You are on page 1of 69

DAFTAR UPAH KERJA DAN BAHAN

TAHUN ANGGARAN : 2020

UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN

C. SEWA ALAT
Sewa Stemper Jam 113,700.00
Sewa Alat Bantu Strouss Pile Jam 11,000.00
Sewa Compresor Min. 5 Jam Jam 103,400.00
TAHUN ANGGARAN : 2020

UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN

A. UPAH
1 Mandor OH 150,000.00
2 Kepala Tukang OH 135,000.00
3 Tukang OH 125,000.00
4 Pekerja OH 100,000.00
DAFTAR UPAH KERJA DAN BAHAN

UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN

B BAHAN
- Kayu Meranti Usuk m3 3,893,229.17
- Kayu Meranti Papan 2/20, 4/10 m3 3,893,229.17
- Kayu Meranti Balok m3
3,743,489.58
- Kayu Meranti Begesting m3
3,231,380.21
- Plywood Uk .122x 244 x 9 mm Lbr 112,700.00
- Kalsiplank 0,8/20 m1 15,390.83
- Kalsiplank 0,8/30 m1 23,057.50
- Kalsiboard 1200x2400x60 mm Lembar 140,300.00
- Gypsumboard 1200x2400x90 mm Lembar 88,550.00
- Kayu Jati Balok 6/15 m3 6,845,238.10
- Kayu Kamper Balok 6/12, 6/15 m3 6,289,062.50
- Kayu Jati Papan 4/10 m3 4,704,545.45
- Kayu Kamper Papan 2/20, 4/10 m3 6,289,062.50

- Pasir Urug m3 237,666.67


- Sirtu m3 184,000.00
- Pasir Pasang m3
245,333.33
- Pasir Cor m3 306,666.67

- Semen PC 40 Kg Sak 65,550.00


- Semen Berwarna Kg 18,400.00

- Batu Kali Belah15/20 cm m3 230,000.00


- Batu Krikil Beton m3
306,666.67
- Batu Pecah Mesin 1/2 cm m3 306,666.67
- Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Bh 977.50

- Besi Beton Polos kg 10,350.00


- Besi Beton Polos kg 9,545.00
- Paku biasa 2” – 5” Dus 19,550.00
- Kawat Beton kg 23,000.00
- Paku Usuk kg 19,550.00
- Paku Reng kg 20,700.00
- Rangka Galvalume Uk 0.8mm m2 330,500.00
- Usuk Galvalume Uk C. 0.75 mm m2 90,000.00
- Reng Galvalume Uk R. 0.45 mm m2 80,000.00
- Paku Asbes Sekrup 4 inchi Bh 6,900.00
- Seng Talang BJLS 30 Lbr 90 m 46,000.00
- Besi Hollow 40 X 40 X 0.45 mm Batang 27,025.00
- Besi Hollow 20 X 40 X 0.35 mm Batang 14,950.00
- Besi Hollow 40 X 40 X 1.1 mm Batang 103,500.00
- Besi Hollow 20 X 40 X 1.1 mm Batang 78,200.00
- Paku Asbes Sekrup 4 inchi Bh 6,900.00
- Paku Klem (No 4) / Beton Dos 10,350.00
- Besi Profil WF Kg 12,075.00
- Besi Canal C Kg 11,394.01
- Plat Besi/Baja Kg 23,575.00
- Angkur dia. 16 mm L 40 Bh 41,112.50
- Mur Baut dia. 14 mm Bh 4,772.50
- Mur Baut dia. 10 mm Bh 2,645.00
- Jarum Keras Bh 23,000.00
- Seng Talang BJLS 30 Lbr 60 m 31,050.00

- Minyak Bekisting Ltr 23,000.00


- Air Kerja Ltr 138.00

- Waterproof Kg 51,175.00
- Serat Fiber Lembar 2,012.50
- Cat Kayu Kg 58,545.45
- Cat Meni Kayu Kg 34,500.00
- Clear Gloss Kg 75,192.31
- Plamir Tembok 5 Kg Kaleng 71,875.00
- Kuas 4 inchi Bh 23,000.00
- Cat Besi Kg 40,250.00
- Kertas Gosok Halus Lembar 17,825.00
- Kertas Gosok Kasar Lembar 22,425.00
- Cat Meni Besi Kg 35,022.73
- Cat Tembok Dalam 2.5 Kg Kaleng 186,875.00
- Cat Tembok Luar 2.5 Kg Kaleng 277,006.25
- Dempul Tembok Kg 10,350.00
- CThinner A Liter 41,400.00
- Coumpond Kaleng 48,300.00
- Wood Filler Kg 43,125.00
- Clear Gloss Kg 75,192.31
- Shanding Kg 75,900.00
- Lem Kayu Kg 15,525.00

