You are on page 1of 68
eames 26-06 (102002) SAUDI ARABIAN OIL COMPANY eleal2 Gpgouull gSolji Saudi Aramco EWwo-16N018 COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM AND UPS. ESTABLISHMENT FOR ECC & PORT CONTROL AT RT a LOW VOLTAGE CABLE SIZING CALCULATION i i : 2 § i ; : g & i i 5 i : : ‘| | JACOBS ZATE BE i 5 |e 3 [estes ateoumon rarest core pecs ow |r | cat | OT TORTS TOONS Introdueti ‘The selection of Low Voltage cables is based on: 1+ Cable Ampacity as per NEC tables. 2. Voltage Drop calculation. 4: Cable Ampacity: Ampacity is defined as “the current in amperes a conductor can carry continuously under the conditions of Use (conditions of the surrounding medium in which the cables are installed) without exceeding ils temperature rating’. The ampacity values stated (specified) in NEC tables are based an some specific conditions relative to the cable's immediate surrounding environment. So, a derating factor should be. applied against a base ampacity to calculate the derated ampacity as stated in the following formula: r F Where: ("')is Derated Ampacity, cable ampacity at actual installation conditions. (I) is Base Ampacity, cable ampacity specified in NEC tables. (F) is Overall Derating Factor. The overall derating factor is a correction factor that takes into account the differences in the cable's actual installation and operating conditions from the base conditions. This factor establishes the maximum load capability that results in an actual cable life equal to or greater than that expected when operated at the| base ampacity under the specified conditions". The Overall Derating Factor (F) is composed of several ‘components as indicated in the following Equation: F=Ffx Ftx Fthx Fg Where Ff = Derating factor for firo coating, Ft = Derating factor to account for the differences in ambient and conductor temperatures from the base case Fh = Derating factor for underground soil thermal resistance (only for Directly Buried cables). Fg = Derating factor for cable grouping, 20F4 Fire Coating Derating Factor (Fj: As per Sec. 12.6.4 of SAES-P-104, F, = 0,85 when cables are freproofed by coating or wrapping with a compound or other material. Ifnot, then F; shall equal to 1.0 Ambient and conductor temperature derating factor (Ft): This adjustment factor is used to determine the cable ampacity when the operating ambient, temperature and/or the maximum allowable conductor temperature differ trom the original temperatures at which the cable base ampacity is specified in the NEC Tables. The expression for calculating the effect of changes in the conductor and ambient temperatures on the base ampacily is given by this Equation for copper conductors: 112 Te-Tal As per SAES-P-104 Section 12.6 Te-Ta (Source of formula: IEEE 835) Where: Tc : Conductor temperature (used in the table) Ta: Table ambient temperature Tat : Actual ambient temperature Soil Thermal Resistance Derating Factor for Direct Buried Cables (F, As per Sec. 12.6.1(B) of SAES-P-104, Earth Thermal Resistivity (RHO) for Land = 120°C-cmW. To obtain ampacities at 120°C-cmiwatt, when not listed in the NEC lables, ampacitios at 90°C-cmvW should be multiplied by the following factors: 0.892 (for Direct buried single core cables) 0.90 (for Direct buried multicore core cables) Grouping Derating Factor (Fa): Grouping derating factor (Fg) of cables directly buried 3/C and 1/C are selected as per tables 13-10 and 13-11 of IEEE standard 399-1997; respectively. Grouping derating factor (Fg) of cables in conduit is selected depending on the number of current carrying conductors in a raceway as per table Table 310.15(8)(3)(a) of NEC2011 30F4 2. Voltage Drop Limitations: ‘The selected conductor, if not of sufficient size, will cause excessive voltage drop in the circuit, and the drop will be in direct proportion to the circuit length. The NEC recommends that the steady-state voltage drop in power, heating, or lighting feeders be no more than 3% of the system nominal voltage. The percentage voltage drop can be determined from the formulas below: (Simplified equations from IEEE Standard 141-1993) For Three-Phase Load: BX lw XL (R Cos 0-+X Sin 6) x 100% 1000 x WV.D.= For Two-Phase/Single-Phase Load: 2X Imac ¥ L(R Cos +X Sin @) x 100% 1000 x Es WV.D.= Where %6V.D. = Percent Voltage Drop. E; = System Nominal Voltage (Volts). Iyex = Maximum Operating Current (Amperes), Circuit Length (meters) R ircuit Resistance (Ohms/km), x Circuit Reactance (Ohms/km). Cos @ = Power Factor of Load Sin® = Reactive Factor of Load Under the steady-state conditions, the voltage at the utilization equipment must comply with the requirements of Saudi Aramco Engineering Standard SAES-P-100, Sec. 6.2. Notes: ~ This calculation sheet is for Low voltage systems only. Cable Type is Copper, XLPE Insulated - NEC ampacity tables are selected as per the guidelines of Section 12.6.1 of SAES-P-104. - Fault duration time has been considered as per SAES-P-104, Para 12.6.6 and ETAP study. Attachments: - Attachment-1: Low Voltage Cable Size Calculation - Attachment-2: SAUD! Cable Company Catalogue 40F4 afelalelalala See =o x ors r +} |ATTACHMENT-2 THREE AND FOUR CORE CABLES WITH COpPER CON XLPE INSULATED AND PVC SHEA asta 8 a = 2» ‘ oi 8 2 “3 ® » ° 208 = “ @ “ » x © = ® ® = er 2 @ ® vs te o @ 2 « = on7 Ce ~~ aoe wr wma 1 ost avr ee ee ee ‘= coe a0 a ee ee ee 5 a1 oa ws amma 2 corse oat ee ee m0 0 cera ee 19 ooera cess ee ee 0 osseo ose ows 2s asm oxes0 oxo ‘ sea ana ower 10 1310 soe oat veer 000 1088 oy = asses cars x08 0353 0 sera ooo om as? os esr aoe os ars 1% 1008 ore ons ors 1 ona cece omer 205 15 cee cess 00038 700 20 wore cers en) nr 0 cscs ees 035 orm “eo case acess ome ont so cos cece om ave ABLES LAID DIRECT IN GROUND Ite site condtins a ot the sane as he tere cnc fr which the apace ae CANE, th urn ating inthe proves tables are te mums wit te gpropreta aig ators shan ma flowing es Rating factors fr varaion aground temperate XC ates 80°) ating factors fo variation n depth of burl to contre of cable in the efi! group of cables), oa 125 109 oss ow 006 Coe) ows os RATING FACTORS FOR LOW VOLTAGE CABLES Rating factors for variation in thermelresisityof sol average values) Sng cor eatie oro 160 16 12 107 ost oe ors ro 4c.) a7 noe or os: 80 on wos ue 108 108 asa ose or fem 25-59 16 190 108) owe oe ars ter 185.900 18 1 16 oe ost on Rating actors for variation in ar temperate wpe be 10 108 ‘ ons ow pee ve yea 85°) 18 ant 105 1 098 ony ose ‘Group rating factors fr muticore cabs in formation 2 oe asr ost 093 6 ose 070 ore oa 5 ass os or a3 RATING FACTORS OW VOLTAGE CABLES for circuits of thee single core cables, intro old touching i iat harlzontal formation eet oy ot terres oat ae or om re ‘ an EUs 6) on ‘ge ating actors for vari on in thermal resistivity ot sl fverage vas) ee ‘ol tara sity in Can Single ore able fem tes 00 ut 108 100) ass pes ore ro 00-800 12 08 108 oss oe ore wpe 10 100 ce oor pee oss 25-190 108 sot 103 oss so ss 185-00 sor os 103 ons oe oss Rating actors for dept faving (to conte of auctor tet group of vets) 138 2 ‘rou rating factors fr single cor Croup rating tactrs fr muticore sabe In sng way a 098 98 es in treto sinale way ducts, horizontal formation oar as ‘Spscing oa Low vourace SAUD! ARABIAN OIL COMPANY sanz] soup 6v | ao TSSUED FOR CONSTRUCTION sae ean SMU sg, OE ae RE dpgouul gSoly Saudi Aramco EWO- 16N018A COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT FOR ECC & PORT CONTROL ADEQUACY REPORT OF EXISTING STANDBY DIESEL GENERATOR PREPARED BY JACOBS ZATE ‘STANDBY DIESEL GENERATOR SIZING snare] mawrao] wor] onamnewo | ewrno | wvno [2 ‘COMPLETE UPGRAGE OF ENERGENY POWER SYSTEWs | DOC | 7 UPS ESTABLISHMENT FOR ECC & PORT CONTROL ose | P | CALC1315 of | 00 RAS TANURA SAUDIARABIA | W/eNo EWO-16NOTBA | _4 TSO TEIN tar Say Aramco 2646-ENG (03/99) Z| g SAUDI ARABIAN OIL COMPANY els g TABLE OF CONTENTS le BR Ie aly 4. INTRODUCTION 3a |g 52 ie 2. OBJECTIVE seu 3 3 3. REFERENCES ..... 3 3 2 4, PRINCIPLE DESIGN CONSIDERATIONS. svn nnatnnnieseeee . 