.392
101.000
12 -4.75 102.440 7.75 102.53 397.30
14 -4.15 102.451 7.75 102.530 0.00 204.92 0.00
100.000
16 -2.95 102.501 7.75 102.389 0.25 204.73 25.59 -20 -15 -10 -5 0 5 10 15 20
18 -1.75 102.526 8.00 102.336 1.75 204.66 179.08
20 -0.55 102.571 9.75 102.326 0.00 204.78 0.00
22 -0.55 102.800 9.75 102.452 -2.00 204.98 -204.98 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 102.795 7.75 102.530 -7.75 102.53 -397.30
26 0.55 102.571
28 1.85 102.536
15+450.00
30 3.15 102.511
32 4.45 102.471
34 5.75 102.436
36 7.05 102.411
38 7.70 102.399
40 8.00 102.336
42 13.05 102.311
44 13.36 101.283
46 13.86 101.283
48 14.16 102.283
14.55 102.283

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+475.00 15+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

105.000
1 -13.51 101.676
2 -13.35 101.676
104.000
3 -13.20 100.676
4 -12.20 100.676
103.000
5 -12.05 101.676
6 -8.35 101.467
102.000
8 -8.05 101.480
10 -6.55 101.476
101.000
12 -5.05 101.514 7.75 101.58 393.63
14 -3.55 101.527 7.75 101.583 0.00 203.04 0.00
100.000
16 -2.05 101.534 7.75 101.461 0.25 202.87 25.36 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.591 8.00 101.409 1.75 202.81 177.25
20 -0.55 101.846 9.75 101.397 0.00 202.93 0.00
22 0.55 101.866 9.75 101.530 -2.00 203.11 -202.91 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.651 7.75 101.583 -7.75 101.58 -393.63
26 2.05 101.585
28 3.55 101.557
15+475.00
30 5.05 101.510
32 6.55 101.463
34 7.70 101.471
36 8.00 101.409
38 11.95 101.386
40 12.25 100.379
42 12.75 100.379
44 13.05 101.379
46 13.55 101.379

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+500.00 15+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.984
2 -13.35 100.984
102.000
3 -13.20 99.984
4 -12.20 99.984
101.000
5 -12.05 100.984
6 -8.45 100.918
100.000
8 -8.05 100.983
10 -6.55 100.945
99.000
12 -5.05 100.964 7.75 100.99 391.34
14 -3.55 100.966 7.75 100.992 0.00 201.87 0.00
98.000
16 -2.05 100.976 7.75 100.878 0.25 201.64 25.20 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.061 8.00 100.761 1.75 201.59 176.39
20 -0.55 101.277 9.75 100.830 0.00 201.78 0.00
22 0.55 101.241 9.75 100.952 -2.00 201.94 -201.94 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.997 7.75 100.992 -7.75 100.99 -391.34
26 2.05 100.931
28 3.55 100.926
15+500.00
30 5.05 100.921
32 6.55 100.886
34 7.70 100.901
36 8.00 100.761
38 10.95 100.855
40 11.95 100.843
42 12.25 99.835
44 12.75 99.835
46 13.05 100.835
13.26 100.843

Luasan (M2) 0.35

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+525.00 15+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.655
2 -13.35 100.655
102.000
3 -13.20 99.655
4 -12.20 99.655
101.000
5 -12.05 100.655
6 -8.45 100.646
100.000
8 -8.05 100.631
10 -6.55 100.611
99.000
12 -5.05 100.603 7.75 100.55 389.63
14 -3.55 100.577 7.75 100.550 0.00 200.99 0.00
98.000
16 -2.05 100.565 7.75 100.442 0.15 200.86 15.06 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.645 7.90 100.416 1.85 200.85 185.78
20 -0.55 100.871 9.75 100.432 0.00 200.92 0.00
22 0.55 100.873 9.75 100.490 -2.00 201.04 -201.04 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.643 7.75 100.550 -7.75 100.55 -389.63
26 2.05 100.579
28 3.55 100.565
15+525.00
30 5.05 100.533
32 6.55 100.491
34 7.50 100.486
36 7.90 100.416
38 10.95 100.437
40 11.25 99.430
42 11.75 99.430
44 12.05 100.430
46 12.20 100.437

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+550.00 15+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.31 100.486
2 -13.15 100.486
102.000
3 -13.00 99.486
4 -12.00 99.486
101.000
5 -11.85 100.486
6 -8.35 100.526
100.000
8 -8.05 100.536
10 -6.55 100.511
99.000
12 -5.05 100.509 7.75 100.36 388.89
14 -3.55 100.477 7.75 100.359 0.00 200.60 0.00
98.000
16 -2.05 100.466 7.75 100.239 0.05 200.48 5.01 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.471 7.80 100.238 1.95 200.50 195.49
20 -0.55 100.651 9.75 100.265 0.00 200.65 0.00
22 0.55 100.658 9.75 100.389 -2.00 200.75 -200.75 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.421 7.75 100.359 -7.75 100.36 -388.89
26 2.05 100.366
28 3.55 100.331
15+550.00
30 5.05 100.286
32 5.55 100.231
34 7.50 100.246
36 7.80 100.238
38 13.05 100.303
40 13.35 99.296
42 13.85 99.296
44 14.15 100.296
46 15.25 100.305

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+575.00 15+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M
a b c d h
7.75 100.29 388.63
103.000
1 -12.05 100.228 7.75 100.291 0.00 200.46 0.00
2 -8.35 100.224 7.75 100.167 0.25 200.33 25.04
102.000
3 -8.05 100.243 8.00 100.166 1.75 200.37 175.32
4 -6.55 100.262 9.75 100.199 0.00 200.48 0.00
101.000
5 -5.05 100.282 9.75 100.281 -2.00 200.57 -200.57
6 -3.55 100.292 7.75 100.291 -7.75 100.29 -388.63
100.000
8 -2.05 100.282
10 -0.55 100.296
99.000
12 -0.55 100.532
14 0.55 100.522
98.000
16 0.55 100.281 -20 -15 -10 -5 0 5 10 15 20
18 2.05 100.239
20 3.55 100.222
22 5.05 100.197 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.55 100.161
26 7.70 100.167
28 8.00 100.166
15+575.00
30 10.85 100.210
32 11.15 99.204
34 11.65 99.204
36 11.95 100.204
38 13.05 100.214

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+600.00 15+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.25 100.097
2 -14.00 99.097
102.000
3 -12.50 99.097
4 -12.25 100.097
101.000
5 -8.45 99.857
6 -8.05 100.087
100.000
8 -6.55 100.102
10 -5.05 100.142
99.000
12 -3.55 100.177 7.75 100.22 388.36
14 -2.05 100.177 7.75 100.222 0.00 200.33 0.00
98.000
16 -0.55 100.202 7.75 100.103 0.25 200.19 25.02 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.484 8.00 100.090 1.75 200.15 175.13
20 0.55 100.480 9.75 100.058 0.00 200.21 0.00
22 0.55 100.243 9.75 100.149 -2.00 200.37 -200.37 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.174 7.75 100.222 -7.75 100.22 -388.36
26 3.55 100.187
28 5.05 100.133
15+600.00
30 6.55 100.112
32 7.70 100.106
34 8.00 100.090
36 12.25 100.022
38 12.55 99.016
40 13.05 99.016
42 13.35 100.016
44 14.45 100.026

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+625.00 15+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
103.000
1 -13.15 99.910 0.00 0.00 0.00
2 -12.90 98.910 0.00 0.00 0.00
102.000
3 -11.40 98.910 0.00 0.00 0.00
4 -11.15 99.910 0.00 0.00 0.00
101.000
5 -8.45 99.867 0.00 0.00 0.00
6 -8.05 99.987 0.00 0.00 0.00
100.000
8 -6.55 100.012 0.00 0.00 0.00
10 -5.05 100.059 0.00 0.00 0.00
99.000
12 -3.55 100.087 7.75 100.18 388.19
14 -2.05 100.097 7.75 100.178 0.00 200.25 0.00
98.000
16 -0.55 100.187 7.75 100.069 0.25 200.15 25.02 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.421 8.00 100.080 1.75 200.14 175.13
20 0.55 100.399 9.75 100.063 0.00 200.20 0.00
22 0.55 100.200 9.75 100.141 -2.00 200.32 -200.32 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.132 7.75 100.178 -7.75 100.18 -388.19
26 3.55 100.107 0.00 0.00 0.00
28 5.05 100.076 0.00 0.00 0.00
15+625.00
30 6.55 100.047 0.00 0.00 0.00
32 8.00 100.080 0.00 0.00 0.00
34 12.25 100.044 0.00 0.00 0.00
36 12.55 99.038 0.00 0.00 0.00
38 13.05 99.038 0.00 0.00 0.00
40 13.35 100.038 0.00 0.00 0.00
42 14.45 100.048 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+650.00 15+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.35 100.194
2 -12.85 100.194
102.000
3 -12.70 99.194
4 -11.70 99.194
101.000
5 -11.55 100.194
6 -8.45 100.100
100.000
8 -8.05 100.142
10 -6.55 100.127
99.000
12 -5.15 100.142 7.75 100.26 388.50
14 -3.55 100.113 7.75 100.259 2.00 200.43 200.43
98.000
16 -2.05 100.139 9.75 100.169 0.00 200.27 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.237 9.75 100.103 -1.75 200.20 -175.18
20 0.00 100.237 8.00 100.101 -0.25 200.22 -25.03
22 0.55 100.167 7.75 100.119 0.00 200.38 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.147 7.75 100.259 -7.75 100.26 -388.50
26 4.35 100.131
28 6.25 100.117
15+650.00
30 8.00 100.101
32 14.55 100.108
34 14.55 100.108
36 14.65 99.108
38 15.15 99.108
40 15.25 100.108
42 16.09 100.108

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+675.00 15+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.75 100.15 388.09
101.000
1 -15.35 100.232 7.75 100.151 0.00 200.48 0.00
2 -14.85 100.232 7.75 100.324 2.00 200.57 200.57
3 -14.70 99.232 9.75 100.249 0.00 200.38 0.00
4 -13.70 99.232 9.75 100.127 -1.75 200.25 -175.22 100.000
5 -13.55 100.232 8.00 100.122 -0.25 200.27 -25.03
6 -8.35 100.231 7.75 100.151 -7.75 100.15 -388.09
7 -8.05 100.272 99.000
8 -6.55 100.280
9 -5.05 100.313
10 -3.55 100.232
98.000
11 -2.05 100.312 -20 -15 -10 -5 0 5 10 15 20
12 -0.55 100.349
13 -0.55 100.597
14 0.55 100.532 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 0.55 100.282
16 1.85 100.204
17 3.15 100.200
15+675.00
18 4.45 100.192
19 5.75 100.172
20 7.05 100.147
21 7.70 100.157
22 8.00 100.122
23 11.75 100.131
24 11.85 99.131
25 12.35 99.131
26 12.45 100.108
27 13.45 100.108

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+700.00 15+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.95 100.572
2 -14.45 100.572
102.000
3 -14.30 99.572
4 -13.30 99.572
101.000
5 -13.15 100.572
6 -8.45 100.514
100.000
8 -8.15 100.573
10 -5.25 100.587
99.000
12 -4.35 100.612 7.75 100.42 389.12
14 -2.45 100.562 7.75 100.419 0.00 200.71 0.00
98.000
16 -0.55 100.650 7.75 100.292 0.25 200.53 25.07 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.871 8.00 100.242 1.75 200.46 175.40
20 0.55 100.797 9.75 100.220 0.00 200.66 0.00
22 0.55 100.552 9.75 100.439 -2.00 200.86 -200.86 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.45 100.482 7.75 100.419 -7.75 100.42 -389.12
26 4.35 100.437
28 5.25 100.357
15+700.00
30 8.00 100.242
32 11.75 100.202
34 11.85 99.202
36 12.35 99.202
38 12.45 100.179
40 12.95 100.179

Luasan (M2) 0.39

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+725.00 15+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.75 100.859
2 -13.25 100.859
102.000
3 -13.10 99.859
4 -12.10 99.859
101.000
5 -11.95 100.859
6 -8.55 100.771
100.000
8 -8.25 100.763
10 -6.55 100.718
99.000
12 -5.05 100.743 7.75 100.58 389.73
14 -3.55 100.738 7.75 100.575 0.00 201.00 0.00
98.000
16 -2.05 100.732 7.75 100.428 0.15 200.84 15.06 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.793 7.90 100.413 1.85 200.76 185.70
20 -0.55 101.008 9.75 100.344 0.00 200.90 0.00
22 0.55 100.933 9.75 100.559 -2.00 201.13 -201.13 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.718 7.75 100.575 -7.75 100.58 -389.73
26 1.55 100.642
28 3.55 100.573
15+725.00
30 5.05 100.503
32 6.55 100.462
34 7.90 100.413
36 13.25 100.233

Luasan (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+750.00 15+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -15.15 100.919
2 -14.65 100.919
102.000
3 -14.50 99.919
4 -13.50 99.919
101.000
5 -13.35 100.919
6 -8.45 100.881
100.000
8 -8.15 100.871
10 -6.55 100.840
99.000
12 -5.05 100.841 7.75 100.83 390.70
14 -3.55 100.858 7.75 100.827 0.00 201.47 0.00
98.000
16 -2.05 100.875 7.75 100.641 0.25 201.23 25.15 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.881 8.00 100.588 1.75 201.15 176.00
20 -0.55 101.212 9.75 100.559 0.00 201.37 0.00
22 0.55 101.226 9.75 100.809 -2.00 201.64 -201.64 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.924 7.75 100.827 -7.75 100.83 -390.70
26 2.05 100.863
28 3.55 100.816
15+750.00
30 5.05 100.738
32 6.55 100.673
34 8.00 100.588
36 13.15 100.512
38 13.25 99.512
40 13.75 99.512
42 13.85 100.489
44 14.35 100.489

Luasan (M2) 0.48

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+775.00 15+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 101.010
2 -13.55 101.010
102.000
3 -13.40 100.010
4 -12.40 100.010
101.000
5 -12.25 101.010
6 -7.75 101.022
100.000
8 -7.45 101.020
10 -6.15 101.009
99.000
12 -4.75 101.024 7.75 100.98 391.29
14 -3.35 101.015 7.75 100.978 2.00 201.81 201.81
98.000
16 -1.95 100.996 9.75 100.829 0.00 201.55 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.060 9.75 100.724 -1.75 201.47 -176.28
20 -0.55 101.258 8.00 100.743 -0.25 201.60 -25.20
22 0.55 101.268 7.75 100.859 0.00 201.84 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.050 7.75 100.978 -7.75 100.98 -391.29
26 2.05 100.990
28 3.55 100.937
15+775.00
30 5.05 100.884
32 6.55 100.883
34 8.00 100.743
36 14.75 100.677
38 14.85 99.677
40 15.35 99.677
42 15.45 100.654
44 15.95 100.654

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+800.00 15+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.995
2 -13.55 100.995
102.000
3 -13.40 99.995
4 -12.40 99.995
101.000
5 -12.25 100.995
6 -7.75 100.962
100.000
8 -7.45 100.972
10 -6.15 100.973
99.000
12 -4.75 100.990 7.75 100.95 391.17
14 -3.35 100.962 7.75 100.946 2.00 201.79 201.79
98.000
16 -1.95 100.903 9.75 100.839 0.00 201.58 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.967 9.75 100.742 -1.75 201.50 -176.31
20 -0.55 101.164 8.00 100.753 -0.25 201.52 -25.19
22 0.55 101.183 7.75 100.770 0.00 201.72 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.968 7.75 100.946 -7.75 100.95 -391.17
26 2.05 100.884
28 3.55 100.858
15+800.00
30 5.05 100.820
32 6.55 100.791
34 8.00 100.753
36 14.75 100.715
38 14.85 99.715
40 15.35 99.715
42 15.45 100.692
44 15.95 100.692
46

Luasan (M2) 0.29

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+825.00 15+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -14.05 100.841
2 -13.55 100.841
102.000
3 -13.40 99.841
4 -12.40 99.841
101.000
5 -12.25 100.848
6 -7.75 100.831
100.000
8 -7.45 100.835
10 -6.15 100.814
99.000
12 -4.75 100.829 7.75 100.79 390.57
14 -3.35 100.851 7.75 100.791 2.00 201.56 201.56
98.000
16 -1.95 100.826 9.75 100.764 0.00 201.32 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.878 9.75 100.553 -1.75 201.16 -176.02
20 -0.55 101.138 8.00 100.609 -0.25 201.25 -25.16
22 0.55 101.138 7.75 100.637 0.00 201.43 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.908 7.75 100.791 -7.75 100.79 -390.57
26 2.05 100.823
28 3.55 100.759
15+825.00
30 5.05 100.718
32 6.55 100.681
34 8.00 100.609
36 11.25 100.523
38 11.35 99.523
40 11.85 99.523
42 11.95 100.500
44 12.45 100.500
46

Luasan (M2) 0.38

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+850.00 15+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -12.65 100.883
2 -12.50 99.883
102.000
3 -11.50 99.883
4 -11.35 100.859
101.000
5 -7.75 100.793
6 -7.45 100.833
100.000
8 -6.15 100.773
10 -4.75 100.791
99.000
12 -3.35 100.813 7.75 100.78 390.51
14 -1.95 100.788 7.75 100.776 0.00 201.40 0.00
98.000
16 -0.55 100.907 7.75 100.624 0.25 201.25 25.16 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 101.022 8.00 100.628 1.75 201.24 176.08
20 0.55 101.036 9.75 100.610 0.00 201.39 0.00
22 0.55 100.833 9.75 100.776 -2.00 201.55 -201.55 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.05 100.765 7.75 100.776 -7.75 100.78 -390.51
26 3.55 100.688
28 5.05 100.673
15+850.00
30 6.55 100.661
32 8.00 100.628
34 14.75 100.563
36 14.85 99.563
38 15.35 99.563
40 15.45 100.540
42 15.95 100.540

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+875.00 15+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

103.000
1 -13.51 100.999
2 -13.00 100.999
102.000
3 -12.85 99.999
4 -11.85 99.999
101.000
5 -11.70 100.976
6 -7.95 100.838
100.000
8 -7.55 100.837
10 -6.15 100.824
99.000
12 -4.75 100.847 7.75 100.91 391.04
14 -3.35 100.844 7.75 100.914 2.00 201.82 201.82
98.000
16 -1.95 100.895 9.75 100.909 0.00 201.58 0.00 -20 -15 -10 -5 0 5 10 15 20
18 -0.55 100.976 9.75 100.669 -1.75 201.34 -176.18
20 -0.55 101.052 8.00 100.675 -0.25 201.41 -25.18
22 0.55 101.067 7.75 100.734 0.00 201.65 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 100.882 7.75 100.914 -7.75 100.91 -391.04
26 2.05 100.822
28 3.55 100.808
15+875.00
30 5.05 100.788
32 6.55 100.753
34 8.00 100.675
36 13.75 100.657
38 13.85 99.657
40 14.35 99.657
42 14.45 100.634
44 14.95 100.634

Luasan (M2) 0.47

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 15+903.00 15+903.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

1 -14.11 100.861
2 -13.60 100.861
102.000
3 -13.45 99.861
4 -12.45 99.861
5 -12.30 100.837
6 -10.05 101.118 9.75 101.19 493.28
100.000
8 -7.95 101.146 9.75 101.186 0.00 202.21 0.00
10 -7.55 101.196 9.75 101.024 -1.75 202.10 -176.84
12 -6.15 101.215 8.00 101.078 -0.25 202.29 -25.29
14 -4.75 101.276 7.75 101.216 0.00 202.46 0.00
98.000
16 -3.35 101.302 7.75 101.248 2.00 202.43 202.43 -20 -15 -10 -5 0 5 10 15 20
18 -1.95 101.350 9.75 101.186 -9.75 101.19 -493.28
20 -0.55 101.407
22 -0.55 101.533 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.55 101.546
26 0.55 101.419
28 2.05 101.365
15+903.00
30 3.55 101.338
32 5.05 101.295
34 6.55 101.187
36 8.00 101.078
38 13.75 100.919
40 13.85 99.919
42 14.35 99.919
44 14.45 100.896
14.95 100.896

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A

No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 14+897.00 L 0.00
3.00 2.84
2 14+900.00 L M3 1.89
25.00 48.12
3 14+925.00 L M3 1.96
25.00 50.96
4 14+950.00 L M3 2.12
25.00 69.01
5 14+975.00 L M3 3.40
25.00 80.61
6 15+000.00 L M3 3.05
25.00 76.41
7 15+025.00 L M3 3.06
25.00 65.18
8 15+050.00 L M3 2.15
7.00 7.52
9 15+057.00 L M3 0.00

JUMLAH M3 397.829
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 14+337.50 L 0.00
12.50 7.59
2 14+350.00 L M3 1.21
25.00 21.17
3 14+375.00 L M3 0.48
25.00
4 14+400.00 L M3 0.00
25.00 -
5 14+425.00 L M3 0.00
25.00 -
6 14+450.00 L M3 0.00
25.00 14.73
7 14+475.00 L M3 1.18
28.00 45.31
8 14+503.00 L M3 2.06

JUMLAH M3 81.210
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 14+337.50 R 0.00
12.50 14.43
2 14+350.00 R M3 2.31
25.00 34.97
3 14+375.00 R M3 0.49
25.00
4 14+400.00 R M3 0.00
25.00 -
5 14+425.00 R M3
25.00 -
6 14+450.00 R M3 0.00
25.00 15.89
7 14+475.00 R M3 1.27
28.00 38.78
8 14+503.00 R M3 1.50

JUMLAH M3 89.643
CALCULATION SHEET OF VOLUME (DATA UKUR)

Project/Sub Project
Kontraktor
Sub Kontraktor

Update survey : 16/9/2020

Calculation of Volume
No. STATION Remark
Area Cut Area Cut Selisih Area
Length Area Cut Area Cut
Cut BATU SOFT ROCK BATU SOFT ROCK
(m) (Sq.m) (Sq.m)
(Sq.m) (Sq.m) (Sq.m)
a b GORGA PP PP PP e GORGA PP PP PP g

1 14+864
- - - -
2 14+850
- - - -
3 14+825
- - - -
4 14+800
- - - -
5 14+775
- - - -
6 14+750
- - - -
7 14+725 4.893 4.893
25 290.625 - - -
8 14+700 18.357 18.357
25 1,404.438 - - -
9 14+675 93.998 93.998
25 2,122.388 672.225 - -
10 14+650 75.793 53.778 22.015
25 3,089.888 2,075.025 - -
11 14+625 171.398 112.224 59.174
25 5,371.075 3,654.425 - -
12 14+600 258.288 180.130 78.158
25 7,355.138 5,858.913 - -
13 14+575 330.123 288.583 41.540
25 9,027.900 6,642.188 - 1,160.475
14 14+550 392.109 242.792 149.317 92.838
25 9,086.463 4,619.750 1,498.513 1,981.863
15 14+525 334.808 126.788 208.020 119.881 65.711
25 8,396.325 2,460.763 2,077.075 1,889.788
16 14+500 336.898 70.073 266.825 46.285 85.472
25 9,485.725 3,229.250 1,777.813 3,198.388
17 14+475 421.960 188.267 233.693 95.940 170.399
25 10,599.138 7,517.438 1,199.250 2,129.988
18 14+450 425.971 413.128 12.843
25 8,242.263 5,349.088 - -
19 14+425 233.410 14.799 218.611
25 5,483.913 2,066.488 - -
20 14+400 205.303 150.520 54.783
25 5,426.288 4,203.250 - -
21 14+375 228.800 185.740 43.060
25 5,277.838 3,512.700 - -
22 14+350 193.427 95.276 98.151
25 7,356.063 4,170.475 - -
23 14+325 395.058 238.362 156.696
25 7,055.488 4,888.013 - -
24 14+300 169.381 152.679 16.702
25 3,645.513 3,203.663 580.413 -
25 14+275 122.260 103.614 18.646 46.433
25 3,736.825 3,345.038 966.575 -
26 14+250 176.686 163.989 12.697 30.893
25 7,036.513 2,112.063 915.350 -
27 14+225 386.235 4.976 381.259 42.335
25 6,815.988 1,436.788 1,008.213 -
28 14+200 159.044 109.967 49.077 38.322
25 2,614.550 1,374.588 1,252.263 -
29 14+175 50.120 50.120 61.859
25 1,170.150 468.400 1,679.938 -
30 14+150 43.492 37.472 6.020 72.536
25 1,556.988 861.475 1,319.838 -
31 14+125 81.067 31.446 49.621 33.051
25 1,013.338 393.075 413.138 -
32 14+100 - - -
25 - - - -
33 14+075 - -
25 288.100 200.113 - -
34 14+050 23.048 16.009 7.039
25 939.150 777.713 - -
35 14+025 52.084 46.208 5.876
Calculation of Volume
No. STATION Remark
Area Cut Area Cut Selisih Area
Length Area Cut Area Cut
Cut BATU SOFT ROCK BATU SOFT ROCK
(m) (Sq.m) (Sq.m)
(Sq.m) (Sq.m) (Sq.m)
a b GORGA PP PP PP e GORGA PP PP PP g
25 2,188.763 1,893.763 - -
36 14+000 123.017 105.293 17.724
25 2,259.400 1,944.075 - -
37 13+975 57.735 50.233 7.502
25 805.625 693.175 - -
38 13+950 6.715 5.221 1.494
25 2,276.088 1,536.350 - -
39 13+925 175.372 117.687 57.685
25 3,855.238 2,841.925 - -
40 13+900 133.047 109.667 23.380
25 4,248.925 3,092.013 - -
41 13+875 206.867 137.694 69.173
25 4,821.713 3,484.438 - -
42 13+850 178.870 141.061 37.809
25 5,736.350 5,058.763 - -
43 13+825 280.038 263.640 16.398
25 5,658.663 4,752.075 - -
44 13+800 172.655 116.526 56.129
25 3,191.300 1,951.238 - -
45 13+775 82.649 39.573 43.076
25 1,063.388 509.075 - -
46 13+750 2.422 1.153 1.269
25 288.113 226.763 - -
47 13+725 20.627 16.988 3.639
25 544.200 458.275 - -
48 13+700 22.909 19.674 3.235
25 1,164.725 1,025.788 - -
49 13+675 70.269 62.389 7.880
25 1,105.300 939.263 - -
50 13+650 18.155 12.752 5.403
25 610.388 178.188 - -
51 13+625 30.676 1.503 29.173
25 1,454.763 835.700 - -
52 13+600 85.705 65.353 20.352
25 3,216.650 2,490.488 - -
53 13+575 171.627 133.886 37.741
25 4,004.838 3,044.275 - -
54 13+550 148.760 109.656 39.104
25 3,309.038 2,417.738 - -
55 13+525 115.963 83.763 32.200
25 1,535.300 1,047.038 - -
56 13+500 6.861 - 6.861
25 171.525 60.550 - -
57 13+475 6.861 4.844 2.017
25 233.850 160.813 - -
58 13+450 11.847 8.021 3.826
25 234.125 151.813 - -
59 13+425 6.883 4.124 2.759
25 357.500 265.563 - -
60 13+400 21.717 17.121 4.596
25 271.463 214.013 - -
61 13+375 - -
25 114.863 68.775 - -
62 13+350 9.189 5.502 3.687
25 266.225 174.625 - -
63 13+325 12.109 8.468 3.641
25 381.338 274.588 - -
64 13+300 18.398 13.499 4.899
25 331.038 229.525 - -
65 13+275 8.085 4.863 3.222
25 101.063 60.788 - -
66 13+250 - -
25 - - - -
67 13+225 - -
25 - - - -
68 13+200 - -
25 663.100 62.625 567.513 -
69 13+175 53.048 5.010 48.038 45.401
25 1,400.925 305.663 994.113 -
70 13+150 59.026 19.443 39.583 34.128
25 1,290.500 296.888 856.875 -
71 13+125 44.214 4.308 39.906 34.422
25 1,344.513 778.900 430.275 -
72 13+100 63.347 58.004 5.343
25 1,196.913 1,085.188 - -
73 13+075 32.406 28.811 3.595
25 677.850 586.350 - -
74 13+050 21.822 18.097 3.725
25 448.338 368.488 - -
75 13+025 14.045 11.382 2.663
25 471.113 393.688 - -
76 13+000 23.644 20.113 3.531
25 428.563 342.600 - -
77 12+975 10.641 7.295 3.346
25 294.988 207.675 - -
Calculation of Volume
No. STATION Remark
Area Cut Area Cut Selisih Area
Length Area Cut Area Cut
Cut BATU SOFT ROCK BATU SOFT ROCK
(m) (Sq.m) (Sq.m)
(Sq.m) (Sq.m) (Sq.m)
a b GORGA PP PP PP e GORGA PP PP PP g
78 12+950 12.958 9.319 3.639
25 161.975 116.488 - -
79 12+925 - -
25 - - - -
80 12+900 - -
25 - - - -
81 12+875 - -
25 169.050 138.013 - -
82 12+850 13.524 11.041 2.483
25 282.763 220.488 - -
83 12+825 9.097 6.598 2.499
25 147.500 101.613 - -
84 12+800 2.703 1.531 1.172
25 155.325 97.550 - -
85 12+775 9.723 6.273 3.450
25 234.488 145.375 - -
86 12+750 9.036 5.357 3.679
25 224.338 132.975 - -
87 12+725 8.911 5.281 3.630
25 351.238 266.013 - -
88 12+700 19.188 16.000 3.188
25 378.150 273.625 - -
89 12+675 11.064 5.890 5.174
25 1,150.238 997.350 - -
90 12+650 80.955 73.898 7.057
25 2,233.250 2,049.538 - -
91 12+625 97.705 90.065 7.640
25 1,264.025 1,147.825 - -
92 12+600 3.417 1.761 1.656
25 42.713 22.013 - -
93 12+575 -
25 - - - -
94 12+550 -
25 - - - -
95 12+525 -
25 - - - -
96 12+500 -
25 383.875 317.863 - -
97 12+475 30.710 25.429 5.281
25 432.613 332.663 - -
98 12+450 3.899 1.184 2.715
25 139.150 52.138 - -
99 12+425 7.233 2.987 4.246
25 139.663 47.713 - -
100 12+400 3.940 0.830 3.110
25 272.313 161.113 - -
101 12+375 17.845 12.059 5.786
25 467.463 326.450 - -
102 12+350 19.552 14.057 5.495
25 485.600 358.850 - -
103 12+325 19.296 14.651 4.645
25 466.375 325.525 - -
104 12+300 18.014 11.391 6.623
25 301.888 166.025 - -
105 12+275 6.137 1.891 4.246
25 182.888 88.663 - -
106 12+250 8.494 5.202 3.292
25 240.863 153.900 - -
107 12+225 10.775 7.110 3.665
25 321.938 238.525 - -
108 12+200 14.980 11.972 3.008
25 187.250 149.650 - -
109 12+175
25 - - - -
110 12+150
25 - - - -
111 12+125
25 - - - -
112 12+100
25 - - - -
113 12+075
25 - - - -
114 12+050
25 - - - -
115 12+025
25 - - - -
116 12+000

(a)T O T A L REALISASI GALIAN 2700 208,723.54 130,030.350 17,537.150 10,360.500


CALCULATION SHEET OF VOLUME (ESTIMASI)

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume Design PP(SHOP DRAWING)

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+900 L/R #REF! #REF!


25 #REF! #REF!
2 14+875 L/R #REF! #REF!
25 #REF! #REF!
3 14+850 L/R #REF!
25 #REF! -
4 14+825 L/R #REF!
25 #REF! #REF!
5 14+800 L/R #REF! #REF!
25 #REF! #REF!
6 14+775 L/R #REF! #REF!
25 #REF! #REF!
7 14+750 L/R #REF! #REF!
25 #REF! #REF!
8 14+725 L/R #REF! #REF!
25 #REF! #REF!
9 14+700 L/R #REF! #REF!
25 #REF! #REF!
10 14+675 L/R #REF! #REF!
25 #REF! #REF!
11 14+650 L/R #REF! #REF!
25 #REF! #REF!
12 14+625 L/R #REF!
25 #REF! -
13 14+600 L/R #REF!
25 #REF! -
14 14+575 L/R #REF!
25 #REF! -
15 14+550 L/R #REF!
25 #REF! -
16 14+525 L/R #REF!
25 #REF! -
17 14+500 L/R #REF!
25 #REF! -
18 14+475 L/R #REF!

