Quiz (20 questions/20 points)
SWOUGS, Fp
Bach question is worth 1 point. Attempt all 20 auestibns All questions are true/false type
Part A
“Statement True/Palee
1) Execute a sales program for a new home air purifier is an example of a project | pease.
2) Disadvantages of functional project teams are Lack of ownership end poor :
integration Wwe
'3)_Work on an audit ofa major client is an example of a project False
4) A temporary endeavor undertaken to create a unique product, sevice, or result is
called a project A
5) Major characteristics of a project includes establishing an objective, specific time, | __
cost, and performance requirements, etc we,
6) Project lifecycle consists of defining, planning, executing, andclosing of the
project life cycle - [Tae
7) Agile project management Focusses on “breaking projects into small finctional | __
pieces, and adapting to changing requirements” [ime |
8) Strategic management is “a continuous, iterative process aimal a developing an
integrated and coordinated long-term plan of action” False
9) Project Priority System is required duo to implementation gap, organization
Politics, Resource Conflicts and Multitasking Tae
10) Advantages of functional project teams are Flexibility and In-depth expertise “Tae
Parts
Siatement | True/Faise
+ |11)No functional area can play a dominant role in completing the project False
12) Agile project management focusses on “passive collaboration beeween the project
and customer representatives” Woe
13) Three different project management siructures are Functional, Dedisated and
structured project teams LTAtse,
| 14) Weakness of “Dedicated Project Team Approach” include simple and cohesive | "Palse
15) Advantages of Matrix Management include Dysfunctional conflict and infighting | Fa Se.
16)Project Scope is defined as “results to be achieved in specific, tangible, and
measurable terms” z Trae,
T7)Project Charter often includes « brief scope description as well s Such items as risk
limits, business case, spending limits, and even team composition Tree,
18) WBS provides management with information appropriate to exch organizational
level wale
19)Project estimating isthe process of forecasting or approximating the time and cost |=.
|__ of completing project deliverables. wae
20) Critical Path is the shortest expected time in which the entire project can be 7
| completed False
Sonam Sounder SWOEG BFTEST ANSWER BOOKLET
THE UNIVERSITY OF THE
SOUTH TACHIC
sumame:,. SEAM hex,
Student 10 Wurber on 2ANO DEF
couse code: MOA 436 64
Course Title.
Campus/Centre ww PleseTickOne: st [] Tests rest]
INSTRUCTIONS TO CANDIDATES Toalnesnb teas
fone et ogra (ears
4. Write legibly in Enlish on both sides of the paper. Begin the answer sain a
sais Chanson
to anew question ona new page. Number each shswer ae per the esaeeg aie
question inthe exam question paper.
2. Writeyour nme on every sheet of poper use fae aad
3. Peneilmay net be used except for diagrams, or when specially
asked to do so Boh
4. Allenswers should be writen in blsck or blue nk. Do not use red oy
0 oF pencil unless questions specifiy requires you todo so.
5. this answer booklets full and you would lke to continue writing, Oz
please request fora supplementary ancwer booklet. Multiple snswer
booklets should be tied together, loosely, with a sting, which is Rut &
avalaleon request, Make sure you vrte your rame and student iD a
‘number on each additional answer booklet used, ay
5. Rough working sheuld be done on lose tned sheets of paper that
is avallable on request. @ 2
7. Only question numbers shouldbe writen nthe lf-hand margin. :
8. Youarenot cequiced to write out the question. Pat
8, Born start writing until you ae told todo so. Stop writing when
‘The supervisorn-Charge indicates that the exam has finished, ay
“You will be penalized if you do nat follow these Instructions, j
10, Complete the teor-off attendance slip below by filing inal the
‘quired deta, Detach the slp and leave tin the right-hand
corner of your desk with your student IO card. Once collected, TOTAL Pee
this wil confirm your attendances the examination. pacamade
x“ x
Ea
@USP cero anlODREEO
THE UNNaSrTS OF Tae
SOPRA
sumame: .. 204M sa OtherNames:-.. SEAN?
NOLFNT... course code MOMSEN uoseor guy: .. PZ, Centon)
Student lONumber | on
Year nc PAE so an Campus/Centre : Lakes Nae.
Semaster
ont oA us: tea reel]
SignatureUSE
‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name: Sonam Gounder
ID: Silo 4 24
aA phase
22s | parenWuor
THE UNIVERSITY OF TE
SOUTH PACIFIC
ame: Serer Ceswndoy I: SWUCUTAF
w coantuclt, payaot HAE oagele dnd ean de® wyeet
ment glee So raped vole For oogonia ejectSOUOL
‘THE UNIVERSITY OF THE
SOUTH PACIFIC
NAME: Sonewn Geandoy ID: S (lo 4qaty
oraemsdkion, Stracuye and the
son PP REE errs
are, shat anive is
degre d on»
smn 8 SEEORA, SAA. GL VS hecicaded Pn beams iisJe
‘THE UNIVERSITY OF THE,
SOUTH PACIFIC
NAME: Sonam Qeander ID: S\ohFBY
tehere ai * e stediated team +o vokIi
‘THE UNIVERSITY OF THE
SOUTH PACIRIC
NAME: Savio Feander wm: Sunoweeig Ons Aweind tier —
completion
xed Shrwetne one
aBUI
‘THE UNIVERS'TY OF THE
SOUTH PACIFIC
name: Sonam Gowdey 1D: BNOUARAT
sa pth ane Bene hy
ahanty,,.Ubte Mra x
£4 Research ard. daweloprnant‘THE UNIVERSITY OF THE
‘SOUTH PACIFICSy t/J/7h
‘THE UNIVERSITY OF THE
SOUTH PACIFIC
name: Sitodaa > Dr S\Wo4ae\z-
Th \ovelves Analy out wheal can:
nxmal operations - assessment
wbarclay wish and shave rick:
A Pa, OY. cares.
Soy nek oven, wcfereting ¢ 2 ee kowrees, aha pradaMS Uo
‘THE UNIVERSITY OF THE
SOUTH PAGIFIC
ID: Syoqeq 2
nave a cevtnnagn,
YE. went - es
2 Reshma a NENA
ae orcas atom, “he Yea the. caditvs, stvoutegeQW VJs
‘THE UNIVERSITY OF THE
SOUTH PACITC.
NAMED Spam Ceun die DQ owaar>
10ee ee oe eel
‘THE UNIVERSITY OF THE
‘SOUTH PACIFIC
name: Sora Cecinder Ws SUoGa ary
2 sg he. a PAO. MSSM.
7 Aad heels, lb 6) -
speek‘THE UNIVERSITY OF THE
SOUTH PACIFIC
NAME: Goran Qos WD: SNOLF RP