3a 85 Hl ale 5. LOAD SUMMARY FOR STANDBY DIESEL GENERATOR vo sesoss a ff gle IP Slo 6. STANDBY DG SET SIZING CALCULATION a 2 7. CONCLUSIONS... 4 ie lz Ie Bae FE a FE sau a re | 4 "Rav I3 Amo | aan le ay E Le 3 | | iS | IE peld LE Saad E Zi E Bs aie E Brads le gfe IS Bogik iE Bitte. * £5 | ££] stanoay oieset GENERATOR SENG ewarrre| mac wo] wor] oamwewo [wno [rev [2 gi | 1: F[SOMPLETE UPGRADE OF EMERGENY POWERSYSTEN | DOC a 3 | 1 5 5 slurs esraauisiaenr FoR Ecc a PORT CONTROL oss | P| CALCISIS | oF | 00 © 25 be &[ RAS TANURA SAUDIARABIA | 10/EWO. EWO-16N018A, . TSO RES UIT Te ‘Saud romeo 2646-£NG (03/99) 2]3] SAUDI ARABIAN OIL COMPANY sly 1. INTRODUCTION 42 The project scope is to provide Emergency power backup to new critical equipment’s ats inside new ECC room on the fist floor and port control room on the second flor. Also, 10 51 | provide UPS backup for Computers, lighting and emergency lighting for conference room during emergencies. The new emergency loads shall be connected to existing standby Diesel Generator. The existing Diesel Generator is feeding the existing Emergency Main Distribution Board. The new emergency loads shall be connected at Emergency Main Distribution board via distribution transformer F F 2. OBJECTIVE The purpose of this report is to verify the existing diesel Generator capacity by considering new emergency loads considered in this project. ISSUED FOR CONSTRUCTION Sle 3. REFERENCES Ao gl? = The calculation is performed using latest revisions of the NFPA and Saudi Aramco ele standard referred therein: lel e 3.1, SAES-P-100 Basic Power System Design Criteria F earns 3.2. SAES-P-113 Motors & Generators. IE ine le 3.3. 17-SAMSS-518 Diesel Generator sets. > Fee 3.4. NEC National Electrical Code. EB "ow E a E “gu | 4. CONSIDERATIONS Ss to 4.1. The existing emergency loads connected at existing diesel Generator are taken from [2 ngeNer RA-248806,001 iz —— 4.2, The new Dry type distribution Transformer is proposed and shall be connected at le ny existing Emergency Main Distribution Board to feed all the new emergency loads. Ie 4.3. The existing loads and new loads details are covered in project load list (CAL1312) and same is considered in this report. 5 ‘venFienTion a 4.4. The connected loading on new distribution Transformer is considered 85% of its 2 ua rating, E fest il ; gil le Bie td Be 3 | € | stanoBy o1eset GENERATOR sizinc ona oanrne] nec] ennwmene [vino [mvve: fe ||| S[[COMPLETE UPGRADE OF ENERGENY POWER SYSTEME | DOC —T3 5 | | | [ups estaBusiiMeNT FOR ECC & PORT CONTROL os6 | P| CALCISIS | | oo Bis RAS TANURA __savorarasia | oie Ewo-16no18A a TDSOTOTS OSTA ‘Sous Aramco 2616 NG (03/99) SAUDI ARABIAN OIL COMPANY tang} smul xo | a DescarTow ISSUED FOR CONSTRUCTION. » [rears [ero] NINE ‘shu ‘su Rev 5. LOAD SUMMARY FOR STANDBY DIESEL GENERATOR Refer Load list (Document No-CAL1312) for details of connected load at existing Standby Diesel Generator, EXISTING STANDBY DIESEL GENERATOR items No. | LOAD DESIGNATION ‘CONNECTED LOAD (KVA)_| REMARK 1 | AicHanaling Unit ($1 —S6) 27.9 (Note-1) eae 2 Electric Duct Heater 15 Baiering. aad Load _| 3 _| Load on New Distribution Transformer 95.62 (Note-2) fe | Total Load = 13852 TOTAL LOAD INCLUDING FUTURELOAD | ___ 13852 EE TLAKW, 0.8PF = Minimum Required DG RATING 138.52kVA Note: 1, 30 HP Motor rating for AHU (30 x 0.746/0.8 = 27.9 KVA) 2. 85% of Transformer rating (112.5 x 0.85 = 95.62 kVA) 6. ADEQUACY CHECK OF EXISTING DG SET Total load on Existing Standby Diesel Generator in kVA = 138.52 kVA Total load on Existing Standby Diesel Generator in kW = 111 kW (0.8 Power Factor) The Existing Standby Diesel Generator Rating = 136kW, 0.8 PF, 3 phase, 60Hz % Loading of Existing Standby Diese! Generator = 111/136 = 81.6 % 7. CONCLUSIONS Based on the above calculation, it is verified that the existing standby diesel Generator 136 KW, 0.8PF, 3 Phase, 480V, 60Hz is sufficient to cater new emergency loads considered in this project. The loading of generator is not more than 90% of its rating fi E IE Hl E le ie h H ki ‘STANDBY DIESEL GENERATOR SIZING ‘owarvee [nr no] moc] RARE HO, COMPLETE UPGRADE OF EMERGENY POWER SYSTEMS | DOC [UPS ESTABLISHMENT FOR ECC & PORT CONTROL ose | P| CALCt315 a of | 00 RAS TANURA SAUDIARABIA |-0/E" EWO.16NOTEA 4 TOS OTBIO ATID ‘sus franco SOS-6- 16518 (95/2005) = SAUDI ARAMCO 33 Data Schedule g2 For 16-Samss-si8: Low Voltage Panelboards ae mats sed BE | 1 puyer's quotation Request/ Purchase Order No. 8; 2 Buyers 81/3.0.Ne, _16H038_, Lne Item No i 3 Ponelboard Tag No, — Bs Service information B& 20 © Indoor © Outdoor B], | 22 electrical area cassteation eis © Unclassified gal © Classified a IE ~ | 20. Severe corrsive Environment: __No eae 33 System frequency: 60 Hz evntinetany| ISOUED FOR CONSTRUCTION ake IFAC, Number of Phases/Wires __3/4 ae 5 le 35. UPS service: _No aa 40 Rated Current: __400__ A (100A minimum) EGE g | 42 snor cncut merging Rang: 10. (10 KA minimum) BEE 25 | 43 rated vottase: 208 © FE) 50. Minimum ambient SF fmperatare (Flower than 0°C) *c [2 8] 53 site altitude (it greater than 1000 meters) meters, Le 70 ‘Neutral bus required: __Yes _f n IFYES, rated current of neutral bus as a % of phase busi _100% BEE 58 [he 4] 74 Main circuit disconnector required Yes ike IFYES, trip rating _400_ A Be 76 Main circuit supply conductor conneetors(if applicable): Supplied by Supplier Yes eS Bel a7 IFYES: No./phase and size of main circuit supply conductors as | 33 2 pn. 95 mm? 79 Branch circuit breaker requirements d z Quantity Poles Trip Rating fi 80 1 3100 Ss BL a 3P 70. | 28g 82 1 3P 50. z| Bee | || 9 i SPACE 3| 938 ee 3) 355 Z| 238 @] 283 228 | ||wotes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrasive Environment. £55 IP ccancercurcae ormmnaencrronensvsens [WG TYPE[puanT Ho INDEX | — DRAWING NO."—[SHT NO] REV NO gee Us ESTAR. GHENT FOR EOC & PORT COWTROL 05 eee TERMINAL WEST FER ea P| RE- 364626 | on | 238 at Saar 2u0 aco $05 16515 05/205 SAUDI ARAMCO Data Schedule For 16-SAMSS-518" Low Voltage Panelboards ornaten eb supe Sues USED FON CONSTRUCTION vic osm avo oat 5 es | De TOE ORDERETOW ori ONE o TERTESONE our acran PERATRSONT] ToeseNaceNcr) TSGTRTE FEVSON VALIDATION i : [Notes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrosive Environment, Buyer's Quotation Request/ Purchase Order No. Buyer’s B.1/2.0. No. _16NO18._, Line Item No Panelboard Tag No. 056-064-PP-011 Service information: @ Indoor © Outdoor Electrical Area Classification © Unclassified © Classified Severe Corrosive Environment" No. System frequency: _60 Hz IFAC, Number of Phases/Wires __3/4 UPS service: __Yes Rated Current: 100 A (100A minimum) Short Circuit interrupting Rating: 10__kA (10 kA minimum) Rated Voltage: 208 Minimum ambient air temperature (Flower than 0°C) °C Site altitude (if greater than 1000 meters) meters Neutral bus required: __Yes IFYES, rated current of neutral bus as a % of phase bus: __100% Main circuit disconnector required Yes IFYES, trip rating _70__ A ‘Main circuit supply conductor connectors(if applicable): Supplied by Supplier: Yes. IF YES: No,/phase and size of main circuit supply conductors: 1__joh._25 mm? Branch circuit breaker requirements \ Quantity Poles _Thip Rating en enn eaRSTRUCTION 4 3 50 B0 FOR coHSTRUCTION z SPACE lade COUFLETE URGE OF eNERCENOY POWER YETENA OWS. TYPE[PLANT NO.| INDEX | —ORAWNG NO = TERMINAL WEST PIER. 088 e RE- 364627 Sus sean SbS-E-16515 (05/2005) REVSON VALOATON 38 SAUDI ARAMCO 8 Data Schedule ae For 16-SaM5s-518: Low Voltage Panciboards 28 {iromaon ob eapledo upat) EA | i Guyer Quctation Raquiet) purcheke Orde Ne. a5 2 Buyer's 8.1/2.0. No. _16NO38_, Line Iter No Be 3 Panelboard Tag No. 056-064-PP-008 a8 Service information: a& 20 @ Indoor © Outdoor a 22 Electrical Area Classification: Dek © Unclassified gag © Classified @ [ee | 30 Severe Corrosive Environment! No. Belk | 33 system frequency: 50 Hz ek. IFAC, Number of Phases/Wires __3/4 5 JB & | 35 upsservice: __ ves . E - 40 Rated Current: 100__A (100A minimum) EE|E =| 41 stot cra neruntingRathor 10 KA (10 KA minimum) Bil By gilt 43 Rated Voltage: 202 r ie 50, Minimum ambient air temperature (if lower than 0°C) Ba|| 9) | 2 steateuse orarenter mon 1000 meters meters if 70 Neutral bus required: __Yes -E IFYES, rated current of neutral bus as a % of phase bus: __ 100% sale Main circuit disconnector recuired: __Yes 5S IFYES, tp voting 30 A ack 76 Main cireut supply conductor connector applicable): Suppled by Supple "ig 2 eS} 7 IFYES: No./phese and size of main cireuit supply conductors: gs] 78 1__/ph. 16 mm? 79 Branch circuit Breaker requirements gf] Quantity Poles Thp Rating |. 