SUB T O T A L VOLUME 425 #REF! #REF!


KOMULATIF T O T A L VOLUME 425 #REF! #REF!
CALCULATION SHEET OF VOLUME (ESTIMASI)

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume Design PP(SHOP DRAWING)

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+475 L/R #REF!


25 #REF! -
2 14+450 L/R #REF!
25 #REF! #REF!
3 14+425 L/R #REF! #REF!
25 #REF! #REF!
4 14+400 L/R #REF!
25 #REF! -
5 14+375 L/R #REF!
25 #REF! -
6 14+350 L/R #REF!
25 #REF! -
7 14+325 L/R #REF!
25 #REF! -
8 14+300 L/R #REF!
25 #REF! -
9 14+275 L/R #REF!
25 #REF! -
10 14+250 L/R #REF!
25 #REF! -
11 14+225 L/R #REF!
25 #REF! -
12 14+200 L/R #REF!
25 #REF! -
13 14+175 L/R #REF!
25 #REF! -
14 14+150 L/R #REF!
25 #REF! -
15 14+125 L/R #REF!
25 #REF! -
16 14+100 L/R -
25 - -
17 14+075 L/R
25 #REF! -
18 14+050 L/R #REF!

SUB T O T A L VOLUME 425 #REF! #REF!


KOMULATIF T O T A L VOLUME 850 #REF! #REF!
CALCULATION SHEET OF VOLUME (ESTIMASI)

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume Design PP(SHOP DRAWING)

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 14+050 L/R #REF!


25 #REF! -
2 14+025 L/R #REF!
25 #REF! -
3 14+000 L/R #REF!
25 #REF! -
4 13+975 L/R Err:509
25 Err:509 -
5 13+950 L/R Err:509
25 Err:509 -
6 13+925 L/R Err:509
25 Err:509 -
7 13+900 L/R Err:509
25 Err:509 -
8 13+875 L/R Err:509
25 Err:509 -
9 13+850 L/R Err:509
25 Err:509 -
10 13+825 L/R Err:509
25 Err:509 -
11 13+800 L/R Err:509
25 Err:509 -
12 13+775 L/R Err:509
25 Err:509 -
13 13+750 L/R Err:509
25 Err:509 -
14 13+725 L/R Err:509
25 Err:509 -
15 13+700 L/R Err:509
25 Err:509 -
16 13+675 L/R Err:509
25 Err:509 -
17 13+650 L/R Err:509
25 Err:509 -
18 13+625 L/R Err:509 -

SUB T O T A L VOLUME 425 Err:509 -


KOMULATIF T O T A L VOLUME 1275 Err:509 #REF!
CALCULATION SHEET OF VOLUME (ESTIMASI)

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume Design PP(SHOP DRAWING)

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 13+625 L/R Err:509


25 Err:509 -
2 13+600 L/R - 45.61
25 - 1,680.44 -
3 13+575 L/R - 88.82
25 - 1,983.40 -
4 13+550 L/R - 69.85
25 - 1,800.24 -
5 13+525 L/R - 74.17
25 - 1,012.89 -
6 13+500 L/R - 6.86
25 - 171.53 -
7 13+475 L/R - 6.86
25 - 233.85 -
8 13+450 L/R - 11.85
25 - 234.13 -
9 13+425 L/R - 6.88
25 - 357.50 -
10 13+400 L/R - 21.72
25 - 271.46 -
11 13+375 L/R -
25 - 114.86 -
12 13+350 L/R - 9.19
25 - 266.23 -
13 13+325 L/R - 12.11
25 - 381.34 -
14 13+300 L/R - 18.40
25 - 331.04 -
15 13+275 L/R - 8.09
25 - 101.06 -
16 13+250 L/R -
25 - -
17 13+225 L/R -
25 - -
18 13+200 L/R -

SUB T O T A L VOLUME 425 Err:509 -


KOMULATIF T O T A L VOLUME 1700 Err:509 #REF!
CALCULATION SHEET OF VOLUME (ESTIMASI)

Project/Sub Project : JALUR LINTAS SELATAN LOT 6


Kontraktor : PT. PP (Persero),Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI

Calculation of Volume Design PP(SHOP DRAWING)

No. STATION L/R Remark


Area Cut Length Volume Cut Area Fill
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)

a b c d e f d f g

1 13+200 L/R
25 - 663.10 -
2 13+175 L/R - 53.05
25 - 1,400.93 -
3 13+150 L/R - 59.03
25 - 1,290.50 -
4 13+125 L/R - 44.21
25 - 1,344.51 -
5 13+100 L/R - 63.35
25 - 1,196.91 -
6 13+075 L/R - 32.41
25 - 677.85 -
7 13+050 L/R - 21.82
25 - 448.34 -
8 13+025 L/R - 14.05
25 - 471.11 -
9 13+000 L/R - 23.64
25 - 428.56 -
10 12+975 L/R - 10.64
25 - 294.99 -
11 12+950 L/R - 12.96
25 - 161.98 -
12 12+925 L/R -
25 -
13 12+900 L/R -
25 -
14 12+875 L/R -
25 - 169.05
15 12+850 L/R - 13.52
25 - 282.76
16 12+825 L/R - 9.10
25 - 147.50
17 12+800 L/R - 2.70
25 - 155.33
18 12+775 L/R - 9.72

SUB T O T A L VOLUME 425 - 8,378.78 -


KOMULATIF T O T A L VOLUME 2125 Err:509 #REF!
CALCULATION SHEET OF VOLUME

Div. 3 EARTHWORKS
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : #REF!
Kontraktor : PT.PP(PERSERO) Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : Galian Biasa
No Item Pembayaran : #REF!
Satuan : m³

Calculation of Volume
No. STATTION L/R Area Cut Length Area Fill Remark
Volume Cut (Cu.m) Volume Fill (Cu.m)
(Sq.m) (m) (Sq.m)
a b c d e f d f g
1 14+650 LR -2.79
25.00 -1422.81
2 14+625 LR -111.04
25.00 -2607.05
3 14+600 LR -97.52
25.00 -3859.99
4 14+575 LR -211.28
25.00 -7237.71
5 14+550 LR -367.74
25.00 -10885.03
6 14+525 LR -503.06
25.00 -14380.14
7 14+500 LR -647.35
25.00 -12511.80
8 14+475 LR -353.59
25.00 #REF!
9 14+450 LR #REF!
25.00 #REF!
10 14+425 LR #REF!
25.00 #REF!
11 14+400 LR #REF!
25.00 #REF!
12 14+375 LR -281.60
25.00 #REF!
13 14+350 LR #REF!
25.00 #REF!
14 14+325 LR #REF!
25.00 #REF!
15 14+300 LR #REF!
25.00 #REF!
16 14+275 LR #REF!
25.00 #REF!
17 14+250 LR #REF!
25.00 #REF!
18 14+225 LR #REF!
25.00 #REF!
19 14+200 LR #REF!
25.00 #REF!
20 14+175 LR #REF!
25.00 #REF!
21 14+150 LR #REF!
25.00 #REF!
22 14+125 LR #REF!
25.00 #REF!
23 14+100 LR #REF!

TOTAL 525.00 #REF! -

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO),Tbk. PT.GORGA MARGA MANDIRI

........................ ........................
Quantity Surveyor Quantity Surveyor
CALCULATION SHEET OF VOLUME
Div. 3 EARTHWORKS
Kontrak No. : 0265/SPS/SCM/PP/I1/219007/III/2020
Paket : Perencanaan Pembangunan Jalan Karanggongso - Bts.Kab.TulungAgung - Klatak
Kontraktor : PT.PP(PERSERO) Tbk.
Sub Kontraktor : PT. GORGA MARGA MANDIRI
Jenis Pekerjaan : Galian Biasa
No Item Pembayaran : 1
Satuan : m3

Calculation of Volume
No. STATTION L/R Area Cut Length Volume Cut Area Fill Remark
Volume Fill (Cu.m)
(Sq.m) (m) (Cu.m) (Sq.m)
a b c d e f d f g
1 14+650 LR 2.79
25.00 1422.81
1 14+625 LR 111.04
25.00 2607.05
2 14+600 LR 97.52
25.00 3859.99
3 14+575 LR 211.28
25.00 7237.71
4 14+550 LR 367.74
25.00 10885.03
5 14+525 LR 503.06
25.00 14380.14
6 14+500 LR 647.35
25.00 11846.08
7 14+475 LR 300.34
25.00 7771.01
8 14+450 LR 321.35
25.00 9551.88
9 14+425 LR 442.81
25.00 11409.70
10 14+400 LR 469.97
25.00 6040.53
11 14+375 LR 13.27
25.00 349.65
12 14+350 LR 14.70
25.00 460.15
13 14+325 LR 22.11
25.00 603.95
14 14+300 LR 26.20
25.00 612.25
15 14+275 LR 22.78
25.00 593.83
16 14+250 LR 24.73
25.00 618.81
17 14+225 LR 24.77
25.00
18 14+200 LR 21.29

TOTAL 425.00 90,250.59 -

Diperiksa dan Disetujui Oleh Dibuat Oleh


Kontraktor Pelaksana Sub Kontraktor Pelaksana
PT.PP (PERSERO),Tbk. PT.GORGA MARGA MANDIRI

........................ ........................
Quantity Surveyor Quantity Surveyor
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 14+886.00 R 0.00
14.00 10.32
2 14+900.00 R M3 1.47
25.00 47.78
3 14+925.00 R M3 2.35
25.00 66.71
4 14+950.00 R M3 2.99
25.00 70.54
5 14+975.00 R M3 2.65
25.00 61.59
6 15+000.00 R M3 2.27
25.00 52.78
7 15+025.00 R M3 1.95
25.00 37.52
8 15+050.00 R M3 1.05
5.00 2.63
9 15+055.00 R M3 0.00

JUMLAH M3 339.556
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 15+903.00 R M3 0.31
28.00 10.90
2 15+875.00 R M3 0.47
25.00 9.79
3 15+850.00 R M3 0.31
25.00 8.68
4 15+825.00 R M3 0.38
25.00 8.36
5 15+800.00 R M3 0.29
25.00 7.62
6 15+775.00 R M3 0.32
25.00 10.02
7 15+750.00 R M3 0.48
25.00 10.62
8 15+725.00 R M3 0.37
25.00 9.47
9 15+700.00 R M3 0.39
25.00 8.85
10 15+675.00 R M3 0.32
25.00 6.79
11 15+650.00 R M3 0.22
25.00 4.97
12 15+625.00 R M3 0.18
25.00 4.91
13 15+600.00 R M3 0.22
25.00 5.35
14 15+575.00 R M3 0.21
25.00 5.71
15 15+550.00 R M3 0.25
25.00 5.46
16 15+525.00 R M3 0.19
25.00 6.73
17 15+500.00 R M3 0.35
25.00 8.07
18 15+475.00 R M3 0.30
25.00 7.64
19 15+450.00 R M3 0.31
25.00 8.95
20 15+425.00 R M3 0.40
25.00 11.35
21 15+400.00 R M3 0.50
25.00 11.05
22 15+375.00 R M3 0.38
25.00 9.24
23 15+350.00 R M3 0.36
25.00 6.01
24 15+325.00 R M3 0.12
25.00 6.08
25 15+300.00 R M3 0.36
25.00 10.36
26 15+275.00 R M3 0.46
25.00 9.34
27 15+250.00 R M3 0.28
25.00 6.61
28 15+225.00 R M3 0.25
25.00 7.09
29 15+200.00 R M3 0.32
25.00 10.92
30 15+175.00 R M3 0.55
25.00 12.64
31 15+150.00 R M3 0.46
25.00 8.59
32 15+125.00 R M3 0.23
25.00 7.81
33 15+100.00 R M3 0.40
25.00 8.08
34 15+075.00 R M3 0.25
25.00 3.14
35 15+050.00 R M3 -

JUMLAH M3 853.000 277.216


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 15+903.00 L M3 0.16
28.00 4.78
2 15+875.00 L M3 0.19
25.00 7.57
3 15+850.00 L M3 0.42
25.00 7.90
4 15+825.00 L M3 0.21
25.00 6.63
5 15+800.00 L M3 0.32
25.00 7.80
6 15+775.00 L M3 0.31
25.00 7.55
7 15+750.00 L M3 0.30
25.00 8.16
8 15+725.00 L M3 0.36
25.00 8.32
9 15+700.00 L M3 0.31
25.00 6.71
10 15+675.00 L M3 0.23
25.00 5.64
11 15+650.00 L M3 0.23
25.00 8.84
12 15+625.00 L M3 0.48
25.00 12.71
13 15+600.00 L M3 0.54
25.00 10.07
14 15+575.00 L M3 0.27
25.00 8.77
15 15+550.00 L M3 0.43
25.00 8.82
16 15+525.00 L M3 0.27
25.00 7.17
17 15+500.00 L M3 0.30
25.00 7.49
18 15+475.00 L M3 0.30
25.00 8.38
19 15+450.00 L M3 0.37
25.00 12.14
20 15+425.00 L M3 0.60
25.00 11.42
21 15+400.00 L M3 0.31
25.00 7.67
22 15+375.00 L M3 0.30
25.00 8.43
23 15+350.00 L M3 0.37
25.00 7.86
24 15+325.00 L M3 0.25
25.00 7.44
25 15+300.00 L M3 0.34
25.00 8.01
26 15+275.00 L M3 0.30
25.00 6.64
27 15+250.00 L M3 0.23
25.00 6.68
28 15+225.00 L M3 0.30
25.00 6.10
29 15+200.00 L M3 0.18
25.00 5.61
30 15+175.00 L M3 0.26
25.00 10.61
31 15+150.00 L M3 0.58
25.00 13.07
32 15+125.00 L M3 0.46
25.00 10.97
33 15+100.00 L M3 0.42
25.00 9.58
34 15+075.00 L M3 0.35
25.00 4.37
35 15+050.00 L M3

JUMLAH M3 853.000 279.907


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 13+900.00 L 0.00
25.00 3.78
2 13+925.00 L M3 0.30
25.00 8.30
3 13+950.00 L M3 0.36
25.00 7.85
4 13+975.00 L M3 0.27
25.00 3.32
5 14+000.00 L M3 0.00

JUMLAH M3 23.248
-1.3 101.934
0 101.893
0 101.623
1.9 101.584
3.8 101.613
5.7 101.608
7.5 101.671
8.995 101.631
9.5 101.883
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+634.00 39+634.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 101.69 -457.60
104.000
1 -10.20 101.511 -9.00 101.689 1.50 203.44 152.58
2 -8.90 101.523 -7.50 101.749 0.00 203.35 0.00 103.000
3 -7.60 101.598 -7.50 101.600 -0.10 203.20 -10.16
4 -6.00 101.625 -7.60 101.598 0.00 203.20 0.00 102.000
5 -4.50 101.701 -7.60 101.598 -1.30 203.12 -132.03
101.000
6 -3.00 101.753 -8.90 101.523 -0.10 203.05 -10.15
7 -1.50 101.783 -9.00 101.522 0.00 203.21 0.00 100.000
8 0.00 101.835 -9.00 101.689 9.00 101.69 457.60
9 0.00 102.064 99.000
10 1.40 102.041
98.000
11 1.40 101.714 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+634.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :
Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket ……………………….: REKONTRUSI JALAN WELERI - KENDAL - SEMARANG ………………………. ………………………. Back Up Kuantitas Bulan
………………………. : NOVEMBER 2021
Nomor dan Tanggal Kontrak Penilik Jalan : Inspector
HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Surveyor Periode Pelaksana : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+594.00 39+594.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 101.69 -457.61
104.000
1 -11.70 103.629 -9.00 101.690 1.50 203.44 152.58
2 -10.86 103.058 -7.50 101.750 0.00 203.30 0.00 103.000
3 -11.20 103.058 -7.50 101.545 -0.10 203.09 -10.15
4 -11.20 101.394 -7.60 101.543 0.00 203.09 0.00 102.000
5 -7.60 101.543 -7.60 101.543 -1.15 203.04 -116.75
101.000
6 -6.00 101.573 -8.75 101.495 -0.25 202.98 -25.37
7 -4.50 101.631 -9.00 101.485 0.00 203.18 0.00 100.000
8 -3.00 101.703 -9.00 101.690 9.00 101.69 457.61
9 -1.50 101.764 0.00 0.00 0.00 99.000
10 0.00 101.823
98.000
11 0.00 102.091 -20 -15 -10 -5 0 5 10 15 20
12 1.40 102.075
13 1.40 101.784
14 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15

39+594.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+354.00 39+354.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.46 -372.96
102.000
1 -11.60 101.331 -7.50 99.456 0.00 198.73 0.00
2 -10.76 100.760 -7.50 99.276 -0.10 198.55 -9.93
3 -11.10 100.760 -7.60 99.275 -1.00 198.53 -99.27 101.000
4 -11.10 99.210 -8.60 99.256 -0.40 198.50 -39.70
5 -10.10 99.210 -9.00 99.244 0.00 198.64 0.00
100.000
6 -8.60 99.256 -9.00 99.396 1.50 198.85 149.14
8 -7.60 99.275 -7.50 99.456 7.50 99.46 372.96
10 -6.00 99.290 99.000
12 -4.50 99.333
14 -3.00 99.393
98.000
16 -1.50 99.468 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.528
20 0.00 99.918
22 1.40 99.838 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.597

39+354.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+375.00 39+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -12.10 101.374 0.00 0.00 0.00
2 -11.26 100.803 0.00 0.00 0.00
3 -11.60 100.803 0.00 0.00 0.00 101.000
4 -11.60 99.253 0.00 0.00 0.00
5 -10.60 99.253 0.00 0.00 0.00
100.000
6 -9.10 99.308 0.00 0.00 0.00
8 -7.60 99.338 0.00 0.00 0.00
10 -6.00 99.386 0.00 0.00 0.00 99.000
12 -4.50 99.428
14 -3.00 99.490
98.000
16 -1.50 99.558 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.618
0.00 100.019
1.40 99.938 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
1.40 99.470

39+375.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+400.00 39+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 -14.10 101.411 0.00 0.00 0.00
2 -13.26 100.840 0.00 0.00 0.00
101.000
3 -13.60 100.840 0.00 0.00 0.00
4 -13.60 99.290 0.00 0.00 0.00
100.000
5 -12.60 99.290 0.00 0.00 0.00
6 -12.60 98.290 0.00 0.00 0.00
99.000
8 -10.60 98.290
10 -10.60 99.290
98.000
12 -9.10 99.260
14 -7.60 99.350
97.000
16 -6.00 99.388 -20 -15 -10 -5 0 5 10 15 20
18 -4.50 99.468
-3.00 99.560
-1.50 99.626 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
0.00 99.672
0.00 99.897
1.40 99.917
39+400.00
1.40 99.568

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+425.00 39+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
100.000
1 -10.90 99.300 0.00 0.00 0.00
2 -9.10 99.455 0.00 0.00 0.00
3 -7.60 99.427 0.00 0.00 0.00
4 -6.00 99.440 0.00 0.00 0.00 99.000
5 -4.50 99.503 0.00 0.00 0.00
6 -3.00 99.562 0.00 0.00 0.00
8 -1.50 99.603 98.000
10 0.00 99.615
12 0.00 99.572
14 0.00 99.597
97.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+425.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+454.00 39+454.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.62 -373.59
101.000
1 -10.60 99.270 -7.50 99.623 0.00 199.09 0.00
2 -8.90 99.395 -7.50 99.465 0.00 198.93 0.00
3 -7.50 99.465 -7.50 99.465 -1.40 198.86 -139.20
4 -6.00 99.500 -8.90 99.395 -0.10 198.78 -9.94 100.000
5 -4.50 99.564 -9.00 99.388 0.00 198.95 0.00
6 -3.00 99.617 -9.00 99.563 1.50 199.19 149.39
8 -1.50 99.667 -7.50 99.623 7.50 99.62 373.59 99.000
10 0.00 99.734
12 0.00 100.153
14 1.40 100.136
98.000
16 1.40 99.825 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+454.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+475.00 39+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.68 -373.80
102.000
1 -11.10 101.624 -7.50 99.681 0.00 199.19 0.00
2 -10.26 101.053 -7.50 99.507 0.00 199.01 0.00
3 -10.60 101.053 -7.50 99.507 -1.00 199.00 -99.50 101.000
4 -10.60 99.503 -8.50 99.493 -0.50 198.99 -49.75
5 -9.60 99.503 -9.00 99.498 0.00 199.12 0.00
100.000
6 -8.50 99.493 -9.00 99.621 1.50 199.30 149.48
8 -7.50 99.507 -7.50 99.681 7.50 99.68 373.80
10 -6.00 99.545 0.00 0.00 0.00 99.000
12 -4.50 99.590
14 -3.00 99.664
98.000
16 -1.50 99.720 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.770
20 0.00 100.224
22 1.40 100.236 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.003

39+475.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+500.00 39+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.83 -374.38
102.000
1 -11.20 101.711 -7.50 99.834 0.00 199.45 0.00
2 -10.36 101.140 -7.50 99.620 -0.20 199.24 -19.92
3 -10.70 101.140 -7.70 99.617 -1.10 199.20 -109.56 101.000
4 -10.70 99.590 -8.80 99.584 -0.20 199.17 -19.92
5 -9.70 99.590 -9.00 99.585 0.00 199.36 0.00
100.000
6 -8.80 99.584 -9.00 99.774 1.50 199.61 149.71
8 -7.70 99.617 -7.50 99.834 7.50 99.83 374.38
10 -6.00 99.643 0.00 0.00 0.00 99.000
12 -4.50 99.697
14 -3.00 99.775
98.000
16 -1.50 99.856 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.935
20 0.00 100.363
22 1.40 100.359 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.121

39+500.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+525.00 39+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.98 -449.91
102.000
1 -10.20 101.856 -9.00 99.980 1.50 200.02 150.02
2 -9.36 101.285 -7.50 100.040 0.00 199.90 0.00
3 -9.70 101.285 -7.50 99.856 -0.20 199.71 -19.97 101.000
4 -9.70 99.735 -7.70 99.855 -0.40 199.64 -39.93
5 -8.70 99.735 -8.10 99.780 -0.60 199.52 -59.85
100.000
6 -8.10 99.780 -8.70 99.735 -0.30 199.47 -29.92
8 -7.70 99.855 -9.00 99.735 0.00 199.72 0.00
10 -6.00 99.860 -9.00 99.980 9.00 99.98 449.91 99.000
12 -4.50 99.920 0.00 0.00 0.00
14 -3.00 99.979 0.00 0.00 0.00
98.000
16 -1.50 100.047 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 0.00 100.110
20 0.00 100.566
22 1.40 100.557 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.307

39+525.00

Luasan (M2) 0.34

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+550.00 39+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-12.00 102.506 -9.00 100.47 -452.12
1 -11.16 101.935 -9.00 100.472 1.50 201.00 150.75 103.000
2 -11.50 101.935 -7.50 100.532 0.00 200.86 0.00
3 -11.50 100.385 -7.50 100.329 -0.10 200.66 -10.03 102.000
4 -10.50 100.385 -7.60 100.327 0.00 200.65 0.00
5 -8.80 100.247 -7.60 100.327 -1.20 200.57 -120.34 101.000
6 -7.60 100.327 -8.80 100.247 -0.20 200.51 -20.05
8 -6.00 100.355 -9.00 100.263 0.00 200.74 0.00 100.000
10 -4.50 100.409 -9.00 100.472 9.00 100.47 452.12
12 -3.00 100.480 99.000
14 -1.50 100.555
16 0.00 100.610 98.000
18 0.00 101.018 -20 -15 -10 -5 0 5 10 15 20
20 1.40 101.023
22 1.40 100.752
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+550.00

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+575.00 39+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 101.17 -455.25
104.000
1 -11.20 103.094 -9.00 101.166 1.50 202.39 151.79
2 -10.36 102.523 -7.50 101.226 0.00 202.30 0.00
103.000
3 -10.70 102.523 -7.50 101.072 -0.10 202.14 -10.11
4 -10.70 100.973 -7.60 101.072 0.00 202.14 0.00
102.000
5 -9.70 100.973 -7.60 101.072 -1.30 202.09 -131.36
6 -8.90 101.013 -8.90 101.013 -0.10 202.02 -10.10
101.000
8 -7.60 101.072 -9.00 101.008 0.00 202.17 0.00
10 -6.00 101.077 -9.00 101.166 9.00 101.17 455.25
100.000
12 -4.50 101.124 0.00 0.00 0.00
14 -3.00 101.204
99.000
16 -1.50 101.274 -20 -15 -10 -5 0 5 10 15 20
18 0.00 101.357
20 0.00 101.741
22 1.40 101.671 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 101.435

39+575.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan
………………………. Konsultan Supervisi
………………………. ………………………. Penyedia Jasa
……………………….
PPK 3.1 Provinsi
Penilik Jawa
Jalan Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero)
Inspector Cabang Semarang - PT. Buana Archicon
Surveyor PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Pelaksana
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+650.00 39+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 101.18 -455.32
104.000
1 -11.70 103.084 -9.00 101.182 1.50 202.42 151.82
2 -10.86 102.513 -7.50 101.242 0.00 202.31 0.00 103.000
3 -11.20 102.513 -7.50 101.068 -0.10 202.13 -10.11
4 -11.20 100.963 -7.60 101.065 0.00 202.13 0.00 102.000
5 -10.20 100.963 -7.60 101.065 -1.15 202.05 -116.18
101.000
6 -9.00 100.968 -8.75 100.985 -0.25 201.95 -25.24
7 -7.60 101.065 -9.00 100.968 0.00 202.15 0.00 100.000
8 -6.00 101.108 -9.00 101.182 9.00 101.18 455.32
9 -4.50 101.203 99.000
10 -3.00 101.263
98.000
11 -1.50 101.303 -20 -15 -10 -5 0 5 10 15 20
12 0.00 101.365
13 0.00 101.768
14 1.40 101.624 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 101.343

39+650.00

Luasan (M2) 0.29

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+675.00 39+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.63 -452.84
104.000
1 -11.80 102.369 -9.00 100.632 1.50 201.32 150.99
2 -10.96 101.798 -7.50 100.692 0.00 201.18 0.00 103.000
3 -11.30 101.798 -7.50 100.486 -0.10 200.97 -10.05
4 -11.30 100.248 -7.60 100.483 0.00 200.97 0.00 102.000
5 -10.30 100.248 -7.60 100.483 -1.15 200.91 -115.52
101.000
6 -9.00 100.413 -8.75 100.425 -0.25 200.84 -25.10
8 -7.60 100.483 -9.00 100.413 0.00 201.05 0.00 100.000
10 -5.70 100.548 -9.00 100.632 9.00 100.63 452.84
12 -3.80 100.598 0.00 0.00 0.00 99.000
14 -1.90 100.642
98.000
16 0.00 101.062 -20 -15 -10 -5 0 5 10 15 20
18 1.40 101.018
20 1.40 100.714
22 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24

39+675.00

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+700.00 39+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.29 -451.32
104.000
1 -12.10 102.192 -9.00 100.294 1.50 200.65 150.49
2 -11.26 101.621 -7.50 100.354 0.00 200.52 0.00 103.000
3 -11.60 101.621 -7.50 100.163 0.00 200.33 0.00
4 -11.60 100.071 -7.50 100.163 0.00 200.33 0.00 102.000
5 -10.60 100.071 -7.50 100.163 -1.50 200.26 -150.19
101.000
6 -9.30 100.078 -9.00 100.092 0.00 200.18 0.00
8 -7.50 100.163 -9.00 100.092 0.00 200.39 0.00 100.000
10 -6.00 100.178 -9.00 100.294 9.00 100.29 451.32
12 -4.50 100.241 99.000
14 -3.00 100.265
98.000
16 -1.50 100.303 -20 -15 -10 -5 0 5 10 15 20
18 0.00 100.353
20 0.00 100.734
22 1.40 100.651 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.374

39+700.00

Luasan (M2) 0.29

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+725.00 39+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.14 -450.61
104.000
1 -12.40 102.067 -9.00 100.135 1.50 200.33 150.25
2 -11.56 101.496 -7.50 100.195 0.00 200.23 0.00 103.000
3 -11.90 101.496 -7.50 100.036 -1.40 200.00 -140.00
4 -11.90 99.946 -8.90 99.966 -0.10 199.93 -10.00 102.000
5 -10.90 99.946 -9.00 99.965 0.00 199.93 0.00
101.000
6 -8.90 99.966 -9.00 99.965 0.00 200.10 0.00
8 -7.50 100.036 -9.00 100.135 9.00 100.14 450.61 100.000
10 -6.00 100.086
12 -4.50 100.117 99.000
14 -3.00 100.191
98.000
16 -1.50 100.251 -20 -15 -10 -5 0 5 10 15 20
18 0.00 100.306
20 0.00 100.586
22 1.40 100.598 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.346

39+725.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+750.00 39+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.06 -450.25
102.000
1 -11.70 101.899 -9.00 100.055 0.00 199.89 0.00
2 -10.86 101.328 -9.00 99.833 0.25 199.73 24.97
3 -11.20 101.328 -8.75 99.892 0.15 199.82 14.99 101.000
4 -11.20 99.778 -8.60 99.927 1.10 199.88 109.93
5 -10.20 99.778 -7.50 99.949 0.00 200.06 0.00
100.000
6 -9.00 99.833 -7.50 100.115 -1.50 200.17 -150.13
8 -8.60 99.927 -9.00 100.055 9.00 100.06 450.25
10 -6.00 99.978 99.000
12 -4.50 100.038
14 -3.00 100.096
98.000
16 -1.50 100.136 -20 -15 -10 -5 0 5 10 15 20
18 0.00 100.178
20 0.00 100.605
22 1.40 100.540 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.254

39+750.00

Luasan L1 (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+775.00 39+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.98 -449.93
102.000
1 -11.90 101.847 -9.00 99.984 0.00 199.81 0.00
2 -11.06 101.276 -9.00 99.821 0.25 199.65 25.06
3 -11.40 101.276 -8.75 99.833 1.15 199.72 114.74 101.000
4 -11.40 99.726 -7.60 99.886 0.10 199.77 9.99
5 -10.40 99.726 -7.50 99.887 0.00 199.93 0.00
100.000
6 -9.00 99.821 -7.50 100.044 -1.50 200.03 -150.02
8 -7.60 99.886 -9.00 99.984 9.00 99.98 449.93
10 -6.00 99.906 99.000
12 -4.50 99.966
14 -3.00 99.995
98.000
16 -1.50 100.016 -20 -15 -10 -5 0 5 10 15 20
18 0.00 100.076
20 0.00 100.468
22 1.40 100.395 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.111

39+775.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+800.00 39+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.90 -449.53
102.000
1 -10.60 99.746 -9.00 99.895 0.00 199.67 0.00
2 -9.10 99.777 -9.00 99.778 0.25 199.56 24.94
3 -7.70 99.788 -8.75 99.780 1.05 199.57 104.77 101.000
4 -6.00 99.807 -7.70 99.788 0.20 199.58 19.96
5 -4.50 99.803 -7.50 99.790 0.00 199.75 0.00
100.000
6 -3.00 99.831 -7.50 99.955 -1.50 199.85 -149.89
8 -1.50 99.877 -9.00 99.895 9.00 99.90 449.53
10 0.00 99.936 0.00 0.00 0.00 99.000
12 0.00 100.376
14 1.40 100.365
98.000
16 1.40 100.071 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+800.00

Luasan L1 (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+825.00 39+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.77 -448.94
102.000
1 -11.00 99.560 -9.00 99.765 0.00 199.32 0.00
2 -9.00 99.555 -9.00 99.555 1.20 199.15 119.49
3 -7.80 99.591 -7.80 99.591 0.20 199.25 19.93 101.000
4 -7.60 99.661 -7.60 99.661 0.10 199.32 9.97
5 -6.00 99.686 -7.50 99.663 0.00 199.49 0.00
100.000
6 -4.50 99.741 -7.50 99.825 -1.50 199.59 -149.69
8 -3.00 99.791 -9.00 99.765 9.00 99.77 448.94
10 -1.50 99.836 0.00 0.00 0.00 99.000
12 0.00 99.886
14 0.00 100.284
98.000
16 1.40 100.231 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.991

