Professional Documents
Culture Documents
Curing Compound Vs Water Curing
Curing Compound Vs Water Curing
for 1
550000 Rs.
bore
5500 yar 16.9 2.5 2.5 21.9 92950 7540.5
1500 12.5256945825874
94450
66 I-Girder
178 U-Girder
244 Total spans
115 Station piers
considering 2 bore @5.5 lakhs for entire
100.3 359 1100000
project piers
considering 1/3rd effciency of bore for all
366667 curing works
considering 1/2 effciency of bore for all
183333
pier curing works only
82,023,300.00
815,824,830
465,839,865.00
669,899,745.00
1,902,732,181.00
138,616,624.00
19,354,720.00
8,248,302.00
18,000,000.00
16,500,000.00
24,000,000.00
9,000,000.00
9,000,000.00
4,179,039,567
Foundation Sub-str Super-str Misc.
82,023,300.00 82,023,300.00
815,824,830 815,824,830
465,839,865.00 465,839,865
669,899,745.00 669899745
1,902,732,181.00 455601421.8 607468562 455601422
384060775
138,616,624.00 138616624
19,354,720.00 19354720
8,248,302.00 8248302
18,000,000.00 18,000,000.00
16,500,000.00 16,500,000.00
24,000,000.00 24,000,000.00
9,000,000.00 9,000,000.00
9,000,000.00 9,000,000.00
4,179,039,567 1271426251.8 1073308427.4 1675781587.8 158,523,300.00
30% 26% 40% 4%
1631226000 1518671406