2 80 8 1p 20 “ 5st : at 2 SPACE (save ssi nan Ne 2 82 g 83 3 sa i @ Notes to Buyer: (1) Refer to SAES-P-100 for definition of Severe Corrasive Environment. 3 COORLETE UAE OF BREF PONER Tea JONG. TPE] PLANT NO] WDEX | DRAWN NO a en ae eee £56 BAST "SAUDI ARABIA| Sout ym 0 61658 n7095 a8 SAUDI ARAMCO a Data Schedule £2 For 16-SAMSS-518¢ Low Voltage Panelboords Ha {eterna ets et He 1 Buyer's Quotation Request/ Purchase Order No. 55 2 Buyer's 81/9.0.No. _16NO18 , Line tem No Be 3 Panelboard Tag No. 056-064-PP-010 g8 Service information a8 20 @ Indoor © Outdoor aI, 22 Electrical Area Classification i ®© Unclassified E © Classited Fees sgt ceee Coma ene entail FS | 33 system frequency: _ 60 He se IFAC, Number of Phases/Wires _3/4 oe = ef 3 B28] 35 ursservice: __ves i 2 =e ZTE] 42 Rated Current: _100__ (1008 minimum) BE [Eg | 41 snorcrcutnterupting Rating: 10K 10 KA minimum Bile 43 Rated Voltage: 208, re 50 Minimum ambient Bir EmMperature (Flower than 0°C) 2 [E28 | 53 site attitude ct greater than 1000 meters) meters Ola 8s tS 79 Neutral bus required: __Yes Bol? IFYES, rated current of neutral bus as a % of phase bus: _ 100% eal 74 Main cireuit disconnector required Yes a8 75 XFYES, trip rating __ 30 A eek, a 76 Main eircult supply conductor connectors applicable): Supple by Suople: ves foe le 8 | 27 If YES: No./phase and size of main circuit supply conductors: as | 3 tion mm? 79 Branch circuit Breaker requirements g Quantity Poles Trip Rating £2 80 7 e 20 53 ai 5 SPACE 3| 255) || 2 g| See | || & 3] 838 Be AG 282 | |Ihotes to suyer:_(1) Refer to SAES-P-100 for definition of Severe Corrosive Environment. 388 coum urcnioe oFenscEucyonrnsvsreua OW. 1E] PLANT NO] WOEX | DRAWN WO. —[SHT-NO Bbo [UPS ESTABLISHMENT FORECC & PORT CONTROL 02 ahs Tein ero oe | © | RE. 364629} o SAUDI ARAMCO Data Schedule 16-5aMSS-521: Indoor Transfer Switch - Low Voltage USED FOR CONSTRUCTION uvriceestife> ao pare REVSIONBESCRETION 33 35 40 HBR REE oO TRIPE [on aan TST 56 57 58 (SIGN CERTIRCATION {DESI AGENCY TSGTRTE TENSONALDATION Buyer's Quotation Request/ Purchase Order No. Buyer's B.1,/1.0.No. _16N018_, Line Item No 3 Tag No. 056-064-ATS-001 Service information: 20 As indicated on the attached reference documents OQ ____@arinetotoung system frequency: _60 Hz Number of Phases/Wires 3/4 _ Rated Current : _225 A System Grounding Method: __ Solid Short Circult Interrupting Rating: 10 _ kA (10 kA minimum) Rated voltage: __480__(600V maximum) Site altitude (if greater than 1000 meters) meters Operation Type(1): _Open-Transition Maintenance Bypass Switch Required": _Yes Overlapping neutral contacts Required’: __Yes. Main circuit supply conductor connectors (if applicable): Supplied by Supplier: _No If YES: No./phase and size of main circuit supply conductors: 1 /ph.,_120, _mm2 Space Heater voltage: VAC (240 V maximum) Notes to Buyer: (1) Refer to SAES-P-116 for criteria (2) Use of Closed-Transition requires approval per SAES-P-116, oNPAETE UDGHADE OF PRERGENGY POWER SYsTEws [OWS TVPE[PLANTING] INDEX | DRAWNGNO.[SHT.NO.[REV.NO,) TERUNA, VEST PER, oo | © | RE- 364630 | om i i i e 5 : i é TS Twia, SAUDI ARASI| £ SAUDI ARAMCO, PURCHASE ORDER. Gla | [de eects te OTE WroRATON TooecourereD BY _fF}rurcwasen I~ wwwweacrunex INFORMATION SUPPLIED BY THE GUYER 8] | | clewens ne rownennen Tt ale s»feeounounruns eran accu [No ~ é g x Se reeaeene errr ale ef sou vos Gare SGOT om a wf eweuencr sor 2589 ean eaeer ner Tel eas) . : x] auewor camara ale “| a 2 zifuxrenerree [RODD LAA GL ele rhrrenvonciue 30_awuresar_ 17.4 __wrtow: ov as PER ATTACHED CUTYEYELE AGRA ae beri! joo ram roanumcnae H foe caressa g SAUDI ARAMCO Rew bate rene AH ce cna STN as 7 TFORMATION SUPPLIED BY THE VENGOR pasate in 2] norma voursce 0%) 5 4 ruin ale ‘xfs ourur Ay | pareoranen won arr. <0a.ncone ad f BB) | [oq woman = own 8 vw] eReausey coroner) Blarias a TSEC | vuerscnses . z Species meen HOURS TO BOR AN CAPACITY FTE al neat ornare ano vanonne ele]e] [2] re esomronmenscuny 52 |8) |=] cserommonsaw ns asrons 3/° a sf SAUDI ARAMCO ge Data Schedule a pceeeereene BE [1 wners citer none case re No 2 Buyers 84/10.Ne, _LONDIB_, Une Rem No 3 3 Panto a9 No 56.064 8 ‘Service information: i eter Sem H), | 22 eecent aren cameos ad © Unclassified af 6 clssitee =H _ | 50 severe corosveenvronment”: wo M3 | 33 system frequency: 60 Hz Ei UAC Nurber of hases/res _ 3 ibs & |e 8 35 UPS service: __Yes FT] corsets _ 0082004 mney EE |B =| 42 shorccrcutinerrupting Rating: _10_ KA (10 kA minimum) ae GEIL EE | o> estervetage 208 FEES SS BNRIe tien arrencein Oiower than O°) ‘c 5 _ TE 2] 53. site attitude (if areater than 1000 meters) meters “Oli és EA] 70 Neal but aged: Yen _ n IFYES, rated current of neutral bus as a % of phase bus: __100% agle & 5a |e .2 | 74 — main circuit disconnector required: Yes Bees] ctaryee ensteuag raat BPI | 26 sam cnetuny onder emt rite: uptedy Supe ves Pe. E El zz inves: no/phove and aze or main creat sup enduro g5 | 78 1 /ph._16 mm? 2B mchoeutiaruienes | — : J JACOBS ZATE| i cuetty Fees Tap Rtg gF 80 3 2» 30 oman fe | |g 3 ts ISSUED FOR CONS "AUCTION 8) 28s 82 4 SPACE a] Ege | |] 8 | ¢93| || 6 BE ||uotes to suyer: (1) Reter to SAES-P-100 for definition of Severe Corrosive Environment FA COURT Pct oF eteEnGyoneTTTEMa [OG TYPE[PLANT NG] ROEK [DRANG NO [BAN [RENN 8: TERMINAL WEST FER “| oe | | Re- seacsz] o | | aa sama Sous race 2616 ENG (1/2002) Page : 1/2 ED RCTS g ‘SAUDI ARABIAN OIL COMPANY 7 Data Schedule 1 ie > 14-SAMSS-533 e a ‘Three-Phase Dry-Type Power Transformers ; i Description Buyer's Required Values Vendor's Proposed Values ff 2|e Transformer Voltage E Al High Side (Delta) kV (0.480) fae 4 ae Low Side (WYE) kV (0.208.120) cg) Pe 1 Transformer Rating E (Nominal) kVA ars) fea ale Type of Transformer E eh Indoor (x) fen, E pls Outdoor cea ce) STL LF tndoorrastomer Coling Mead : eae Ventilated SelfCooled Class AA (x) Cs A sort | Yortons spcuetroce ai 0 cy ; ze npn: Read E Minimum 4% (xX) C ¥ A Other (specify in %) aay eee) ie Enclosure for Indoor Transformer E P caaimcror] Standard Tye 2 ox) Cee FS rage a Other (specify) Saar | ie d fe Pstinoe| Enclosure Paint Color: Fl Standard (Lieht gray) (x) Cay E Other (specify) tc ( ) = Coil Assembly Construction 4 Resin Encapsulated x) eee F 3 5 i : ag Solid Cast t 73 FE Ein TRUCTION) : A or Fee |e | wes Toor] uw Cees [RAS TANURA, “SAU01 ARABIA] JO /EWO Teno Sous ams 2616.46 (30/2002) SAUDI ARABIAN OIL COMPANY 7 Data Schedule Ho ‘Three-Phase Dr Tpe Power Transformers . Description Buyer's Required Values Vendor's Proposed Values 2|8 Tap changer Range (De-enersized : 8 Standard (2-1/2% FCAN, 2-1/2% FCBN) ( X ) ( ale Othe (specify) t3 t a Aunilliary Power Supply: 120 VAC (single phase) C ) ¢ Other (specify) eli High Vottaze Winding Terminations th ( i Interal en) r 7 Flanged Throat: es] 8 Terminal Enclosure fee fe ‘eronees | Incoming Cable Size (mm*/AWG) (5) ( ms ser] Low Voltae Winding Terminators a o) : ‘CERTIFIED. Flanged Throat < t { sw} Terminal Enclosure ['sosimcie] Outgoing Cable Size (mm*/AWG) (2x95) ( Js | Newt abe size mms ao) (1x50) ( |__| Remarks: aF ele BUYER VENDOR ee | 5 5 & i COUPLETE UsGRADE OF NERGENEY POWER YSTENE] wwe Wwe | Rano | pase | vomes [ane] we besususicrrenceze rortcome, olla ire lice eas TAWA pies tees Ta WHOIS race 2646-ENG (10/2002) SAUDI ARABIAN OIL COMPANY, Fecal cer] pur oma] &ngouwl gSoll ‘Saudi Aramco El EWO-16N018 “lg COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & 7 UPS ESTABLISHMENT FOR ECC & PORT CONTROL RAS TANURA REFINERY gfe chen UPS SIZING CALCULATION isu ED FOR const uC ON} ae PREPARED BY: be E SB g § - 2 E & 3 2), RSeee cease 00 Pose |e | enti | 3 CALIHONE Page: 112 Toso TOONS UPS SIZING CALCULATION 1.0 Objective ‘This calculation is for sizing the new UPS system to be installed in administration bullding at TER (Room-112). 