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+825.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+850.00 39+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.75 -448.88
102.000
1 -12.81 99.292 -9.00 99.751 1.50 199.56 149.67
2 -11.81 99.292 -7.50 99.811 0.00 199.45 0.00
3 -11.78 99.112 -7.50 99.638 -0.10 199.27 -9.96 101.000
4 -11.45 99.112 -7.60 99.636 -0.20 199.21 -19.92
5 -11.40 99.471 -7.80 99.576 -1.20 199.08 -119.45
100.000
6 -9.00 99.504 -9.00 99.504 0.00 199.26 0.00
8 -7.80 99.576 -9.00 99.751 9.00 99.75 448.88
10 -7.60 99.636 0.00 0.00 0.00 99.000
12 -6.00 99.666
14 -4.50 99.701
98.000
16 -3.00 99.766 -20 -15 -10 -5 0 5 10 15 20
18 -1.50 99.826
20 0.00 99.885
22 0.00 100.279 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.188
26 1.40 99.938

39+850.00

Luasan (M2) 0.34

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+875.00 39+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.63 -448.33
102.000
1 -12.41 99.422 -9.00 99.629 1.50 199.32 149.49
2 -11.41 99.422 -7.50 99.689 0.00 199.20 0.00
3 -11.38 99.242 -7.50 99.510 -0.10 199.02 -9.95 101.000
4 -11.05 99.242 -7.60 99.509 -0.20 198.98 -19.90
5 -11.00 99.601 -7.80 99.474 -1.20 198.86 -119.32
100.000
6 -9.00 99.385 -9.00 99.385 0.00 199.01 0.00
8 -7.80 99.474 -9.00 99.629 9.00 99.63 448.33
10 -7.60 99.509 99.000
12 -6.00 99.529
14 -4.50 99.578
98.000
16 -3.00 99.645 -20 -15 -10 -5 0 5 10 15 20
18 -1.50 99.721
20 0.00 99.796
22 0.00 100.178 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 100.107
26 1.40 99.838

39+875.00

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+900.00 39+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.51 -447.79
102.000
1 -12.41 99.277 -9.00 99.508 1.50 199.08 149.31
2 -11.41 99.277 -7.50 99.568 0.00 198.96 0.00
3 -11.38 99.097 -7.50 99.389 -0.10 198.78 -9.94 101.000
4 -11.05 99.097 -7.60 99.389 -0.20 198.75 -19.88
5 -11.00 99.456 -7.80 99.361 -1.20 198.65 -119.19
100.000
6 -9.00 99.286 -9.00 99.286 0.00 198.79 0.00
8 -7.80 99.361 -9.00 99.508 9.00 99.51 447.79
10 -7.60 99.389 99.000
12 -6.00 99.387
14 -4.50 99.459
98.000
16 -3.00 99.514 -20 -15 -10 -5 0 5 10 15 20
18 -1.50 99.604
20 0.00 99.664
22 0.00 100.097 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.961
26 1.40 99.755

39+900.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+925.00 39+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.47 -447.62
102.000
1 -13.21 99.224 -9.00 99.472 0.00 198.82 0.00
2 -12.21 99.224 -9.00 99.352 0.20 198.70 19.87
3 -12.18 99.044 -8.80 99.348 1.00 198.72 99.36 101.000
4 -11.85 99.044 -7.80 99.371 0.20 198.75 19.87
5 -11.80 99.403 -7.60 99.377 0.10 198.76 9.94
100.000
6 -8.80 99.348 -7.50 99.378 0.00 198.91 0.00
7 -7.80 99.371 -7.50 99.532 -1.50 199.00 -149.25
8 -7.60 99.377 -9.00 99.472 9.00 99.47 447.62 99.000
9 -6.00 99.388 0.00 0.00 0.00
10 -4.50 99.398
98.000
11 -3.00 99.473 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.532
13 0.00 99.598
14 0.00 99.981 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.875
16 1.40 99.613

39+925.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+950.00 39+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.45 -447.51
102.000
1 -13.21 99.256 -9.00 99.446 0.00 198.79 0.00
2 -12.21 99.256 -9.00 99.347 0.20 198.69 19.87
3 -12.18 99.076 -8.80 99.341 1.00 198.70 99.35 101.000
4 -11.85 99.076 -7.80 99.355 0.20 198.73 19.87
5 -11.80 99.435 -7.60 99.373 0.10 198.75 9.94
100.000
6 -8.80 99.341 -7.50 99.373 0.00 198.88 0.00
7 -7.80 99.355 -7.50 99.506 -1.50 198.95 -149.21
8 -7.60 99.373 -9.00 99.446 9.00 99.45 447.51 99.000
9 -6.00 99.372
10 -4.50 99.378
98.000
11 -3.00 99.418 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.467
13 0.00 99.533
14 0.00 99.845 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.806
16 1.40 99.551

39+950.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+975.00 39+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.42 -447.40
100.000
1 -12.41 98.993 -9.00 99.422 0.00 198.72 0.00
2 -11.41 98.993 -9.00 99.294 0.25 198.60 24.82
3 -11.38 98.813 -8.75 99.302 0.95 198.64 94.35
4 -11.05 98.813 -7.80 99.333 0.20 198.68 19.87
5 -11.00 99.172 -7.60 99.344 0.10 198.69 9.93
99.000
6 -9.00 99.294 -7.50 99.344 0.00 198.83 0.00
7 -7.80 99.333 -7.50 99.482 -1.50 198.90 -149.18
8 -7.60 99.344 -9.00 99.422 9.00 99.42 447.40
9 -6.00 99.343
10 -4.50 99.353
98.000
11 -3.00 99.403 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.444
13 0.00 99.478
14 0.00 99.785 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.744
16 1.40 99.503

39+975.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+000.00 40+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.38 -372.66
100.000
1 -13.31 98.956 -7.50 99.377 0.00 198.61 0.00
2 -12.31 98.956 -7.50 99.237 -0.10 198.47 -9.92
3 -12.28 98.776 -7.60 99.237 -0.20 198.44 -19.84
4 -11.95 98.776 -7.80 99.198 -1.10 198.36 -109.10
5 -11.90 99.135 -8.90 99.161 -0.10 198.32 -9.92
99.000
6 -8.90 99.161 -9.00 99.160 0.00 198.48 0.00
7 -7.80 99.198 -9.00 99.317 1.50 198.69 149.02
8 -7.60 99.237 -7.50 99.377 7.50 99.38 372.66
9 -6.00 99.235 0.00 0.00 0.00
10 -4.50 99.240
98.000
11 -3.00 99.273 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.325
13 0.00 99.361
14 0.00 99.744 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.712
16 1.40 99.486

40+000.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+325.00 39+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.34 -372.53
102.000
1 -11.80 101.224 -7.50 99.340 0.00 198.51 0.00
2 -10.96 100.653 -7.50 99.165 -0.10 198.33 -9.92
3 -11.30 100.653 -7.60 99.163 -1.00 198.29 -99.15 101.000
4 -11.30 99.103 -8.60 99.128 -0.40 198.25 -39.65
5 -10.30 99.103 -9.00 99.122 0.00 198.40 0.00
100.000
6 -8.60 99.128 -9.00 99.280 1.50 198.62 148.97
8 -7.60 99.163 -7.50 99.340 7.50 99.34 372.53
10 -6.00 99.198 99.000
12 -4.50 99.248
14 -3.00 99.303
98.000
16 -1.50 99.368 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.436
20 0.00 99.750
22 1.40 99.810 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.570

39+325.00

Luasan (M2) 0.25


]

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+300.00 39+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.17 -371.88
102.000
1 -12.00 101.287 -7.50 99.169 0.00 198.51 0.00
2 -11.16 100.716 -7.50 99.344 -1.50 198.63 -148.97
3 -11.50 100.716 -9.00 99.284 0.00 198.45 0.00 101.000
4 -11.50 99.166 -9.00 99.168 1.40 198.34 138.84
5 -10.50 99.166 -7.60 99.168 0.10 198.34 9.92
100.000
6 -9.00 99.168 -7.50 99.169 0.00 198.34 0.00
8 -7.60 99.168 -7.50 99.169 7.50 99.17 371.88
10 -6.00 99.178 99.000
12 -4.50 99.228
14 -3.00 99.288
98.000
16 -1.50 99.355 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.406
20 0.00 99.819
22 1.40 99.810 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.550

39+300.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+275.00 39+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.19 -371.94
102.000
1 -11.60 101.199 -7.50 99.185 0.00 198.53 0.00
2 -10.76 100.628 -7.50 99.349 -1.50 198.64 -148.98
3 -11.10 100.628 -9.00 99.289 0.00 198.46 0.00 101.000
4 -11.10 99.078 -9.00 99.170 0.10 198.35 9.92
5 -10.10 99.078 -8.90 99.178 1.40 198.36 138.85
100.000
6 -8.90 99.178 -7.50 99.185 0.00 198.37 0.00
8 -7.50 99.185 -7.50 99.185 7.50 99.19 371.94
10 -6.00 99.190 0.00 0.00 0.00 99.000
12 -4.50 99.224
14 -3.00 99.281
98.000
16 -1.50 99.348 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.413
20 0.00 99.857
22 1.40 99.820 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.576

39+275.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+250.00 39+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.17 -371.90
102.000
1 -12.43 98.669 -7.50 99.173 0.00 198.51 0.00
2 -11.43 98.669 -7.50 99.332 -1.50 198.60 -148.95
3 -11.39 98.169 -9.00 99.272 0.00 198.39 0.00 101.000
4 -10.89 98.169 -9.00 99.121 0.20 198.24 19.82
5 -10.80 99.169 -8.80 99.116 1.30 198.29 128.89
100.000
6 -8.80 99.116 -7.50 99.173 0.00 198.35 0.00
8 -7.50 99.173 -7.50 99.173 7.50 99.17 371.90
10 -6.00 99.196 99.000
12 -4.50 99.256
14 -3.00 99.310
98.000
-1.50 99.368 -20 -15 -10 -5 0 5 10 15 20
0.00 99.428
0.00 99.899
1.40 99.876 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
1.40 99.663

39+250.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+225.00 39+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.18 -371.94
102.000
1 -12.43 98.633 -7.50 99.183 0.00 198.58 0.00
2 -11.43 98.633 -7.50 99.395 -1.50 198.73 -149.05
3 -11.39 98.133 -9.00 99.335 0.00 198.47 0.00 101.000
4 -10.89 98.133 -9.00 99.137 0.20 198.28 19.83
5 -10.80 99.133 -8.80 99.138 1.30 198.32 128.91
100.000
6 -8.80 99.138 -7.50 99.183 0.00 198.37 0.00
7 -7.50 99.183 -7.50 99.183 7.50 99.18 371.94
8 -6.00 99.208 0.00 0.00 0.00 99.000
9 -4.50 99.273
10 -3.00 99.363
98.000
11 -1.50 99.408 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.503
13 0.00 99.998
14 1.40 100.018 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.820

39+225.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+200.00 39+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.28 -372.29
102.000
1 -12.23 98.630 -7.50 99.278 0.00 198.73 0.00
2 -11.23 98.630 -7.50 99.453 -1.50 198.85 -149.13
3 -11.19 98.130 -9.00 99.393 0.00 198.56 0.00 101.000
4 -10.69 98.130 -9.00 99.170 0.20 198.41 19.84
5 -10.60 99.130 -8.80 99.240 1.20 198.51 119.11
100.000
6 -9.00 99.170 -7.60 99.274 0.10 198.55 9.93
7 -8.80 99.240 -7.50 99.278 7.50 99.28 372.29
8 -7.60 99.274 99.000
9 -5.70 99.345
10 -3.80 99.405
98.000
11 -1.90 99.450 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.520
13 0.00 100.120
14 1.40 100.118 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.885

39+200.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+175.00 39+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.33 -372.50
102.000
1 -12.33 98.780 -7.50 99.333 0.00 198.84 0.00
2 -11.33 98.780 -7.50 99.503 -1.50 198.95 -149.21
3 -11.29 98.280 -9.00 99.443 0.00 198.70 0.00 101.000
4 -10.79 98.280 -9.00 99.260 0.20 198.57 19.86
5 -10.70 99.280 -8.80 99.310 1.20 198.64 119.18
100.000
6 -9.00 99.260 -7.60 99.330 0.10 198.66 9.93
7 -8.80 99.310 -7.50 99.333 7.50 99.33 372.50
8 -7.60 99.330 99.000
9 -5.00 99.410
10 -2.50 99.462
98.000
11 0.00 99.520 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.550
1.40 100.148
1.40 99.890 EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+175.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+150.00 39+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.43 -372.84
102.000
1 -10.60 99.050 -7.50 99.425 0.00 199.03 0.00
2 -9.60 99.050 -7.50 99.605 -1.50 199.15 -149.36
3 -9.55 98.550 -9.00 99.545 0.00 198.93 0.00 101.000
4 -9.05 98.550 -9.00 99.382 0.10 198.77 9.94
5 -9.00 99.178 -8.90 99.385 1.30 198.81 129.22
100.000
6 -7.60 99.422 -7.60 99.422 0.10 198.85 9.94
7 -6.00 99.470 -7.50 99.425 7.50 99.43 372.84
8 -4.50 99.520 99.000
9 -3.00 99.550
10 -1.50 99.595
98.000
11 0.00 99.634 -20 -15 -10 -5 0 5 10 15 20
12 0.00 100.208
13 1.40 100.209
14 1.40 99.959 EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+150.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+125.00 39+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.52 -373.18
102.000
1 -13.13 99.050 -7.50 99.515 0.00 199.18 0.00
2 -12.13 99.050 -7.50 99.668 -1.50 199.28 -149.46
3 -12.09 98.550 -9.00 99.608 0.00 199.13 0.00 101.000
4 -11.59 98.550 -9.00 99.519 0.30 199.03 29.86
5 -11.50 99.550 -8.70 99.515 1.00 199.03 99.51
100.000
6 -8.70 99.515 -7.70 99.512 0.20 199.03 19.90
7 -7.70 99.512 -7.50 99.515 7.50 99.52 373.18
8 -6.00 99.535 0.00 0.00 0.00 99.000
9 -4.50 99.568 0.00 0.00 0.00
10 -3.00 99.589
98.000
11 -1.50 99.625 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.740
13 0.00 100.248
14 1.40 100.215 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.001

39+125.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+100.00 39+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.58 -373.42
102.000
1 -13.33 99.002 -7.50 99.579 0.00 199.30 0.00
2 -12.33 99.002 -7.50 99.720 -1.50 199.38 -149.54
3 -12.29 98.502 -9.00 99.660 0.00 199.20 0.00 101.000
4 -11.79 98.502 -9.00 99.541 0.30 199.09 29.86
5 -11.70 99.502 -8.70 99.545 1.00 199.12 99.56
100.000
6 -8.70 99.545 -7.70 99.577 0.20 199.16 19.92
7 -7.70 99.577 -7.50 99.579 7.50 99.58 373.42
8 -6.00 99.595 0.00 0.00 0.00 99.000
9 -4.50 99.628
10 -3.00 99.670
98.000
11 -1.50 99.730 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.785
13 0.00 100.172
14 1.40 100.182 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.942

39+100.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+075.00 39+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.62 -373.59
102.000
1 -12.83 99.050 -7.50 99.624 0.00 199.40 0.00
2 -11.83 99.050 -7.50 99.772 -1.50 199.48 -149.61
3 -11.79 98.550 -9.00 99.712 0.00 199.29 0.00 101.000
4 -11.29 98.550 -9.00 99.578 0.30 199.16 29.87
5 -11.20 99.550 -8.70 99.582 1.00 199.20 99.60
100.000
6 -8.70 99.582 -7.70 99.620 0.20 199.24 19.92
7 -7.70 99.620 -7.50 99.624 7.50 99.62 373.59
8 -6.00 99.650 0.00 0.00 0.00 99.000
9 -4.50 99.690
10 -3.00 99.725
98.000
11 -1.50 99.800 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.840
13 0.00 100.218
14 1.40 100.211 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.950
16

39+075.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+050.00 39+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.64 -373.65
102.000
1 -12.33 99.200 -7.50 99.640 0.00 199.46 0.00
2 -11.33 99.200 -7.50 99.822 -1.50 199.58 -149.69
3 -11.29 98.700 -9.00 99.762 0.00 199.40 0.00 101.000
4 -10.79 98.700 -9.00 99.636 0.30 199.26 29.89
5 -10.70 99.700 -8.70 99.625 1.00 199.26 99.63
100.000
6 -8.70 99.625 -7.70 99.635 0.20 199.28 19.93
7 -7.70 99.635 -7.50 99.640 7.50 99.64 373.65
8 -6.00 99.680 99.000
9 -4.50 99.724
10 -3.00 99.785
98.000
11 -1.50 99.830 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.875
13 0.00 100.268
14 1.40 100.298 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.045

39+050.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+025.00 39+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.81 -374.30
102.000
1 1.40 100.122 -7.50 99.813 0.00 199.77 0.00
2 1.40 100.378 -7.50 99.960 -1.50 199.86 -149.90
101.000
3 0.00 100.348 -9.00 99.900 0.00 199.62 0.00
4 0.00 100.035 -9.00 99.724 0.10 199.45 9.97
100.000
5 -2.60 99.945 -8.90 99.728 1.10 199.53 109.74
6 -5.20 99.900 -7.80 99.802 0.30 199.62 29.94
99.000
7 -7.80 99.802 -7.50 99.813 7.50 99.81 374.30
8 -8.90 99.728
98.000
9 -9.10 99.720
10 -12.00 99.710
97.000
11 -12.09 98.710 -20 -15 -10 -5 0 5 10 15 20
12 -12.59 98.710
13 -12.63 99.210
14 -13.63 99.210 EXISTING DATA UKUR REALISASI AGREGAT KELAS A

39+025.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 39+000.00 39+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.11 -375.40
102.000
1 -13.13 99.288 -7.50 100.107 0.00 200.00 0.00
2 -12.13 99.288 -7.50 99.896 -0.30 199.79 -29.97
101.000
3 -12.09 98.788 -7.80 99.890 -1.20 199.72 -119.83
4 -11.59 98.788 -9.00 99.834 0.00 199.88 0.00
100.000
5 -11.50 99.788 -9.00 100.047 1.50 200.15 150.12
6 -9.10 99.828 -7.50 100.107 7.50 100.11 375.40
99.000
7 -8.90 99.840
8 -7.80 99.890
98.000
9 -5.20 99.945
10 -2.60 100.024
97.000
11 0.00 100.100 -20 -15 -10 -5 0 5 10 15 20
12 0.00 100.430
13 1.40 100.412
14 1.40 100.200 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15
16

39+000.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 38+975.00 38+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.08 -375.30
102.000
1 -11.70 100.012 -7.50 100.079 0.00 200.00 0.00
2 -10.40 99.855 -7.50 99.918 -0.20 199.83 -19.98
101.000
3 -10.20 99.883 -7.70 99.915 -1.30 199.81 -129.88
4 -7.70 99.915 -9.00 99.898 0.00 199.92 0.00
100.000
5 -5.70 99.940 -9.00 100.019 1.50 200.10 150.07
6 -3.80 100.018 -7.50 100.079 7.50 100.08 375.30
99.000
7 -1.90 100.086
8 0.00 100.137
98.000
9 0.00 100.508
10 1.40 100.445
97.000
11 1.40 100.273 -20 -15 -10 -5 0 5 10 15 20
12
13
14 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15
16

38+975.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+025.00 40+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.32 -372.43
100.000
1 -12.81 98.822 -7.50 99.315 0.00 198.44 0.00
2 -11.81 98.822 -7.50 99.122 -0.10 198.24 -9.91
3 -11.78 98.642 -7.60 99.122 0.00 198.24 0.00
4 -11.45 98.642 -7.60 99.122 -1.30 198.26 -128.87
5 -11.40 99.001 -8.90 99.133 -0.10 198.24 -9.91
99.000
6 -9.10 99.085 -9.00 99.109 0.00 198.36 0.00
7 -8.90 99.133 -9.00 99.255 1.50 198.57 148.93
8 -7.60 99.122 -7.50 99.315 7.50 99.32 372.43
9 -6.00 99.128 0.00 0.00 0.00
10 -4.50 99.166
98.000
11 -3.00 99.193 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.251
13 0.00 99.305
14 0.00 99.658 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.638
16 1.40 99.403

40+025.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+040.00 40+040.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.23 -372.11
100.000
1 -12.11 98.922 -7.50 99.229 0.00 198.27 0.00
2 -11.11 98.922 -7.50 99.042 -0.10 198.08 -9.90
3 -11.08 98.742 -7.60 99.042 0.00 198.08 0.00
4 -10.75 98.742 -7.60 99.042 -1.30 198.10 -128.76
5 -10.70 99.101 -8.90 99.053 -0.10 198.08 -9.90
99.000
6 -9.10 99.001 -9.00 99.027 0.00 198.19 0.00
7 -8.90 99.053 -9.00 99.162 1.50 198.39 148.79
8 -7.60 99.042 -7.50 99.229 7.50 99.23 372.11
9 -6.00 99.035
10 -4.50 99.065
98.000
11 -3.00 99.123 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.183
13 0.00 99.245
14 0.00 99.602 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.582
16 1.40 99.333

40+040.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+075.00 40+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
100.000
1 -11.71 98.956 0.00 0.00 0.00
2 -10.71 98.956 0.00 0.00 0.00
3 -10.68 98.776 0.00 0.00 0.00
4 -10.35 98.776 0.00 0.00 0.00
5 -10.30 99.135 0.00 0.00 0.00
99.000
6 -9.00 99.341 0.00 0.00 0.00
7 -8.80 99.191
8 -7.60 99.283
9 -6.00 99.292
10 -4.50 99.312
98.000
11 -3.00 99.372 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.413
13 0.00 99.455
14 0.00 99.652 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.638
16 1.40 99.331

40+075.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 ……………………….
Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) -……………………….
PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon
………………………. PT. Ayudi Persada -……………………….
PT. Multi Bangun Indonesia, KSO
Penilik Jalan Cabang Surabaya
Inspector Surveyor Pelaksana

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+775.00 40+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.00 -374.98
102.000
1 -11.51 99.729 -7.50 99.995 0.00 200.14 0.00
2 -10.51 99.729 -7.50 100.140 -1.50 200.11 -150.09
3 -10.48 99.549 -9.00 99.974 0.00 199.91 0.00 101.000
4 -10.15 99.549 -9.00 99.933 1.40 199.90 139.93
5 -10.10 99.908 -7.60 99.964 0.10 199.96 10.00
100.000
6 -7.60 99.964 -7.50 99.995 7.50 100.00 374.98
7 -7.40 100.027
8 -7.10 100.046 99.000
9 -5.60 100.038
10 -4.20 100.051
98.000
11 -2.80 100.055 -20 -15 -10 -5 0 5 10 15 20
12 -1.40 100.054
13 0.00 100.078
14 0.00 100.727 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.725
1.40 100.477

40+775.00

Luasan (M2) 0.16

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Archicon Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :
Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket ……………………….: REKONTRUSI JALAN WELERI - KENDAL - SEMARANG ………………………. ………………………. Back Up Kuantitas Bulan
………………………. : NOVEMBER 2021
Nomor dan Tanggal Kontrak Penilik Jalan : Inspector
HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Surveyor Periode Pelaksana : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+768.00 40+768.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.52 -376.95
102.000
1 -10.63 100.332 -7.50 100.520 0.00 201.18 0.00
2 -10.21 100.332 -7.50 100.655 -1.50 201.25 -150.94
3 -10.18 100.152 -9.00 100.595 0.00 201.11 0.00 101.000
4 -9.85 100.152 -9.00 100.513 1.40 201.03 140.72
5 -9.80 100.511 -7.60 100.516 0.10 201.04 10.05
100.000
6 -7.60 100.516 -7.50 100.520 7.50 100.52 376.95
7 -7.10 100.536
8 -5.60 100.561 99.000
9 -4.20 100.578
10 -2.80 100.588
98.000
11 -1.40 100.630 -20 -15 -10 -5 0 5 10 15 20
12 0.00 100.665
13 0.00 101.124
14 1.40 101.105 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.827

40+768.00

Luasan (M2) 0.17

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+500.00 40+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.95 -445.27
102.000
1 -13.50 98.800 -9.00 98.948 1.50 197.98 148.48
2 -9.10 98.810 -7.50 99.029 0.00 197.87 0.00
3 -9.10 98.810 -7.50 98.840 -0.20 197.68 -19.77 101.000
4 -8.90 98.783 -7.70 98.836 -1.20 197.62 -118.57
5 -7.70 98.836 -8.90 98.783 -0.10 197.58 -9.88
100.000
6 -6.00 98.869 -9.00 98.796 0.00 197.74 0.00
8 -4.50 98.937 -9.00 98.948 9.00 98.95 445.27
10 -3.00 99.030 99.000
12 -1.50 99.071
14 0.00 99.100
98.000
16 0.00 99.536 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.549
20 1.40 99.277
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+500.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+525.00 40+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.98 -445.41
102.000
1 -11.70 98.774 -9.00 98.980 1.50 198.02 148.52
2 -9.10 98.775 -7.50 99.044 0.00 197.94 0.00
3 -8.80 98.833 -7.50 98.894 0.00 197.79 0.00 101.000
4 -7.50 98.894 -7.50 98.894 -1.30 197.73 -128.52
5 -6.00 98.934 -8.80 98.833 -0.20 197.63 -19.76
100.000
6 -4.50 98.994 -9.00 98.794 0.00 197.77 0.00
8 -3.00 99.015 -9.00 98.980 9.00 98.98 445.41
10 -1.50 99.025 0.00 0.00 0.00 99.000
12 0.00 99.050
14 0.00 99.524
98.000
16 1.40 99.487 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.247

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+525.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+550.00 40+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.92 -370.96
100.000
1 -13.50 98.803 -7.50 98.922 0.00 197.99 0.00
2 -9.10 98.793 -7.50 99.067 -1.50 198.03 -148.13
3 -8.80 98.855 -9.00 98.964 0.00 197.78 0.00
4 -7.50 98.922 -9.00 98.815 0.20 197.67 19.37 99.000
5 -6.00 98.944 -8.80 98.855 1.30 197.78 128.56
6 -4.50 99.017 -7.50 98.922 7.50 98.92 370.96
8 -3.00 99.047 98.000
10 -1.50 99.060
12 0.00 99.087
14 0.00 99.544
97.000
16 1.40 99.493 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.294

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+550.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+575.00 40+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.93 -445.16
100.000
1 -11.00 98.797 -9.00 98.925 0.00 197.97 0.00
2 -9.10 98.906 -9.00 99.040 1.50 198.19 148.64
3 -8.90 98.945 -7.50 99.145 0.00 198.14 0.00
4 -7.50 98.993 -7.50 98.993 -1.40 197.94 -138.56 99.000
5 -6.00 98.997 -8.90 98.945 -0.10 197.87 -9.89
6 -4.50 99.057 -9.00 98.925 9.00 98.93 445.16
8 -3.00 99.135 98.000
10 -1.50 99.173
12 0.00 99.227
14 0.00 99.615
97.000
16 1.40 99.576 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.336

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+575.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+600.00 40+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.94 -445.21
101.000
1 -10.60 98.887 -9.00 98.935 0.00 198.02 0.00
2 -9.70 98.950 -9.00 99.088 1.50 198.27 148.70
3 -9.00 98.935 -7.50 99.185 0.00 198.21 0.00
4 -8.80 99.005 -7.50 99.020 -1.30 198.03 -128.72 100.000
5 -7.50 99.020 -8.80 99.005 -0.20 197.94 -19.79
6 -6.00 99.035 -9.00 98.935 9.00 98.94 445.21
8 -4.50 99.094 0.00 0.00 0.00 99.000
10 -3.00 99.137
12 -1.50 99.175
14 0.00 99.217
98.000
16 0.00 99.676 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.635
20 1.40 99.379
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+600.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+625.00 40+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.07 -445.82
101.000
1 -10.75 99.016 -9.00 99.070 1.50 198.26 148.69
2 -7.75 98.965 -7.50 99.185 0.00 198.20 0.00
3 -7.50 99.013 -7.50 99.013 -0.25 197.98 -24.75
4 -6.00 99.014 -7.75 98.965 -1.25 197.95 -123.72 100.000
5 -4.50 99.053 -9.00 98.986 9.00 98.99 445.44
6 -3.00 99.124
8 -1.50 99.175 99.000
10 0.00 99.228
12 0.00 99.677
14 1.40 99.666
98.000
16 1.40 99.416 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+625.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+650.00 40+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.01 -371.29
101.000
1 -10.60 99.097 -7.50 99.010 0.00 198.21 0.00
2 -7.70 98.975 -7.50 99.195 -1.50 198.37 -148.78
3 -7.50 99.010 -9.00 99.174 0.00 198.20 0.00
4 -6.00 99.005 -9.00 99.030 1.30 198.01 128.70 100.000
5 -4.50 99.055 -7.70 98.975 0.20 197.99 19.80
6 -3.00 99.020 -7.50 99.010 7.50 99.01 371.29
8 -1.50 99.150 99.000
10 0.00 99.185
12 0.00 99.724
14 1.40 99.716
98.000
16 1.40 99.463 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+650.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+675.00 40+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.99 -371.22
101.000
1 -10.00 99.013 -7.50 98.992 0.00 198.18 0.00
2 -7.60 98.964 -7.50 99.192 -1.50 198.30 -148.72
3 -7.30 99.047 -9.00 99.106 0.00 198.10 0.00
4 -6.00 98.977 -9.00 98.993 1.40 197.96 138.57 100.000
5 -4.50 99.023 -7.60 98.964 0.10 197.96 9.90
6 -3.00 99.045 -7.50 98.992 7.50 98.99 371.22
8 -1.50 99.075 99.000
10 0.00 99.143
12 0.00 99.834
14 1.40 99.833
98.000
16 1.40 99.565 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+675.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+700.00 40+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.40 -372.74
101.000
1 -11.10 99.275 -7.50 99.397 0.00 199.03 0.00
2 -7.60 99.385 -7.50 99.631 -1.50 199.20 -149.40
3 -7.20 99.435 -9.00 99.566 0.00 198.91 0.00
4 -5.60 99.424 -9.00 99.341 1.40 198.73 139.11 100.000
5 -4.20 99.420 -7.60 99.385 0.10 198.78 9.94
6 -2.80 99.445 -7.50 99.397 7.50 99.40 372.74
8 -1.40 99.467 99.000
10 0.00 99.495
12 0.00 100.154
14 1.40 100.183
98.000
16 1.40 99.894 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+700.00

Luasan (M2) 0.35

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+723.00 40+723.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.38 -376.42
102.000
1 -10.00 100.234 -7.50 100.378 0.00 200.62 0.00
2 -7.60 100.241 -7.50 100.240 -0.10 200.48 -10.02
3 -7.20 100.235 -7.60 100.241 -1.40 200.48 -140.33
4 -5.60 100.248 -9.00 100.237 0.00 200.56 0.00 101.000
5 -4.20 100.294 -9.00 100.318 1.50 200.70 150.52
6 -2.80 100.341 -7.50 100.378 7.50 100.38 376.42
8 -1.40 100.379 100.000
10 0.00 100.388
12 0.00 100.928
14 1.40 100.918
99.000
16 1.40 100.710 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+723.00

