Quiz (20 questions/20 points)
Each question is worth I point. Attempt all 20 aes. All questions are true/false type
Part A
‘Statement ___[True/False
T)_Execiite @ sales program for @ new home air purifier is an example of a project
73) Disadvantages of functional project teams are Lack of ownership and poor
integration
3)_Work on an audit of'a major client is an example of a project
4) A temporary endeavor undertaken to create a unique product, srvice, or result is
called a project
5) Major characteristics of a project includes establishing an objective, specific time,
cost, and performance requirements, etc.
6) Project lifecycle consists of defining, planning, executing, and closing of the
|__project life cycle
7) Agile project management focusses on “breaking projects into small functional
pieces, and adapting to changing requirements”
8) Strategic management is “a continuous, iterative process aimed at developing an
integrated and coordinated long-term plan of action”
9) Project Priority System is required duc to implementation gap, organizetion
Politics, Resource Conflicts and Multitasking
10) Advantages of functional project teams are Flexi
lity and In-depth expertise
bol aiaadad
Part B
Statement ‘Tree/False_
TI)No functional area can play a dominant role in completing the project
T2) Agile project management focusses on “passive collaboration between the project
and customer representatives”
13) Three different project management structures are Functional, Dedicated and
structured project teams
14) Weakness of “Dedicated Project Team Approach” include simple and cohesive
15) Adventages of Matrix Management include Dysfunctional conflict end Infighting
16) Project Scope is defined as “results fo be achieved in specific tangible, and
‘measurable terms”
17) Project Charter often includes a brief scope description as well as such items as risk
limits, business ease, spending limits, and even team composition.
18) WBS provides management with information appropriate to exch organizational —
level.
19) Project estimating is the process of forecasting or approximating the fime and cast
of completing project deliverables.
20) Critical Path is the shortest expected time in which the entire project can be
completed
aT [Aly a Rin: @UsPp TEST ANSWER BOOKLET
THE UNIVERSITY OF THE
SOUTH MACIEIC
PleoseTickOne: mst [] testa] rest []
ISTRUCTIONS TO CANDIDATES
“obefledin by sande
nba of pagesusee 12
1, Write legibty in English on both sides of the paper. Bagin the answer
et Guestone
Torderyou
tae snowed then
farina wo
to anew question on anew page. Number each answer as per the
question inthe exam question paper
2, Write your name on every shest of paper used.
3. Penclimay not be used except for diagrams, or when specifically
askedto do so,
4, Allanswers shouldbe writen in black or blue ink, Do not use red
pen orpereil unless questions spectclly requires you todo so,
5. Ifthisenswer booldet is full and you would keto continue waiting,
please request for a supplementary answer booklet. Multiple answer
booklets should be tied together, loosely, with a string, which s
avalable on request. Wake sure you write your name and student 10
number on each addtional answer boolet used
6 Rough working should be done on loose ned sheets of paper that
isavollable on request.
7. Only question numbers should be written in the left-hand margin Role
8. Yousrenct required to write out the question. —_——
Do not start writing until you ae told to do so. Stop writing when Bit Wo
“The superisorn-Charg indicates thatthe exam has finished,
“You wil be penalized if yu do nat Follow these Instructions
10. Complete the tear-off attendance slip below by filling in all the
‘equked detals, Detach the slip and eave tin the eiht-hand
corner of your desk with your student ID card, Once collected, TOTAL
this wil confirm your etendance a the examination. TONING
ourionto, ss
7 se «
:
BI
surname : es, sens Other Names nnn ACLS,
Stadent 1D Humber <2ACA ZS
somes: DD
serine
curse Code: RAM 2O Amin o sudy: KALE, WO Pack +
SPOR. an Compus/Cont OAS.
owes eho ae as Cro] ralUSP
‘THE UNIVERSITY OF THE
SOUTH PACIFIC
Name: DOE ERKcson ip, Sqoaies(o‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name: PORemY FECSou iD: S4oqrso
revailoc » Wis ides : oo:
40 Wwaplecinert , Muorclon ond repo Feel pgs‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name: Dooorey ERGSonl wm Sqoqias.oTHE UNIVERSITY OF THE
SOUTH PACIFIC
name Do@otuy ERICson pw: SQDq 2510‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name: Lorotey Ecol ip, S4eqiacie‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name POQateY ERCsoN ID: S4OUZSID‘THE UNIVERSITY OF THE
‘SOUTH PACIFIC“THE ONIVERSITY OFTHE
SOUTH PACIFIC
name, Devaney ERS 9 sqaqiesoUS
‘THE UNIVERSITY OF THE
‘SOUTH PACIFIC
name: [>o@estiey ERICSON wp: SIoaECa“THE UNIVERSITY OR THE
SOUTH PACIFIC
name: DONTE ELSON Ig, S GOAISS'S