2, Reference Drawings: Drawing # Dascription IRACBAaAIOG [ONE LINE DIAGRAM IRA3ad622 & 248818 [PANEL BOARD SCHEDULE [GALI312 JELECTRIGAL LOAD CALCULATION 3.0 Assumptions: 1. The UPS system configuration is Unitary UPS System, 2. As per Tablo-1 of SAES-P-103, the required Battery Backup time is 30 minutes for In-Plant AC (UPS} load where the Primary Power Source is EMDB and stand-by generator. 3. The calculation is based on the selection of flooded lead acid batteries which are mast suitable for standby float service applications (UPS) in an indoor temperature contralled environment, 4.0 UPS Load List: sn ono oESoRPTiON ono va) [avanty] TOL | newanns [anise Paraben, COC ay aye | [Eran Darton Pars COR Nee)| age —| 4 —t9—| —anay 37 Brora Dslr Parebape EO. Wow t)| ase —[ 4 24g iy TOTALUPSLOAD= 14.40 kVA Note: 1) Refer drawing number RA-364622,001 & RA-248818.002 for load detail on Panel board, 5.0 Inverter Sizing (UPS kVA rating at 0.8 Power Factor) 5.1) Steady-state power requirement: mFuegown= = w= 2A A per AES, Tate. for UPS The UPS size is 20 kVAUnit @ 0.8 Power Factor AC input: 208V, 60Hz, 9-Phase, 3-Wire + Ground ‘AC Output: -208/120v, 60Hz, 3-Phase, 4-Wire + Ground Page 20f 2 Su Ware 217 ENG (1200) DRAWING START cour) CMT pomecensremce ueci Ahmed CONTROL JACOBS ZATE 22-Dec-16 lemme comerniem comer bana 56 s7erts-400023 jenn prawine — [seer] nev aia PERCENT COMPLETE couiere wou ewsion TeaNGATIED MEER = | DRAWING TITLES: " = ar aie —_ cae ee a cesroc Ist Rees ‘9 [bev TYPE TaANGFORUER DATASHEET OSE XFRTO08 Trae cor | a0 feecrmeal ove Une OGRA ae 7 | lLeceno: Notes: REVISION VALIDATION 1 usTonawmcs or NOEKHNNNEREA ORE THIS REVEIOUN. W016 COVERED FOR KL APPRGNAL RD CERTIFICATION ACHES ZATEL SUED FARCONSTRUCTON —— REQUREMENTS, PER AEP 234, UNDER DRAWING COMPLETION CERTIFICATE NO SAUDI ARABIAN OIL COMPANY lorammes conrRot SHEET psc Ce woe) Complete Upgrade Of Emergency Power System & UPS Establishment oar | ae | eee | eee a Seman veo ee mien wasn oc cow RASTANURA ‘SAUDI ARABIA TGB ORGERIETONO 56 A RD-714676 ot oF 02 | 00 Sau Wane 27.NG (200) pascal} arart_[_coue] “PTT ocaocr me renee er . mene | meee CONTROL JACOBS ZATE 22.Dee-46 bern srinsstetta besoroe . see ae drawn [ager] ey Gane se PERCENT coWPLETE re rn rn ae Peseta Eero a i T c I I | lLeceno: notes. REVISION VALIDATION. fy usr onsrms er noes KavenEn ORDER ee a 00m 2703 WEEKS 10 THE AED ED CAPTION DATE ABOVE [PRAWINGS CONTROL SHEET sc “er 7 Complete Upgrade Of Emergency Power System & UPS Establishment Raa OE | Sa SE | ae aa Poms err noms | mom nowt nowt [RASTANURA SAUDI ARABIA TOS ORDERED WO. 56 A RD-714676 02 OF 02 | oo REFERENCE DRAWINGS 4 YEE JACOBS ZAT F ISSUED FOR CONSTRUCTIO PANELBOARD SCHEDULE TERMINAL WEST PIER (P| RA-248) SSD ISSUED FOR COKSTA JACOBS ZATE TION Ly a58 HP ‘EER STEEL S/STE PVE ‘POWER Im) - CONTRCL pee oom fax] ne [mw |'[ noasze | ee ae mo iamen 6 oe tat afoia + recast : PC-s87 zsKva | 200 036-064-UFS.002 ey ‘056-064-011 Hy oe P| 1416 25 mma 18 |p 0.3838 POWER Hee ikva | 208 056-064PP-011 “— ae P| 4c temmz 6 — ls reaese rowan vie | 2ae scoserr-o11 z aoa Po se P| 4c tem 3% hs ee i sewn | ae Ser ceeeeeee 2a aa eee n : i roses ania | wef cceoeaPrane PROJECT UNT IN CONFERENCE 3 | 128 some {| ra hs reson Powe avemin | | ‘86 064.008 ‘ouecRenice ROOM ticimic ot” [8 P| 12 10m | xiPe foorioad a0 > asa ows cons feat said a tte oo ee i si ATELECT. ROOM-RTI9 ST eee ss te oe 6 uC 4 [20 3 aE ese oaer caeeececon ounce Sefer eee re ss : Rese | Povie aewa | a0 ‘cen 06.008 ea Is resi vow caina) vo eae ESE aianae |e er acame [ane ponent 0 I: po-saar | Power - FanaKva | 120 056-069-FF-010 [ECE ROOM LIGHTING CKT 8 p| 12K: ame sainay by ATELECT ROOM -R212 7 ft 7 6 ANC 4mm as omer aT o) een || "Cons ZATE =a aS Sa seniaveront | =] seats [sake bon ~~ | SUED FOR CORSERUCTON earl en reer | apa a ee =i aie nema ese eel of PC-3853 - ‘ 208 2 056-064-PP.077 056-064-FP-010 — fsafaey “Lo | +416 tema | xv foot 50 = 39. (ea = AEnnoNWALATON j SAUDI ARABIAN OIL COMPANY gear iu eve churn hie) a Scr PA OTR ORTON |oC - Electrical Contra (Per SAES-P-104) [SHALL BE VERIFIED BY CONSTRUCTION CONTRACTOR DURING CONSTRUCTION. | REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: Hee ro Pome cote Per sAEs-P-104) CABLE & CONDUIT SCHEDULE ccs ie heen pene (DESIGN AGENCY) I) reowneo @nuOLArUNUCO} NUMBER Laduiad THROUGH — ata copra feel etal eee Fema wer ERLE SET —| wae | wan | wom | vee | see ELECTRIGAL ONE LINE DIAGRAM RA 240606 ,007 Ev. No. [OATE, "REVISION DESCRIPTION beaseenes beanie! SEGRE Ge TRSNMNTS | —Tassersor —| oe | weave [estenronconmucton Ce Tee ero TEST nt — [OREN TEENS avo ORE RETRACTION s6NO18. "CERTIFIED AND DATED 056 ¥ RD-364620 007 00 a Toa RS TOTES TATSEE z GS AUCTION TO ons TOROUETORS g58 HP B i >) PRR ESTEELISISTEPVG [)—— sowerey- cowmeen or TOTAL ie senvice focus) uae |g fa yp estegeer fy] tn saetty | are ewanKs 582 Te) se De |! | woes _ rae : FORE wn | Cod APR or Fae tome Pe fon 50 ATELECT ROOW-Ri3 Aver ROOM 1042 S| vevtene | pve esse fo Sasi’ | 08 6.04.90 1N609R A UN 8 P| vaca | sare pooion 30 srevect Roow 212 ATECCROO S| etme | pve reas Powe eauiein | on 6.087009 ins0oR wc Uw 3 P| iacame | sare posion 30 |__areect Roowmoie ——|_areco Room | se4mme | pve Ese se eee seseece pe e87 sane : : ees ine See Leceno Jo -cendun per saES.P.108) Jat owes caates LENGTH IS APPROXIATELY. THE ACTUAL LENGTH SHALL be veRimeD By consTRUCTION CONTRACTOR DURING CONSTRUCTION [REVISION VALIDATION | SAUDI ARABIAN OIL COMPANY ieripdcailecuetnns moraine Hixeersak ncn canes eee a mee aes oeanien CABLE & CONDUIT SCHEDULE footie is Srpesevacicn \ty moun euoamen |_| NUMBER ast THROUGH ue RT TE oan - caee [a Tan. West PER "ELECTRICAL ONE LINE DIAGRAM RA-248806 001 REV.NO, | GATE [REVISION DESCRETION sspabascsssel pareassenemscel TEETRE Ne eae [teaser —| w | wan lenumvrencoemuceon RTT — TR — RT ae TREE RON ENON | aro TERE 18307 001 aN P70 AED FOR 056 P RD-364620 002 00 ‘Ser aco ETERS TOTO SE JACOBS ZATE ISSUED FOR CONSTRUCTION ici T ‘SOREDILE GpgnuJl gSoll Saudi Aramco DOC. NO. 2 CAL1312 JOB NO. : EWO-16N018 JACOBS ZATE ELECTRICAL LOAD CALCULATION COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT FOR ECC & PORT CONTROL PROJECT PROJECT NO. EWO-16N018 LOCATION RAS TANURA 00 Decté ISSUED FOR CONSTRUCTION AAA GSI ‘SMU REV. DATE DESCRIPTION PREPARED CHECKED ‘APPROVED. @pgoui gSolt ‘Saudi Aramco. JACOBS ZATE Page: 113 ELECTRICAL LOAD CALCULATION FOR MDB PROJECT TITLE COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM DATE: 12122116 UPS ESTABLISHMENT FOR ECC & PORT CONTROL JEWO-16NO18A Rev 00 ax. trem LOAD TAG # LOAD Description S| ae Boman’ lactual KVA| Operating Duty poof WA | LOADS DETAIL 1 AHU-t [AIR HANDLING UNIT=1 Tea] WA] 480] 1.00] 100.0% 7600 | 16.00 c 2 fawu2 ~ [a HANDLING UNIT-2 120] wa | 400 | 1.00 | 100.0% 1200 | 12.00 c 3 [pp POWER PANEL -1 66.0] kvA | 480 1.00 | 100.0% 66.00 66.00 | c 4 |pp2 Power PI eit ‘sa eva} 480 | 4.00 | 100% ce | 5 [oP JOP IN ELECTRICAL ROOM -113 zo} va | 480 | 1.00 | 100.0% 7ooo | 7ooo | c_ 6 [SPARE SPARE kva | 480 | 1.00 100.0% 0.00, 0.00 7_|SPARE Eeiaa| SPARE Teva | 480 0.00 0.00 8 [anus JAIR HANDLING UNIT-2 as| wa | 480 3.50 380 c 9 |ewos EMERGENCY DISTRIBUTION BOARD. ~152.5| kvA | 480 162.49 | 152.49 c = Total Load in MDB 37199 | 371.99 a71a9_| 37199 INoTE: }. The existing loads information are taken from Drawing RA-248606.001. Total Connected Max.Demand kVA 371.99 KVA Maximum Operating Demand kVA 371.99 kVA REFERENCE: 4. Electrical One Line Diagram - RA-248806.001 371.99 KVA 2, Panelboard schedule - RA-248818.002 Existing Transformer rating 500 KVA Derated Transformer rating as per SAES-P-121, TABLE+ 425 KVA Calculated Operating load 372.0 KVA Corresponding Amperes 447.4 Amps CONCLUSION Existing Transformer (S00KVA) derated rating 