Luasan (M2) 0.16

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan
………………………. Konsultan Supervisi
………………………. ………………………. Penyedia Jasa
……………………….
PPK 3.1 Provinsi
Penilik Jawa
Jalan Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero)
Inspector Cabang Semarang - PT. Buana Archicon
Surveyor PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Pelaksana
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+800.00 40+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.51 -373.16
102.000
1 -11.61 99.096 -7.50 99.509 0.00 198.83 0.00
2 -10.61 99.096 -7.50 99.320 -0.10 198.63 -9.93
3 -10.58 98.916 -7.60 99.305 -1.40 198.61 -139.02 101.000
4 -10.25 98.916 -9.00 99.300 0.00 198.73 0.00
5 -10.20 99.296 -9.00 99.425 1.50 198.93 149.20
100.000
6 -7.60 99.305 -7.50 99.509 7.50 99.51 373.16
7 -7.20 99.365
8 -5.60 99.354 99.000
9 -4.20 99.407
10 -2.80 99.424
98.000
11 -1.40 99.426 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.450
13 0.00 100.153
14 1.40 100.145 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.884

40+800.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+825.00 40+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.06 -445.75
102.000
1 -11.51 98.811 -9.00 99.055 0.00 198.05 0.00
2 -10.51 98.811 -9.00 98.994 1.40 197.99 138.60
3 -10.48 98.631 -7.60 99.000 0.10 197.99 9.90 101.000
4 -10.15 98.631 -7.50 98.988 0.00 198.12 0.00
5 -10.10 98.990 -7.50 99.134 -1.50 198.19 -148.64
100.000
6 -7.60 99.000 -9.00 99.055 9.00 99.06 445.75
8 -7.20 98.952
10 -5.60 98.968 99.000
12 -4.20 99.022
14 -2.80 99.045
98.000
16 -1.40 99.087 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.125
20 0.00 99.799
22 1.40 99.865 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.561

40+825.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+850.00 40+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.05 -371.45
102.000
1 -10.20 98.860 -7.50 99.054 0.00 197.88 0.00
2 -7.60 98.818 -7.50 98.826 -0.10 197.64 -9.88
3 -7.30 98.841 -7.60 98.818 -1.40 197.66 -138.36 101.000
4 -6.00 98.858 -9.00 98.841 0.00 197.78 0.00
5 -4.50 98.925 -9.00 98.941 1.50 198.00 148.50
100.000
6 -3.00 98.950 -7.50 99.054 7.50 99.05 371.45
8 -1.50 99.002
10 0.00 99.040 99.000
12 0.00 99.713
14 1.40 99.731
98.000
16 1.40 99.478 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+850.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+875.00 40+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.77 -370.37
102.000
1 -10.10 98.709 -7.50 98.766 0.00 197.70 0.00
2 -7.60 98.755 -7.50 98.930 -1.50 197.76 -148.32
3 -7.60 98.755 -9.00 98.826 0.00 197.56 0.00 101.000
4 -7.30 98.788 -9.00 98.729 1.40 197.48 138.24
5 -7.30 98.788 -7.60 98.755 0.10 197.52 9.88
100.000
6 -6.00 98.802 -7.50 98.766 7.50 98.77 370.37
8 -6.00 98.802
10 -4.50 98.871 99.000
12 -4.50 98.871
14 -3.00 98.915
98.000
16 -3.00 98.915 -20 -15 -10 -5 0 5 10 15 20
18 -1.50 98.952
20 -1.50 98.952
22 0.00 99.002 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.00 99.002
26 0.00 99.657
28 0.00 99.657
40+875.00
30 1.40 99.668
32 1.40 99.668
34 1.40 99.428

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+900.00 40+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.77 -370.39
102.000
1 -10.10 98.785 -7.50 98.770 -0.10 197.54 -9.88
2 -7.60 98.769 -7.60 98.769 -1.40 197.55 -138.28
3 -7.30 98.772 -9.00 98.778 0.00 197.64 0.00 101.000
4 -6.00 98.770 -9.00 98.861 1.50 197.82 148.36
5 -4.50 98.820 -7.50 98.955 0.00 197.73 0.00
100.000
6 -3.00 98.862 -7.50 98.770 7.50 98.77 370.39
8 -1.50 98.893
10 0.00 98.928 99.000
12 0.00 99.579
14 1.40 99.568
98.000
16 1.40 99.326 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+900.00

Luasan L1 (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+925.00 40+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.72 -370.22
102.000
1 -10.10 98.710 -7.50 98.724 -0.10 197.43 -9.87
2 -7.60 98.708 -7.60 98.708 -1.40 197.42 -138.19
3 -7.20 98.772 -9.00 98.709 0.00 197.56 0.00 101.000
4 -5.60 98.802 -9.00 98.847 1.50 197.75 148.31
5 -4.20 98.841 -7.50 98.903 0.00 197.63 0.00
100.000
6 -2.80 98.868 -7.50 98.724 7.50 98.72 370.22
8 -1.40 98.924
10 0.00 98.951 99.000
12 0.00 99.509
14 1.40 99.529
98.000
16 1.40 99.312 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+925.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+950.00 40+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.66 -369.96
102.000
1 -11.10 98.798 -7.50 98.655 -0.10 197.28 -9.86
2 -7.60 98.622 -7.60 98.622 -1.40 197.31 -138.12
3 -7.20 98.755 -9.00 98.692 0.00 197.55 0.00 101.000
4 -5.60 98.721 -9.00 98.854 1.50 197.75 148.31
5 -4.20 98.825 -7.50 98.894 0.00 197.55 0.00
100.000
6 -2.80 98.887 -7.50 98.655 7.50 98.66 369.96
8 -1.40 98.922
10 0.00 98.975 99.000
12 0.00 99.518
14 1.40 99.508
98.000
16 1.40 99.280 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+950.00

Luasan L1 (M2) 0.33

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+975.00 40+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -11.10 98.718 -7.50 98.71 -370.14
2 -7.40 98.705 -7.50 98.705 0.00 197.41 0.00
3 -7.00 98.762 -7.50 98.705 -1.50 197.42 -148.06 101.000
4 -5.60 98.761 -9.00 98.711 0.00 197.58 0.00
5 -4.20 98.802 -9.00 98.868 1.50 197.77 148.33
100.000
6 -2.80 98.825 -7.50 98.902 0.00 197.61 0.00
8 -1.40 98.870 -7.50 98.705 7.50 98.71 370.14
10 0.00 98.930 99.000
12 0.00 99.558
14 1.40 99.518
98.000
16 1.40 99.268 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+975.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+000.00 41+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.69 -370.10
102.000
1 -11.40 98.759 -7.50 98.692 0.00 197.59 0.00
2 -7.40 98.690 -7.50 98.897 -1.50 197.77 -148.32
3 -7.00 98.731 -9.00 98.869 0.00 197.59 0.00 101.000
4 -5.60 98.730 -9.00 98.718 1.50 197.41 148.06
5 -4.20 98.789 -7.50 98.692 7.50 98.69 370.10
100.000
6 -2.80 98.812 0.00 0.00 0.00
8 -1.40 98.832
10 0.00 98.880 99.000
12 0.00 99.502
14 1.40 99.518
98.000
16 1.40 99.230 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+000.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+025.00 41+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.70 -370.12
102.000
1 -13.50 98.708 -7.50 98.698 0.00 197.57 0.00
2 -7.50 98.698 -7.50 98.870 -1.50 197.72 -148.29
3 -7.30 98.723 -9.00 98.847 0.00 197.55 0.00 101.000
4 -6.00 98.733 -9.00 98.700 1.50 197.40 148.05
5 -4.50 98.773 -7.50 98.698 7.50 98.70 370.12
100.000
6 -3.00 98.778
8 -1.50 98.803
10 0.00 98.878 99.000
12 0.00 99.405
14 1.40 99.416
98.000
16 1.40 99.098 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+025.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+050.00 41+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.70 -370.11
102.000
1 -12.50 98.660 -7.50 98.697 0.00 197.53 0.00
2 -7.60 98.697 -7.50 98.836 -1.50 197.64 -148.23
3 -7.00 98.698 -9.00 98.804 0.00 197.49 0.00 101.000
4 -5.60 98.696 -9.00 98.686 1.50 197.38 148.04
5 -4.20 98.739 -7.50 98.697 7.50 98.70 370.11
100.000
6 -2.80 98.777
8 -1.40 98.813
10 0.00 98.853 99.000
12 0.00 99.036
14 1.40 99.059
98.000
16 1.40 98.908 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+050.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+075.00 41+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.84 -370.64
102.000
1 -12.70 98.749 -7.50 98.837 0.00 197.47 0.00
2 -7.60 98.633 -7.50 98.635 -0.10 197.27 -9.86
3 -7.00 98.648 -7.60 98.633 -1.40 197.30 -138.11 101.000
4 -5.60 98.677 -9.00 98.665 0.00 197.49 0.00
5 -4.20 98.708 -9.00 98.827 1.50 197.66 148.25
100.000
6 -2.80 98.727 -7.50 98.837 7.50 98.84 370.64
8 -1.40 98.737
10 0.00 98.753 99.000
12 0.00 98.959
14 1.40 98.998
98.000
16 1.40 98.807 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+075.00

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+100.00 41+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.87 -370.77
102.000
1 -12.20 98.827 -7.50 98.872 0.00 197.62 0.00
2 -7.30 98.743 -7.50 98.746 0.00 197.49 0.00
3 -7.00 98.720 -7.50 98.746 -1.50 197.52 -148.14 101.000
4 -5.60 98.730 -9.00 98.772 0.00 197.62 0.00
5 -4.20 98.757 -9.00 98.845 1.50 197.72 148.29
100.000
6 -2.80 98.777 -7.50 98.872 7.50 98.87 370.77
8 -1.40 98.783
10 0.00 98.806 99.000
12 0.00 99.033
14 1.40 99.097
98.000
16 1.40 98.899 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+100.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+125.00 41+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.02 -371.33
100.000
1 -10.40 98.779 -7.50 99.020 0.00 197.91 0.00
2 -7.40 98.893 -7.50 98.889 0.00 197.78 0.00
3 -7.00 98.860 -7.50 98.889 -1.50 197.72 -148.29
4 -5.60 98.883 -9.00 98.832 0.00 197.79 0.00
5 -4.20 98.943 -9.00 98.960 1.50 197.98 148.49
99.000
6 -2.80 98.993 -7.50 99.020 7.50 99.02 371.33
8 -1.40 99.046
10 0.00 99.088
12 0.00 99.320
14 1.40 99.319
98.000
16 1.40 99.119 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+125.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+150.00 41+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
100.000
1 -9.00 98.939 0.00 0.00 0.00
2 -6.90 98.947 0.00 0.00 0.00
3 -5.60 98.968 0.00 0.00 0.00
4 -4.20 99.012 0.00 0.00 0.00
5 -2.80 99.036 0.00 0.00 0.00
99.000
6 -1.40 99.088 0.00 0.00 0.00
8 0.00 99.146
10 0.00 99.350
12 1.40 99.306
14 1.40 99.139
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+150.00

Luasan (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+475.00 40+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.84 -370.63
102.000
1 -12.00 98.747 -7.50 98.835 0.00 197.84 0.00
2 -9.10 98.760 -7.50 99.002 -1.50 197.95 -148.46
3 -8.90 98.783 -9.00 98.944 0.00 197.72 0.00 101.000
4 -7.70 98.832 -9.00 98.772 0.10 197.56 9.88
5 -6.00 98.858 -8.90 98.783 1.20 197.62 118.57
100.000
6 -4.50 98.910 -7.70 98.832 0.20 197.67 19.77
8 -3.00 98.940 -7.50 98.835 7.50 98.84 370.63
10 -1.50 98.990 99.000
12 0.00 99.053
14 0.00 99.489
98.000
16 1.40 99.507 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.286

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+475.00

Luasan (M2) 0.25


]

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+450.00 40+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.95 -371.07
102.000
1 -10.70 98.867 -7.50 98.952 0.00 198.04 0.00
2 -9.10 98.836 -7.50 99.092 -1.50 198.04 -148.83
3 -8.90 98.878 -9.00 98.950 0.00 197.81 0.00 101.000
4 -7.70 98.947 -9.00 98.856 0.10 197.73 10.18
5 -6.00 98.989 -8.90 98.878 1.20 197.83 118.70
100.000
6 -4.50 99.083 -7.70 98.947 0.20 197.90 19.79
8 -3.00 99.158 -7.50 98.952 7.50 98.95 371.07
10 -1.50 99.240 99.000
12 0.00 99.310
14 0.00 99.730
98.000
16 1.40 99.643 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.453

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+450.00

Luasan (M2) 0.16

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+425.00 40+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.87 -370.77
102.000
1 -11.00 98.773 -7.50 98.873 0.00 197.90 0.00
2 -9.00 98.768 -7.50 99.027 -1.50 197.95 -148.46
3 -8.80 98.788 -9.00 98.918 0.00 197.69 0.00 101.000
4 -7.50 98.873 -9.00 98.768 0.20 197.56 19.76
5 -6.00 98.920 -8.80 98.788 1.30 197.66 128.48
100.000
6 -4.50 99.003 -7.50 98.873 7.50 98.87 370.77
8 -3.00 99.103
10 -1.50 99.180 99.000
12 0.00 99.263
14 0.00 99.706
98.000
16 1.40 99.688 -20 -15 -10 -5 0 5 10 15 20
18 1.40 99.456

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+425.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+400.00 40+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.96 -371.09
102.000
1 -10.50 98.918 -7.50 98.956 0.00 198.03 0.00
2 -7.90 98.938 -7.50 99.074 -1.50 198.05 -148.54
3 -7.50 98.956 -9.00 98.980 0.00 197.91 0.00 101.000
4 -5.70 99.008 -9.00 98.930 1.10 197.87 108.83
5 -3.80 99.053 -7.90 98.938 0.40 197.89 39.58
100.000
6 -1.90 99.110 -7.50 98.956 7.50 98.96 371.09
8 0.00 99.168
10 0.00 99.656 99.000
12 1.40 99.627
14 1.40 99.406
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+400.00

Luasan (M2) 0.13

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+375.00 40+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.97 -371.13
102.000
1 -12.30 98.788 -7.50 98.969 0.00 197.78 0.00
2 -9.10 98.668 -7.50 98.815 -1.40 197.56 -138.29
3 -8.90 98.748 -8.90 98.748 -0.10 197.46 -9.87 101.000
4 -7.50 98.815 -9.00 98.708 0.00 197.67 0.00
5 -6.00 98.848 -9.00 98.964 1.50 197.95 148.46
100.000
6 -4.50 98.889 -7.50 98.982 7.50 98.98 371.18
7 -3.00 98.967
8 -1.50 99.018 99.000
9 0.00 99.058
10 0.00 99.507
98.000
11 1.40 99.519 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.277

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+375.00

Luasan (M2) 0.34

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+350.00 40+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.82 -444.67
102.000
1 -12.60 98.663 -9.00 98.816 0.00 197.47 0.00
2 -9.20 98.526 -9.00 98.653 1.50 197.33 148.00
3 -9.00 98.653 -7.50 98.680 0.00 197.53 0.00 101.000
4 -7.50 98.680 -7.50 98.854 -1.50 197.63 -148.22
5 -6.00 98.690 -9.00 98.776 9.00 98.78 444.49
100.000
6 -4.50 98.723
7 -3.00 98.789
8 -1.50 98.877 99.000
9 0.00 98.956
10 0.00 99.377
98.000
11 1.40 99.377 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.128

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+350.00

Luasan (M2) 0.40

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+325.00 40+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.61 -369.79
102.000
1 -11.60 98.559 -7.50 98.610 0.00 197.40 0.00
2 -9.50 98.546 -7.50 98.788 -1.50 197.55 -148.16
3 -9.20 98.578 -9.00 98.758 0.00 197.38 0.00 101.000
4 -9.00 98.617 -9.00 98.617 1.40 197.23 138.06
5 -7.60 98.608 -7.60 98.608 0.10 197.22 9.86
100.000
6 -6.00 98.633 -7.50 98.610 7.50 98.61 369.79
7 -4.50 98.690
8 -3.00 98.738 99.000
9 -1.50 98.803
10 0.00 98.856
98.000
11 0.00 99.340 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.357

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+325.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+300.00 40+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.62 -369.81
102.000
1 -11.60 98.511 -7.50 98.617 0.00 197.45 0.00
2 -9.20 98.523 -7.50 98.834 -1.50 197.55 -148.16
3 -9.00 98.569 -9.00 98.718 0.00 197.29 0.00 101.000
4 -7.60 98.616 -9.00 98.569 1.40 197.19 138.03
5 -6.00 98.639 -7.60 98.616 0.10 197.23 9.86
100.000
6 -4.50 98.699 -7.50 98.617 7.50 98.62 369.81
7 -3.00 98.764
8 -1.50 98.839 99.000
9 0.00 98.901
10 0.00 99.344
98.000
11 1.40 99.333 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.096

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+300.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+275.00 40+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.71 -370.16
102.000
1 -11.60 98.526 -7.50 98.710 0.00 197.59 0.00
2 -9.20 98.553 -7.50 98.882 -1.50 197.70 -148.27
3 -9.00 98.655 -9.00 98.817 0.00 197.47 0.00 101.000
4 -7.60 98.709 -9.00 98.655 1.40 197.36 138.15
5 -6.00 98.727 -7.60 98.709 0.10 197.42 9.87
100.000
6 -4.50 98.756 -7.50 98.710 7.50 98.71 370.16
7 -3.00 98.824
8 -1.50 98.864 99.000
9 0.00 98.899
10 0.00 99.345
98.000
11 1.40 99.342 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.093

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+275.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+250.00 40+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.83 -370.63
102.000
1 -11.90 98.719 -7.50 98.834 0.00 197.81 0.00
2 -9.20 98.754 -7.50 98.972 -1.50 197.88 -148.41
3 -9.00 98.814 -9.00 98.912 0.00 197.73 0.00 101.000
4 -7.60 98.834 -9.00 98.814 1.40 197.65 138.35
5 -6.00 98.826 -7.60 98.834 0.10 197.67 9.88
100.000
6 -4.50 98.856 -7.50 98.834 7.50 98.83 370.63
7 -3.00 98.876
8 -1.50 98.921 99.000
9 0.00 98.971
10 0.00 99.393
98.000
11 1.40 99.335 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.094

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+250.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+225.00 40+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.99 -371.21
102.000
1 -13.31 98.555 -7.50 98.989 0.00 197.82 0.00
2 -12.31 98.555 -7.50 98.834 -0.10 197.67 -9.88
3 -12.28 98.375 -7.60 98.834 -1.40 197.64 -138.35 101.000
4 -11.95 98.375 -9.00 98.806 0.00 197.75 0.00
5 -11.90 98.734 -9.00 98.942 1.50 197.93 148.45
100.000
6 -9.20 98.774 -7.50 98.989 7.50 98.99 371.21
7 -9.00 98.806
8 -7.60 98.834 99.000
9 -6.00 98.832
10 -4.50 98.856
98.000
11 -3.00 98.875 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 98.907
13 0.00 98.954
14 0.00 99.406 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.362
16 1.40 99.084

40+225.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+200.00 40+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.95 -371.05
102.000
1 -14.21 98.543 -7.50 98.946 0.00 197.69 0.00
2 -13.21 98.543 -7.50 98.742 -0.10 197.48 -9.87
3 -13.18 98.363 -7.60 98.742 -1.30 197.47 -128.35 101.000
4 -12.85 98.363 -8.90 98.727 -0.10 197.44 -9.87
5 -12.80 98.722 -9.00 98.714 0.00 197.60 0.00
100.000
6 -9.10 98.702 -9.00 98.886 1.50 197.83 148.37
7 -8.90 98.727 -7.50 98.946 7.50 98.95 371.05
8 -7.60 98.742 99.000
9 -6.00 98.744
10 -4.50 98.784
98.000
11 -3.00 98.806 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 98.842
13 0.00 98.884
14 0.00 99.375 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.373
16 1.40 99.132

40+200.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+175.00 40+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.75 -370.29
100.000
1 -14.03 98.164 -7.50 98.745 0.00 197.68 0.00
2 -13.03 98.164 -7.50 98.930 -1.50 197.78 -148.33
3 -12.99 97.664 -9.00 98.846 0.00 197.51 0.00
4 -12.49 97.664 -9.00 98.667 0.10 197.37 9.87 99.000
5 -12.40 98.664 -8.90 98.705 1.30 197.45 128.34
6 -9.10 98.629 -7.60 98.744 0.10 197.49 9.87
7 -8.90 98.705 -7.50 98.745 7.50 98.75 370.29 98.000
8 -7.60 98.744
9 -6.00 98.754
10 -4.50 98.786
97.000
11 -3.00 98.834 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 98.856
13 0.00 98.896
14 0.00 99.373 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.345
16 1.40 99.094

40+175.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+150.00 40+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.68 -444.08
100.000
1 -13.63 98.224 -9.00 98.684 0.00 197.57 0.00
2 -12.63 98.224 -9.00 98.886 1.50 197.77 148.33
3 -12.59 97.724 -7.50 98.886 0.00 197.62 0.00
4 -12.09 97.724 -7.50 98.734 -0.10 197.47 -9.87 99.000
5 -12.00 98.724 -7.60 98.732 -1.40 197.42 -138.19
6 -9.20 98.619 -9.00 98.684 9.00 98.68 444.08
7 -9.00 98.684 98.000
8 -7.60 98.732
9 -6.00 98.766
10 -4.50 98.816
97.000
11 -3.00 98.849 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 98.864
13 0.00 98.891
14 0.00 99.385 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.362
16 1.40 99.135

40+150.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+125.00 40+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.78 -370.44
100.000
1 -13.41 98.454 -7.50 98.784 0.00 197.73 0.00
2 -12.41 98.454 -7.50 98.946 -1.50 197.82 -148.37
3 -12.38 98.274 -9.00 98.877 0.00 197.60 0.00
4 -12.05 98.274 -9.00 98.719 1.40 197.50 138.25 99.000
5 -12.00 98.633 -7.60 98.784 0.10 197.57 9.88
6 -9.20 98.684 -7.50 98.784 7.50 98.78 370.44
7 -9.00 98.719 98.000
8 -7.60 98.784
9 -6.00 98.788
10 -4.50 98.864
97.000
11 -3.00 98.936 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.004
13 0.00 99.084
14 0.00 99.544 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.446
16 1.40 99.193

40+125.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+175.00 41+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.98 -445.40
100.000
1 -11.30 98.913 -9.00 98.977 1.50 198.03 148.52
2 -7.50 98.883 -7.50 99.052 0.00 197.94 0.00
3 -7.10 98.856 -7.50 98.883 -1.50 197.78 -148.33
4 -5.60 98.887 -9.00 98.895 0.00 197.87 0.00
5 -4.20 98.947 -9.00 98.977 9.00 98.98 445.40
99.000
6 -2.80 98.987 0.00 0.00 0.00
7 -1.40 99.010
8 0.00 99.127
9 0.00 99.279
10 1.40 99.297
98.000
11 1.40 99.119 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+175.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+200.00 41+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.92 -370.95
100.000
1 -11.30 98.716 -7.50 98.919 0.00 197.67 0.00
2 -9.00 98.728 -7.50 98.747 -1.50 197.48 -148.11
3 -7.40 98.748 -9.00 98.728 0.00 197.58 0.00
4 -7.10 98.768 -9.00 98.851 1.50 197.77 148.33
5 -5.60 98.778 -7.50 98.919 7.50 98.92 370.95
99.000
6 -4.20 98.807 0.00 0.00 0.00
7 -2.80 98.833
8 -1.40 98.866
9 0.00 98.928
10 0.00 99.129
98.000
11 1.40 99.107 -20 -15 -10 -5 0 5 10 15 20
12 1.40 98.949

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+200.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+225.00 41+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.86 -370.74
100.000
1 -10.10 98.710 -7.50 98.863 0.00 197.53 0.00
2 -7.40 98.663 -7.50 98.665 -1.50 197.36 -148.02
3 -7.10 98.671 -9.00 98.691 0.00 197.48 0.00
4 -5.60 98.706 -9.00 98.791 1.50 197.65 148.24
5 -4.20 98.771 -7.50 98.863 7.50 98.86 370.74
99.000
6 -2.80 98.803 0.00 0.00 0.00
7 -1.40 98.852
8 0.00 98.900
9 0.00 99.112
10 1.40 99.113
98.000
11 1.40 98.903 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+225.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+250.00 41+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 98.89 -444.99
100.000
1 -11.00 98.781 -9.00 98.887 0.00 197.68 0.00
2 -7.60 98.806 -9.00 98.796 1.50 197.60 148.20
3 -7.30 98.799 -7.50 98.804 0.00 197.76 0.00
4 -6.00 98.813 -7.50 98.955 -1.50 197.84 -148.38
5 -4.50 98.856 -9.00 98.887 0.00 197.68 0.00
99.000
6 -3.00 98.901 -9.00 98.796 0.00 197.68 0.00
7 -1.50 98.949 -9.00 98.887 9.00 98.89 444.99
8 0.00 98.981
9 0.00 99.159
10 1.40 99.182
98.000
11 1.40 98.969 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+250.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+275.00 41+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.09 -371.57
100.000
1 -10.10 98.872 -7.50 99.086 0.00 197.92 0.00
2 -7.60 98.846 -7.50 98.837 -0.10 197.68 -9.88
3 -7.30 98.820 -7.60 98.846 -1.40 197.71 -138.39
4 -6.00 98.896 -9.00 98.861 0.00 197.89 0.00
5 -4.50 98.943 -9.00 99.026 1.50 198.11 148.58
99.000
6 -3.00 99.002 -7.50 99.086 7.50 99.09 371.57
7 -1.50 99.032
8 0.00 99.073
9 0.00 99.398
10 1.40 99.431
98.000
11 1.40 99.150 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+275.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+300.00 41+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.19 -371.96
100.000
1 -10.40 98.932 -7.50 99.188 0.00 198.15 0.00
2 -8.40 98.932 -7.50 98.957 -0.90 197.89 -89.05
3 -7.40 98.960 -8.40 98.932 -0.60 197.86 -59.36
4 -7.10 99.022 -9.00 98.932 0.00 198.06 0.00
5 -5.60 99.060 -9.00 99.128 1.50 198.32 148.74
99.000
6 -4.20 99.085 -7.50 99.188 7.50 99.19 371.96
7 -2.80 99.122
8 -1.40 99.160
9 0.00 99.193
10 0.00 99.503
98.000
11 1.40 99.529 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.251

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+300.00

Luasan (M2) 0.33

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+325.00 41+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.07 -445.81
100.000
1 -14.20 98.871 -9.00 99.068 1.50 198.20 148.65
2 -11.80 99.214 -7.50 99.136 0.00 198.01 0.00
3 -9.80 99.230 -7.50 98.872 -0.30 197.74 -29.66
4 -7.80 98.871 -7.80 98.871 -0.45 197.82 -44.11
5 -5.80 98.876 -8.25 98.952 -0.75 197.87 -74.60
99.000
6 -5.50 98.951 -9.00 98.918 0.00 197.99 0.00
7 -4.20 98.966 -9.00 99.068 9.00 99.07 445.81
8 -2.80 99.049
9 -1.40 99.094
10 0.00 99.129
98.000
11 1.40 99.260 -20 -15 -10 -5 0 5 10 15 20
12 1.40 99.206
13 1.40 99.216
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+325.00

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+350.00 41+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.14 -446.12
1 -10.30 98.922 -9.00 99.138 1.50 198.34 148.75 100.000
2 -7.30 98.992 -7.50 99.198 0.00 198.19 0.00
3 -7.00 99.021 -7.50 98.987 -1.25 197.95 -123.72
4 -5.60 99.050 -8.75 98.958 -0.25 197.91 -24.74
5 -4.20 99.101 -9.00 98.952 0.00 198.09 0.00
6 -2.80 99.139 -9.00 99.138 9.00 99.14 446.12 99.000
7 -1.40 99.151
8 0.00 99.181
9 0.00 99.402
10 1.40 99.422
98.000
11 1.40 99.224
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+350.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+375.00 41+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.41 -372.69
1 -9.00 99.285 -7.50 99.411 0.00 198.65 0.00 100.000
2 -7.50 99.243 -7.50 99.243 -1.00 198.51 -99.46
3 -7.10 99.272 -8.50 99.271 -0.50 198.56 -50.04
4 -5.60 99.280 -9.00 99.285 0.00 198.64 0.00
5 -4.20 99.291 -9.00 99.351 1.51 198.76 149.67
6 -2.80 99.273 -7.50 99.411 7.50 99.41 372.69 99.000
7 -1.40 99.255
8 0.00 99.276
9 0.00 99.482
10 1.40 99.453
98.000
11 1.40 99.234
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+375.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+400.00 41+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.67 -373.64
1 -10.50 99.463 -7.50 99.665 0.00 199.10 0.00 100.000
2 -7.50 99.433 -7.50 99.433 0.00 198.87 -0.20
3 -7.10 99.460 -7.50 99.433 -1.50 198.88 -149.16
4 -5.60 99.443 -9.00 99.448 0.00 199.08 0.20
5 -4.20 99.422 -9.00 99.632 1.50 199.30 149.47
6 -2.80 99.360 -7.50 99.665 7.50 99.67 373.64 99.000
7 -1.40 99.309
8 0.00 99.299
9 0.00 99.513
10 1.40 99.503
98.000
11 1.40 99.251
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+400.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+425.00 41+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.75 -374.07
1 -12.00 99.499 -7.50 99.752 0.00 199.34 0.00 100.000
2 -7.80 99.571 -7.50 99.586 -0.30 199.16 -30.07
3 -7.40 99.591 -7.80 99.571 -1.20 199.12 -119.27
4 -6.00 99.552 -9.00 99.550 0.00 199.24 0.00
5 -4.50 99.516 -9.00 99.692 1.50 199.44 149.58
6 -3.00 99.511 -7.50 99.752 7.50 99.75 374.07 99.000
7 -1.50 99.439
8 0.00 99.361
9 0.00 99.319
10 1.40 99.632
98.000
11 1.40 99.281
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+425.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+450.00 41+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.77 -448.96
1 -10.30 99.562 -9.00 99.768 1.50 199.60 149.70 100.000
2 -7.50 99.631 -7.50 99.828 0.00 199.46 0.00
3 -7.20 99.669 -7.50 99.631 -1.50 199.23 -149.42
4 -5.60 99.648 -9.00 99.594 0.00 199.36 0.00
5 -4.20 99.611 -9.00 99.768 9.00 99.77 448.96
6 -2.80 99.548 0.00 0.00 0.00 99.000
7 -1.40 99.471
8 0.00 99.481
9 0.00 99.711
10 1.40 99.682
98.000
11 1.40 99.379
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+450.00

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+475.00 41+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.86 -449.39
1 -10.20 99.689 -9.00 99.864 0.00 199.56 0.00 100.000
2 -7.50 99.698 -9.00 99.693 1.50 199.39 149.54
3 -7.20 99.753 -7.50 99.698 0.00 199.62 0.00
4 -5.60 99.729 -7.50 99.924 -1.50 199.79 -149.84
5 -4.20 99.694 -9.00 99.864 0.00 199.56 0.00
6 -2.80 99.616 -9.00 99.693 0.00 199.56 0.00 99.000
7 -1.40 99.551 -9.00 99.864 9.00 99.86 449.39
8 0.00 99.526 0.00 0.00 0.00
9 0.00 99.752
10 1.40 99.736
98.000
11 1.40 99.452
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+475.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+500.00 41+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.96 -374.84
1 -10.40 99.869 -7.50 99.957 0.00 199.77 0.00 102.000
2 -7.40 99.813 -7.50 99.815 -1.50 199.66 -149.74
3 -7.10 99.791 -9.00 99.843 0.00 199.74 0.00 101.000
4 -5.60 99.759 -9.00 99.897 1.50 199.85 149.89
5 -4.20 99.729 -7.50 99.957 7.50 99.96 374.84
6 -2.80 99.659 0.00 0.00 0.00 100.000
7 -1.40 99.606
8 0.00 99.596 99.000
9 0.00 99.843
10 1.40 99.770
98.000
11 1.40 99.470
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+500.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+525.00 41+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.81 -374.27
1 -10.00 99.660 -7.50 99.806 0.00 199.41 0.00 102.000
2 -7.30 99.600 -7.50 99.604 -1.50 199.24 -149.43
3 -7.00 99.630 -9.00 99.638 0.00 199.38 0.00 101.000
4 -5.60 99.609 -9.00 99.746 1.50 199.55 149.66
5 -4.20 99.578 -7.50 99.806 7.50 99.81 374.27
6 -2.80 99.541 0.00 0.00 0.00 100.000
7 -1.40 99.492
8 0.00 99.480 99.000
9 0.00 99.753
10 1.40 99.692
98.000
11 1.40 99.442
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+525.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+550.00 41+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.49 -373.10
1 -10.00 99.330 -7.50 99.492 0.00 198.82 0.00 102.000
2 -7.30 99.323 -7.50 99.324 -1.50 198.65 -148.99
3 -7.00 99.339 -9.00 99.327 0.00 198.76 0.00 101.000
4 -5.60 99.313 -9.00 99.432 1.50 198.92 149.19
5 -4.20 99.320 -7.50 99.492 7.50 99.49 373.10
6 -2.80 99.312 0.00 0.00 0.00 100.000
7 -1.40 99.350
8 0.00 99.401 99.000
9 0.00 99.630
10 1.40 99.560
98.000
11 1.40 99.373
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+550.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+575.00 41+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.28 -446.77
1 -10.00 99.269 -9.00 99.282 0.00 198.51 0.00 102.000
2 -7.30 99.161 -9.00 99.229 1.50 198.40 148.80
3 -7.00 99.187 -7.50 99.169 0.00 198.51 0.00 101.000
4 -5.60 99.189 -7.50 99.342 -1.50 198.62 -148.97
5 -4.20 99.222 -9.00 99.282 9.00 99.28 446.77
6 -2.80 99.253 0.00 0.00 0.00 100.000
7 -1.40 99.271
8 0.00 99.311 99.000
9 0.00 99.516
10 1.40 99.545
98.000
11 1.40 99.310
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+575.00