- Keramik Lantai Bermotif Uk. 30x30 cm (Rock Tile) m2 105,800.00


- Keramik Lantai Bermotif Uk. 60x60 cm m2 97,750.00
- Granit Tile 60x60 cm m2 242,000.00
- Keramik (Plint) Uk. 7,5 x 20 Cm Bh 8,200.00

- Genteng Karang Pilang Flat Bh 9,775.00


- Genteng Wuwung Karang Pilang Bh 17,825.00
- Genteng Beton Flat Bh 5,200.00
- Genteng Wuwung Beton Flat Bh 7,200.00

- Klem PVC Bh 2,530.00


- Pipa Plastik PVC Tipe AW Uk. 3 Pj. 4 mtr Batang 224,940.00

- Kaca Polos 5 mm m2 138,000.00


- Kaca Ryband 5 mm m2 149,500.00
- Kunci Tanam Bh 113,900.00
- Kunci Tanam Besar (Kuningan) Bh 330,000.00
- Engsel Jendela Stel 25,900.00
- Engsel Pintu Stel 66,000.00
- Grendel Biasa (Kecil) Bh 27,000.00
- Grendel Panjang Bh 103,000.00
- Grendel Tanam Bh 92,200.00
- Hak Angin Sikutan Biasa Stel 20,200.00
- Hak Angin Lurus Biasa Bh 31,100.00
- Kabel NYM 3 x 2,5 mm m 11,902.50
- Stop Kontak Unit 32,200.00
- Pipa Pralon 5/8 Batang 4,025.00
- T Doos Pvc Bh 3,450.00
- Isolator Unit 7,705.00
- Fiting Plafon Bh 14,950.00
- Saklar Tunggal Unit 55,085.00
- Saklar Ganda Unit 72,335.00
- Lampu LED 18 Watt Unit 120,750.00
- Lampu LED 11 Watt Unit 74,750.00
- Lampu LED 5 Watt Unit 27,600.00
- Downlight 4" Unit 86,250.00

- Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 36,455.00
- Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 49,795.00
- Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 121,670.00
- Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 191,360.00
- Kran Air Dia. 3/4 Bh 50,600.00
- Rol TBA Roll 4,600.00
- Closet Duduk Porselin Bh 3,795,000.00
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN : 2020

24.01 Pekerjaan Persiapan & Tanah


24.01.01 Pekerjaan Persiapan
24.01.01.05 Pembuatan Bouwplank /Titik Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Kepala tukang 0.0045 135,000.00 607.50
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja 0.1000 100,000.00 10,000.00
JUMLAH TENAGA KERJA
24,607.50
BAHAN
m3
1 Kayu Meranti Usuk 5/7 0.0120 3,893,229.17 46,718.75
m3
2 Kayu Meranti Begesting 0.0080 3,231,380.21 25,851.04
3 Paku biasa 2” – 5” Dus 0.0500 19,550.00 977.50
JUMLAH HARGA BAHAN
73,547.29
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 98,154.79


DIBULATKAN 98,100.00

24.01.01.02 Pengukuran dan Pemasangan Bouwplank (UITZET) Sat. : / m1


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Kepala tukang 0.0050 135,000.00 675.00
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja 0.1000 100,000.00 10,000.00
JUMLAH TENAGA KERJA
24,675.00
BAHAN
m3
1 Kayu Meranti Papan 2/20, 4/20 0.0070 3,893,229.17 27,252.60
m3
2 Kayu Meranti Usuk 5/7 0.0120 3,893,229.17 46,718.75
3 Paku biasa 2” – 5” Dus 0.0200 19,550.00 391.00
JUMLAH HARGA BAHAN
74,362.35
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 99,037.35


DIBULATKAN 99,000.00

24.01.01.03 Pembersihan Lapangan "Ringan" dan Perataan Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Pekerja 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA
8,750.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 8,750.00


DIBULATKAN 8,700.00
24.01.01.04 Pembersihan Lapangan "Berat" dan Perataan Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Pekerja 0.1000 100,000.00 10,000.00
JUMLAH TENAGA KERJA
17,500.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 17,500.00


DIBULATKAN 17,500.00

24.01.01.06 Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
21,500.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 21,500.00


DIBULATKAN 21,500.00

24.01.01.07 Pembongkaran Rangka Atap dan Penutup Dipakai Kembali Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
21,500.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 21,500.00