425 KVA> 371.99 KVA Opearating load LEGEND : Considered as per SAER-6268 JC-CONTINUOUS LOAD 100% I- INTERMITTENT LOAD/MOV. 30% |S-STANDBY LOAD 10% PAGE 20F 3 ELECTRICAL LOAD CALCULATION FOR EMDB DATE: 12/22/16 PROJECT TITLE : COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM. &UPS ESTABLISHMENT FOR ECC & PORT CONTROL EWO-16NO18A Efficiency (%) Equipment KVA Rating Voltage (Volts) Item no. LOAD TAG # LOAD Description PF Demand Factor] NEW LOADS 1 [o56-XFR(T)-Ox1 Transformer 125] kA] 480 | 1.00 | 100.0% 112.50] 0.85] 95.63 95.63 c uaa iz Total new Load a EXISTING LOADS 1_[Transtromer T-3 [AIR HANDLING UNIT 28] kVA | 480 28.00 28.00 ] c | 2 |eDH-307 ELECTRICAL DUCT HEATER 15| va | 480 | 1.00 | 100.0% 75.09] 15.00 c 3. |sPare [ aoe 4 5 | Existing Load 138.63 138.63 Total Connected Max. Demand kVA 138.63 kVA, Maximum Operating Demand kVA 138.63 kVA 10% Future Load 13.86 KVA NOTE: 152.49 kVA 1. The existing and new loads information are taken from Drawing RA-248806,001. REFERENCE: 1. Electrical One Line Diagram - RA-248806.001 2. Panelboard schedule - RA-248818.001 3. Panelboard schedule - RA-248818.002 4, Panelboard schedule - RA-364622.002 PAGE 3 OF 3 COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT FOR ECC & PORT CONTROL DETAIL DESIGN EWO # 16N018 TRANSFORMER SIZING CALCULATION OC. NO. ae avout CLIENT 24-240008.001 __flecvical ne Line Diagram Admin Bi (00 | ISSUED FOR CONSTRUCTION Lararon MA sd JACOBS ZATE REFERENCES: REV. DESORIPTION Date | PRERD.| cHkO. | APPvD.| APPVD. ENGINEERING DESIGN CONSULTANT. [CONTRACT NO: EWOHTENOT®-001 COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT FOR ECC & PORT CONTROL TRANSFORMER SIZING CALCULATION 056 P DOCNO: — CALI3I4 IsHTNO: 001 OF 003 | 00 cour Page 113 ELECTRICAL LOAD SUMMARY Type of Duty Continous 3: Sany at ee (MAXIMUM OPERATING EMERGENCY sswormmce LORD DESCRIPTION tocamon — voctace aay] CURRENT su ee | an cunRent oan ere o e ry os | _s wa Wa ae wr es Powe Pare ee 9) wo fo [0 | am | © [© | 7000 700 Essent Ostiton Panelbar (95900 om [> [|e [as | «| 0 | ws 1000 meroocytain |EssrtlDtbtonPanetin(EDP-A) woo [0 | wa [0 | 0 | 2506 1899 Sab Bord ‘amination dra | 99g 400 1616 v6 eons toonaton ae akon om Drawing RA E4200 & RA2EB8002 LEGEND 20F3 TRANSFORMER SIZING CALCULATION For NEW Transformers T Taso a A tion) | femstone | awmet Pj Fut Lond A ra Song Dee | Fae, Coin | Ten Operaing fa Tenpusie | cyfiy | tarstomer | Socooed | rocsacoace | Sat ae a ee ee Ip ay tems [SIT Omra! cvetacor | Lem | “bag | ERY | "Ee | Sarina | "raping |OOR=TO! (ea) = ror wen [ww | ta | She SEPT — [RAS TaNORAL —O a na a ca} 3s} a re aaa aero szoaSoga Sample Calation or New Transtorme:86FR(T}XX1 Min Tans Sze VA) = (uot X Fo x A Mn. Tanker Siz KYA) wn SolcodTarsomerSo(KVA)= 13289, Ni 4. Total Operating Load (Lo) isthe Continues Load + 30% of Inlermittent Load + 10% of Stand by Loac (refer to Load Caleulation Summary Sheet) 2. Projected Future Load is assumed to be 20% of the Total Operating Load. 3. Growth Factor is assumod tobe 1.1% for eol-cooled transformers as por SAES-P-121, Section 6.1.4 tis assumed to bo 1.0% for OAVFA transformers 4, Load Factor is assumed to bo 1.0% 5. Tomporature Derating Factor is per table 1 of SAES-F 6. Diversity Factor is assumed tobe 1.0% 7. Transformer Rating is per ANSI stander preferred KVA ratings, 121. Its 15% for Ol mmersed / Outdoor Solar Exposed 30FS ELECTRICAL ROOW-RII 2No FLo0R ELECTRIC! ROOM «82121 EQUPOMENT PLAN NOTES: REFERENCE DRAWINGS COMMAICATION ROON-RIQS FIRST FLOOR COMMUNICATION ROOM &186) £0U UACOBS ZATE ISSUED FOR CONSTRUCTION TLL THE OMEWSIOW WERE WARKED UP SED OO SITE MIST ON 01/25/2016 ° to 29 28 Lou 1. i we TERS TTRICAL EQUIPWENT_ PLAN ADMINISTRATION BLILOING Reemmicran) =) soe ie A ls e Gacoas ZATE ELECTRICAL ROOW-AIS Issn rth pousraucttl ' | el TEEN Gr came commu REFERENCE DRAWINGS eect, FROW-R 2 i 3. Le ala. communteariow ROOM IOS Pete enihaae anal 1) des "SAUDI ARANTAN” OM COMPANY CABLE/CONDUIT LavouT "BL ADMINISTRATION BUILOING IER AUDT ARAB 2N0 FLOOR ELECTRICAL ROOM 18212) CABLE/CONOMIT PLAN NOTES CONTINUE eo HT oe T {Ell coomlbh«» JACOBS ZA ged F62 CONSTRUCTION WOTES CONTINUE SINGLE LINE DIAGRAM AGMNISTRATION BUILOING JACOBS ZATE ISSUED FOR CONSTRUCTION 00 coo H «ok Oe LegEND REFERENCE ORAWNGS TeaEN da a | T SAUD] ARABIAN OW. COMPAN iE LINE Din 2OKVA UPS = P_RB-364621 [RasrRiCTED | OY PRowance CONNECTION TaBLE-Is INSIDE BUILDING FLOOR MOUNTED ELECTRICAL EQUIPMENT GROUNDING BROS a NOTES: REFERENCE _ORAWINGS wosame (7 at sat INSIOE BUILDING WALL MOUNTED ELECTRICAL EQUIPMENT GROUNDING ona a en, 2otSmm 9/067 918 JACOBS ZATE 0 £98 CONSTRUCTION * Pe 5S ancnon eo.7 wre Ene BOT SE FLO SAUDI ARABIAN Oi COMPANY ELECTRICAL INSTALLATION DE TAIL | EDT UiL DING © JACOBS ZATE ISSUED FOR CONSTRUCTION onde nseap SALW TAS THe EORUCTON CONTANED TEER GRE THE BOLE PREAH GF AGfISWIICE NG REPRODUCTION GROUNDING GRID PLAN a GROUNDING LOOP-COMMUNICATION ROON-186 DETAIL 3) z T T ® oe DENELIION NOTES WNOER £90" GROUNDING GRID PLAN coon 81s 208 GROUNDING LOOP-ELECTRICAL ROOM-RII3 DETAIL GROUNDING LOOP-ELECTRICAL ROOM-212 DETAIL & 56 P RA-248815 no boy [EDR-TaT]coMMUNICATION TOWER a Te 1Roow-R106) [SACOBS ZATE| : ay fete Toei f EAUDIARAWAN, | es | aon ga wees -{eoW-30i| communicarion TONER can ig ls WO. PONER RISER OWAGRAM | EPI ea q —— i Te moow-n200 I —_etecT. RooW Aa i i 0-8 : tee ss E ec ip a i f lz - “ ie aie a een ce oats desetetalt thoce tee-renena OM e« crt [fie coor oa EF ERENEE DEE i Te ROOM-RIVE> H \ eo Beene sige (accede E ; ae | JACOBS ZATE] |; ; i : coupe sae eaueraueringl le i 5] i re 25 £08 CONSTRUCTION! E ti E oe =] | : i Pearce \ le 1 5 wr id v ! CENERATOA | es ae (sak 5 08 ‘ lais| i fae Ee 9 : oo oo ye i : en ais ly B ie 056 RA-248807 ; - Sa a MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) SAS. 7 cans] OWS] 308 REV. CODE DESCRIPTION sooner] se | av | vu | stans [OWS] SCOR co [PTE TRansronten: 112.5608, ov fame ta 7 fs:zo, sna, soz cM, 224.0% co esa ka Ome an sooo0ori76 | 1.0 ea lvrennurrisic Power suerey les: ackva co nur tev apse en, ame sooosssz6] 10 ” Joureur. 200, smsnse cares firs nou BATTERIES. rancuscano, ELECTRICAL: 8 BREAKER, Jit, PL, ie, SOLD NeTRAL fae, sou Han, ne 1, COPPER Bus, Ise snrace ma, Hor-P GaLv ot 0 fetecrao cat zc RATED evaOsuRe, ox ASIC coz, Ut, ASSEMOLED, MT leace ror nin ster eeAKen, re toon Wate Renee, ANS eRenAER 208 toooso7e73| 0 fm Joweasonno,euecrrcay: 1 aReaKeR, 22 vac, 3, DISTRAUTION 3 Pi 4 fn, rc se, Soto nee, sans, 100. man, nan, coPrER BUS, [sree sunrace nf, HOTS GALY OR 00 Jetecrap oa amc ouareD enctasne, ox AStc Dra, UL, ASSEMALE, WH b"seace For rican ranch fneness. wit se on xeaneR, fxanch acne zon soonsessr2 | 9 eB Jswernoaso,evecrRIcN: 12 oREAKER, qa ¥AG, 34, DISTREGTION 3H, 4 vane, puscn, «tke, SOLO NEURAL ins 00 wa en 1, COPPER IS sree, surrace mig, HOT OIP GAL oR 00 Jetectno caw zinc euaTeD encosuRe, sanososses | 1.0 ms oka Sic, cor, ASSEMBLED, WIT Isnces FoR icin amv eens, fri Sox warn eaeaKeR, ano Inores: {ISSUED FOR CONSTRUCTION REFERENCE ORAWING comPILeD BY Rev. ‘CHECKED | DATE | _PROJECTENGR FaReLaoRRD SCHED Fae Tenors. we sr Taare | ao ager, equim avo sete EW.O. PHASE TENG. ITEM [AREA | START-UP DATE row ustncxhchaw ——[v-oaen? rina_[_ if [reviston| a0 finoex Fitarias for ELECTRICAL EQUIPMENTS SHEET 1 OF 9 p COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT pcan FOR ECC & PORT CONTROL /0-248807 056 __JeasTaNuRa saupI Rasta) MATERIAL TAKE-OFF LIST “ARAMCO 6226(03/05) REV. CODE DESCRIPTION ans STOCK NUMBER DWE] 308 cove | _numsens sare [ow | wu ‘STATUS Jenner owen execretcas: 12 Jnence, 1209 VAC, 2, fisteasinon 3, site Luc fn me, Scuto mre AN, 00 Wa, ne, COOPER BUS, foe. suRince sr, Horo Gay Jenccosun, roca Si 2, UL, Jassencuco, win «saces fon JpucimeRatcneneaxens, ir ous en ene, sean aRevce} o rovesos027| Lo mA raves, eurcracaL 2 aneaces 008 vac, 9 bisreaunion 3p, Nie, PL In WR, SUID NEUTRAL was, ino ma, ue caeen as Ise, suazace NT, HOT ox cALW Jor electro cay zwcruareo Jescuasune, 106 sic oH fasta, wins snces Fon uci saan: oRcacens Wirt Jor warn aaence, eaancr wera ronosa6o2?