Recovery Act Plan ‐ Nobles County
Introduced/Proposed Projects (to date)
Project
Location Identifier Start Date Local Units Affected Project Detail Projected Cost
DGR Water/Sewer Replacement
Adrian Engineering 2022 Adrian on Louisiana Avenue $ 205,000.00
Water Nitrate/Potential
DGR LPRW Connection & Lift
Adrian Engineering 2023‐2025 Adrian Station Updates $ 1,500,000.00
Wastewater
DGR Improvements due to
Brewster & MNSP Engineering 2022‐2024 Brewster MPCA regulations $ 5,600,000.00
Water & Sewer Main
DGR Improvements w/ Street
Ellsworth Engineering 2023‐2024 Ellworth Replacement Project $ 760,000.00
Lincoln Pipestone BIOTTTA Implementation
Rural Water LPRW All Units at Holland WTP $ 5,156,250.00
Wenck & Reading Residents Central Mound
Reading and immediate Wastewater Systems for
Reading Residents 2023‐24 surrounding residents $ 3,000,000.00
DGR Water Distribution &
Rushmore Engineering 2022 Rushmore LPRW Connection, Pending $ 2,175,000.00
$ 26,363,919.00