HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN : PENINGKATAN JALAN KABUPATEN


PEKERJAAN : PERENCANAAN UNTUK TA. 2014
LOKASI : KABUPATEN LAMANDAU
JANGKA WAKTU : 30 (tiga puluh) HARI KALENDER

BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL


A. PROFFESIONAL STAFF -
B. SUB PROFFESIONAL STAFF -
C. Err:509 -

SUB TOTAL I -

II BIAYA LANGSUNG NON PERSONIL

A. BIAYA OPERASIONAL KANTOR 5,250,000.00


B. BIAYA KOMUNIKASI DAN LISTRIK -
C. Err:509 Err:509
D. BIAYA TRANSPORTASI Err:509
E. BIAYA PELAPORAN 2,909,500.00

SUB TOTAL II Err:509

SUB TOTAL ( I + II) Err:509


PPN 10 % Err:509

TOTAL HARGA Err:509

PEMBULATAN Err:509

Terbilang : Seratus Delapan Puluh Juta Rupiah

Nanga Bulik, Oktober 2013

: Dibuat Oleh
Pejabat Pembuat Komitmen
Bidang Bina Marga
Dinas Pekerjaan Umum
Kabupaten Lamandau

AGUS IN'YULIUS
NIP. 19690806 200312 1 009
I. BIAYA LANGSUNG PERSONIL

JUMLAH HARGA HARGA JUMLAH


NO. PERSONIL Waktu SATUAN SATUAN HARGA
Volume Satuan
Bulan (Rp.) (Rp.) (Rp.)
A. SUB PROFFESIONAL STAFF
1. Inspector 1 4.00 OB #NAME? #NAME? #NAME?
SUB TOTAL #NAME?
B. SUPPORTING STAFF
1. Operator Komputer 1 4.00 OB 6,100,000 2,440,000 26,840,000
SUB TOTAL 26,840,000
TOTAL BIAYA LANGSUNG PERSONIL #NAME?

II.BIAYA LANGSUNG NON PERSONIL

JUMLAH HARGA HARGA JUMLAH


NO. JENIS PENGELUARAN Jumlah SATUAN SATUAN HARGA
Volume Satuan
Bulan (Rp.) (Rp.) (Rp.)
A. BIAYA OPERASIONAL KANTOR
1 Biaya Sewa Kantor 1 4.00 Unit - Bulan 1,000,000 400,000 4,400,000
2 Biaya Alat Tulis Kantor 1 4.00 Bulan
5 unit-bulan 890,000 356,000 3,916,000
SUB TOTAL 8,316,000

JUMLAH HARGA HARGA JUMLAH


NO. JENIS PENGELUARAN Jumlah SATUAN SATUAN HARGA
Volume Satuan
Bulan (Rp.) (Rp.) (Rp.)
B. BIAYA TRANSPORTASI
1. Sewa Kendaraan roda 2 (termasuk O & M) 2 4.00 Unit - Bulan 1,700,000 1,360,000 14,960,000
SUB TOTAL 14,960,000

JUMLAH HARGA HARGA JUMLAH


NO. JENIS PENGELUARAN SATUAN SATUAN HARGA
Volume Satuan
(Rp.) (Rp.) (Rp.)
C. BIAYA PELAPORAN
1 Laporan Bulanan 20 Buku 125,000 250,000 2,750,000
2 Laporan Akhir 5 Buku 250,000 125,000 1,375,000

SUB TOTAL 4,125,000


8,250,000
TOTAL BIAYA LANGSUNG NON PERSONIL 27,401,000
REKAPITULASI PENAWARAN

PROGRAM : Program Pengembangan Permukiman


KEGIATAN : Penyelenggaraan Infrastruktur Pada Permukiman di Kawasan Strategis Daerah Kabupaten / Kota
PEKERJAAN : Pengawasan Peningkatan Jalan Raden Paru Desa Kujan
LOKASI : Kabupaten Lamandau
JANGKA WAKTU : 45 ( Empat Puluh Lima ) HARI KALENDER
BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONEL


A. PROFFESIONAL STAFF
B. SUPORTING STAFF
SUB TOTAL I

II BIAYA LANGSUNG NON PERSONEL

A. BIAYA OPERASIONAL KANTOR


B. BIAYA TRANSPORTASI
C. BIAYA PELAPORAN

SUB TOTAL II

SUB TOTAL ( I + II)


PPN 10 %

TOTAL HARGA

Terbilang : .........................................................