| Lo ” NOTES: ISSUED FOR CONSTRUCTION REFERENCE DRAWING ‘compro By ev. ‘checked | DATE | PROJECT ENGR a RS SERED — ET TaRoTs ca or Tapais_| sm | apa. eqUNENT VOUT Ree Bi EW.0. BHASE ENG. ITEM | AREA | — START-UP DATE —[romtn wser oiasaan —[ucrnaor Fiwal__| rec _[ Revision] 00 INDEX | Materials for ELECTRICAL EQUIPMENTS [SHEET 20F 9 > (COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT pcan FOR ECC & PORT CONTROL 1/0-248807 156 __|eas TANURA SAUDI ARABIA] MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) " ss J Sa 08 REV, CODE DESCRIPTIOF ae] oe [ov | ow sans [ere | ae Lv power cance eno son, co fouetrervcriencune, ccorsrt cue] 200 | wre lovrowen cae oo ee, — |euoaperrecenaeeoureD, 4: rooonrser | aso | wre somes ky rower casi, san too, co —_Jourcremucanaanouten, c- rowers | asa | we lov eowes cate eo 000, o> |eupurerecunanouten, 4: roooss2 | os50 | wre re 00 |cupaetyeucrunaamouReD, °yC- 000447085 (S48)] 15.0 mie 9 fowxtre/evcrunaamourcn, 2/c rooonzes7 | ao.0 or sam ky rower cau oa-000, o> |eupapereveiunasenouren, 2: roonrees | scoo | oom rote lov rower case, e-an0, co aayoezrvermioeune,2- some | mmo | wre on founarerrecunannoureD, 2: ronmeirssscmy]s600 | we [own krone case, on 020%, o> feuoareirvenasoouren, 2c: vowairss | sooo | ure |wores: ISSUED FOR CONSTRUCTION [REFERENCE DRAWING COMPILED BY Rev. ‘CHECKED ate PROIECT ENGR CLE [COROT — eT Tonos, o eH ToS | ea | ae ae conor soos BE EW.0. PHASE ENG. ITEM ‘AREA | _ START-UP DATE —|roveR isin oIAGRIN —|pase0o7 inal [FE Revision] 00. jiex | Watarals or COW VOLTAGE POWER CABLES [SHEET 30F9 ° ‘COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT Poa FOR ECC & PORT CONTROL, T/0-248807 o36__}eas tanura SAUDI ARAsiA| MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) rence] omen EET owe [aw [iw eae ST acs coon Sieg » faxes es 0 |. GREEN FOR GROUNDING cane | a a alas nen ieee ov fase zee 26am age | me | om ANE @ |, GREEN FOR GROUNDING amen) om ™ - JGREEN FOR GROUNDING mest | ae — aa Ga > [GREEN FOR GROUNDING (su8) = = mama pee —— oe — go] amr raat or cee Re ers eran bis eae re-set? MATERIAL TAKE-OFF LIST ARAMCO 6226(03/06) Sar a Dae] sea wev.cooe| vescumrion aaa] swe | en | vo | sans [eS] Som ence wren commen eonression re, ua om snomren 0 Jos-txy, cunaperpvcrunaAMouRED, (su8) * - fist xe nme comms omresson Tres rau rom sone 00 Jos-uxy, cunaperevcrunaRmoureD, (8) = ae ficsssne rs wc men commen, nsw res sae ro bl KV, CU/XLPE/PYCAUNARMOURED, ee a a [rec men conven, -cnrsion rr, sac roR @ [0.6-1KV, CU/KLPE/PVCAINARMOURED, an oe 7 [re ween conve, go eons nee src ron woos | sco |g sew curarerscunamautcy, om Jie warts comer, ao fomescnnme state ron eee le camarerenauoi Jesus wen come, ao foment Sorat eon ross | gy | eg lt, cuparemvennnouney ‘im Frese lauren core, kcrresion testa ron see ee 00 Jo.stkv, cupnrerevcrunaamoureD, — * fico fee us men comes, Sno STALE FOR © Jose, cumservcnaRwouren, Sept | 40: e fics i sae wc men conven, cSeression tre, sma ron oe : (00 Jost, cure resPYCIUNARMOURED, oe ™ pice ISSUED FOR consTRUCTION nerenence onawina compute ev nev, cnecxeo [eave] paovecrencr (coca TT oH 3 I Tepes | sara corms S| ew.o. [pias —[ eva. [ann | ~ staR-up pate ores oes buena ferns finat_|_iFC [REVISION] 00. oa Waar Tor WER CABLES ACCESSORIES IsHEET 'S OF 8 2 _| “"comPLETE upciabe oF EMERGENCY POWER SYSTEM 8 UPS ESTABLISHMENT fran FOR ECC poRT COnTROL 10249807 055__Jeas ranuna savor anaotal MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) REV, DESCRIF SAMS Pe ae y ‘STAT a berero a vacate Srocknumeee] 5 * "= Tus | cove NUMBERS | [eaaecron: ream sian nx stu eae (00 Josxcunoin conoucroR, Hove —e ease asco To Jomecron rena; (00 Jeno, surtaBue FoR so sqM oes] 42 a ohresson ne ou rena veo 0 fra, surTaace ror 25 som (suB), ” m cms oe ous Wa wooo! so | Joao, surraeue FoR is SH (su5) enone conbicox Jcamecron: eran; Eerste ce enn 00 fra, surtasce For 20 sqm ee ae a 2 |pto suman roves swore | oo | Jeomecron: rer; 00 Jeno, SurTABLE FoR 3 sqM 8) a “ [xeon coneucron co _ieusnn commen i. rossero] 19 | x co fvmsuaron wn ro rvs mova] 20 | a co face se sonsene] 20 | {ISSUED FOR CONSTRUCTION erenence oRaWiNG courneo sy rev qiecee | pave | prowecrence are aE TonOTE ta Hr Tapas | “|e foe mi eon sor — fase Siew. | ~puask | ene. ren —[ ‘ane | ~ start-up oateponttnce snomer—frsess Fina [tec | revision] 00 foe | waters or ‘GROUNDING CABLES ACCESSORIES SHEET 6 OF9 »_| "COMPLETE UPGRADE OF EMERGENCY POWER SYSTEM & UPS ESTABLISHMENT cane FORECC PORT CONTROL 1v0-248807 oss_frastanuna savor anaeia MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) EV. CODE -RIPTIC Pt y — 3 com a ee "STOCK NUMBER = = ve oe | NUMBERS | co fewer A rs vanes | 20 fe o gerececeericms cea o fecssryemeome vars | 20 |e o> fesrneceor ass ze Lo romero | aco ex oo ex sco aonceronas rowaraot | seo |x oo fparwsisc ems ox mers woes | ao | es oo feast smune Te as worm | ao | a co fexmoccnrano roasts | reve] en oo feomgtmcw near eeae Heeee a co feet ran omc ee voi | io | ex © feawome vommse | sored] wre co _feezmmeatow sues voowrasse | seve’'s| me are 1SUED FoR consrRUCTION erenence namin conrnso ey ew Ca a senora—| oa =I Tae —| soe foae se coeur ofa Bi_| “ewo,—|—“past —| ene ren | — aren — | ~stanviue bate fume toot fo FINAL [IFC [ REVISION] 00 ioe — arate ‘GROUNDING CABLES ACCESSORIES ‘SHEET 7 OF > _| ""conptére urbe or enencricy powensroren & UPS ESTABLISHMENT a once pont como. Tyo-24a807 ss _ [eas rama savor anal MATERIAL TAKE-OFF LIST ARAMCO 6228(03/06) CODE (PTION iAPS. “SAP st TY yu rarus | OWS a — sn STOCK NUMBER ¥ ul wan CODE NUMBERS. See eT sian sono, ansican Zine coareD rov01289 | go fi eats on a . oe wwocsz] 40 |e uarae (00 fret rateans, STANDARD LG, wer ane) be * eae cur ac pee eae ieee |e ee encase me etc on | # Lr ase aaa fe fame ban ecto woo! oy | sq [conDurr, NOT THREADED Tw (35) . ee ea sawansal 20 | en 00 oonourr, ner rinexDeD Tree ween) ee e eee on eee fstenence pawns sx | —ewos —| — mane —| aren | nee] Sta fe FINAL | 1FC_| REVISION] 00 ecg ONDUTTS AND ACCESSORIES weer S0r9 ig ien sass MATERIAL TAKE-OFF LIST “ARAMCO 6228(03/06) EY, CODE Bescon a ed ee oo fomor ourne 3:0 ns wor! 5p |g [our Al re oi) co fenou cone om. cs cov oor] 40 |e oo Geer ree roe ee vwooean| oo | ex on pista comron aeons ce ae ce co fowsrarrave ror cs cone won| so | ex co fomsmuraae ronson. cs vor | i lower aes og co aL ene nam unm cone. swoon] 200 | % soa nataseeso0 SO ‘omnes | “0 |e hu scsesowsrresmimcrox > woroir| ay |g (00 fr oa. 5: concur ‘GuB) " co fp corouri20e 3 sto won| 54 | eg fein co’ on oo fupmase sense sumac ron zon swooows| 20 | en co fer cmc eoc 2 0. rows vovasi| 26 | ea a) eases vwoenaa | zo | ta oo fa roo ne A swovasiz7} 200 | ta SSUED FoR CONSTRUCTION erenence orawin conmmteo ov wey. ‘enecee | eave | pnonkcranae ona a ae | eae no ooo ef ew. Base —| ewe. ven —[-anea—|~ staRr-DPonte ropes as gat ors Final [18] Reviston]| 0 noe — |r Tar “CONDUITS AND ACCESSORIES isHEET 9 OFS ° COMPLETE UPGRADE OF EMERGENCY POWER SEI B UPS ESTABLISHMENT far FoR ece& pont conto 110-248907 [as ranua savor anes z 3 SAUDI ARABIAN OIL COMPANY HE Gogowl gSoljl Saudi Aramco EWO16N018 COMPLETE UPGRADE OF EMERGENCY POWER ISSUED FOR CONSTRUCTION SYSTEM & UPS ESTABLISHMENT FOR ECC & PORT CONTROL ‘NA _ARA CONSTRUCTION SCOPE OF WORK ‘SMU aaa See PREPARED BY nn JACOBS ZATE = DECEMBER 2016 2 5 g SCOPE OF WORK onare| parva] noes] own [owe [eon]? 3 LNT TREATS | “DOG : F 3 TERMINAL WEST PIER ase | a | REET | OF | 49 Ep RAS TANURA SAUDIARABIA | S7=O _yen078 9 TDSORTS TSN Svc Aramco 2616-ENG (03/99) 23 SAUDI ARABIAN OIL COMPANY £8 TABLE OF CONTENTS [2| q 1 ABBREVIATIONS / LETTER SYMBOLS. 3 2. PROJECT SUMMARY. 8 3 REFERENCE DOCUMENTS. 3.1, Saudi Aramco Engineering Standards (SAES) 3.2 Saudi Aramco Material System Specification (SAMS) DESCRIPTION ISSUED FOR CONSTRUCTION 3.3 Saudi Aramco Engineering Procedures, 3.4 Saudi Aramco General Instruction Manual 3.5 Industry Codes and Standards 3.6 Project Documents. ~ 4 ELECTRICAL SCOPE... 