Operation Process Chart

Nama Objek : Kursi Keiko Plus no. 6


Nomor Peta :1
Dipetakan Oleh : Kelompok 10 Kelas A
Tanggal Pemetaan : 16 Maret 2022

Rangka Kursi Bagian Depan Rangka Kursi Bagian Belakang


Penyangga Bawah Penyangga Atas
(Material PP Plastic) (Material PP Plastic) (Material SS Tube, 5000xØ25x1) (Material SS Tube, 5000xØ25x1)

10'' Dipotong (1605xØ25x1) 10'' Dipotong (1660xØ25x1)


O-201 O-101
5,018% Circular Saw Machine 0,44% Circular Saw Machine
Mal Ukur Mal Ukur

20'' Dibending 20'' Dibending


O-202 O-102
0% Hydraulic Pipe 0% Hydraulic Pipe
Bending Machine Bending Machine

20'' Dilubangi (4 titik x Ø5) 20'' Dilubangi (4 titik x Ø5)


O-204 O-103
0,018% Drilling Machine 0,02% Drilling Machine
Mata Bor Mata Bor

300'' Assembly Las


O-104
0% Electric Welding Machine
Electrode

60'' Inspeksi (Bench Work)


I-101
0% Gerinda Tangan
Cat Besi

600'' Pengecatan
O-105
0% Spraygun
Compressor

Baut M5

120'' Assembly & Inspeksi


O-106
0% Kunci Pas

Storage
Gudang
Penyimpanan

RINGKASAN
KEGIATAN JUMLAH WAKTU

6 1000''

1 60''

1 120''

TOTAL 8 1180''