Nanga Bulik, ........................... 2021

Penawar
CV/PT/FIRMA

NAMA TERANG
Jabatan
I. BIAYA LANGSUNG PERSONEL

HARGA JUMLAH
Waktu
NO. PERSONEL Volume Satuan SATUAN HARGA
Bulan
(Rp.) (Rp.)
A. PROFFESIONAL STAFF
1. Supervision Engineer 1 1.50 Orang - Bulan
SUB TOTAL A
B. SUPORTING STAFF
1. Operator Komputer 1 1.50 Orang - Bulan
SUB TOTAL B
TOTAL BIAYA LANGSUNG PERSONEL (A+B)

II.BIAYA LANGSUNG NON PERSONEL

HARGA JUMLAH
Jumlah
NO. JENIS PENGELUARAN Volume Satuan SATUAN HARGA
Bulan
(Rp.) (Rp.)
A. BIAYA OPERASIONAL KANTOR
1 Sewa Kantor 1 1.50 Unit - Bulan
2 Biaya Alat Tulis Kantor (ATK) 1 Ls
5 unit-bulan
SUB TOTAL. A

HARGA JUMLAH
Jumlah
NO. JENIS PENGELUARAN Volume Satuan SATUAN HARGA
Bulan
(Rp.) (Rp.)
B. BIAYA TRANSPORTASI
1. Sewa Kendaraan roda 2 (termasuk O & M) 2 1.50 Unit - Bulan
SUB TOTAL. B

HARGA JUMLAH
NO. JENIS PENGELUARAN Volume Satuan SATUAN HARGA
(Rp.) (Rp.)
C. BIAYA PELAPORAN
1 Laporan Bulanan 8 Buku
2 Laporan Akhir 5 Buku
unit-bulan
SUB TOTAL. C
TOTAL BIAYA LANGSUNG NON PERSONEL (A+B+C)
II.BIAYA LANGSUNG NON PERSONIL

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN SATUAN HARGA
Volume Jumlah Bulan Satuan
(Rp.) (Rp.)
A. BIAYA OPERASIONAL KANTOR
1. Biaya Sewa Kantor 1 7.00 Unit-Bulan 500,000 3,500,000
2. Alat Tulis Kantor 1 7.00 Bulan
5 unit-bulan 250,000 1,750,000
SUB TOTAL 5,250,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN SATUAN HARGA
Volume Jumlah Bulan Satuan
(Rp.) (Rp.)
B. BIAYA TRANSPORTASI
1. Sewa Kendaraan roda 2 (termasuk O & M) 1 7.00 Unit - Bulan 1,500,000 10,500,000
SUB TOTAL 10,500,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN SATUAN HARGA
Volume Satuan
(Rp.) (Rp.)
C. BIAYA PELAPORAN
1 Laporan Bulanan 25 Buku 95,000 2,375,000
2 Laporan Akhir 5 Buku 106,900 534,500

SUB TOTAL 2,909,500


5,819,000
TOTAL BIAYA LANGSUNG NON PERSONIL 18,659,500
I. BIAYA LANGSUNG PERSONIL

JUMLAH HARGA JUMLAH


NO. PERSONIL Person/ SATUAN HARGA
Volume Satuan
Unit (Rp.) (Rp.)
A. PROFFESIONAL STAFF
1. Ketua Tim 1 1.00 OB 10,312,500 10,312,500
2. Ahli Teknik Jalan Raya 1 1.00 OB 8,250,000 8,250,000
3. Ahli Teknik Geodesi 1 0.50 OB 8,250,000 4,125,000
4. Cost/Quantity Engineer 1 0.50 OB 8,250,000 4,125,000

SUB TOTAL I 26,812,500


B SUB PROFFESIONAL STAFF
1. Assisten Ahli Teknik Jalan Raya 1 1.00 OB 5,750,000 5,750,000
2. Assisten Ahli Teknik Geodesi 1 0.50 OB 5,750,000 2,875,000

SUB TOTAL II 8,625,000


C. SUPPORTING STAFF
1. Surveyor 2 0.50 OB 2,760,000 2,760,000
2. Draftman 2 0.50 OB 2,760,000 2,760,000
3. Estimator 1 0.50 OB 2,760,000 1,380,000
4. Operator Komputer 1 1.00 OB 2,208,000 2,208,000
5. Labour 2 0.50 OB 1,000,000 1,000,000
6. Office Boy 1 1.00 OB 1,000,000 1,000,000
SUB TOTAL III 11,108,000
TOTAL BIAYA LANGSUNG PERSONIL 46,545,500
II. BIAYA LANGSUNG NON PERSONIL