4.1 General — —| 42 Demolition Scope of work alg 4.3. New Scope of work gl als ream ‘SMU OPERATIONS le fon 2 Lb be 3 | IS Be g| | Ie a5! a ed e Ear ie 8 q 2 : SCOPE OF WORK ovarire[anrno] nace] _onawmana [owno [revno [2 g SEE On ORT ORT SGT] DOC 7 3 TERMINAL WEST PIER SSI a beeen or | 00 = RAS TANURA, SAUDIARABIA | “9/50 16NO18 s TSO TETSU Tae Aeameo 2616-£NG (93/99) — The entire emergency load of the Admin building shall be fed from the EMDB. In normal zg SAUDI ARABIAN OIL COMPANY els 1 ABBREVIATIONS / LETTER SYMBOLS ES gle RIR Ras Tanura Refinery a sa] SAEP —_Saual Arameo Engineering Procedure E a/= SAES Saudi Aramco Engineering Standard iE SAMSS. ‘Saudi Aramco Material System Specification Ee 7 Ecc Emergency Control Center I= 8 MCC Motor Control Center q alE SWGR Switchgear lE 2/5 [2 go le als 2 PROJECT SUMMARY E a The Marine Admin Building consists of three (3) floors; a - * Ground Floor - Engineering departments, le | * First Floor - ECC and Emergency control and HE ae + Second Fioor - Port Control. iq S| | | Recently on first floor a new ECC room was constructed. [; ze Al main electrical systems are located in ELECTRICAL ROOM-108 on the ground floor. | 5 The normal power system is fed by a SOOKVA, 13.8kV/480V, 3-phase, 4-wire transformer |= eal e to a MDB with an Automatic Transfer Switch (ATS) to transfer power to the Emergency EE sera MDB (EMDB). E — tina” E bie 22a For emergencies an additional standby generator (136KW, 480V, 60Hz, make [2 ee CUMMINGS) is available for power supply. E ARA FE IE IP Ee fe le “SM operating conditions the MDB feeds the EMDB through the ATS. During power failures the 6 standby generator wil start up automatically to feed EMDB through the ATS. ToS See high level schematic below: Fee ‘OPERATIONS AMO Transformer. Standby Generator foare 12 IS zg] woe |[__ats__[|-{_ewoe A Ee 3 Ee 63.4 Loads Loads F mis a __boads | | |? Zar ; Bile L Begis E Ae 239 Fl sconeor work were [ranrvo] oer] aemmevo [ano 852 Si pmreomeancsormerrenrEETET ‘DOS = + 3 4 2 2 [TERMINAL WEST PIER oss | A 714677 le 2252 5 {[ RAS TANURA SAUDI ARABIA | 2/20 16NO18 2 TDSOTGTS Ua Saudi tramco 2516-£NG (01/99) SAUDI ARABIAN OIL COMPANY 3 REFERENCE DOCUMENTS 5/3 Ela 3.1. Saudi Aramco Engineering Standards (SAES) 32 SAES-A-202 Saudi Aramco Engineering Drawing Preparation SAES-P-100 Basic Power System Design Criteria = SAES-P-103, UPS and DG Systems 2 SAES-P-104 Wiring Methods and Materials ele SAES-P-111 Grounding f2 SAES-P-116 ‘Switchgear and Control Equipment gle SAES-P-121 Transformers and Reactors 8/5 g 3.2 Saudi Aramco Material System Specification (SAMSS) 14-SAMSS-533 __Three-Phase Dry-Type Power Transformers 16-SAMSS-518 Low Voltage Panelboards 16-SAMSS-521 Indoor Automatic Transfer Switch - Low Voltage 16-SAMSS-516 Uninterruptible Power Supply System ing Procedures MINA, SAEP-122 Project Records Ser SAEP-304 Instructions for Establishing and Maintaining Mandatory _ARA Saudi Aramco Engineering Requirements CERTFED SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi Sear Aramco Engineering Requirements P casa SAEP-303 Engineering Review of Projects = SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco OPERATIONS Engineering and Vendor Drawings = SAEP-281 Project Quailty Issues Escalation Process Ps SAEP-1023 ‘Saudi Aramco Engineering Procedure / Inspection Coverage Ls in Projects I re SAEP-1150 Inspection Coverage on Projects Ee --— SAEP-1151 Inspection Requirements for Contractor - Procured Materials | Belair and Equipment E Par SAEP-1154 Guidelines for Contractor's Quality Pian H Baie. E 3528! S) scope or work ararnre|macrwo] mocx] _orawnena [ano [anna | 8525 2 oem rommcmrroTTETEGATTET] ‘DOC = 2) 0 | | s[TERMINAL WEST PIER os [eee] cei | toe |e &255: '[ Ras TaNuRA SAUDIARABIA | 2/80 16NO18 2 TDSOTST OIE tae Souai srameo 26 16-£NG (03/99) z|8 SAUDI ARABIAN OIL COMPANY. siz 3.4 Saudi Aramco General Instruction Manual =e G1-0006.012 Isolation, Lockout and use of Hold Tags S18 GL2.710 Mechanical Completion and Performance Acceptance of Lel2 Facilities z 3.5. Industry Codes and Standards 8 NFPA 70 National Electrical Codes (NEC) ale RA-248818 PANELBOARD SCHEDULE 8 RA-248818 PANELBOARD SCHEDULE 2 RD-364620 CABLE AND CONDUIT SCHEDULE Z RD-364620 ‘CABLE AND CONDUIT SCHEDULE ~ RA-364622 PANELBOARD SCHEDULE g 2 RB-364625 ELECTRICAL EQUIPMENT PLAN ele RB-364624 CABLE/CONDUIT LAYOUT als RA-248806 ELECTRICAL ONE LINE DIAGRAM lee 8 RA-248806 DEMO. ELECT. ONE LINE DIAGRAM RB-364621 ELECTRICAL ONE LINE DIAGRAM RA-248807 POWER RISER DIAGRAM = RA248807 DEMO. POWER RISER DIAGRAM mars RE-364626 POWER PANEL DATA SHEET 056-064-PP-007 SMU RE-364627 POWER PANEL DATA SHEET 056-064-PP-011 oar, 122278 RE-364628 EMERGENCY PNL DATA SHEET 056-064-PP-008 RE-364629 EMERGENCY PNL DATA SHEET 056-064-PP-010 ae RE-364630 AUTOMATIC TRANSFER SWITCH DATA SHEET ATS oro RE-364631 UPS DATA SHEET e122 RE-364632 POWER PANEL DATA SHEET 056-064-PP-009 Pi] RE-364633 DRY TYPE TRANSFORMER DATA SHEET 056-064-XFR | | (7-003 fay RA-248815 GROUNDING PLAN aree RB-364623 ELECTRICAL INSTALLATION DETAIL Fae RB-364625 ELECTRICAL EQUIPMENT PLAN Ee 10-240807 MATERIAL TAKE OFF 3 7 [Score oF work oeanre ear] sec] oma [erm [son 3: BES TTT DOS > 3 i [TERMINAL WEST PIER faucet of | 00 8 RAS TANURA SAUDI ARABIA | 60 y6NOIe 8 OTITIS Ie Sout Aramco 2516-€NG (03/99) z\3 SAUDI ARABIAN OIL COMPANY ely CE-ALI311 LV CABLE SIZING CALCULATION aS CE-ALI312 ELECTRICAL LOAD CALCULATION 816 CE-AL1313 UPS SIZING CALCULATION HE CE-AL1314 TRANSFORMER SIZING CALCULATION CEALISIS, ADEQUACY REPORT OF EXISTING STANDBY DIESEL GENERATOR 4 ELECTRICAL SCOPE 4.1 General This Section of the Construction Scope of Work provides the electrical requirements of upgrading the emergency power system & UPS establishment for ECC and Port Control at Ras Tanura Administration Building. DESCRIPTION ISSUED FOR CONSTRUCTION + The CONTRACTOR shall be responsible for all aspect of the project in terms of configuration, fabrication, procurement, documentation, drawings, inspection, integration, installation, testing & commissioning and system familiarizationitraining, Sls sé * Contractor shall have total system responsibility for the performance and functionality of all ety] items furnished as per contract. ea =e ‘+ All components necessary for the proper functionality of the equipment's, but not explicitly sl e specified and/or described herein shall be identified and provided by CONTRACTOR as Te part of the system. MINA 22 + The CONTRACTOR shall plan and execute the work as per Saudi Aramco Procedures TEE and Standards, Where required a detailed project execution plan shall be submitted for "aRA Saudi Aramco approval prior to the start of work. The CONTRACTOR shall carry out site eae surveys to verify actual field conditions. CERTFED uu + Obtain the proper work permit in accordance with Saudi Aramco Construction Safely aa Manual. ner + The CONTRACTOR shall carry-out site inspection prior to start construction, OPERATORS + Ensure that specific work package are prepared, whereby specific work task are defined, i work permit are identified necessary tools and equipment are prepared and the area are poe provided with necessary safety markings/barrer. I: gi] Ie ke 3 * All electrical materials and work associated that are required for this project, whether [= Be g | shown or not on the drawings shall be supplied and installed by the CONTRACTOR. |E ge. unless specified otherwise. ie Basie + The CONTRACTOR shall perform all works in accordance with the requirement of this fy Beds project. Any deviation must frst be approved by Sau Aramco Representative prior to ts | 3 impiementation E Si) | 2 sl scope or work ‘oware|rowTno] noe] onawcna [ewrna [rcwne [2 50 25 2 2 penrtmenctornmmncrmnmanraEMRTTRT| DOC 5 2292 2 2[TERMINAL WEST PIER SEI a aceon of | 00 2: 15 &[ RAS TANURA ‘SAUDI ARABIA | 29/5" 46NO18 2 DSO OT Suet rarnco 2616-ENG (03/99 HB SAUDI ARABIAN OIL COMPANY * Provide all required test equipment and perform all required testing for all electrical equipment's, cables in accordance with all applicable International and Saudi Aramco Standards. Provide all