Luasan (M2) 0.17

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+650.00 41+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.39 -372.72
1 -10.60 99.031 -7.50 99.392 0.00 198.51 0.00 102.000
2 -7.40 99.124 -7.50 99.121 -1.50 198.20 -148.65
3 -7.10 99.220 -9.00 99.078 0.00 198.41 0.00 101.000
4 -5.60 99.211 -9.00 99.332 1.50 198.72 149.04
5 -4.20 99.247 -7.50 99.392 7.50 99.39 372.72
6 -2.80 99.264 0.00 0.00 0.00 100.000
7 -1.40 99.306
8 0.00 99.359 99.000
9 0.00 99.631
10 1.40 99.636
98.000
11 1.40 99.352
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+650.00

Luasan (M2) 0.39

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+675.00 41+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.37 -372.63
1 -10.40 99.152 -7.50 99.369 0.00 198.52 0.00 102.000
2 -7.50 99.153 -7.50 99.153 -1.50 198.31 -148.73
3 -7.30 99.220 -9.00 99.153 0.00 198.46 0.00 101.000
4 -6.00 99.241 -9.00 99.309 1.50 198.68 149.01
5 -4.50 99.290 -7.50 99.369 7.50 99.37 372.63
6 -3.00 99.333 0.00 0.00 0.00 100.000
7 -1.50 99.369
8 0.00 99.412 99.000
9 0.00 99.679
10 1.40 99.670
98.000
11 1.40 99.411
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+675.00

Luasan (M2) 0.28

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+700.00 41+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.28 -446.77
1 -10.30 99.164 -9.00 99.282 0.00 198.45 0.00 102.000
2 -7.30 99.170 -9.00 99.167 1.50 198.34 148.75
3 -7.10 99.214 -7.50 99.170 0.00 198.51 0.00 101.000
4 -5.60 99.231 -7.50 99.342 -1.50 198.62 -148.97
5 -4.20 99.263 -9.00 99.282 9.00 99.28 446.77
6 -2.80 99.314 0.00 0.00 0.00 100.000
7 -1.40 99.363
8 0.00 99.421 99.000
9 0.00 99.690
10 1.40 99.699
98.000
11 1.40 99.394
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+700.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+725.00 41+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.36 -372.59
1 -10.50 99.142 -7.50 99.357 0.00 198.51 0.00 102.000
2 -7.50 99.151 -7.50 99.151 -1.50 198.30 -148.72
3 -7.30 99.194 -9.00 99.147 0.00 198.44 0.00 101.000
4 -6.00 99.193 -9.00 99.297 1.50 198.65 148.99
5 -4.50 99.217 -7.50 99.357 7.50 99.36 372.59
6 -3.00 99.230 0.00 0.00 0.00 100.000
7 -1.50 99.244
8 0.00 99.290 99.000
9 0.00 99.569
10 1.40 99.570
98.000
11 1.40 99.279
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+725.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+750.00 41+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.24 -372.16
1 -9.90 99.090 -7.50 99.243 0.00 198.31 0.00 102.000
2 -7.40 99.061 -7.50 99.062 -1.50 198.14 -148.61
3 -7.20 99.084 -9.00 99.080 0.00 198.26 0.00 101.000
4 -5.60 99.102 -9.00 99.183 1.50 198.43 148.82
5 -4.20 99.122 -7.50 99.243 7.50 99.24 372.16
6 -2.80 99.154 0.00 0.00 0.00 100.000
7 -1.40 99.191
8 0.00 99.232 99.000
9 0.00 99.527
10 1.40 99.520
98.000
11 1.40 99.264
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+750.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+775.00 41+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.02 -371.33
1 -9.90 98.922 -7.50 99.020 0.00 198.18 0.00 102.000
2 -7.40 99.024 -7.50 99.163 -1.50 198.27 -148.70
3 -7.20 99.152 -9.00 99.103 0.00 198.06 0.00 101.000
4 -5.40 98.979 -9.00 98.959 1.50 197.98 148.48
5 -3.60 99.067 -7.50 99.020 7.50 99.02 371.33
6 -1.80 99.099 0.00 0.00 0.00 100.000
7 0.00 99.183
8 0.00 99.212 99.000
9 1.40 99.222
10 1.40 99.244
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+775.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+800.00 41+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.10 -445.96
1 -9.80 99.001 -9.00 99.102 1.50 198.26 148.70 102.000
2 -7.40 98.979 -7.50 99.162 0.00 198.14 0.00
3 -7.20 99.032 -7.50 98.980 -1.50 197.97 -148.48 101.000
4 -5.60 99.040 -9.00 98.994 0.00 198.10 0.00
5 -4.20 99.102 -9.00 99.102 9.00 99.10 445.96
6 -2.80 99.162 0.00 0.00 0.00 100.000
7 -1.40 99.202
8 0.00 99.252 99.000
9 0.00 99.512
10 1.40 99.511
98.000
1.40 99.269
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+800.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+625.00 41+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.23 -446.41
1 -10.65 99.047 -9.00 99.225 1.50 198.51 148.68 102.000
2 -7.35 99.127 -7.50 99.284 0.00 198.41 0.00
3 -7.10 99.144 -7.50 99.123 -1.50 198.21 -148.46 101.000
4 -5.60 99.154 -9.00 99.087 0.00 198.31 0.00
5 -4.20 99.202 -9.00 99.225 9.00 99.23 446.41
6 -2.80 99.233 0.00 0.00 0.00 100.000
7 -1.40 99.277
8 0.00 99.310 99.000
9 0.00 99.530
10 1.40 99.541
98.000
11 1.40 99.303
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+625.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+600.00 41+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.29 -372.34
1 -10.80 99.251 -7.50 99.290 0.00 198.39 0.00 102.000
2 -7.30 99.091 -7.50 99.100 -1.50 198.27 -148.70
3 -7.00 99.131 -9.00 99.169 0.00 198.40 0.00 101.000
4 -5.60 99.120 -9.00 99.230 1.50 198.52 148.89
5 -4.20 99.162 -7.50 99.290 7.50 99.29 372.34
6 -2.80 99.186 0.00 0.00 0.00 100.000
7 -1.40 99.219
8 0.00 99.263 99.000
9 0.00 99.461
10 1.40 99.469
98.000
11 1.40 99.272
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+600.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+113.00 40+113.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.26 -446.67
100.000
1 -13.41 98.934 -9.00 99.260 0.00 198.36 0.00
2 -12.41 98.934 -9.00 99.103 0.10 198.16 9.91
3 -12.38 98.754 -8.90 99.053 1.30 198.21 128.83
4 -12.05 98.754 -7.60 99.152 0.10 198.30 9.92 99.000
5 -12.00 99.113 -7.50 99.152 0.00 198.47 0.00
6 -9.10 99.152 -7.50 99.320 -1.50 198.58 -148.94
7 -8.90 99.053 -9.00 99.260 0.00 198.36 0.00 98.000
8 -7.60 99.152 -9.00 99.103 9.00 99.10 445.96
9 -6.00 99.148 0.00 0.00 0.00
10 -4.50 99.228
97.000
11 -3.00 99.283 -20 -15 -10 -5 0 5 10 15 20
12 -1.50 99.315
13 0.00 99.368
14 0.00 99.614 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.578
16 1.40 99.268

40+113.00

Luasan (M2) 0.99

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+450.00 35+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.66 381.24
103.000
1 -1.35 101.435 7.50 101.663 1.50 203.27 152.15
2 0.00 101.485 9.00 101.604 0.00 203.17 0.00
3 0.00 101.230 9.00 101.561 -1.50 203.06 -151.99
4 1.50 101.297 7.50 101.503 0.00 203.17 0.00 102.000
5 3.80 101.366 7.50 101.663 -7.50 101.66 -381.24
6 5.50 101.450 0.00 0.00 0.00
7 7.50 101.503 101.000
8 9.50 101.580
9 10.50 101.670

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+450.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+475.00 35+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.38 380.19
102.000
1 -1.35 101.345 7.50 101.383 1.50 202.71 151.73
2 0.00 101.395 9.00 101.323 0.00 202.54 0.00
3 0.00 101.150 9.00 101.215 -1.50 202.44 -151.52
4 2.00 101.156 7.50 101.223 0.00 202.61 0.00
5 3.70 101.162 7.50 101.383 -7.50 101.38 -380.19
101.000
6 5.00 101.196 0.00 0.00 0.00
7 7.50 101.223
8 9.50 101.212
9 10.50 101.416

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+475.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+500.00 35+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.14 379.16
102.000
1 -1.35 101.327 7.50 101.136 1.50 202.21 151.36
2 0.00 101.287 9.00 101.076 0.00 201.98 0.00
101.000
3 0.00 101.047 9.00 100.900 -0.09 201.80 -9.59
4 1.80 100.997 8.90 100.900 -1.40 201.89 -141.53
100.000
5 5.50 100.978 7.50 100.991 0.00 202.13 0.00
6 7.40 100.997 7.50 101.136 -7.50 101.14 -379.16
99.000
7 8.90 100.900 0.00 0.00 0.00
8 11.40 100.907
98.000
9 12.00 101.060

97.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+500.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+525.00 35+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.08 379.06
102.000
1 -1.35 101.291 7.50 101.082 1.50 202.10 151.58
2 0.00 101.323 9.00 101.022 0.00 201.89 0.00
3 0.00 101.068 9.00 100.872 -1.50 201.80 -151.35 101.000
4 1.80 101.024 7.50 100.932 0.00 202.01 0.00
5 3.70 100.992 7.50 101.082 -7.50 101.08 -379.06
100.000
6 5.50 100.966 0.00 0.00 0.00
7 7.40 100.941 0.00 0.00 0.00
8 9.40 100.855 99.000

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+525.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+550.00 35+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.12 379.19
102.000
1 -1.35 101.347 7.50 101.116 1.50 202.17 151.63
2 0.00 101.344 9.00 101.056 0.00 201.96 0.00
3 0.00 101.111 9.00 100.906 -0.70 201.84 -70.64 101.000
4 1.80 101.037 8.30 100.932 -0.80 201.84 -80.73
5 3.60 100.900 7.50 100.904 0.00 202.02 0.00
100.000
6 5.50 100.917 7.50 101.116 -7.50 101.12 -379.19
7 7.30 100.897
8 8.30 100.932 99.000
9 9.80 100.876

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+550.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+575.00 35+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.11 379.17
102.000
1 -1.50 101.318 7.50 101.113 0.00 202.03 0.00
2 0.00 101.347 7.50 100.917 1.30 201.84 131.19
3 0.00 101.100 8.80 100.918 0.20 201.87 20.19 101.000
4 1.80 101.013 9.00 100.956 0.00 202.01 0.00
5 3.60 100.999 9.00 101.053 -1.50 202.17 -151.62
100.000
6 5.50 100.957 7.50 101.113 -7.50 101.11 -379.17
7 7.30 100.917
8 8.80 100.918 99.000
9 9.80 101.107

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+575.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+600.00 35+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.13 379.24
102.000
1 -1.35 101.357 7.50 101.130 1.50 202.20 151.65
2 0.00 101.367 9.00 101.070 0.00 202.00 0.00
3 0.00 101.120 9.00 100.933 -0.20 201.85 -20.18 101.000
4 1.90 101.028 8.80 100.912 -1.30 201.84 -131.19
5 3.70 101.023 7.50 100.925 0.00 202.06 0.00
100.000
6 5.50 100.986 7.50 101.130 -7.50 101.13 -379.24
7 7.30 100.927
8 8.80 100.912 99.000
9 10.30 101.067

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+600.00

Luasan (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+625.00 35+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.05 378.93
102.000
1 -1.35 101.401 7.50 101.049 1.50 202.04 151.23
2 0.00 101.401 9.00 100.989 0.00 201.88 0.00
3 0.00 101.141 9.00 100.895 -1.50 201.79 -151.04 101.000
4 1.80 101.011 7.50 100.891 0.00 201.94 0.00
5 3.70 101.011 7.50 101.049 -7.50 101.05 -378.93
100.000
6 5.50 100.951 0.00 0.00 0.00
7 7.40 100.891
8 9.40 100.896 99.000
9 9.40 100.390

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+625.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+650.00 35+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.07 379.02
102.000
1 -1.35 101.394 7.50 101.072 1.50 202.09 151.26
2 0.00 101.386 9.00 101.013 0.00 201.92 0.00
3 0.00 101.130 9.00 100.902 -1.50 201.81 -151.25 101.000
4 1.80 101.031 7.50 100.905 0.00 201.98 0.20
5 3.50 101.014 7.50 101.072 -7.50 101.07 -379.02
100.000
6 5.30 100.951 0.00 0.00 0.00
7 7.20 100.905
8 9.20 100.902 99.000
9 11.00 101.111

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+650.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+675.00 35+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.16 379.34
102.000
1 -1.35 101.450 7.50 101.158 1.50 202.26 151.69
2 0.00 101.450 9.00 101.098 0.00 202.05 0.00
3 0.00 101.195 9.00 100.953 -1.50 201.94 -151.46 101.000
4 1.80 101.101 7.50 100.989 0.00 202.15 0.00
5 3.70 101.076 7.50 101.158 -7.50 101.16 -379.34
100.000
6 5.50 101.038
7 7.40 100.991
8 9.20 100.948 99.000
9 10.20 101.109

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+675.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+700.00 35+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.34 380.01
102.000
1 -1.35 101.564 7.50 101.336 1.50 202.61 151.96
2 0.00 101.556 9.00 101.276 0.00 202.45 0.00
3 0.00 101.346 9.00 101.178 -1.50 202.31 -151.73 101.000
4 1.90 101.251 7.50 101.135 0.00 202.47 0.00
5 3.70 101.181 7.50 101.336 -7.50 101.34 -380.01
100.000
6 5.50 101.148 0.00 0.00 0.00
7 7.40 101.132
8 9.10 101.181 99.000
9 10.10 101.273

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+700.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+725.00 35+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.26 379.72
102.000
1 -1.35 101.561 7.50 101.258 1.50 202.46 151.84
2 0.00 101.581 9.00 101.198 0.00 202.27 0.00
3 0.00 101.382 9.00 101.076 -1.50 202.17 -151.62 101.000
4 1.90 101.291 7.50 101.089 0.00 202.35 0.00
5 3.70 101.190 7.50 101.258 -7.50 101.26 -379.72
100.000
6 5.50 101.126 0.00 0.00 0.00
8 7.40 101.090
10 9.50 101.072 99.000
12 9.50 101.101
14 11.50 101.180
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+725.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+750.00 35+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.33 379.98
102.000
1 -1.35 101.521 7.50 101.328 1.50 202.60 151.95
2 0.00 101.536 9.00 101.268 0.00 202.37 0.00
3 0.00 101.321 9.00 101.100 -1.50 202.25 -151.69 101.000
4 1.90 101.270 7.50 101.149 0.00 202.48 0.00
5 3.20 101.211 7.50 101.328 -7.50 101.33 -379.98
100.000
6 5.60 101.191 0.00 0.00 0.00
8 7.40 101.152
10 9.20 101.093 99.000
12 9.20 101.101

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+750.00

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+775.00 35+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.34 380.02
102.000
1 0.00 101.331 7.50 101.338 1.50 202.62 151.96
2 0.00 101.321 9.00 101.278 0.00 202.39 0.00
3 1.90 101.273 9.00 101.108 -1.40 202.21 -141.55 101.000
4 3.80 101.208 7.60 101.106 -0.10 202.21 -10.11
5 5.70 101.191 7.50 101.101 0.00 202.44 0.00
100.000
6 7.50 101.101 7.50 101.338 -7.50 101.34 -380.02
8 7.60 101.106 0.00 0.00 0.00
10 9.60 101.109 99.000
12 11.10 101.069

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+775.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+800.00 35+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.39 380.22
102.000
1 -1.35 101.627 7.50 101.393 1.50 202.73 152.04
2 0.00 101.632 9.00 101.333 0.00 202.38 0.00
3 0.00 101.388 9.00 101.051 -1.20 202.24 -121.35 101.000
4 1.90 101.302 7.80 101.191 0.00 202.38 0.00
5 3.80 101.262 7.80 101.186 -0.30 202.38 -30.36
100.000
6 5.60 101.234 7.50 101.191 0.00 202.58 0.00
8 5.70 101.218 7.50 101.393 -7.50 101.39 -380.22
10 7.80 101.186 99.000
12 7.80 101.191
14 9.30 101.016
98.000
16 9.30 100.902 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+800.00

Luasan (M2) 0.34


]

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana

KM.40+100 L
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+825.00 35+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.33 380.00
102.000
1 -1.30 101.631 7.50 101.332 1.50 202.60 151.95
2 0.00 101.661 9.00 101.272 0.00 202.36 0.00
3 0.00 101.402 9.00 101.092 -1.30 202.20 -131.43 101.000
4 1.90 101.341 7.70 101.110 -0.10 202.28 -10.11
5 3.80 101.297 7.60 101.165 -0.10 202.33 -10.12
100.000
6 5.70 101.232 7.50 101.169 0.00 202.50 0.00
8 7.60 101.165 7.50 101.332 -7.50 101.33 -380.00
10 7.70 101.110 99.000
12 9.70 101.082

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+825.00

Luasan (M2) 0.29

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+850.00 35+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.38 380.17
102.000
1 -1.30 101.631 7.50 101.379 1.50 202.70 152.02
2 0.00 101.631 9.00 101.319 0.00 202.47 0.00
3 0.00 101.361 9.00 101.148 -1.30 202.28 -131.48 101.000
4 1.90 101.321 7.70 101.135 -0.10 202.31 -10.12
5 3.80 101.289 7.60 101.171 -0.10 202.35 -10.12
100.000
6 5.70 101.256 7.50 101.175 0.00 202.55 0.00
8 7.60 101.171 7.50 101.379 -7.50 101.38 -380.17
10 7.70 101.135 0.00 0.00 0.00 99.000
12 9.80 101.156

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+850.00

Luasan (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+875.00 35+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.34 380.01
102.000
1 -1.30 101.582 7.50 101.335 1.50 202.61 151.96
2 0.00 101.657 9.00 101.275 0.00 202.36 0.00
101.000
3 0.00 101.401 9.00 101.082 -1.30 202.16 -131.41
4 1.90 101.290 7.70 101.081 -0.10 202.24 -10.11
100.000
5 3.80 101.281 7.60 101.160 -0.10 202.32 -10.12
6 5.70 101.230 7.50 101.164 0.00 202.50 0.00
99.000
8 7.60 101.160 7.50 101.335 -7.50 101.34 -380.01
10 7.70 101.081 0.00 0.00 0.00
98.000
12 9.70 101.082

97.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+875.00

Luasan (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+900.00 35+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 100.61 377.27
102.000
1 -1.30 99.988 7.50 100.606 1.50 201.15 150.86
2 0.00 100.327 9.00 100.546 0.00 200.94 0.00
3 0.00 100.318 9.00 100.396 -1.30 200.84 -130.55 101.000
4 1.90 100.419 7.70 100.448 0.00 200.90 0.00
5 3.80 100.368 7.70 100.448 -0.20 200.89 -20.09
100.000
6 5.70 100.409 7.50 100.442 0.00 201.05 0.00
8 7.50 100.442 7.50 100.606 -7.50 100.61 -377.27
10 7.70 100.448 0.00 0.00 0.00 99.000
12 9.00 100.396
14 10.90 100.723
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+900.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+925.00 35+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.51 380.66
102.000
1 -1.30 101.675 7.50 101.509 0.00 202.88 0.00
2 0.00 101.742 7.50 101.367 0.10 202.69 10.13
3 0.00 101.498 7.60 101.322 1.40 202.70 141.89
4 1.90 101.411 9.00 101.382 0.00 202.83 0.00
5 3.70 101.413 9.00 101.449 -1.50 202.96 -152.22
101.000
6 5.60 101.364 7.50 101.509 -7.50 101.51 -380.66
8 7.50 101.367 0.00 0.00 0.00
10 7.60 101.322
12 9.30 101.395
14 10.80 101.128
100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+925.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+950.00 35+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.73 381.50
102.000
1 -1.30 101.755 7.50 101.733 1.50 203.41 152.25
2 0.00 101.747 9.00 101.673 0.00 203.27 0.00
3 0.00 101.567 9.00 101.594 -1.50 203.17 -152.07 101.000
4 1.90 101.492 7.50 101.578 0.00 203.31 0.00
5 3.80 101.507 7.50 101.733 -7.50 101.73 -381.50
100.000
6 5.70 101.546
8 7.50 101.578
10 9.30 101.597 99.000

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+950.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+975.00 35+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.87 382.00
103.000
1 -1.30 101.747 7.50 101.867 1.50 203.67 152.45
2 0.00 101.827 9.00 101.807 0.00 203.52 0.00
3 0.00 101.583 9.00 101.709 -1.50 203.41 -152.25
4 1.90 101.532 7.50 101.703 0.00 203.57 0.00 102.000
5 3.80 101.582 7.50 101.867 -7.50 101.87 -382.00
6 5.60 101.627 0.00 0.00 0.00
8 7.50 101.703 101.000
10 9.70 101.712
12 10.70 101.342

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+975.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+000.00 36+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.85 381.93
103.000
1 -1.30 101.802 7.50 101.849 1.50 203.64 152.22
2 0.00 101.867 9.00 101.789 0.00 203.55 0.00
3 0.00 101.639 9.00 101.765 -1.40 203.47 -141.92
4 1.90 101.612 7.60 101.702 -0.10 203.40 -10.17 102.000
5 3.80 101.643 7.50 101.702 0.00 203.55 0.00
6 5.70 101.657 7.50 101.849 -7.50 101.85 -381.93
8 7.60 101.702 101.000
10 9.60 101.792
12 11.10 101.963

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+000.00

Luasan (M2) 0.13

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+025.00 36+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.80 381.75
103.000
1 -1.30 101.854 7.50 101.801 1.50 203.54 152.66
2 0.00 101.872 9.00 101.741 0.00 203.33 0.00
102.000
3 0.00 101.582 9.00 101.591 -0.30 203.19 -30.48
4 1.90 101.565 8.70 101.603 -1.20 203.23 -121.94
101.000
5 3.70 101.587 7.50 101.625 0.00 203.43 0.00
6 5.60 101.597 7.50 101.801 -7.50 101.80 -381.75
100.000
8 7.40 101.627
10 8.70 101.603
99.000
12 9.00 101.591
9.70 101.995
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+025.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+050.00 36+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.80 381.73
104.000
1 -1.30 101.922 7.50 101.795 0.00 203.41 0.00
2 0.00 101.856 7.50 101.613 0.00 203.23 0.00
103.000
3 0.00 101.592 7.50 101.612 1.50 203.29 152.47
4 1.90 101.572 9.00 101.679 0.00 203.41 0.00
102.000
5 3.70 101.572 9.00 101.735 -1.50 203.53 -152.65
6 5.60 101.501 7.50 101.795 -7.50 101.80 -381.73
101.000
8 7.40 101.632
10 7.50 101.612
100.000
12 9.50 101.702

99.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+050.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan
………………………. Konsultan Supervisi
………………………. ………………………. Penyedia Jasa
……………………….
PPK 3.1 Provinsi
Penilik Jawa
Jalan Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero)
Inspector Cabang Semarang - PT. Buana Archicon
Surveyor PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Pelaksana
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :
Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket ……………………….: REKONTRUSI JALAN WELERI - KENDAL - SEMARANG ………………………. ………………………. Back Up Kuantitas Bulan
………………………. : NOVEMBER 2021
Nomor dan Tanggal Kontrak Penilik Jalan : Inspector
HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Surveyor Periode Pelaksana : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+075.00 36+075.00 41125
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.84 381.90
104.000
1 -1.30 101.934 7.50 101.841 1.50 203.62 152.72
2 0.00 101.893 9.00 101.781 0.00 203.41 0.00 103.000
3 0.00 101.623 9.00 101.631 -1.50 203.30 -152.48
4 1.90 101.584 7.50 101.671 0.00 203.34 0.00 102.000
5 3.80 101.613 7.50 101.671 0.00 203.51 0.00
101.000
6 5.70 101.608 7.50 101.841 -7.50 101.84 -381.90
7 7.50 101.671 100.000
8 9.00 101.631
9 9.50 101.883 99.000

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+075.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+100.00 36+100.00 41125
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.91 382.17
104.000
1 -1.30 101.988 7.50 101.913 1.50 203.77 152.82
2 0.00 102.006 9.00 101.853 0.00 203.61 0.00 103.000
3 0.00 101.747 9.00 101.754 -1.50 203.47 -152.61
4 1.90 101.693 7.50 101.720 0.00 203.63 0.00 102.000
5 3.70 101.723 7.50 101.913 -7.50 101.91 -382.17
101.000
6 5.50 101.723 0.00 0.00 0.00
7 7.30 101.761 100.000
8 7.40 101.718
9 9.40 101.763 99.000
10 11.40 101.763
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+100.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+125.00 36+125.00 41125
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.08 382.79
104.000
1 0.00 101.748 7.50 102.076 1.50 204.09 153.07
2 0.00 101.782 9.00 102.016 0.00 204.00 0.00 103.000
3 1.90 101.818 9.00 101.980 -1.50 203.89 -152.92
4 3.80 101.843 7.50 101.908 0.00 203.98 0.00 102.000
5 5.60 101.873 7.50 102.076 -7.50 102.08 -382.79
101.000
6 7.50 101.908 0.00 0.00 0.00
7 9.40 101.999 100.000
8 10.30 102.184
99.000

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+125.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+150.00 36+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.09 382.68
104.000
1 -1.00 102.104 7.50 102.089 1.50 204.12 152.88
2 0.00 102.246 9.00 102.029 0.00 203.98 0.00 103.000
3 0.00 101.892 9.00 101.953 -1.30 203.87 -132.01
4 1.90 101.883 7.70 101.918 -0.10 203.86 -10.19 102.000
5 3.80 101.913 7.60 101.943 -0.10 203.89 -10.50
101.000
6 5.70 101.933 7.50 101.942 0.00 204.03 0.00
8 7.60 101.943 7.50 102.089 -7.50 102.09 -382.68 100.000
10 7.70 101.918 0.00 0.00 0.00
12 9.90 101.978 99.000
14 9.90 101.493
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+150.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+175.00 36+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.12 382.94
104.000
1 -1.30 102.073 7.50 102.118 1.50 204.18 153.13
2 0.00 102.153 9.00 102.058 0.00 203.99 0.00 103.000
3 0.00 101.865 9.00 101.928 -0.40 203.83 -40.77
4 1.90 101.874 8.60 101.898 -1.00 203.85 -101.92 102.000
5 3.80 101.904 7.60 101.950 -0.10 203.90 -10.20
101.000
6 5.70 101.952 7.50 101.950 0.00 204.07 0.00
8 7.60 101.950 7.50 102.118 -7.50 102.12 -382.94 100.000
10 8.60 101.898
12 9.60 101.975 99.000
14 9.60 101.513
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+175.00

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+200.00 36+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.16 383.10
104.000
1 -1.30 102.104 7.50 102.161 1.50 204.26 153.20
2 0.00 102.197 9.00 102.101 0.00 204.12 0.00 103.000
3 0.00 101.928 9.00 102.018 -1.50 204.02 -153.02
4 1.90 101.923 7.50 102.003 0.00 204.16 0.00 102.000
5 3.80 101.953 7.50 102.161 -7.50 102.16 -383.10
101.000
6 5.70 101.968 0.00 0.00 0.00
8 7.50 102.003 100.000
10 9.50 102.023
12 9.50 100.765 99.000

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+200.00

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+225.00 36+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.17 383.12
103.000
1 -1.30 102.147 7.50 102.165 1.50 204.27 153.20
2 0.00 102.243 9.00 102.105 0.00 204.11 0.00
3 0.00 101.969 9.00 102.005 -1.40 204.01 -142.81
4 1.90 101.974 7.60 102.008 -0.10 204.02 -10.20 102.000
5 3.80 101.993 7.50 102.007 0.00 204.17 0.00
6 5.70 101.993 7.50 102.165 -7.50 102.17 -383.12
8 7.60 102.008 101.000
10 9.70 102.003
12 9.70 101.413

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+225.00

Luasan L1 (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+250.00 36+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.19 383.22
103.000
1 -1.30 102.189 7.50 102.192 1.50 204.32 153.24
2 0.00 102.209 9.00 102.132 0.00 204.24 0.00
3 0.00 101.983 9.00 102.109 -1.50 204.14 -153.10
4 1.90 101.978 7.50 102.029 0.00 204.22 0.00 102.000
5 3.70 101.988 7.50 102.192 -7.50 102.19 -383.22
6 5.60 102.004 0.00 0.00 0.00
8 7.50 102.029 101.000
10 9.50 102.136
12 10.00 102.318

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+250.00

Luasan (M2) 0.14

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+275.00 36+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.24 383.42
103.000
1 -1.35 102.233 7.50 102.244 0.00 204.33 0.00
2 0.00 102.238 7.50 102.088 1.00 204.21 102.11
3 0.00 102.028 8.50 102.123 0.50 204.28 51.07
4 1.80 102.023 9.00 102.153 0.00 204.34 0.00 102.000
5 3.70 102.033 9.00 102.184 -1.50 204.43 -153.32
6 5.60 102.043 7.50 102.244 -7.50 102.24 -383.42
8 7.50 102.088 101.000
10 8.50 102.123
12 10.50 102.243

100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+275.00

Luasan L1 (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 36+300.00 36+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 102.30 383.61
103.000
1 -1.40 102.248 7.50 102.297 0.00 204.43 0.00
2 0.00 102.265 7.50 102.130 1.50 204.27 153.20
3 0.00 102.035 9.00 102.142 0.00 204.38 0.00
4 1.80 102.005 9.00 102.237 -1.50 204.53 -153.40 102.000
5 3.70 102.050 7.50 102.297 -7.50 102.30 -383.61
6 5.60 102.108
8 7.50 102.130 101.000
10 9.30 102.145
12 9.30 101.705
14 9.80 101.702
100.000
16 9.80 102.105 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

36+300.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
40800
40800
40800
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+200.00 37+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-8.75 100.61 -440.18
103.000
1 -10.85 100.558 -8.75 100.613 0.00 201.13 0.00
2 -10.25 100.549 -8.75 100.518 1.25 201.01 125.63
3 -10.25 100.549 -7.50 100.496 0.00 201.16 0.00 102.000
4 -10.15 100.527 -7.50 100.663 -1.25 201.28 -125.80
5 -10.15 100.527 -8.75 100.613 8.75 100.61 440.18
101.000
6 -8.15 100.493 0.00 0.00 0.00
7 -8.05 100.527
8 -4.45 100.523 100.000
9 -0.85 100.537
10 0.85 100.488
99.000
11 4.60 100.504 -20 -15 -10 -5 0 5 10 15 20
12 8.35 100.315
13 8.45 100.283
14 10.75 100.146 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 10.85 99.522
16 11.55 99.477
17 11.55 100.127
37+200.00