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN Person/ SATUAN HARGA
Volume Satuan
Unit (Rp.) (Rp.)
A. BIAYA OPERASIONAL KANTOR
1. Sewa Kantor 1 1.00 bulan -
2. Alat Tulis Kantor 1 1.00 bulan 1,000,000 1,000,000
3. Sewa Komputer 1 1.00 bulan 900,000 900,000
4. Sewa Printer Color A4 1 1.00 bulan 400,000 400,000
4. Sewa Printer Color A3 1 1.00 bulan 700,000 700,000
SUB TOTAL 3,000,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN Person/ SATUAN HARGA
Volume Satuan
Unit (Rp.) (Rp.)
B. BIAYA KOMUNIKASI
1. Biaya Telepon dan Faks 1 1 Bln 2,400,000 2,400,000
SUB TOTAL 2,400,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN Person/ SATUAN HARGA
Perjalanan Satuan
Unit (Rp.) (Rp.)
C. BIAYA HARIAN PERJALAN DINAS
1. Supervision Engineer 1 6 trip 150,000 900,000
2. Err:509 1 6 trip 100,000 600,000
3. Err:509 1 6 trip 100,000 600,000
4. #NAME? 1 6 trip 75,000 450,000
5. Lab. Technician 1 6 trip 75,000 450,000
6. Err:509 2 6 trip 50,000 600,000
SUB TOTAL 3,600,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN Person/ SATUAN HARGA
Volume Satuan
Unit (Rp.) (Rp.)
D. BIAYA SURVEY LAPANGAN
1. Sewa Kendaraan roda 4 ( termasuk O & M ) 1 0.50 bulan 12,000,000 6,000,000
2. Sewa Kendaraan roda 2 (termasuk O & M ) 1 0.50 bulan 1,800,000 900,000
4. Sewa Theodolit 1 0.50 bulan 4,000,000 2,000,000
5. Sewa Waterpass 1 0.50 bulan 2,500,000 1,250,000
7. Perlengkapan Survey 1 1.00 bulan 500,000 500,000
SUB TOTAL 10,650,000

JUMLAH HARGA JUMLAH


NO. JENIS PENGELUARAN Person/ SATUAN HARGA
Volume Satuan
Unit (Rp.) (Rp.)
E. BIAYA PELAPORAN
1 Laporan Survey Pendahuluan 5 Expl. 140,000 700,000
2 Laporan Akhir Perencanaan 5 Expl. 280,000 1,400,000
3 Laporan Survey Topografi 5 Expl. 480,000 2,400,000
4 Pembuatan RKS 15 Expl. 110,000 1,650,000
5. Pembuatan RAB/OE 15 Expl. 110,000 1,650,000
6. Pembuatan Gambar Perencanaan 15 Expl. 200,000 3,000,000
7. Back Up CD 3 kpg 20,000 60,000
SUB TOTAL 10,860,000
TOTAL BIAYA LANGSUNG NON PERSONIL 30,510,000
HARGA PERKIRAAN SENDIRI ( HPS )

KEGIATAN : PEMELIHARAAN/PENINGKATAN JALAN


PEKERJAAN : BELANJA JASA KONSULTASI PERENCANAAN
LOKASI : KABUPATEN LAMANDAU
JANGKA WAKTU : 60 (enam puluh) HARI KALENDER

BIAYA
NO URAIAN
(Rp)

I BIAYA LANGSUNG PERSONIL


A. Proffesional Staff 26,812,500.00
B. Sub Proffesional Staff 8,625,000.00
C. Supporting Staff 11,108,000.00

SUB TOTAL I 46,545,500.00

II BIAYA LANGSUNG NON PERSONIL

A. Biaya Operasional Kantor 3,000,000.00


B. Biaya Komunikasi 2,400,000.00
C. Biaya Perjalanan Dinas 3,600,000.00
D. Biaya Survey Lapangan 10,650,000.00
E. Biaya pelaporan 10,860,000.00

SUB TOTAL II 30,510,000.00

SUB TOTAL ( I + II) 77,055,500.00


PPN 10 % 7,705,550

TOTAL HARGA 84,761,050.00

DIBULATKAN

Terbilang : Dua Ratus Lima Puluh Juta Rupiah

Nanga Bulik, 17 Maret 2011

: Diperiksa/Disetujui Oleh : Disusun Oleh


Kabid Bina Marga Pejabat Pelaksana Teknis Kegiatan
Dinas Pekerjaan Umum Pemeliharaan/Peningkatan Jalan
Kabupaten Lamandau Tahun Anggaran 2011

Ir. RAY PASKAN EDDY KARUSMAN, ST


NIP. 19651026 199703 1 002 NIP. 19770207 200312 1 004

: Menyetujui
Kepala Dinas Pekerjaan Umum
Kabupaten Lamandau

Ir. LEONARD S. AMPUNG


NIP. 19660315 199203 1 010
RINCIAN KOMPONEN REMUNERASI PERSONEL
PROGRAM : Program Pengembangan Permukiman
KEGIATAN : Penyelenggaraan Infrastruktur Pada Permukiman di Kawasan Strategis Daerah Kabupaten / Kota
PEKERJAAN : Pengawasan Peningkatan Jalan Raden Paru Desa Kujan
LOKASI : Kabupaten Lamandau
TAHUN ANGGARAN : 2021
WAKTU PELAKSANAAN : 45 ( Empat Puluh Lima ) HARI KALENDER

Gaji Dasar Beban Biaya Beban Biaya Keuntungan


NO Bidang Penugasan Biaya Langsung Personel (BLP)
(GD) Sosial (BBS) Umum (BBU) Perusahaan (KP)

C D E F G
A B
(1 X GD) (0.3 - 0.4 )X GD (0.5 - 1.3) X GD 0.1 X (GD+BBS+BBU) GD+BBS+BBU+TP+KP

1 Supervision Engineer

2 Operator Komputer