necessary test report. AMO Fexca[oear] our wana] sw) RO + Coordination with Saudi Aramco shall be the responsibilty of the CONTRACTOR with regard to the de-energization / energization of the related electrical equipment in the project. Any installation hardware which is not listed in Material Take Off and is required to Complete the job in total to the satisfaction of SAUD! ARAMCO is to be supplied by the CONTRACTOR © Complete cabling and installation shall be performed by the CONTRACTOR as per relevant Saudi Aramco engineering standard SAES-P-104 and standard drawings. Saudi ‘Aramco inspector shall inspect cable laying, testing and complete inspection in compliance with the latest Saudi Aramco Pre-commissioning forms and guide lines. DESGRPTION ISSUED FOR CONSTRUCTION * All electrical installation work shall be carried out in compliance with the latest National Electrical Code (NEC) and applicable Saudi Aramco Engineering Standards SAES-P-103, SAES-P-104 and SAES-P-111. Any installation hardware which is not listed in Material ‘Take Off and is required to complete the job in total to the satisfaction of SAUDI ARAMCO. is to be supplied by the CONTRACTOR, reW9| The CONTRACTOR shall follow Saudi Aramco General Instruction Manual (GI-0006.012) for Isolation, Lockout and use of Hold Tags. 6 frenove S * The CONTRACTOR shall follow Saudi Aramco Construction Safety Manual, 5" edition. Teac] 4.2 Demolition Scope of work Tmsie| © All Electrical works shall comply with the latest Saudi Aramco Engineering Standards, == Specification and industrial standards. ARA Demolition works shall include the following works: + Disconnect and demolish the existing ATS in electrical room no. 113 and keep all related cables and conduits for the new ATS. Refer to RA-248807.001, RA-248815.001 and RA- 248806.001 * Demolish and remove the dry type transformer T-2 in electrical room no. 113 as per drawing RA-248807.001 and RA-248806.001 ‘+ The existing power/conduit (PC-3518 and PC-3519) which is connected to dry type transformer T-2 shall be demolished and removed as per RA-248806.001 | | 4.3 New Scope of work + The existing diesel generator has been verified against new emergency loads, the loading Of generator is not more than 90% of its name plate rating, refer to adequacy report CAL1315. So, the existing generator shall not be replaced, + The new 112.5 KVA dry type transformer 056-064-XFR (T)-003 has been sized based on TORR ETSEWETATEET | DOC +" or | 00 RAS TANURA, SAUDI ARABIA | “6/60 16NO18 2 TDSOIETE OSE dae oss | a | RE-714677 Sout Aramco 2616-£N6 (03/99) ‘SAUDI ARABIAN OIL COMPANY ‘nal smu] Rov DESCRPTION ISSUED FOR CONSTRUCTION few] __ hana ARA “Suu. i = modified loads; refer to transformer sizing calculation CAL 1314. CONTRACTOR shall provide and install new 480V Automatic Transfer Switch (056-064- ATS-001) in electrical room no. 113 in same location of the demolished ATS as per drawing RA-248806,001 and RB-364625.001 The existing power and control cables (PC-3503, PC-3504, and PC-3515 & CC-3621) shall be reconnected to new ATS 056-064-ATS-001 as per drawing RA-248807.001 CONTRACTOR shall provide and install new 250AF/175AT breaker in the existing (space location no. 5) of Emergency Distribution Board (EMDB) at as per drawing RA-28806.001. ‘The existing EDP-A load of EMDB in breaker no. 3 shall be shifted to new panel 056-064- PP-007 and make breaker no.3 as spare. CONTRACTOR shall provide and install new 112.5KVA dry type transformer 056-064- XFR (T)-003 in electrical room no. 113 at the location of demolished transformer T-2 as er equipment layout drawing RB-364625.001. Provide new power cables for the 112.5KVA dry transformer 056-064-XFR (T)-003 as per RA-248806.001 and RD-364620.001 CONTRACTOR shall provide and install new 20KVA UPS (056-064-UPS-002) in Telecommunication Electrical Room no. 106 as per RA-248807.001, RB-364625.001 and RB-364621.001 Connect the new 056-064-UPS-002 to new distribution panelboard 056-064-PP-007 as per RB-364621.001 and RB-364625,001 CONTRACTOR shall provide and install new UPS panel 056-064-PP-011 in Telecommunication Electrical Room no.106 as per drawing RA-248807.001, RB- 364625.001 The main incomer cable of existing panel "EDP-C" shall be disconnected from existing panel "EDP-A" in ckt. 14, 16 & 18 and make it spare breaker as per drawing RA- 248818.002, Provide new main incomer cable (PC-3852) from existing panel "EDP-A" to 056-064-PP- 007 as per drawing RA-248807.001 The CONTRACTOR shall connect the main incomer of the existing “EDP-C", which is located in communication tower, to new UPS panel 056-064-PP-011 as per drawing RB- 364621.001, RB-364625,001 and RA-364622.001 CONTRACTOR shall provide and install new UPS distribution panel 056-064-PP-008 in electrical room no. 113 as per drawing RA-248807.001 Rev.0A2, RB-364625.001 and RA- zene 364622.001 5 be: ‘The new emergency distribution panel 056-064-PP-008 shall be connected to new UPS Bgib panel 056-064-PP.011 as per RA-248807.001 gissse 522 § [scope or work ware [pwrwo]encx] omamwena [aaa [san 325 | Eiger gaornnacronnmmrarimaTToTE| “DOC $2) | sfrennnac west PER lh 224 ts e[ Ras TANURA SAUDI ARABIA | +6)" 16NO18 a TOSI TOT OTT Saudi Aramco 2616-ENG (93/99) Zs SAUDI ARABIAN OIL COMPANY Ela e|8 * The lighting loads for conference room shall be transferred from existing LP-A and PP-A to AB (056-064-PP-008 as per drawing RA-364622.001. s/s + The existing loads at ckt. 2 & 8 of LP-A shall be shifted to new UPS panel 056-064-PP- ras 008. * The existing loads at ckt. 5, 7, 12 & 13 of PP-A shall be shifted to new UPS panel 056- 064-PP-008. + The CONTRACTOR shall provide and install new UPS distribution panel 056-064-PP-010 in electrical room no. 212 as per drawing RB-364621.001, RB-364625.001 and RA- 364622.001 * The new UPS distribution panel 056-064-PP-010 shall be connected to new UPS panel 056-064-PP-011 as per RA-248807.001 + The existing loads at (ckt. 10, 11 & 12) of LP-B shall be shifted to new UPS panel 056- 064-PP-010 as per drawing RA-248818.001 DESGRETION ISSUED FOR CONSTRUCTION ‘+ The existing loads for ECC room at (ckt. 16 & 17) of PP-B shall be shifted to new UPS ele panel 056-064-PP-010 as per drawing RA-248818.001 HE - + The CONTRACTOR shall provide and install new distribution panel 056-064-PP.009 in gla electrical room no. 212 as per drawing RA-364622.001, RA-248807.001 and RB- “le 364625.001 re * The new split AC for ECC Room shall be fed from new emergency panel 056-064-PP.009 as per drawing RA-364622.001. +The new power cables shall be routed through RGS conduit as indicated in drawing. The roe Conduit shall be supported from room ceiling structure as per drawing RB-364624.001 and ean RD-364620. TaD] ‘smu + The CONTRACTOR should provide grounding for all new equipment and panels; lars 1220010 automatic transfer switch, dry type transformer, power panels and uninterruptable power cRaETN supply. Refer to drawing RA-248815.001 Lo Taam ‘+ Grounding connection should be provided to all new electrical equipment and panels. The SEAT grounding shall be connected to existing grounding bus bar or grounding grid lone 22076 + All new equipment, conduits, structures and other appurtenances installed under this Fee project shall be grounded as required by SAES-P-111 and article 250 of NFPA-70. After 2 | the installation of the new equipment, reconnect the disconnected grounding cables. Le i z »} © Electrical drawings indicate the general layout of the installation, Layouts of accessories of bs the conduit system are shown diagrammatically unless specifically shown and/or zo dimensioned, they do not necessarily indicate all required fittings, bends, conduits, Be Fy ae ‘supports and other similar items required for a complete installation. ae END OF SCOPE OF WORK Bilis 9232 7 [score oF work osinre[euoT Wo] mom] onawmano [ovina [Rovno $52 0) i earmnmncorsncncrmenmarermsmmareer "BOC > 22% 2 2[ TERMINAL WEST PIER z 056 | A | RE-714677 or | oo @25 55 [pas Tanura SAUDIARABIA | “0/50 16No18. 2 TDSO BETS UI Tae

You might also like