Luasan (M2) 0.16

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+225.00 37+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.51 -452.29
102.000
1 -13.25 100.467 -9.00 100.509 1.50 201.08 150.81
2 -12.25 100.440 -7.50 100.569 0.00 201.00 0.00
3 -12.25 100.440 -7.50 100.429 -1.50 200.86 -150.64
4 -10.25 100.427 -9.00 100.427 0.00 200.94 0.00 101.000
5 -10.25 100.427 -9.00 100.509 9.00 100.51 452.29
6 -8.25 100.429 0.00 0.00 0.00
7 -4.50 100.492 100.000
8 -0.85 100.542
9 0.85 100.507
10 4.85 100.407
99.000
11 8.35 100.082 -20 -15 -10 -5 0 5 10 15 20
12 8.45 100.257
13 10.55 100.137
14 10.65 99.537 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 11.35 99.537
16 11.35 100.137

37+225.00

Luasan (M2) 0.17

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+250.00 37+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.44 -451.98
102.000
1 -13.40 100.408 -9.00 100.441 1.50 200.94 150.71
2 -12.40 100.397 -7.50 100.501 0.00 200.84 0.00
101.000
3 -12.40 100.397 -7.50 100.336 -1.50 200.69 -150.51
4 -10.40 100.357 -9.00 100.350 0.00 200.79 0.00
100.000
5 -10.40 100.357 -9.00 100.441 9.00 100.44 451.98
6 -7.90 100.333 0.00 0.00 0.00
99.000
7 -5.80 100.379 0.00 0.00 0.00
8 -4.10 100.408
98.000
9 -2.10 100.437
10 -0.70 100.478
97.000
11 -0.70 100.657 -20 -15 -10 -5 0 5 10 15 20
12 0.70 100.676
13 0.70 100.468
14 2.50 100.392 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.30 100.349
16 6.10 100.327
17 7.90 100.267
37+250.00
18 8.00 100.238
19 10.10 100.139
20 10.10 99.448
21 10.80 99.410
22 10.80 100.136

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+275.00 37+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.44 -376.67
102.000
1 -15.35 100.108 -7.50 100.444 0.00 200.71 0.00
2 -14.35 100.117 -7.50 100.264 -0.10 200.53 -10.03
3 -14.35 100.117 -7.60 100.262 -1.40 200.51 -140.36 101.000
4 -13.35 100.220 -9.00 100.250 0.00 200.63 0.00
5 -13.35 100.220 -9.00 100.384 1.50 200.83 150.62
100.000
6 -8.35 100.262 -7.50 100.444 7.50 100.44 376.67
7 -6.35 100.309 0.00 0.00 0.00
8 -4.35 100.354 99.000
9 -2.55 100.387
10 -0.75 100.427
98.000
11 -0.75 100.474 -20 -15 -10 -5 0 5 10 15 20
12 0.75 100.657
13 0.75 100.468
14 2.55 100.403 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.35 100.359
16 6.15 100.332
17 8.05 100.300
37+275.00
18 8.15 100.267
19 10.45 100.127
20 10.45 99.424
21 11.15 99.357
22 11.15 100.131
23 11.95 100.151

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+300.00 37+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.50 -452.23
102.000
1 -13.20 99.988 -9.00 100.496 1.50 201.05 150.79
2 -12.40 100.327 -7.50 100.556 0.00 200.97 0.00
3 -12.40 100.327 -7.50 100.411 -1.50 200.76 -150.57 101.000
4 -10.40 100.318 -9.00 100.347 0.00 200.84 0.00
5 -10.40 100.318 -9.00 100.496 9.00 100.50 452.23
100.000
6 -8.00 100.419 0.00 0.00 0.00
7 -6.10 100.368
8 -4.30 100.409 99.000
9 -2.50 100.442
10 -0.70 100.469
98.000
11 -0.70 100.648 -20 -15 -10 -5 0 5 10 15 20
12 0.70 100.723
13 0.70 100.467
14 2.40 100.412 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.20 100.374
16 6.00 100.351
17 7.80 100.377
37+300.00
18 7.90 100.297
19 9.90 100.174
20 9.90 99.378
21 10.60 99.334
22 10.60 100.168

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+325.00 37+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.36 -451.62
102.000
1 -10.80 100.067 -9.00 100.359 1.50 200.78 150.58
2 -10.00 100.077 -7.50 100.419 0.00 200.60 0.00
3 -8.00 100.197 -7.50 100.185 -1.25 200.30 -125.18 101.000
4 -6.30 100.224 -8.75 100.110 -0.25 200.21 -25.03
5 -4.90 100.277 -9.00 100.095 0.00 200.45 0.00
100.000
6 -3.50 100.311 -9.00 100.359 9.00 100.36 451.62
7 -2.10 100.332
8 -0.70 100.403 99.000
9 -0.70 100.574
10 0.70 100.577
98.000
11 0.70 100.397 -20 -15 -10 -5 0 5 10 15 20
12 2.60 100.377
13 4.40 100.347
14 6.20 100.329 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 7.90 100.297
16 9.90 100.280
17 10.90 100.337
37+325.00
18 13.00 100.132

Luasan (M2) 0.37

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+350.00 37+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.32 -376.22
102.000
1 -11.90 100.256 -7.50 100.324 0.00 200.42 0.00
2 -10.90 99.924 -7.50 100.096 -1.50 200.07 -150.05
3 -10.90 99.314 -9.00 99.970 0.00 200.23 0.00 101.000
4 -10.30 99.344 -9.00 100.264 1.50 200.59 150.44
5 -10.30 99.920 -7.50 100.324 7.50 100.32 376.22
100.000
6 -8.00 100.113 0.00 0.00 0.00
7 -7.90 100.140
8 -6.10 100.094 99.000
9 -4.30 100.244
10 -2.50 100.277
98.000
11 -0.70 100.347 -20 -15 -10 -5 0 5 10 15 20
12 -0.70 100.520
13 0.70 100.497
14 0.70 100.311 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 2.50 100.268
16 4.30 100.226
17 6.10 100.200
37+350.00
18 7.80 100.153
19 7.90 100.098
20 9.90 99.996
21 12.90 99.999

Luasan (M2) 0.39

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+375.00 37+375.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.17 -450.75
102.000
1 -13.60 99.427 -9.00 100.166 0.00 200.31 0.00
2 -13.60 98.782 -9.00 100.144 1.50 200.25 150.19
3 -12.90 98.747 -7.50 100.103 0.00 200.33 0.00 101.000
4 -12.90 99.902 -7.50 100.226 -1.50 200.39 -150.29
5 -10.90 100.176 -9.00 100.166 9.00 100.17 450.75
100.000
6 -7.90 100.095 0.00 0.00 0.00
7 -6.10 100.114
8 -4.30 100.132 99.000
9 -2.50 100.173
10 -0.70 100.202
98.000
11 -0.70 100.398 -20 -15 -10 -5 0 5 10 15 20
12 0.70 100.408
13 0.70 100.210
14 2.50 100.138 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.30 100.111
16 6.10 100.087
17 7.90 100.056
37+375.00
18 8.00 100.034
19 10.40 99.886
20 10.40 99.052
21 11.00 99.047
22 11.00 99.871
23 12.50 100.192
24

Luasan (M2) 0.11

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+400.00 37+400.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.04 -450.20
102.000
1 -13.00 99.547 -9.00 100.044 1.50 200.15 150.11
2 -12.30 99.281 -7.50 100.104 0.00 200.03 0.00
3 -12.30 99.577 -7.50 99.927 -1.25 199.82 -124.89 101.000
4 -10.00 99.882 -8.75 99.896 -0.25 199.79 -24.97
5 -8.00 99.932 -9.00 99.889 0.00 199.93 0.00
100.000
6 -7.90 99.978 -9.00 100.044 9.00 100.04 450.20
7 -6.10 100.003
8 -4.30 100.043 99.000
9 -2.50 100.080
10 -0.70 100.088
98.000
11 -0.70 100.157 -20 -15 -10 -5 0 5 10 15 20
12 0.70 100.333
13 0.70 100.132
14 2.50 100.132 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.30 100.072
16 6.10 100.052
17 7.90 99.997
37+400.00
18 9.70 99.969
19 11.20 99.929
20 11.20 99.929
21 12.40 98.882
22 12.40 98.882
23 12.40 99.917

Luasan (M2) 0.25

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+425.00 37+425.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.11 -375.42
102.000
1 -14.20 99.931 -7.50 100.112 0.00 200.08 0.00
2 -14.20 99.631 -7.50 99.972 -1.50 199.99 -150.00
3 -13.20 99.617 -9.00 100.022 0.00 200.07 0.00 101.000
4 -13.20 99.846 -9.00 100.052 1.50 200.16 150.12
5 -10.20 100.039 -7.50 100.112 7.50 100.11 375.42
100.000
6 -7.90 99.962
7 -6.10 100.032
8 -4.30 100.032 99.000
9 -2.50 100.071
10 -0.70 100.097
98.000
11 -0.70 100.261 -20 -15 -10 -5 0 5 10 15 20
12 0.70 100.255
13 0.70 100.081
14 2.50 100.022 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.30 99.967
16 6.10 99.932
17 7.90 99.937
37+425.00
18 9.90 100.137
19 9.90 99.227
20 10.50 99.247
21 10.50 100.127

Luasan (M2) 0.13

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+450.00 37+450.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.03 -375.11
102.000
1 -14.70 100.358 -7.50 100.030 0.00 199.91 0.00
2 -13.70 100.257 -7.50 99.877 -1.50 199.70 -149.77
3 -11.70 100.137 -9.00 99.820 0.00 199.79 0.00 101.000
4 -9.70 99.993 -9.00 99.970 1.50 200.00 150.00
5 -7.90 99.854 -7.50 100.030 7.50 100.03 375.11
100.000
6 -6.10 99.962 0.00 0.00 0.00
7 -4.30 99.972
8 -2.50 99.998 99.000
9 -0.70 100.012
10 -0.70 100.155
98.000
11 0.70 100.172 -20 -15 -10 -5 0 5 10 15 20
12 0.70 99.969
13 2.50 99.882
14 4.30 99.827 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.10 99.806
16 7.90 99.672
17 9.90 99.967
37+450.00
18 10.70 99.395
19 11.70 99.283

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+475.00 37+475.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.02 -375.07
102.000
1 -13.10 100.042 -7.50 100.019 0.00 199.85 0.00
2 -11.10 99.992 -7.50 99.826 -1.50 199.74 -149.80
101.000
3 -7.90 99.809 -9.00 99.912 0.00 199.87 0.00
4 -6.10 99.820 -9.00 99.959 1.50 199.98 149.98
100.000
5 -3.70 99.864 -7.50 100.019 7.50 100.02 375.07
6 -2.50 99.931 0.00 0.00 0.00
99.000
7 -0.70 99.992
8 -0.70 100.108
98.000
9 0.70 100.113
10 0.70 99.933
97.000
11 2.50 99.905 -20 -15 -10 -5 0 5 10 15 20
12 4.30 99.905
13 6.10 99.907
14 7.90 99.909 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 10.90 99.921
16 14.90 99.868
17 14.90 97.844
37+475.00
18 15.60 97.747
19 15.60 99.817

Luasan (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+500.00 37+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 100.13 -450.60
102.000
1 -11.80 99.769 -9.00 100.134 1.50 200.33 150.25
2 -9.80 100.169 -7.50 100.194 0.00 200.21 0.00
3 -7.30 100.002 -7.50 100.015 -1.50 200.13 -150.10 101.000
4 -7.20 100.058 -9.00 100.116 0.00 200.25 0.00
5 -5.20 100.067 -9.00 100.134 9.00 100.13 450.60
100.000
6 -3.40 100.072 0.00 0.00 0.00
8 -1.60 100.072 0.00 0.00 0.00
10 0.00 100.072 0.00 0.00 0.00 99.000
12 0.00 100.171 0.00 0.00 0.00
14 0.30 100.335 0.00 0.00 0.00
98.000
16 0.30 100.738 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 0.30 100.738 0.00 0.00 0.00
20 1.10 101.267 0.00 0.00 0.00
22 1.10 100.598 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 2.90 100.538 0.00 0.00 0.00
26 4.70 100.539 0.00 0.00 0.00
28 6.50 100.539 0.00 0.00 0.00
37+500.00
30 8.30 100.517
32 10.10 100.507
34 11.10 100.615
36 14.10 100.552

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+500.00 42+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.52 -395.58
103.000
1 -10.75 99.497 -7.95 99.517 0.00 198.88 0.00
2 -7.45 99.409 -7.95 99.367 -2.00 198.65 -198.65
3 -6.85 99.406 -9.95 99.287 0.00 198.72 0.00 102.000
4 -5.25 99.398 -9.95 99.437 2.00 198.95 198.95
5 -4.05 99.417 -7.95 99.517 7.95 99.52 395.58
101.000
6 -2.85 99.438 0.00 0.00 0.00
7 -1.65 99.469 0.00 0.00 0.00
8 -0.45 99.497 0.00 0.00 0.00 100.000
9 -0.45 99.527 7.95 99.93 397.32
10 -0.45 99.819 7.95 99.930 2.00 199.86 199.86
99.000
11 0.45 99.808 9.95 99.930 0.00 199.59 0.00 -20 -15 -10 -5 0 5 10 15 20
12 0.45 99.536 9.95 99.658 -2.00 199.32 -199.32
13 0.45 99.572 7.95 99.657 0.00 199.59 0.00
14 2.25 99.620 7.95 99.930 -7.95 99.93 -397.32 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 4.05 99.677 0.00 0.00 0.00
16 5.85 99.687
17 7.65 99.688
42+500.00
18 7.85 99.657
19 10.75 99.658

Luasan R (M2) 0.55


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+525.00 42+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.33 -394.84
102.000
1 -11.45 99.338 -7.95 99.332 0.00 198.50 0.00
2 -8.55 99.177 -7.95 99.168 -2.00 198.27 -198.27
3 -6.95 99.152 -9.95 99.102 0.00 198.35 0.00 101.000
4 -5.65 99.154 -9.95 99.252 2.00 198.58 198.58
5 -4.35 99.177 -7.95 99.332 7.95 99.33 394.84
100.000
6 -3.05 99.206 0.00 0.00 0.00
7 -1.75 99.236 0.00 0.00 0.00
8 -0.45 99.287 7.95 99.69 396.26 99.000
9 -0.45 99.526 7.95 99.688 2.00 199.30 199.30
10 0.45 99.577 9.95 99.608 0.00 198.99 0.00
98.000
11 0.45 99.337 9.95 99.385 -2.00 198.80 -198.80 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.346 7.95 99.415 0.00 199.10 0.00
13 3.25 99.407 7.95 99.688 -7.95 99.69 -396.26
14 4.65 99.445 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.05 99.455 0.00 0.00 0.00
16 7.65 99.482 0.00 0.00 0.00
17 7.85 99.417
42+525.00
18 11.15 99.366

Luasan R (M2) 0.50


Luasan L (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+550.00 42+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.30 -394.70
102.000
1 -10.55 99.307 -7.95 99.296 0.00 198.44 0.00
2 -8.25 99.147 -7.95 99.146 -2.00 198.21 -198.21
101.000
3 -6.45 99.127 -9.95 99.066 0.00 198.28 0.00
4 -4.95 99.162 -9.95 99.216 2.00 198.51 198.51
100.000
5 -3.45 99.215 -7.95 99.296 7.95 99.30 394.70
6 -1.95 99.248 0.00 0.00 0.00
99.000
7 -0.45 99.287 0.00 0.00 0.00
8 -0.45 99.318 0.00 0.00 0.00
98.000
9 0.45 99.318 7.95 99.59 395.86
10 0.45 99.339 7.95 99.588 2.00 199.10 199.10
97.000
11 1.85 99.354 9.95 99.508 0.00 198.80 0.00 -20 -15 -10 -5 0 5 10 15 20
12 3.25 99.346 9.95 99.296 -2.00 198.65 -198.65
13 4.65 99.358 7.95 99.352 0.00 198.94 0.00
14 6.05 99.386 7.95 99.588 -7.95 99.59 -395.86 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 7.65 99.422 0.00 0.00 0.00
16 7.85 99.355 0.00 0.00 0.00
17 10.65 99.276 0.00 0.00 0.00
42+550.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan R (M2) 0.45


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+575.00 42+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.33 -394.84
102.000
1 -11.05 99.296 -7.95 99.332 0.00 198.51 0.00
2 -7.55 99.158 -7.95 99.182 -2.00 198.28 -198.28
3 -7.35 99.178 -9.95 99.102 0.00 198.35 0.00 101.000
4 -6.05 99.209 -9.95 99.252 2.00 198.58 198.58
5 -4.65 99.228 -7.95 99.332 7.95 99.33 394.84
100.000
6 -3.25 99.226 0.00 0.00 0.00
7 -1.85 99.275 0.00 0.00 0.00
8 -0.45 99.307 7.95 99.46 395.35 99.000
9 -0.45 99.619 7.95 99.458 0.00 198.72 0.00
10 0.45 99.649 7.95 99.258 0.10 198.50 9.92
98.000
11 0.45 99.349 8.05 99.237 1.90 198.55 188.62 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.315 9.95 99.312 0.00 198.69 0.00
13 3.45 99.297 9.95 99.378 -2.00 198.84 -198.84
14 4.95 99.274 7.95 99.458 -7.95 99.46 -395.35 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.45 99.269 0.00 0.00 0.00
16 7.85 99.279 0.00 0.00 0.00
17 8.05 99.237 0.00 0.00 0.00
42+575.00
18 10.55 99.336 0.00 0.00 0.00

Luasan R (M2) 0.29


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+600.00 42+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.50 -395.50
102.000
1 -8.95 99.387 -7.95 99.497 0.00 198.84 0.00
2 -7.55 99.367 -7.95 99.347 -2.00 198.61 -198.61
3 -7.35 99.387 -9.95 99.267 0.00 198.68 0.00 101.000
4 -6.05 99.395 -9.95 99.417 2.00 198.91 198.91
5 -4.65 99.367 -7.95 99.497 7.95 99.50 395.50
100.000
6 -3.25 99.440 0.00 0.00 0.00
7 -1.85 99.468 0.00 0.00 0.00
8 -0.45 99.507 7.95 99.54 395.65 99.000
9 -0.45 99.827 7.95 99.535 0.00 198.93 0.00
10 0.45 99.838 7.95 99.393 0.10 198.76 9.94
98.000
11 0.45 99.538 8.05 99.370 1.90 198.73 188.80 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.506 9.95 99.362 0.00 198.82 0.00
13 3.45 99.483 9.95 99.455 -2.00 198.99 -198.99
14 4.95 99.457 7.95 99.535 -7.95 99.54 -395.65 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.45 99.428 0.00 0.00 0.00
16 7.85 99.416 0.00 0.00 0.00
17 8.05 99.370
42+600.00
18 11.05 99.357

Luasan R (M2) 0.26


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+625.00 42+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.52 -395.60
102.000
1 -12.45 99.298 -7.95 99.523 0.00 198.90 0.00
2 -7.95 99.348 -7.95 99.372 -2.00 198.66 -198.66
3 -7.45 99.370 -9.95 99.292 0.00 198.74 0.00 101.000
4 -6.05 99.386 -9.95 99.443 2.00 198.97 198.97
5 -4.65 99.428 -7.95 99.523 7.95 99.52 395.60
100.000
6 -3.25 99.460 0.00 0.00 0.00
7 -1.85 99.500 0.00 0.00 0.00
8 -0.45 99.538 0.00 0.00 0.00 99.000
9 -0.45 99.847 7.95 99.57 395.78
10 0.45 99.817 7.95 99.568 0.00 198.96 0.00
98.000
11 0.45 99.578 7.95 99.388 0.10 198.76 9.94 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.538 8.05 99.368 1.90 198.74 188.80
13 3.45 99.483 9.95 99.374 0.00 198.86 0.00
14 4.95 99.448 9.95 99.488 -2.00 199.06 -199.06 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.45 99.499 7.95 99.568 -7.95 99.57 -395.78
16 7.85 99.408 0.00 0.00 0.00
17 8.05 99.368 0.00 0.00 0.00
42+625.00
18 9.05 99.376

Luasan R (M2) 0.31


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+650.00 42+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.37 -395.01
102.000
1 -12.95 99.239 -7.95 99.373 0.00 198.56 0.00
2 -7.95 99.187 -7.95 99.187 -2.00 198.40 -198.40
3 -7.45 99.196 -9.95 99.208 0.00 198.50 0.00 101.000
4 -6.05 99.218 -9.95 99.293 2.00 198.67 198.67
5 -4.65 99.240 -7.95 99.373 7.95 99.37 395.01
100.000
6 -3.25 99.279 0.00 0.00 0.00
7 -1.85 99.318 0.00 0.00 0.00
8 -0.45 99.348 0.00 0.00 0.00 99.000
9 -0.45 99.640 7.95 99.43 395.21
10 0.45 99.663 7.95 99.425 2.00 198.77 198.77
98.000
11 0.45 99.398 9.95 99.345 0.00 198.54 0.00 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.368 9.95 99.195 -1.90 198.43 -188.51
13 3.45 99.391 8.05 99.238 -0.10 198.50 -9.92
14 4.95 99.318 7.95 99.261 0.00 198.69 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.45 99.307 7.95 99.425 -7.95 99.43 -395.21
16 7.85 99.283 0.00 0.00 0.00
17 8.05 99.238 0.00 0.00 0.00
42+650.00
18 11.05 99.176
19
20
21

Luasan R (M2) 0.33


Luasan L (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+675.00 42+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.36 -394.94
102.000
1 -12.35 99.239 -7.95 99.355 0.00 198.55 0.00
2 -7.65 99.187 -7.95 99.190 -2.00 198.40 -198.40
3 -7.35 99.196 -9.95 99.212 0.00 198.49 0.00 101.000
4 -6.05 99.218 -9.95 99.275 2.00 198.63 198.63
5 -4.65 99.240 -7.95 99.355 7.95 99.36 394.94
100.000
6 -3.25 99.279 0.00 0.00 0.00
7 -1.85 99.318 0.00 0.00 0.00
8 -0.45 99.348 0.00 0.00 0.00 99.000
9 -0.45 99.640 7.95 99.41 395.17
10 0.45 99.663 7.95 99.414 2.00 198.75 198.75
98.000
11 0.45 99.398 9.95 99.334 0.00 198.53 0.00 -20 -15 -10 -5 0 5 10 15 20
12 1.85 99.368 9.95 99.199 -2.00 198.43 -198.43
13 3.25 99.391 7.95 99.234 0.00 198.65 0.00
14 4.65 99.318 7.95 99.414 -7.95 99.41 -395.17 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.05 99.307 0.00 0.00 0.00
16 7.45 99.283
17 7.75 99.238
42+675.00
18 11.25 99.176

Luasan R (M2) 0.32


Luasan L (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+700.00 42+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.43 -395.25
102.000
1 -12.35 99.329 -7.95 99.434 0.00 198.70 0.00
2 -7.65 99.258 -7.95 99.263 -2.00 198.56 -198.56
3 -7.35 99.276 -9.95 99.293 0.00 198.65 0.00 101.000
4 -6.05 99.258 -9.95 99.354 2.00 198.79 198.79
5 -4.65 99.279 -7.95 99.434 7.95 99.43 395.25
100.000
6 -3.25 99.283 0.00 0.00 0.00
7 -1.85 99.307 0.00 0.00 0.00
8 -0.45 99.328 7.95 99.37 394.99 99.000
9 -0.45 99.626 7.95 99.368 0.00 198.61 0.00
10 0.45 99.647 7.95 99.237 2.00 198.46 198.46
98.000
11 0.45 99.378 9.95 99.225 0.00 198.51 0.00 -20 -15 -10 -5 0 5 10 15 20
12 1.85 99.328 9.95 99.288 -2.00 198.66 -198.66
13 3.25 99.286 7.95 99.368 -7.95 99.37 -394.99
14 4.65 99.248 0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.05 99.208
16 7.45 99.198
17 7.75 99.238
42+700.00
18 11.25 99.217

Luasan R (M2) 0.19


Luasan L (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+725.00 42+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.38 -395.03
102.000
1 -12.75 99.325 -7.95 99.378 0.00 198.61 0.00
2 -7.95 99.263 -7.95 99.228 -2.00 198.38 -198.38
3 -7.75 99.258 -9.95 99.148 0.00 198.45 0.00 101.000
4 -6.45 99.253 -9.95 99.298 2.00 198.68 198.68
5 -4.95 99.270 -7.95 99.378 7.95 99.38 395.03
100.000
6 -3.45 99.300 0.00 0.00 0.00
7 -1.95 99.328 0.00 0.00 0.00
8 -0.45 99.378 0.00 0.00 0.00 99.000
9 -0.45 99.683 7.95 99.39 395.07
10 0.45 99.669 7.95 99.388 0.00 198.64 0.00
98.000
11 0.45 99.378 7.95 99.256 2.00 198.52 198.52 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.328 9.95 99.261 0.00 198.57 0.00
13 3.45 99.298 9.95 99.308 -2.00 198.70 -198.70
14 4.95 99.270 7.95 99.388 -7.95 99.39 -395.07 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.45 99.252
16 7.75 99.263
17 7.95 99.256
42+725.00
18 12.45 99.268

Luasan R (M2) 0.18


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+750.00 42+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.37 -394.98
102.000
1 -13.45 99.260 -7.95 99.366 0.00 198.58 0.00
2 -7.95 99.258 -7.95 99.216 -2.00 198.35 -198.35
3 -7.75 99.263 -9.95 99.136 0.00 198.42 0.00 101.000
4 -6.45 99.260 -9.95 99.286 2.00 198.65 198.65
5 -4.95 99.276 -7.95 99.366 7.95 99.37 394.98
100.000
6 -3.45 99.289 0.00 0.00 0.00
7 -1.95 99.308 0.00 0.00 0.00
8 -0.45 99.358 0.00 0.00 0.00 99.000
9 -0.45 99.673 7.95 99.37 395.01
10 0.45 99.643 7.95 99.373 0.00 198.60 0.00
98.000
11 0.45 99.358 7.95 99.223 2.00 198.37 198.37 -20 -15 -10 -5 0 5 10 15 20
12 1.95 99.316 9.95 99.143 0.00 198.44 0.00
13 3.45 99.288 9.95 99.293 -2.00 198.67 -198.67
14 4.95 99.248 7.95 99.373 -7.95 99.37 -395.01 Column E Column G
15 6.45 99.227 0.00 0.00 0.00
16 7.75 99.228
17 7.95 99.299
42+750.00
18 11.85 99.343

Luasan R (M2) 0.30


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+775.00 42+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.47 -395.41
102.000
1 -12.75 99.287 -7.95 99.474 0.00 198.80 0.00
2 -7.95 99.329 -7.95 99.324 -2.00 198.57 -198.57
101.000
3 -7.75 99.313 -9.95 99.244 0.00 198.64 0.00
4 -6.45 99.308 -9.95 99.394 2.00 198.87 198.87
100.000
5 -4.95 99.299 -7.95 99.474 7.95 99.47 395.41
6 -3.45 99.300 0.00 0.00 0.00
99.000
7 -1.95 99.306 0.00 0.00 0.00
8 -0.45 99.348 0.00 0.00 0.00
98.000
9 -0.45 99.659 7.95 99.37 395.01
10 0.45 99.677 7.95 99.373 2.00 198.67 198.67
97.000
11 0.45 99.368 9.95 99.293 0.00 198.44 0.00 -20 -15 -10 -5 0 5 10 15 20
12 2.25 99.328 9.95 99.143 -2.00 198.37 -198.37
13 4.05 99.295 7.95 99.223 0.00 198.60 0.00
14 5.85 99.248 7.95 99.373 -7.95 99.37 -395.01 Column E Column G
15 7.65 99.212 0.00 0.00 0.00
16 7.85 99.216 0.00 0.00 0.00
17 11.45 99.278
42+775.00

Luasan R (M2) 0.30


Luasan L (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+800.00 42+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.50 -395.52
102.000
1 -11.85 99.366 -7.95 99.502 0.00 198.79 0.00
2 -7.95 99.286 -7.95 99.286 -2.00 198.61 -198.61
3 -7.75 99.348 -9.95 99.327 0.00 198.75 0.00 101.000
4 -6.45 99.338 -9.95 99.422 2.00 198.92 198.92
5 -4.95 99.360 -7.95 99.502 7.95 99.50 395.52
100.000
6 -3.45 99.376 0.00 0.00 0.00
8 -1.95 99.378 0.00 0.00 0.00
10 -0.45 99.388 0.00 0.00 0.00 99.000
12 -0.45 99.318 0.00 0.00 0.00
14 0.45 99.318 7.95 99.33 394.83
98.000
16 0.45 99.308 7.95 99.328 2.00 198.58 198.58 -20 -15 -10 -5 0 5 10 15 20
18 1.85 99.276 9.95 99.248 0.00 198.40 0.00
20 3.25 99.238 9.95 99.155 -2.00 198.30 -198.30
22 4.65 99.208 7.95 99.141 0.00 198.47 0.00 Column E Column G
24 6.05 99.138 7.95 99.328 -7.95 99.33 -394.83
26 7.65 99.168 0.00 0.00 0.00
28 7.85 99.140 0.00 0.00 0.00
42+800.00
30 11.65 99.168

Luasan R (M2) 0.28


Luasan L (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+825.00 42+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.61 -395.97
102.000
1 -12.55 99.408 -7.95 99.614 0.00 199.06 0.00
2 -7.95 99.447 -7.95 99.447 -2.00 198.88 -198.88
3 -7.75 99.449 -9.95 99.430 0.00 198.96 0.00 101.000
4 -6.45 99.438 -9.95 99.534 2.00 199.15 199.15
5 -4.95 99.435 -7.95 99.614 7.95 99.61 395.97
100.000
6 -3.45 99.416 0.00 0.00 0.00
8 -1.95 99.412 0.00 0.00 0.00
10 -0.45 99.416 0.00 0.00 0.00 99.000
12 -0.45 99.683 7.95 99.35 394.90
14 0.45 99.657 7.95 99.346 0.00 198.50 0.00
98.000
16 0.45 99.327 7.95 99.151 2.00 198.35 198.35 -20 -15 -10 -5 0 5 10 15 20
18 1.85 99.289 9.95 99.201 0.00 198.47 0.00
20 3.25 99.250 9.95 99.266 -2.00 198.61 -198.61
22 4.65 99.216 7.95 99.346 -7.95 99.35 -394.90 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.05 99.176 0.00 0.00 0.00
26 7.65 99.180 0.00 0.00 0.00
28 7.85 99.148
42+825.00
30 11.85 99.248

Luasan R (M2) 0.26


Luasan L (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+850.00 42+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.95 99.64 -396.08
102.000
1 -12.35 99.407 -7.95 99.642 0.00 199.08 0.00
2 -7.95 99.440 -7.95 99.440 -2.00 198.87 -198.87
3 -7.75 99.489 -9.95 99.425 0.00 198.99 0.00 101.000
4 -6.45 99.475 -9.95 99.562 2.00 199.20 199.20
5 -4.95 99.486 -7.95 99.642 7.95 99.64 396.08
100.000
6 -3.45 99.487 0.00 0.00 0.00
8 -1.95 99.493 0.00 0.00 0.00
10 -0.45 99.518 0.00 0.00 0.00 99.000
12 -0.45 99.488 7.95 99.43 395.24
14 0.45 99.488 7.95 99.432 0.00 198.69 0.00
98.000
16 0.45 99.418 7.95 99.255 0.10 198.50 9.93 -20 -15 -10 -5 0 5 10 15 20
18 1.95 99.368 8.05 99.249 1.90 198.50 188.58
20 3.45 99.318 9.95 99.254 0.00 198.61 0.00
22 4.95 99.298 9.95 99.352 -2.00 198.78 -198.78 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.45 99.265 7.95 99.432 -7.95 99.43 -395.24
26 7.75 99.266
28 8.05 99.249
42+850.00
30 11.65 99.259

