41 Grama Sachivalayam Building Works Status Report (Agriculture Staff) -


Abstract
Report as on Date : 22-Mar-2022
District West Godavari Cluster PR Eluru
Mandal Pentapadu

Spill over works from Admin Sanctions Total works during FY No of


Total Expenditure (in Lakhs)
2020-2021 during FY2021-2022 2021-2022 works in
Panchayat Estimated Estimated Estimated
S.No progress Incurred for works during this year
Name No. amount (in No. amount (in No. amount (in during FY EGS- Converge
Lakhs) Lakhs) Lakhs) EGS-Wage Total
2021-2022 Material nce
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Akuteegapadu 0 0 1 21.8 1 21.8 1 0.03 4.16 0 4.2
2 Alampuram 0 0 2 43.6 2 43.6 2 0 20.56 0 20.56
3 B. Kondepadu 0 0 1 21.8 1 21.8 1 0 5.05 0 5.05
4 Darsiparru 0 0 1 21.8 1 21.8 1 0 6.81 0 6.81
5 Jattapalem 0 0 1 21.8 1 21.8 1 0 3.08 0 3.08
6 Pentapadu 0 0 1 21.8 1 21.8 1 0 10.55 0 10.55
7 Korumilli 0 0 1 21.8 1 21.8 1 0 7.15 0 7.15
8 Meenavalluru 0 0 1 21.8 1 21.8 1 0 12.56 0 12.56
9 Mounjdepadu 0 0 1 21.8 1 21.8 1 0 4.82 0 4.82
10 Mudunuru 0 0 1 21.8 1 21.8 1 0.02 8.82 0 8.85
11 ru 0 0 1 21.8 1 21.8 1 0 11.7 0 11.7
12 Parimella 0 0 1 21.8 1 21.8 1 0 8.64 0 8.64
13 Pentapadu 0 0 3 65.5 3 65.5 3 0 15.23 0 15.23
14 Prathipadu 0 0 1 21.8 1 21.8 1 0 14.02 0 14.02
15 Racharla 0 0 1 21.8 1 21.8 1 0 5.69 0 5.69
16 Ravipadu 0 0 1 21.8 1 21.8 1 0 10.47 0 10.47
17 Vallurupalli 0 0 1 21.8 1 21.8 1 0 10.8 0 10.8
Total 0 0 20 436.1 20 436.1 20 0.06 160.1 0 160.16
Total
Cumulativ
e
Expenditu
re (in
Lakhs)
14
10.41
21.87
6.78
12.79
10.54
16.95
15.49
13.99
13.79
9.74
18.49
17.91
31.31
18.56
13.54
11.83
18.04
262.03