SCHEDULE OF BEAMS & GIRDERS

CONCRETE TIE BEAM SCHEDULE


W D SECTION TOP REINF MID REINF BOTT REINF STIRRUP - TIES
MARK (MM) (MM) X Y CONT ADDL CONT CONT ADDL SIZE

FTB 200 300

GROUND FLOOR CONCRETE BEAM SCHEDULE


W D SECTION TOP REINF MID REINF BOTT REINF
MARK

1 @ 50 MM SPACING FROM
(MM) (MM) X Y CONT ADDL CONT CONT ADDL SIZE

REST @ 200 MM MAX O/C


3 @ 100 MM EACH END
B1 200 400

3 @ 150 MM
B-2 200 400

SECOND FLOOR CONCRETE BEAM SCHEDULE

RB-1 200 400

CB-1 200 400

CONCRETE FOOTING SCHEDULE


REINFORCEMENT
MARK SIZE (mm) THK
LONGITUDINAL TRANSVERSE
F1 1 000 X 1 000 300

F2 1 200 X 1 200 300