Luasan R (M2) 0.28


Luasan L (M2) 0.34

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+875.00 42+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.95 99.52 -495.10
102.000
1 -12.55 99.303 -9.95 99.517 0.00 198.82 0.00
2 -8.15 99.306 -9.95 99.305 1.80 198.61 178.75
3 -7.95 99.438 -8.15 99.306 0.20 198.74 19.87 101.000
4 -6.45 99.437 -7.95 99.438 0.00 199.04 0.00
5 -4.95 99.483 -7.95 99.597 -2.00 199.11 -199.11
100.000
6 -3.45 99.500 -9.95 99.517 0.00 198.82 0.00
8 -1.95 99.538 -9.95 99.305 0.00 198.82 0.00
10 -0.45 99.588 -9.95 99.517 9.95 99.52 495.10 99.000
12 -0.45 99.767 0.00 0.00 0.00
14 0.45 99.762 0.00 0.00 0.00
98.000
16 0.45 99.528 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 1.95 99.489 9.95 99.46 494.82
20 3.45 99.471 9.95 99.461 0.00 198.85 0.00
22 4.95 99.438 9.95 99.384 -2.00 198.77 -198.77 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.45 99.408 7.95 99.390 0.00 198.93 0.00
26 7.75 99.400 7.95 99.541 2.00 199.00 199.00
28 8.05 99.390 9.95 99.461 -9.95 99.46 -494.82
42+875.00
30 11.75 99.378 0.00 0.00 0.00
0.00 0.00 0.00

Luasan R (M2) 0.23


Luasan L (M2) 0.49

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+900.00 42+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.95 99.47 -494.63
102.000
1 -12.25 99.366 -9.95 99.474 0.00 198.78 0.00
2 -8.15 99.265 -9.95 99.309 1.80 198.57 178.22
3 -7.95 99.403 -8.15 99.265 0.20 198.67 19.87 101.000
4 -6.45 99.430 -7.95 99.403 0.00 198.81 0.50
5 -4.95 99.488 -7.95 99.403 0.00 198.96 0.00
100.000
6 -3.45 99.520 -7.95 99.554 -2.00 199.03 -199.03
8 -1.95 99.637 -9.95 99.474 9.95 99.47 494.63
10 -0.45 99.678 0.00 0.00 0.00 99.000
12 -0.45 99.886 0.00 0.00 0.00
14 0.45 99.880 0.00 0.00 0.00
98.000
16 0.45 99.645 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
18 1.95 99.624 9.95 99.64 495.70
20 3.45 99.621 9.95 99.638 -2.00 199.36 -199.36
22 4.95 99.610 7.95 99.718 0.00 199.33 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.45 99.583 7.95 99.608 0.00 199.22 0.00
26 7.95 99.578 7.95 99.608 0.00 199.19 0.00
28 8.15 99.558 7.95 99.578 0.20 199.14 19.91
42+900.00
30 11.15 99.468 8.15 99.558 1.80 199.06 179.16
9.95 99.504 0.00 199.14 0.00
9.95 99.638 -9.95 99.64 -495.70

Luasan R (M2) 0.29


Luasan L (M2) 0.44

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+925.00 42+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.95 99.34 -494.21
102.000
1 -13.45 99.360 -9.95 99.339 0.00 198.76 0.00
2 -7.95 99.327 -9.95 99.422 2.00 198.92 198.92
3 -7.75 99.358 -7.95 99.502 0.00 198.83 0.00 101.000
4 -6.45 99.390 -7.95 99.327 -2.00 198.67 -198.67
5 -4.95 99.463 -9.95 99.339 9.95 99.34 494.21
100.000
6 -3.45 99.548 0.00 0.00 0.00
8 -1.95 99.653 0.00 0.00 0.00
10 -0.45 99.717 0.00 0.00 0.00 99.000
12 -0.45 99.933 0.00 0.00 0.00
14 0.45 99.919 7.95 99.88 397.03
98.000
16 0.45 99.668 7.95 99.882 2.00 199.68 199.68 -20 -15 -10 -5 0 5 10 15 20
18 1.95 99.688 9.95 99.802 0.00 199.45 0.00
20 3.45 99.728 9.95 99.646 -1.80 199.30 -179.37
22 4.95 99.758 8.15 99.650 -0.20 199.37 -19.94 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.45 99.699 7.95 99.718 0.00 199.60 0.00
26 7.95 99.718 7.95 99.882 -7.95 99.88 -397.03
28 8.15 99.650 0.00 0.00 0.00
42+925.00
30 12.71 99.641

Luasan R (M2) 0.38


Luasan L (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+950.00 42+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.95 99.33 -494.17
102.000
1 -11.55 99.530 -9.95 99.330 0.00 198.81 0.00
2 -8.05 99.428 -9.95 99.480 2.00 199.04 199.04
3 -7.85 99.407 -7.95 99.560 0.00 198.95 0.00 101.000
4 -6.45 99.458 -7.95 99.385 -2.00 198.72 -198.72
5 -4.95 99.548 -9.95 99.330 9.95 99.33 494.17
100.000
6 -3.45 99.628 0.00 0.00 0.00
8 -1.95 99.693 0.00 0.00 0.00
10 -0.45 99.728 0.00 0.00 0.00 99.000
12 -0.45 99.847 0.00 0.00 0.00
14 0.45 99.863 7.95 100.01 397.55
98.000
16 0.45 99.713 7.95 100.013 0.00 199.85 0.10 -20 -15 -10 -5 0 5 10 15 20
18 1.85 99.716 7.95 99.835 2.00 199.61 199.61
20 3.25 99.748 9.95 99.774 0.00 199.71 0.00
22 4.65 99.789 9.95 99.933 -2.00 199.95 -200.05 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.05 99.798 7.95 100.013 -7.95 100.01 -397.55
26 7.65 99.828 0.00 0.00 0.00
28 7.85 99.838 0.00 0.00 0.00
42+950.00
30 10.85 99.746 0.00 0.00 0.00

Luasan R (M2) 0.34


Luasan L (M2) 0.33

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 42+975.00 42+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.95 99.67 -495.87
102.000
1 -11.55 99.491 -9.95 99.673 2.00 199.43 199.43
2 -8.05 99.502 -7.95 99.753 0.00 199.29 0.00
3 -7.85 99.562 -7.95 99.532 -0.10 199.03 -9.95 101.000
4 -6.45 99.601 -8.05 99.502 -1.90 199.00 -189.05
5 -4.95 99.633 -9.95 99.496 0.00 199.17 0.00
100.000
6 -3.45 99.654 -9.95 99.673 9.95 99.67 495.87
8 -1.95 99.693 0.00 0.00 0.00
10 -0.45 99.742 0.00 0.00 0.00 99.000
12 -0.45 99.941 0.00 0.00 0.00
14 0.45 100.004 0.00 0.00 0.00
98.000
16 0.45 99.842 9.95 99.98 497.40 -20 -15 -10 -5 0 5 10 15 20
18 1.65 99.857 9.95 99.980 0.00 200.15 0.00
20 2.85 99.919 9.95 100.166 -2.00 200.41 -200.41
22 4.05 99.962 7.95 100.246 0.00 200.21 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 5.25 99.958 7.95 99.967 2.00 199.95 199.95
26 6.45 99.987 9.95 99.980 -9.95 99.98 -497.40
28 7.65 100.020 0.00 0.00 0.00
42+975.00
30 7.85 99.966 0.00 0.00 0.00
12.45 99.996

Luasan R (M2) 0.47


Luasan L (M2) 0.43

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 43+000.00 43+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.95 100.11 397.95
102.000
1 -16.15 99.411 7.95 100.112 2.00 200.14 200.14
2 -12.35 99.452 9.95 100.032 0.00 199.83 0.00
3 -11.95 99.552 9.95 99.802 -2.00 199.58 -199.58 101.000
4 -9.65 99.614 7.95 99.773 0.00 199.89 0.00
5 -8.35 99.687 7.95 100.112 -7.95 100.11 -397.95
100.000
6 -5.05 99.732 0.00 0.00 0.00
8 -2.45 99.764
10 -0.45 99.802 99.000
12 -0.45 99.917
14 0.45 99.971
98.000
16 0.45 99.822 -20 -15 -10 -5 0 5 10 15 20
18 1.85 99.827
20 3.25 99.874
22 4.65 99.892 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 6.05 99.899
26 7.65 99.917
28 7.90 99.772
43+000.00
30 10.95 99.817

Luasan R (M2) 0.57


Luasan L (M2)

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+700.00 37+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 100.66 412.71
103.000
1 -12.40 99.957 8.20 100.661 0.50 201.30 50.33
2 -7.90 100.040 8.70 100.641 0.00 201.13 0.00
3 -7.70 100.077 8.70 100.491 -0.50 201.00 -50.25 102.000
4 -6.30 100.082 8.20 100.511 0.00 201.17 0.00
5 -4.90 100.117 8.20 100.661 -8.20 100.66 -412.71
101.000
6 -3.50 100.122 0.00 0.00 0.00
7 -2.10 100.152
8 -0.70 100.143 100.000
9 -0.70 100.277
10 0.70 100.807
99.000
11 0.70 100.671 -20 -15 -10 -5 0 5 10 15 20
12 2.10 100.627
13 3.50 100.582
14 4.90 100.577 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.30 100.537
16 7.80 100.525
17 8.00 100.562
37+700.00
18 9.40 100.587

Luasan R (M2) 0.07

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+725.00 37+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 99.71 408.79
102.000
1 -11.50 99.492 8.20 99.706 0.00 199.26 0.00
2 -8.10 99.472 8.20 99.556 1.50 199.05 149.29
3 -7.90 99.552 9.70 99.496 0.00 199.14 0.00 101.000
4 -6.30 99.552 9.70 99.646 -1.50 199.35 -149.51
5 -4.90 99.580 8.20 99.706 -8.20 99.71 -408.79
100.000
6 -3.50 99.633 0.00 0.00 0.00
7 -2.10 99.677
8 -0.70 99.712 99.000
9 -0.70 99.847
10 0.70 99.832
98.000
11 0.70 99.687 -20 -15 -10 -5 0 5 10 15 20
12 2.10 99.649
13 3.50 99.617
14 4.90 99.602 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.30 99.597
16 7.80 99.632
17 8.00 99.760
37+725.00
18 11.00 99.812

Luasan R (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+750.00 37+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 99.40 407.54
102.000
1 -10.30 99.201 8.20 99.401 1.50 198.74 149.06
2 -8.10 99.171 9.70 99.341 0.00 198.53 0.00
101.000
3 -7.90 99.216 9.70 99.191 -1.50 198.44 -148.83
4 -6.30 99.196 8.20 99.251 0.00 198.65 0.00
100.000
5 -4.90 99.252 8.20 99.401 -8.20 99.40 -407.54
6 -3.50 99.273 0.00 0.00 0.00
99.000
7 -2.10 99.336 0.00 0.00 0.00
8 -0.70 99.373
98.000
9 -0.70 99.593
10 0.70 99.571
97.000
11 0.70 99.411 -20 -15 -10 -5 0 5 10 15 20
12 2.20 99.382
13 3.70 99.352
14 5.20 99.311 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.70 99.296
16 8.20 99.306
17 8.40 99.255
37+750.00
18 11.20 99.313

Luasan R (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+775.00 37+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 99.39 407.56
102.000
1 -9.50 99.272 8.20 99.392 0.00 198.61 0.00
2 -8.00 99.216 8.20 99.217 0.10 198.42 9.92
3 -7.80 99.229 8.30 99.201 0.25 198.43 24.70 101.000
4 -6.30 99.222 8.55 99.228 1.15 198.41 114.18
5 -4.90 99.246 9.70 99.182 0.00 198.51 0.00
100.000
6 -3.50 99.283 9.70 99.332 -1.50 198.72 -149.04
7 -2.10 99.335 8.20 99.392 -8.20 99.39 -407.56
8 -0.70 99.384 0.00 0.00 0.00 99.000
9 -0.70 99.580 0.00 0.00 0.00
10 0.70 99.590
98.000
11 0.70 99.402 -20 -15 -10 -5 0 5 10 15 20
12 2.20 99.343
13 3.70 99.314
14 5.20 99.301 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.70 99.236
16 8.10 99.233
17 8.30 99.201
37+775.00
18 11.40 99.536

Luasan R (M2)
Luasan L (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+800.00 37+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 99.48 407.88
102.000
1 -9.20 99.341 8.20 99.482 1.50 198.90 149.18
2 -7.80 99.340 9.70 99.422 0.00 198.66 0.00
3 -7.60 99.346 9.70 99.233 -1.50 198.48 -148.86 101.000
4 -5.80 99.371 8.20 99.250 0.00 198.73 0.00
5 -4.10 99.421 8.20 99.482 -8.20 99.48 -407.88
100.000
6 -2.40 99.501 0.00 0.00 0.00
7 -0.70 99.520
8 -0.70 99.669 99.000
9 0.70 99.672
10 0.70 99.492
98.000
11 2.10 99.456 -20 -15 -10 -5 0 5 10 15 20
12 3.50 99.434
13 4.90 99.411
14 6.30 99.351 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 7.90 99.331
16 8.10 99.251
17 11.30 99.214
37+800.00
18

Luasan R (M2)
Luasan L (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+825.00 37+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.20 99.51 408.00
102.000
1 -8.90 99.376 8.20 99.511 1.20 198.97 119.38
2 -8.70 99.376 9.40 99.463 0.00 198.70 0.00
3 -8.10 99.343 9.40 99.241 -1.20 198.52 -119.11 101.000
4 -7.90 99.371 8.20 99.276 0.00 198.79 0.00
5 -6.30 99.351 8.20 99.511 -8.20 99.51 -408.00
100.000
6 -4.90 99.406 0.00 0.00 0.00
7 -3.50 99.433
8 -2.10 99.483 99.000
9 -0.70 99.521
10 0.70 99.521
98.000
11 2.20 99.501 -20 -15 -10 -5 0 5 10 15 20
12 3.70 99.453
13 5.20 99.421
14 6.70 99.341 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 8.00 99.324
16 8.20 99.276
17 10.80 99.201
37+825.00

Luasan R (M2)
Luasan L (M2) 0.27

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+850.00 37+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.70 99.29 481.56
102.000
1 -8.70 99.449 9.70 99.291 0.00 198.84 0.00
2 -8.10 99.411 9.70 99.549 -1.50 199.16 -149.37
3 -7.90 99.421 8.20 99.609 0.00 199.05 0.00 101.000
4 -6.70 99.418 8.20 99.443 0.10 198.88 9.94
5 -5.20 99.466 8.30 99.436 1.40 198.73 139.11
100.000
6 -3.70 99.479 9.70 99.291 -9.70 99.29 -481.56
7 -2.20 99.533
8 -0.70 99.601 99.000
9 -0.70 99.876
10 0.70 99.902
98.000
11 0.70 99.619 -20 -15 -10 -5 0 5 10 15 20
12 2.20 99.568
13 3.70 99.526
14 5.20 99.496 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 6.70 99.453
16 8.10 99.451
17 8.30 99.436
37+850.00
18 10.20 99.239

Luasan R (M2)
Luasan L (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+875.00 37+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00 101.000
4 0.00 0.00 0.00
5 0.00 0.00 0.00
100.000
6 0.00 0.00 0.00
7
8 99.000
9
10
98.000
11 -20 -15 -10 -5 0 5 10 15 20
12
13
14 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15
16
17
37+875.00
18

Luasan R (M2)
Luasan L (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 37+900.00 37+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
0.00 0.00 0.00
102.000
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.00 0.00 0.00 101.000
4 0.00 0.00 0.00
5 0.00 0.00 0.00
100.000
6 0.00 0.00 0.00
7
8 99.000
9
10
98.000
11 -20 -15 -10 -5 0 5 10 15 20
12
13
14 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15
16
17
37+900.00
18

Luasan R (M2)
Luasan L (M2) 0.00

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)


Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+800.00 40+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.49 -373.09
102.000
1 -11.61 99.096 -7.50 99.490 0.00 198.81 0.00
2 -10.61 99.096 -7.50 99.320 -0.10 198.63 -9.93
3 -10.58 98.916 -7.60 99.305 -1.40 198.61 -139.02 101.000
4 -10.25 98.916 -9.00 99.300 0.00 198.73 0.00
5 -10.20 99.296 -9.00 99.430 1.50 198.92 149.19
100.000
6 -7.60 99.305 -7.50 99.490 7.50 99.49 373.09
7 -7.20 99.365
8 -5.60 99.354 99.000
9 -4.20 99.407
10 -2.80 99.424
98.000
11 -1.40 99.426 -20 -15 -10 -5 0 5 10 15 20
12 0.00 99.450
13 0.00 100.153
14 1.40 100.145 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 99.884

40+800.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+825.00 40+825.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-9.00 99.11 -446.01
102.000
1 -11.51 98.811 -9.00 99.113 0.00 198.11 0.00
2 -10.51 98.811 -9.00 98.994 1.40 197.99 138.60
3 -10.48 98.631 -7.60 99.000 0.10 197.99 9.90 101.000
4 -10.15 98.631 -7.50 98.988 0.00 198.16 0.00
5 -10.10 98.990 -7.50 99.173 -1.50 198.29 -148.71
100.000
6 -7.60 99.000 -9.00 99.113 9.00 99.11 446.01
8 -7.20 98.952
10 -5.60 98.968 99.000
12 -4.20 99.022
14 -2.80 99.045
98.000
16 -1.40 99.087 -20 -15 -10 -5 0 5 10 15 20
18 0.00 99.125
20 0.00 99.799
22 1.40 99.865 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 1.40 99.561

40+825.00

Luasan (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+850.00 40+850.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.02 -371.31
102.000
1 -10.20 98.860 -7.50 99.017 0.00 197.84 0.00
2 -7.60 98.818 -7.50 98.826 -0.10 197.64 -9.88
3 -7.30 98.841 -7.60 98.818 -1.40 197.66 -138.36 101.000
4 -6.00 98.858 -9.00 98.841 0.00 197.79 0.00
5 -4.50 98.925 -9.00 98.950 1.50 197.97 148.48
100.000
6 -3.00 98.950 -7.50 99.017 7.50 99.02 371.31
8 -1.50 99.002
10 0.00 99.040 99.000
12 0.00 99.713
14 1.40 99.731
98.000
16 1.40 99.478 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+850.00

Luasan (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+875.00 40+875.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.77 -370.37
102.000
1 -10.10 98.709 -7.50 98.766 0.00 197.72 0.00
2 -7.60 98.755 -7.50 98.952 -1.50 197.83 -148.37
3 -7.60 98.755 -9.00 98.880 0.00 197.61 0.00 101.000
4 -7.30 98.788 -9.00 98.729 1.40 197.48 138.24
5 -7.30 98.788 -7.60 98.755 0.10 197.52 9.88
100.000
6 -6.00 98.802 -7.50 98.766 7.50 98.77 370.37
8 -6.00 98.802
10 -4.50 98.871 99.000
12 -4.50 98.871
14 -3.00 98.915
98.000
16 -3.00 98.915 -20 -15 -10 -5 0 5 10 15 20
18 -1.50 98.952
20 -1.50 98.952
22 0.00 99.002 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
24 0.00 99.002
26 0.00 99.657
28 0.00 99.657
40+875.00
30 1.40 99.668
32 1.40 99.668
34 1.40 99.428

Luasan (M2) 0.26

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+900.00 40+900.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.77 -370.39
102.000
1 -10.10 98.785 -7.50 98.770 -0.10 197.54 -9.88
2 -7.60 98.769 -7.60 98.769 -1.40 197.55 -138.28
3 -7.30 98.772 -9.00 98.778 0.00 197.67 0.00 101.000
4 -6.00 98.770 -9.00 98.888 1.50 197.84 148.38
5 -4.50 98.820 -7.50 98.948 0.00 197.72 0.00
100.000
6 -3.00 98.862 -7.50 98.770 7.50 98.77 370.39
8 -1.50 98.893
10 0.00 98.928 99.000
12 0.00 99.579
14 1.40 99.568
98.000
16 1.40 99.326 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+900.00

Luasan L1 (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+925.00 40+925.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.72 -370.22
102.000
1 -10.10 98.710 -7.50 98.724 -0.10 197.43 -9.87
2 -7.60 98.708 -7.60 98.708 -1.40 197.42 -138.19
3 -7.20 98.772 -9.00 98.709 0.00 197.59 0.00 101.000
4 -5.60 98.802 -9.00 98.878 1.50 197.82 148.37
5 -4.20 98.841 -7.50 98.942 0.00 197.67 0.00
100.000
6 -2.80 98.868 -7.50 98.724 7.50 98.72 370.22
8 -1.40 98.924
10 0.00 98.951 99.000
12 0.00 99.509
14 1.40 99.529
98.000
16 1.40 99.312 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+925.00

Luasan L1 (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+950.00 40+950.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.66 -369.96
102.000
1 -11.10 98.798 -7.50 98.655 -0.10 197.28 -9.86
2 -7.60 98.622 -7.60 98.622 -1.40 197.31 -138.12
3 -7.20 98.755 -9.00 98.692 0.00 197.53 0.00 101.000
4 -5.60 98.721 -9.00 98.839 1.50 197.74 148.31
5 -4.20 98.825 -7.50 98.903 0.00 197.56 0.00
100.000
6 -2.80 98.887 -7.50 98.655 7.50 98.66 369.96
8 -1.40 98.922
10 0.00 98.975 99.000
12 0.00 99.518
14 1.40 99.508
98.000
16 1.40 99.280 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+950.00

Luasan L1 (M2) 0.32

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+975.00 40+975.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h

102.000
1 -11.10 98.718 -7.50 98.71 -370.14
2 -7.40 98.705 -7.50 98.705 0.00 197.41 0.00
3 -7.00 98.762 -7.50 98.705 -1.50 197.42 -148.06 101.000
4 -5.60 98.761 -9.00 98.711 0.00 197.52 0.00
5 -4.20 98.802 -9.00 98.811 1.50 197.69 148.27
100.000
6 -2.80 98.825 -7.50 98.883 0.00 197.59 0.00
8 -1.40 98.870 -7.50 98.705 7.50 98.71 370.14
10 0.00 98.930 99.000
12 0.00 99.558
14 1.40 99.518
98.000
16 1.40 99.268 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

40+975.00

Luasan (M2) 0.21

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+000.00 41+000.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.69 -370.10
102.000
1 -11.40 98.759 -7.50 98.692 0.00 197.59 0.00
2 -7.40 98.690 -7.50 98.895 -1.50 197.73 -148.30
3 -7.00 98.731 -9.00 98.835 0.00 197.55 0.00 101.000
4 -5.60 98.730 -9.00 98.718 1.50 197.41 148.06
5 -4.20 98.789 -7.50 98.692 7.50 98.69 370.10
100.000
6 -2.80 98.812 0.00 0.00 0.00
8 -1.40 98.832
10 0.00 98.880 99.000
12 0.00 99.502
14 1.40 99.518
98.000
16 1.40 99.230 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+000.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+025.00 41+025.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.70 -370.12
102.000
1 -13.50 98.708 -7.50 98.698 0.00 197.58 0.00
2 -7.50 98.698 -7.50 98.886 -1.50 197.71 -148.28
3 -7.30 98.723 -9.00 98.826 0.00 197.53 0.00 101.000
4 -6.00 98.733 -9.00 98.700 1.50 197.40 148.05
5 -4.50 98.773 -7.50 98.698 7.50 98.70 370.12
100.000
6 -3.00 98.778
8 -1.50 98.803
10 0.00 98.878 99.000
12 0.00 99.405
14 1.40 99.416
98.000
16 1.40 99.098 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+025.00

Luasan (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+050.00 41+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.70 -370.11
102.000
1 -12.50 98.660 -7.50 98.697 0.00 197.55 0.00
2 -7.60 98.697 -7.50 98.855 -1.50 197.65 -148.24
3 -7.00 98.698 -9.00 98.795 0.00 197.48 0.00 101.000
4 -5.60 98.696 -9.00 98.686 1.50 197.38 148.04
5 -4.20 98.739 -7.50 98.697 7.50 98.70 370.11
100.000
6 -2.80 98.777
8 -1.40 98.813
10 0.00 98.853 99.000
12 0.00 99.036
14 1.40 99.059
98.000
16 1.40 98.908 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+050.00

Luasan (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+075.00 41+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.78 -370.42
102.000
1 -12.70 98.749 -7.50 98.778 0.00 197.41 0.00
2 -7.60 98.633 -7.50 98.635 -0.10 197.27 -9.86
3 -7.00 98.648 -7.60 98.633 -1.40 197.30 -138.11 101.000
4 -5.60 98.677 -9.00 98.665 0.00 197.38 0.00
5 -4.20 98.708 -9.00 98.718 1.50 197.50 148.12
100.000
6 -2.80 98.727 -7.50 98.778 7.50 98.78 370.42
8 -1.40 98.737
10 0.00 98.753 99.000
12 0.00 98.959
14 1.40 98.998
98.000
16 1.40 98.807 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+075.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+100.00 41+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 98.89 -370.82
102.000
1 -12.20 98.827 -7.50 98.886 0.00 197.63 0.00
2 -7.30 98.743 -7.50 98.746 0.00 197.49 0.00
3 -7.00 98.720 -7.50 98.746 -1.50 197.52 -148.14 101.000
4 -5.60 98.730 -9.00 98.772 0.00 197.60 0.00
5 -4.20 98.757 -9.00 98.826 1.50 197.71 148.28
100.000
6 -2.80 98.777 -7.50 98.886 7.50 98.89 370.82
8 -1.40 98.783
10 0.00 98.806 99.000
12 0.00 99.033
14 1.40 99.097
98.000
16 1.40 98.899 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+100.00

Luasan (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 4 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+125.00 41+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 99.02 -371.33
100.000
1 -10.40 98.779 -7.50 99.020 0.00 197.91 0.00
2 -7.40 98.893 -7.50 98.889 0.00 197.78 0.00
3 -7.00 98.860 -7.50 98.889 -1.50 197.72 -148.29
4 -5.60 98.883 -9.00 98.832 0.00 197.79 0.00
5 -4.20 98.943 -9.00 98.960 1.50 197.98 148.49
99.000
6 -2.80 98.993 -7.50 99.020 7.50 99.02 371.33
8 -1.40 99.046
10 0.00 99.088
12 0.00 99.320
14 1.40 99.319
98.000
16 1.40 99.119 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+125.00

Luasan (M2) 0.19

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan
………………………. Konsultan Supervisi
………………………. ………………………. Penyedia Jasa
……………………….
PPK 3.1 Provinsi
Penilik Jawa
Jalan Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero)
Inspector Cabang Semarang - PT. Buana Archicon
Surveyor PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Pelaksana
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :
Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+775.00 40+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.00 -374.98
102.000
1 -11.51 99.729 -7.50 99.995 0.00 200.18 0.00
2 -10.51 99.729 -7.50 100.183 -1.50 200.31 -150.23
3 -10.48 99.549 -9.00 100.123 0.00 200.06 0.00 101.000
4 -10.15 99.549 -9.00 99.933 1.40 199.90 139.93
5 -10.10 99.908 -7.60 99.964 0.10 199.96 10.00
100.000
6 -7.60 99.964 -7.50 99.995 7.50 100.00 374.98
7 -7.40 100.027
8 -7.10 100.046 99.000
9 -5.60 100.038
10 -4.20 100.051
98.000
11 -2.80 100.055 -20 -15 -10 -5 0 5 10 15 20
12 -1.40 100.054
13 0.00 100.078
14 0.00 100.727 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.725
1.40 100.477

40+775.00

Luasan (M2) 0.30

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)
Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
Pekerjaan Tanggal : 3 NOVEMBER 2021

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 40+750.00 40+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
-7.50 100.52 -376.95
102.000
1 -10.63 100.332 -7.50 100.520 0.00 201.18 0.00
2 -10.21 100.332 -7.50 100.655 -1.50 201.25 -150.94
3 -10.18 100.152 -9.00 100.595 0.00 201.11 0.00 101.000
4 -9.85 100.152 -9.00 100.513 1.40 201.03 140.72
5 -9.80 100.511 -7.60 100.516 0.10 201.04 10.05
100.000
6 -7.60 100.516 -7.50 100.520 7.50 100.52 376.95
7 -7.10 100.536
8 -5.60 100.561 99.000
9 -4.20 100.578
10 -2.80 100.588
98.000
11 -1.40 100.630 -20 -15 -10 -5 0 5 10 15 20
12 0.00 100.665
13 0.00 101.124
14 1.40 101.105 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
15 1.40 100.827

40+750.00

Luasan (M2) 0.17


PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+500.00 41+500.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.10 445.93
103.000
1 -1.00 99.873 9.00 99.096 -1.50 198.25 -148.69
2 0.00 99.786 7.50 99.156 0.00 198.20 0.00
102.000
3 0.00 99.482 7.50 99.046 0.10 198.08 9.90
4 1.80 99.359 7.60 99.038 1.40 198.05 138.63
101.000
5 3.75 99.237 9.00 99.010 0.00 198.11 0.00
6 5.60 99.148 9.00 99.096 -9.00 99.10 -445.93
100.000
7 7.50 99.046 0.00 0.00 0.00
8 7.60 99.038 0.00 0.00 0.00
99.000
9 9.10 99.008 0.00 0.00 0.00
10 10.00 98.935 0.00 0.00 0.00
98.000
0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
0.00 0.00 0.00

41+500.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+525.00 41+525.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 99.15 371.80
102.000
1 -0.80 99.863 7.50 99.147 0.00 198.18 0.00
2 -0.80 99.777 7.50 99.037 0.10 198.09 9.90
3 0.00 99.712 7.60 99.057 1.40 198.06 138.64 101.000
4 0.00 99.448 9.00 99.001 0.00 198.09 0.00
5 1.80 99.307 9.00 99.087 -1.50 198.23 -148.68
100.000
6 3.75 99.208 7.50 99.147 -7.50 99.15 -371.80
7 5.60 99.117 0.00 0.00 0.00
8 7.50 99.037 99.000
9 7.60 99.057
10 9.10 98.997
98.000
11 9.80 98.680 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+525.00

Luasan R (M2) 0.13

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+550.00 41+550.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 99.21 372.03
102.000
1 -0.90 99.761 7.50 99.207 1.50 198.35 148.77
2 -0.90 99.646 9.00 99.147 0.00 198.14 0.00
101.000
3 0.00 99.588 9.00 98.997 -1.50 198.05 -148.54
4 0.00 99.391 7.50 99.057 0.00 198.26 0.00
100.000
5 1.80 99.314 7.50 99.207 -7.50 99.21 -372.03
6 3.75 99.208 0.00 0.00 0.00
99.000
7 5.60 99.162 0.00 0.00 0.00
8 7.50 99.097 0.00 0.00 0.00
98.000
9 7.60 99.091 0.00 0.00 0.00
10 9.10 99.249 0.00 0.00 0.00
97.000
11 10.60 99.348 0.00 0.00 0.00 -20 -15 -10 -5 0 5 10 15 20
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 EXISTING DATA UKUR REALISASI AGREGAT KELAS A
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
41+550.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Luasan R (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+575.00 41+575.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.11 446.01
102.000
1 -0.90 99.656 9.00 99.114 0.00 198.24 0.00
2 -0.90 99.531 9.00 99.124 -1.50 198.31 -148.73
3 0.00 99.556 7.50 99.184 0.00 198.26 0.00 101.000
4 0.00 99.308 7.50 99.074 0.10 198.08 9.90
5 1.80 99.249 7.60 99.006 1.40 197.88 138.52
100.000
6 3.75 99.188 9.00 98.878 0.00 197.99 0.00
7 5.60 99.148 9.00 99.114 -9.00 99.11 -446.01
8 7.50 99.074 99.000
9 7.60 99.006
10 9.10 98.869
98.000
11 10.40 98.737 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+575.00

