You are on page 1of 1

International Well Control Forum Grading Analysis Sheet Level 3

Surface BOP Stack Principles and Procedures (P&P) Test

Schedule ID: 40035 CR-Number: CR-825549 Candidate Name: SRIHARSHA ALAPATI Session ID: 702643

Std. Ref. Standards Descriptor Question Summary


*DR-SF-PNP-10.03.06 Kill Method Principles Maintaining constant BHP when changing pump speed.
*DR-SF-PNP-13.01.01 Recognition of Problems and First Actions Indications of downhole or surface problems that can arise
during well control operations.
*DR-SF-PNP-02.01.01 Hydrostatic Pressure Factors that affect hydrostatic pressure.
*DR-SF-PNP-05.04.01 Gas Cutting Gas cutting of drilling fluid.

3P/EN/702643/2108 Page 1 of 1

You might also like