You are on page 1of 3

Comienzo Fin

mié
sáb 09/04/22
29/06/22
9-Apr-22 24-Apr-22
CASA PV 0 S/. 3,906,250.00
EV 0 S/. 6,000,000.00
AC 0 S/. 8,000,000.00

100000000
CURVA S
90000000

80000000

70000000

60000000

50000000

40000000

30000000

20000000

10000000

0
9-Apr-22 9-May-22
9-May-22 24-May-22 8-Jun-22 29-Jun-22
S/. 16,750,000.00 S/. 41,750,000.00 S/. 68,375,000.00 S/. 91,000,000.00
S/. 32,000,000.00 33900000
S/. 32,000,000.00 35670000

000000
CURVA S
000000

000000

000000

000000
PV
000000 EV
AC
000000

000000

000000

000000

0
9-Apr-22 9-May-22 9-Jun-22
% Avance R Costo Actual
EV=%R x PPT
CPTR CRTR

Valor acumulado: VA AC (CRTR)


(CPTP)

S/. 33,900,000.00 S/. 35,670,000.00