Luasan R (M2) 0.31

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+600.00 41+600.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.18 446.33
102.000
1 -0.90 99.635 9.00 99.184 0.00 198.38 0.00
2 -0.90 99.483 9.00 99.194 -1.50 198.45 -148.84
3 0.00 99.479 7.50 99.254 0.00 198.40 0.00 101.000
4 0.00 99.278 7.50 99.144 0.00 198.25 0.00
5 1.80 99.148 7.50 99.109 0.10 198.17 9.91
100.000
6 3.75 99.203 7.60 99.062 1.40 198.12 138.68
7 5.60 99.178 9.00 99.057 -9.00 99.06 -445.76
8 7.50 99.109 0.00 0.00 0.00 99.000
9 7.60 99.062
10 9.10 99.057
98.000
11 10.10 99.059 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+600.00

Luasan R (M2) 0.33

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+625.00 41+625.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.26 446.68
102.000
1 -0.90 99.650 9.00 99.263 -1.50 198.59 -148.94
2 -0.90 99.528 7.50 99.323 0.00 198.54 0.00
3 0.00 99.538 7.50 99.213 0.10 198.41 9.92 101.000
4 0.00 99.298 7.60 99.198 1.40 198.38 138.86
5 1.80 99.286 9.00 99.180 0.00 198.44 0.00
100.000
6 3.75 99.267 9.00 99.263 -9.00 99.26 -446.68
7 5.60 99.248
8 7.50 99.213 99.000
9 7.60 99.198
10 9.10 99.179
98.000
11 10.10 98.993 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+625.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+650.00 41+650.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.30 446.85
102.000
1 -0.90 99.740 9.00 99.299 -1.50 198.66 -148.99
2 -0.90 99.572 7.50 99.359 0.00 198.61 0.00
3 0.00 99.642 7.50 99.249 0.10 198.49 9.92 101.000
4 0.00 99.349 7.60 99.244 1.40 198.50 138.95
5 1.80 99.318 9.00 99.258 0.00 198.55 0.00
100.000
6 3.75 99.288 9.00 99.289 0.00 198.59 0.00
7 5.60 99.269 9.00 99.299 -9.00 99.30 -446.85
8 7.50 99.249 0.00 0.00 0.00 99.000
9 7.60 99.244
10 9.10 99.259
98.000
11 10.10 99.288 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+650.00

Luasan R (M2) 0.12

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+675.00 41+675.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 99.35 372.55
102.000
1 -0.90 99.752 7.50 99.346 0.00 198.58 0.00
2 -0.90 99.643 7.50 99.236 0.10 198.48 9.92
3 0.00 99.669 7.60 99.239 1.40 198.44 138.91 101.000
4 0.00 99.420 9.00 99.197 0.00 198.47 0.00
5 1.80 99.351 9.00 99.276 0.00 198.56 0.00
100.000
6 3.75 99.317 9.00 99.286 -1.50 198.63 -148.97
7 5.60 99.289 7.50 99.346 -7.50 99.35 -372.55
8 7.50 99.236 0.00 0.00 0.00 99.000
9 7.60 99.239
10 9.10 99.194
98.000
11 10.10 99.229 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+675.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+700.00 41+700.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 99.32 372.47
102.000
1 -0.90 99.750 7.50 99.324 1.50 198.59 148.94
2 -0.90 99.625 9.00 99.264 0.00 198.38 0.00
3 0.00 99.678 9.00 99.114 -1.50 198.29 -148.72 101.000
4 0.00 99.402 7.50 99.174 0.00 198.50 0.00
5 1.80 99.346 7.50 99.324 1.50 198.59 148.94
100.000
6 3.75 99.317 9.00 99.264 -1.50 198.59 -148.94
7 5.60 99.260 7.50 99.324 -7.50 99.32 -372.47
8 7.50 99.214 99.000
9 7.60 99.221
10 8.80 99.296
98.000
11 9.40 99.402 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+700.00

Luasan R (M2) 0.22

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+725.00 41+725.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 99.28 372.32
102.000
1 -0.90 99.639 7.50 99.284 1.50 198.51 148.88
2 -0.90 99.514 9.00 99.224 0.00 198.39 0.00
3 0.00 99.539 9.00 99.164 -0.10 198.34 -9.92 101.000
4 0.00 99.291 8.90 99.172 -1.30 198.32 -128.91
5 1.80 99.263 7.60 99.144 -0.10 198.32 -9.92
100.000
6 3.75 99.227 7.50 99.174 0.00 198.46 0.00
7 5.60 99.189 7.50 99.284 -7.50 99.28 -372.32
8 7.50 99.174 0.00 0.00 0.00 99.000
9 7.60 99.144
10 8.90 99.172
98.000
11 9.50 99.125 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+725.00

Luasan R (M2) 0.14

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+750.00 41+750.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.22 446.47
102.000
1 -1.00 99.593 9.00 99.216 -1.50 198.49 -148.87
2 -1.00 99.530 7.50 99.276 0.00 198.44 0.00
3 0.00 99.527 7.50 99.166 0.00 198.31 0.00 101.000
4 0.00 99.270 7.50 99.147 0.10 198.28 9.91
5 1.80 99.245 7.60 99.134 1.40 198.17 138.72
100.000
6 3.75 99.210 9.00 99.033 0.00 198.25 0.00
7 5.60 99.169 9.00 99.216 -9.00 99.22 -446.47
8 7.50 99.147 0.00 0.00 0.00 99.000
9 7.60 99.134
10 9.20 99.019
98.000
11 9.20 98.694 -20 -15 -10 -5 0 5 10 15 20
12 9.80 98.653
13 9.80 99.450
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+750.00

Luasan R (M2) 0.24

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+775.00 41+775.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.12 446.04
102.000
1 -1.00 99.569 9.00 99.121 -1.50 198.30 -148.73
2 0.00 99.249 7.50 99.181 0.00 198.24 0.00
101.000
3 0.00 99.249 7.50 99.057 0.10 198.11 9.91
4 1.80 99.199 7.60 99.054 1.40 198.06 138.64
100.000
5 3.75 99.146 9.00 99.009 0.00 198.13 0.00
6 5.60 99.116 9.00 99.121 -9.00 99.12 -446.04
99.000
7 7.60 99.054 0.00 0.00 0.00
8 9.20 99.003
98.000
9 9.20 98.689
10 9.70 98.669
97.000
11 9.70 98.930 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+775.00

Luasan R (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 41+800.00 41+800.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 99.09 445.88
102.000
1 -0.80 99.579 9.00 99.085 -1.50 198.23 -148.67
2 -0.80 99.519 7.50 99.145 0.00 198.18 0.00
3 0.00 99.508 7.50 99.034 0.10 198.05 9.90 101.000
4 0.00 99.269 7.60 99.019 1.40 198.05 138.63
5 1.85 99.190 9.00 99.027 0.00 198.11 0.00
100.000
6 3.75 99.129 9.00 99.085 -9.00 99.09 -445.88
8 5.60 99.070 0.00 0.00 0.00
10 7.50 99.034 99.000
12 7.60 99.019
14 9.60 99.030
98.000
16 9.60 98.830 -20 -15 -10 -5 0 5 10 15 20
18 10.20 98.819
20 10.20 98.949
EXISTING DATA UKUR REALISASI AGREGAT KELAS A

41+800.00

Luasan R (M2) 0.14

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+050.00 35+050.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
8.30 101.77 422.35
103.000
1 -0.80 101.677 8.30 101.770 -0.80 203.57 -81.43
2 0.00 101.678 7.50 101.802 0.00 203.49 0.00
102.000
3 0.00 101.456 7.50 101.692 0.20 203.37 20.34
4 1.85 101.501 7.70 101.681 0.60 203.36 61.01
101.000
5 3.75 101.561 8.30 101.681 0.00 203.45 0.00
6 5.60 101.621 8.30 101.770 -8.30 101.77 -422.35
100.000
7 7.50 101.692 0.00 0.00 0.00
8 7.70 101.681
99.000
9 8.30 101.681

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+050.00

Luasan R (M2) 0.08

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+075.00 35+075.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 102.17 459.78
103.000
1 -0.90 102.220 9.00 102.174 0.00 204.36 0.00
2 0.00 102.242 9.00 102.184 -1.50 204.43 -153.32
3 0.00 101.951 7.50 102.244 0.00 204.38 0.00
4 1.85 101.962 7.50 102.134 0.10 204.20 10.01 102.000
5 3.75 102.027 7.60 102.063 0.02 204.13 1.74
6 5.60 102.073 7.62 102.062 1.39 204.24 141.43
7 7.50 102.134 9.00 102.174 -9.00 102.17 -459.78 101.000
8 7.60 102.061
9 9.10 102.182
10 10.10 102.192
100.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+075.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+100.00 35+100.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 102.10 459.46
103.000
1 -1.40 102.155 9.00 102.102 -1.50 204.26 -153.20
2 -1.40 102.127 7.50 102.162 0.00 204.21 0.00
3 0.00 102.125 7.50 102.052 0.10 204.08 10.20 102.000
4 0.00 101.861 7.60 102.028 1.40 204.02 142.81
5 1.85 101.884 9.00 101.987 0.00 204.09 0.00
101.000
6 3.75 101.939 9.00 102.102 -9.00 102.10 -459.46
7 5.60 101.980 0.00 0.00 0.00
8 7.50 102.052 100.000
9 7.60 102.028
10 9.10 101.984
99.000
11 10.10 102.121 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+100.00

Luasan R (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+125.00 35+125.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 102.07 459.32
103.000
1 -1.40 102.133 9.00 102.071 -1.50 204.20 -153.15
2 -1.40 102.101 7.50 102.131 0.00 204.15 0.00
3 0.00 102.090 7.50 102.021 0.10 204.00 10.20 102.000
4 0.00 101.821 7.60 101.981 1.40 204.01 142.81
5 1.85 101.849 9.00 102.027 0.00 204.10 0.00
101.000
6 3.75 101.901 9.00 102.071 -9.00 102.07 -459.32
7 5.60 101.971 0.00 0.00 0.00
8 7.50 102.021 100.000
9 7.60 101.981
10 9.10 102.030
99.000
11 9.80 102.044 -20 -15 -10 -5 0 5 10 15 20
12 9.80 101.891

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+125.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+150.00 35+150.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 102.09 459.39
103.000
1 -1.50 102.148 9.00 102.086 -1.50 204.23 -153.17
2 -1.50 102.109 7.50 102.146 0.00 204.18 0.00
3 0.00 102.142 7.50 102.036 0.10 204.03 10.20 102.000
4 0.00 101.876 7.60 101.991 1.40 203.99 142.79
5 1.85 101.901 9.00 101.997 0.00 204.08 0.00
101.000
6 3.75 101.926 9.00 102.086 -9.00 102.09 -459.39
7 5.60 101.962 0.00 0.00 0.00
8 7.50 102.036 0.00 0.00 0.00 100.000
9 7.60 101.991
10 9.10 101.997
99.000
11 9.60 101.999 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+150.00

Luasan R (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+175.00 35+175.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 102.08 459.36
103.000
1 -1.45 102.122 9.00 102.081 -1.50 204.22 -153.17
2 -1.45 102.131 7.50 102.141 0.00 204.17 0.00
102.000
3 0.00 102.157 7.50 102.031 0.10 204.05 10.20
4 0.00 101.898 7.60 102.020 1.40 204.07 142.85
101.000
5 1.85 101.889 9.00 102.050 0.00 204.13 0.00
6 3.75 101.931 9.00 102.081 -9.00 102.08 -459.36
100.000
7 5.60 101.980
8 7.50 102.031
99.000
9 7.60 102.020
10 9.10 102.052
98.000
11 9.60 102.046 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+175.00

Luasan R (M2) 0.11

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+200.00 35+200.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
7.50 101.13 379.24
102.000
1 -1.45 101.090 7.50 101.131 0.00 202.11 0.00
2 -1.45 101.091 7.50 100.981 1.50 201.90 151.43
3 0.00 101.122 9.00 100.921 0.00 201.99 0.00 101.000
4 0.00 100.850 9.00 101.071 -1.50 202.20 -151.65
5 1.85 100.861 7.50 101.131 -7.50 101.13 -379.24
100.000
6 3.75 100.892 0.00 0.00 0.00
7 5.60 100.953 0.00 0.00 0.00
8 7.50 101.021 0.00 0.00 0.00 99.000
9 7.60 101.000
10 9.10 101.090
98.000
11 9.60 101.049 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+200.00

Luasan R (M2) 0.23

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+225.00 35+225.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.08 454.86
102.000
1 -1.45 101.139 9.00 101.080 -1.50 202.22 -151.67
2 -1.45 101.132 7.50 101.140 0.00 202.17 0.00
3 0.00 101.141 7.50 101.030 0.10 202.06 10.10 101.000
4 0.00 100.919 7.60 101.027 1.40 202.08 141.45
5 1.85 100.926 9.00 101.049 0.00 202.13 0.00
100.000
6 3.75 100.958 9.00 101.080 -9.00 101.08 -454.86
7 5.60 100.992 0.00 0.00 0.00
8 7.50 101.030 0.00 0.00 0.00 99.000
9 7.60 101.027
10 9.10 101.051
98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+225.00

Luasan R (M2) 0.11

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+250.00 35+250.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.10 454.94
102.000
1 -1.50 101.171 9.00 101.098 -1.50 202.26 -151.69
2 -1.50 101.145 7.50 101.158 0.00 202.21 0.00
3 0.00 101.161 7.50 101.048 0.10 202.02 10.10 101.000
4 0.00 100.945 7.60 100.971 1.40 201.99 141.39
5 1.85 100.900 9.00 101.016 0.00 202.11 0.00
100.000
6 3.75 100.976 9.00 101.098 -9.00 101.10 -454.94
7 5.60 101.016 0.00 0.00 0.00
8 7.50 101.048 99.000
9 7.60 100.971
10 9.10 101.019
98.000
11 10.10 101.076 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+250.00

Luasan R (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+275.00 35+275.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.12 455.04
102.000
1 -1.50 101.261 9.00 101.120 -1.50 202.30 -151.73
2 0.00 100.951 7.50 101.180 0.00 202.25 0.00
3 0.00 100.971 7.50 101.070 1.50 202.06 151.55 101.000
4 1.85 101.021 9.00 100.991 0.00 202.11 0.00
5 3.75 101.051 9.00 101.120 -9.00 101.12 -455.04
100.000
6 5.60 101.070 0.00 0.00 0.00
7 7.50 101.070 0.00 0.00 0.00
8 9.00 100.991 0.00 0.00 0.00 99.000
9 10.50 100.881

98.000
-20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+275.00

Luasan R (M2) 0.18

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
………………………. ………………………. ………………………. ……………………….
Penilik Jalan Inspector Surveyor Pelaksana

PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+300.00 35+300.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.30 455.85
102.000
1 -1.40 101.251 9.00 101.300 -1.50 202.66 -152.00
2 -1.40 101.250 7.50 101.360 0.00 202.61 0.00
3 0.00 101.287 7.50 101.250 0.10 202.45 10.12 101.000
4 0.00 101.032 7.60 101.200 1.40 202.38 141.67
5 1.85 101.080 9.00 101.183 0.00 202.48 0.00
100.000
6 3.75 101.130 9.00 101.300 -9.00 101.30 -455.85
7 5.60 101.171 0.00 0.00 0.00
8 7.50 101.250 0.00 0.00 0.00 99.000
9 7.60 101.200
10 9.10 101.182
98.000
11 10.60 101.232 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+300.00

Luasan R (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+325.00 35+325.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.53 456.87
102.000
1 -1.35 101.350 9.00 101.526 -1.50 203.11 -152.33
2 -1.35 101.410 7.50 101.586 0.00 203.06 0.00
101.000
3 0.00 101.479 7.50 101.476 0.10 202.92 10.15
4 0.00 101.200 7.60 101.441 1.40 202.91 142.04
100.000
5 1.85 101.242 9.00 101.470 0.00 203.00 0.00
6 3.75 101.321 9.00 101.526 -9.00 101.53 -456.87
99.000
7 5.60 101.410 0.00 0.00 0.00
8 7.50 101.476
98.000
9 7.60 101.441
10 9.10 101.472
97.000
11 10.10 101.541 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+325.00

Luasan R (M2) 0.15

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
PERHITUNGAN KUANTITAS (SERTIFIKAT BULANAN NO. 05)

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG Back Up Kuantitas Bulan : NOVEMBER 2021
Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021 Periode : 26 OKTOBER -
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021 25 NOVEMBER 2021
Penyedia Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
Konsultan Supervisi : PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG - PT. BUANA ARCHICON CABANG SURABAYA
No. Mata Pembayaran : 5.1.(1)
Item Pekerjaan : Lapis Pondasi Agregat Kelas A

EXISTING DATA UKUR REALISASI AGREGAT KELAS A


STA. 35+350.00 35+350.00
SKET GAMBAR / KETERANGAN
Jarak Elevasi Jarak Elevasi Luasan (M2)
Titik
X(DIST)M Y(EL)M X(DIST)M Y(EL)M X(n)-X(n-1) Y(n-1)+Y(n) e x(f/2)
a b c d e f g h
9.00 101.92 458.64
102.000
1 -1.50 101.630 9.00 101.921 -1.50 203.90 -152.93
2 -1.50 101.691 7.50 101.981 0.00 203.85 0.00
3 0.00 101.721 7.50 101.871 0.10 203.70 10.19 101.000
4 0.00 101.521 7.60 101.831 1.40 203.63 142.54
5 1.85 101.531 9.00 101.802 0.00 203.72 0.00
100.000
6 3.75 101.661 9.00 101.921 -9.00 101.92 -458.64
8 5.60 101.760 0.00 0.00 0.00
10 7.50 101.871 99.000
12 7.60 101.831
14 9.10 101.800
98.000
16 10.30 101.841 -20 -15 -10 -5 0 5 10 15 20

EXISTING DATA UKUR REALISASI AGREGAT KELAS A

35+350.00

Luasan R (M2) 0.20

Mengetahui / Menyetujui : Diperiksa oleh : Diajukan oleh :


Pembantu Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PPK 3.1 Provinsi Jawa Tengah PT. Aria Jasa Reksatama(KSO) - PT.Virama Karya (Persero) Cabang Semarang - PT. Buana Archicon PT. Ayudi Persada - PT. Multi Bangun Indonesia, KSO
Cabang Surabaya

………………………. ………………………. ………………………. ……………………….


Penilik Jalan Inspector Surveyor Pelaksana
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 40+768.00 L M3 0.17
7.00 1.14
2 40+775.00 L M3 0.16
25.00 5.07
1 40+800.00 L M3 - 0.25
25.00 4.90
2 40+825.00 L M3 0.15
25.00 4.99
3 40+850.00 L M3 0.25
25.00 5.69
4 40+875.00 L M3 0.20
25.00 5.05
5 40+900.00 L M3 0.20
25.00 5.64
6 40+925.00 L M3 0.25
25.00 7.20
7 40+950.00 L M3 0.33
25.00 7.41
8 40+975.00 L M3 0.27
25.00 6.66
9 41+000.00 L M3 0.27
25.00 6.33
10 41+025.00 L M3 0.24
25.00 5.40
11 41+050.00 L M3 0.19
25.00 5.86
12 41+075.00 L M3 0.28
25.00 5.32
13 41+100.00 L M3 0.15
25.00 4.29
14 41+125.00 L M3 0.19

JUMLAH M3 325.00 80.95


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 40+125.00 L M3 0.24
25.00 6.27
2 40+150.00 L M3 0.26
25.00 6.39
3 40+175.00 L M3 0.25
25.00 6.50
4 40+200.00 L M3 0.27
25.00 6.12
5 40+225.00 L M3 0.22
25.00 4.91
6 40+250.00 L M3 0.18
25.00 5.31
7 40+275.00 L M3 0.25
25.00 6.52
8 40+300.00 L M3 0.27
25.00 6.42
9 40+325.00 L M3 0.24
25.00 8.05
10 40+350.00 L M3 0.40
25.00 9.30
11 40+375.00 L M3 0.34
25.00 5.95
12 40+400.00 L M3 0.13
25.00 4.47
13 40+425.00 L M3 0.22
25.00 4.80
14 40+450.00 L M3 0.16
25.00 5.08
15 40+475.00 L M3 0.25
25.00 6.39
16 40+500.00 L M3 0.26
25.00 6.22
17 40+525.00 L M3 0.23
25.00 5.42
18 40+550.00 L M3 0.20
25.00 4.86
19 40+575.00 L M3 0.19
25.00 4.79
20 40+600.00 L M3 0.19
25.00 4.35
21 40+625.00 L M3 0.15
25.00 5.35
22 40+650.00 L M3 0.27
25.00 6.64
23 40+675.00 L M3 0.26
25.00 7.58
24 40+700.00 L M3 0.35
23.00 5.91
25 40+723.00 L M3 0.16
JUMLAH M3 173.00 143.59
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 41+175.00 L M3 0.19
25.00 5.12
2 41+200.00 L M3 0.22
25.00 5.56
3 41+225.00 L M3 0.22
25.00 5.06
4 41+250.00 L M3 0.18
25.00 6.08
5 41+275.00 L M3 0.30
25.00 7.91
6 41+300.00 L M3 0.33
25.00 7.60
7 41+325.00 L M3 0.28
25.00 7.22
8 41+350.00 L M3 0.30
25.00 5.92
9 41+375.00 L M3 0.18
25.00 6.10
10 41+400.00 L M3 0.31
25.00 6.86
11 41+425.00 L M3 0.24
25.00 6.44
12 41+450.00 L M3 0.28
25.00 7.20
13 41+475.00 L M3 0.30
25.00 5.56
14 41+500.00 L M4 0.15
25.00 4.74
15 41+525.00 L M4 0.23
25.00 5.47
16 41+550.00 L M3 0.20
25.00 4.68
17 41+575.00 L M3 0.17
25.00 4.47
18 41+600.00 L M3 0.19
25.00 5.15
19 41+625.00 L M3 0.22
25.00 7.72
20 41+650.00 L M3 0.39
25.00 8.41
21 41+675.00 L M3 0.28
25.00 6.18
22 41+700.00 L M4 0.22
25.00 6.03
23 41+725.00 L M4 0.27
25.00 6.00
24 41+750.00 L M4 0.21
25.00 5.35
25 41+775.00 L M3 0.22
25.00 5.41
26 41+800.00 L M4 0.22

JUMLAH M3 325.00 152.25


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 38+975.00 L M3 0.21
25.00 6.56
2 39+000.00 L M3 0.31
25.00 6.90
3 39+025.00 L M3 0.24
25.00 6.00
4 39+050.00 L M3 0.24
25.00 5.69
5 39+075.00 L M3 0.21
25.00 5.11
6 39+100.00 L M3 0.20
25.00 4.76
7 39+125.00 L M3 0.19
25.00 5.54
8 39+150.00 L M3 0.26
25.00 6.16
9 39+175.00 L M3 0.24
25.00 6.16
10 39+200.00 L M3 0.26
25.00 7.11
11 39+225.00 L M3 0.31
25.00 6.91
12 39+250.00 L M3 0.24
25.00 5.61
13 39+275.00 L M3 0.21
25.00 5.32
14 39+300.00 L M3 0.22
25.00 5.90
15 39+325.00 L M3 0.25
29.00 7.24
16 39+354.00 L M3 0.25
JUMLAH 379.00 90.97
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 39+454.00 L M3 0.25
21.00 5.01
2 39+475.00 L M3 0.23
25.00 6.67
3 39+500.00 L M3 0.30
25.00 8.08
4 39+525.00 L M3 0.34
25.00 8.33
5 39+550.00 L M3 0.32
25.00 6.94
6 39+575.00 L M3 0.23
19.00 5.10
7 39+594.00 L M3 0.31

JUMLAH 140.00 40.14


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN

Item Pekerjaan : Lapis Pondasi Agregat Kelas A


No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 39+634.00 L M3 0.29
16.00 4.62
2 39+650.00 L M3 0.29
25.00 7.58
3 39+675.00 L M3 0.32
25.00 7.66
4 39+700.00 L M3 0.29
25.00 6.80
5 39+725.00 L M3 0.25
25.00 6.17
6 39+750.00 L M3 0.24
25.00 6.01
7 39+775.00 L M3 0.24
25.00 5.61
8 39+800.00 L M3 0.21
25.00 6.57
9 39+825.00 L M3 0.31
25.00 8.15
10 39+850.00 L M3 0.34
25.00 8.28
11 39+875.00 L M3 0.32
25.00 7.86
12 39+900.00 L M3 0.30
25.00 6.45
13 39+925.00 L M3 0.21
25.00 4.98
14 39+950.00 L M3 0.19
25.00 4.84
15 39+975.00 L M3 0.20
25.00 5.49
16 40+000.00 L M3 0.24
25.00 5.97
17 40+025.00 L M4 0.24
15.00 3.46
18 40+040.00 L M5 0.22
JUMLAH 406.00 106.47
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 35+450.00 R M3 0.15
25.00 4.41
2 35+475.00 R M3 0.20
25.00 5.56
3 35+500.00 R M3 0.24
25.00 5.87
4 35+525.00 R M3 0.22
25.00 5.95
5 35+550.00 R M3 0.25
25.00 6.20
6 35+575.00 R M3 0.24
25.00 6.45
7 35+600.00 R M3 0.27
25.00 5.75
8 35+625.00 R M3 0.19
25.00 4.96
9 35+650.00 R M3 0.21
25.00 5.55
10 35+675.00 R M3 0.24
25.00 5.75
11 35+700.00 R M3 0.22
25.00 5.53
12 35+725.00 R M3 0.22
25.00 5.98
13 35+750.00 R M3 0.26
25.00 7.03
14 35+775.00 R M3 0.30
25.00 8.06
15 35+800.00 R M3 0.34
25.00 7.92
16 35+825.00 R M3 0.29
25.00 7.48
17 35+850.00 R M3 0.31
25.00 7.88
18 35+875.00 R M3 0.32
25.00 6.87
19 35+900.00 R M3 0.23
25.00 5.22
20 35+925.00 R M3 0.19
25.00 4.58
21 35+950.00 R M3 0.18
25.00 4.64
22 35+975.00 R M3 0.20
25.00 4.09
23 36+000.00 R M3 0.13
25.00 4.64
24 36+025.00 R M3 0.24
25.00 5.25
25 36+050.00 R M3 0.18
25.00 5.24
26 36+075.00 R M3 0.24
25.00 5.74
27 36+100.00 R M3 0.22
25.00 4.65
28 36+125.00 R M3 0.15
25.00 4.22
29 36+150.00 R M3 0.18
25.00 5.41
30 36+175.00 R M3 0.25
25.00 5.36
31 36+200.00 R M3 0.18
25.00 4.67
32 36+225.00 R M3 0.19
25.00 4.15
33 36+250.00 R M3 0.14
25.00 3.58
34 36+275.00 R M3 0.15
25.00 4.29
35 36+300.00 R M3 0.20

JUMLAH M3 325.00 188.91


BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 37+200.00 L M3 0.16
25.00 4.13
2 37+225.00 L M3 0.17
25.00 4.48
3 37+250.00 L M3 0.19
25.00 5.35
4 37+275.00 L M3 0.24
25.00 5.71
5 37+300.00 L M3 0.22
25.00 7.42
6 37+325.00 L M3 0.37
25.00 9.56
7 37+350.00 L M3 0.39
25.00 6.25
8 37+375.00 L M3 0.11
25.00 4.47
9 37+400.00 L M3 0.25
25.00 4.70
10 37+425.00 L M3 0.13
25.00 4.43
11 37+450.00 L M3 0.23
25.00 5.09
12 37+475.00 L M3 0.18
25.00 4.10
13 37+500.00 L M3 0.15
JUMLAH M3 300.00 65.70
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 42+500.00 L M3 0.30
25.00 7.68
2 42+525.00 L M3 0.31
25.00 7.68
3 42+550.00 L M3 0.30
25.00 7.50
4 42+575.00 L M3 0.30
25.00 7.50
5 42+600.00 L M3 0.30
25.00 7.52
6 42+625.00 L M3 0.30
25.00 7.16
7 42+650.00 L M3 0.27
25.00 6.24
8 42+675.00 L M3 0.23
25.00 5.75
9 42+700.00 L M3 0.23
25.00 6.65
10 42+725.00 L M3 0.30
25.00 7.50
11 42+750.00 L M3 0.30
25.00 7.50
12 42+775.00 L M3 0.30
25.00 7.64
13 42+800.00 L M3 0.31
25.00 7.27
14 42+825.00 L M4 0.27
25.00 7.63
15 42+850.00 L M5 0.34
25.00 10.36
16 42+875.00 L M6 0.49
25.00 11.67
17 42+900.00 L M7 0.44
25.00 8.78
18 42+925.00 L M8 0.26
25.00 7.29
19 42+950.00 L M9 0.33
25.00 9.39
20 42+975.00 L M10 0.43
25.00 5.33
21 43+000.00 L M11 -
JUMLAH M3 325.00 154.02
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 42+500.00 R M3 0.55
25.00 13.01
2 42+525.00 R M3 0.50
25.00 11.80
3 42+550.00 R M3 0.45
25.00 9.22
4 42+575.00 R M3 0.29
25.00 6.83
5 42+600.00 R M3 0.26
25.00 7.12
6 42+625.00 R M3 0.31
25.00 8.09
7 42+650.00 R M3 0.33
25.00 8.11
8 42+675.00 R M3 0.32
25.00 6.36
9 42+700.00 R M3 0.19
25.00 4.66
10 42+725.00 R M3 0.18
25.00 5.99
11 42+750.00 R M3 0.30
25.00 7.50
12 42+775.00 R M3 0.30
25.00 7.25
13 42+800.00 R M3 0.28
25.00 6.75
14 42+825.00 R M3 0.26
25.00 6.76
15 42+850.00 R M3 0.28
25.00 6.36
16 42+875.00 R M3 0.23
25.00 6.43
17 42+900.00 R M3 0.29
25.00 8.34
18 42+925.00 R M3 0.38
25.00 8.97
19 42+950.00 R M3 0.34
25.00 10.03
20 42+975.00 R M3 0.47
25.00 12.92
21 43+000.00 R M3 0.57
JUMLAH M3 325.00 162.51
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI JAWA TENGAH
PEMBUAT KOMITMEN 3.1 PROVINSI JAWA TENGAH
Alamat : Jl. Durian Raya No. 51 A Pedalangan - Banyumanik Semarang Telp./Fax (024) 7462834

REKAPITULASI
PERHITUNGAN KUANTITAS
SERTIFIKAT BULANAN NO. 05

Paket : REKONTRUSI JALAN WELERI - KENDAL - SEMARANG


Nomor dan Tanggal Kontrak : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/03, TANGGAL 05 JULI 2021
Nomor dan Tanggal SPMK : HK.02.01/PPK3.1-JATENG/PKT/VII/2021/04, TANGGAL 06 JULI 2021
Penyedia Barang/Jasa : PT AYUDI PERSADA - PT. MULTI BANGUN INDONESIA, KSO
PT. ARIA JASA REKSATAMA(KS0) - PT.VIRAMA KARYA (PERSERO) CABANG SEMARANG -
Konsultan Supervisi :
PT. BUANA ARCHICON CABANG SURABAYA
Lingkup Pekerjaan : PERKERASAN BERBUTIR DAN BETON SEMEN
Item Pekerjaan : Lapis Pondasi Agregat Kelas A
No. Mata Pembayaran : 5.1.(1)

Panjang Area
NO. LOKASI R/L SAT. VOLUME (m3) KETERANGAN
(m) (m2)

1 37+700.00 R M3 0.07
25.00 3.75
2 37+725.00 R M3 0.23
25.00 5.63
3 37+750.00 R M3 0.23
25.00 5.72
4 37+775.00 R M3 0.23
25.00 6.86
5 37+800.00 R M3 0.32
25.00 7.37
6 37+825.00 R M3 0.27
25.00 7.37
7 37+850.00 R M3 0.32

JUMLAH M3 150.00 36.70


-1.45 101.818
-1.45 101.901
0 101.981
0 101.811
1.85 101.869
3.75 101.936
5.6 102.039
7.5 102.101
7.6 102.104
8.6 102.281
9.6 102.261