DIBULATKAN 21,500.00
24.01.02 Pekerjaan Tanah
24.01.02.07 Penggalian Tanah Biasa untuk Konstruksi Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Pekerja 0.7500 100,000.00 75,000.00
JUMLAH TENAGA KERJA
78,750.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 78,750.00


DIBULATKAN 78,700.00

24.01.02.13 Pengurugan Tanah Kembali untuk Konstruksi Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Pekerja 0.5000 100,000.00 50,000.00
JUMLAH TENAGA KERJA
57,500.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 57,500.00


DIBULATKAN 57,500.00

24.01.02.15 Pengurugan Pasir (PADAT) Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
31,500.00
BAHAN

1 Pasir Urug m3 1.2000 237,666.67 285,200.00


JUMLAH HARGA BAHAN
285,200.00
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 316,700.00


DIBULATKAN 316,700.00
24.01.02.16 Pengurugan Sirtu (PADAT) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Pekerja 0.2500 100,000.00 25,000.00
JUMLAH TENAGA KERJA
28,750.00
BAHAN

1 Sirtu m3 1.2000 184,000.00 220,800.00


JUMLAH HARGA BAHAN
220,800.00
PERALATAN

1 Sewa Stemper Jam 0.0088 113,700.00 1,000.56


JUMLAH HARGA ALAT
1,000.56
NILAI HSPK 250,550.56
DIBULATKAN 250,500.00

24.02.01 Pondasi
24.02.01.11 Pekerjaan Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0750 150,000.00 11,250.00
OH
2 Kepala tukang 0.0750 135,000.00 10,125.00
OH
3 Tukang 0.7500 125,000.00 93,750.00
OH
4 Pekerja 1.5000 100,000.00 150,000.00
JUMLAH TENAGA KERJA
265,125.00
BAHAN

1 Semen PC 40 Kg Sak 5.0500 65,550.00 331,027.50


m3
2 Pasir Pasang 0.4850 245,333.33 118,986.67
m3
3 Batu Kali Belah15/20 cm 1.2000 230,000.00 276,000.00
JUMLAH HARGA BAHAN
726,014.17
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 991,139.17


DIBULATKAN 991,100.00

24.02.01.12 Pekerjaan Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0750 150,000.00 11,250.00
OH
2 Kepala tukang 0.0750 135,000.00 10,125.00
OH
3 Tukang 0.7500 125,000.00 93,750.00
OH
4 Pekerja 1.5000 100,000.00 150,000.00
JUMLAH TENAGA KERJA
265,125.00
BAHAN

1 Semen PC 40 Kg Sak 4.0750 65,550.00 267,116.25


m3
2 Pasir Pasang 0.5200 245,333.33 127,573.33
m3
3 Batu Kali Belah15/20 cm 1.2000 230,000.00 276,000.00
JUMLAH HARGA BAHAN
670,689.58
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 935,814.58


DIBULATKAN 935,800.00
24.02.01.19 Pemasangan Batu Kali Belah Kosongan (aanstamping) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0390 150,000.00 5,850.00
OH
2 Kepala tukang 0.0390 135,000.00 5,265.00
OH
3 Tukang 0.3900 125,000.00 48,750.00
OH
4 Pekerja 0.7800 100,000.00 78,000.00
JUMLAH TENAGA KERJA
137,865.00
BAHAN
m3
1 Pasir Urug 0.4320 237,666.67 102,672.00
m3
2 Batu Kali Belah15/20 cm 1.2000 230,000.00 276,000.00
JUMLAH HARGA BAHAN
378,672.00
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 516,537.00


DIBULATKAN 516,500.00

24.02.01.20 Pemasangan Batu Kali Kosongan tebal 20 cm) Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0170 150,000.00 2,550.00
OH
2 Kepala tukang 0.0150 135,000.00 2,025.00
OH
3 Tukang 0.1500 125,000.00 18,750.00
OH
4 Pekerja 0.3500 100,000.00 35,000.00
JUMLAH TENAGA KERJA
58,325.00
BAHAN
m3
1 Batu Kali Belah15/20 cm 1.2000 230,000.00 276,000.00
JUMLAH HARGA BAHAN
276,000.00
PERALATAN
JUMLAH HARGA ALAT

NILAI HSPK 334,325.00


DIBULATKAN 334,300.00

24.02.01.22 Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m Sat. : / Titik


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0600 150,000.00 9,000.00
OH
2 Pekerja 1.2000 100,000.00 120,000.00
JUMLAH TENAGA KERJA
129,000.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN

1 Sewa Alat Bantu Strouss Pile Jam 1.2000 11,000.00 13,200.00


JUMLAH HARGA ALAT
13,200.00
NILAI HSPK 142,200.00
DIBULATKAN 142,200.00
24.02.01.23 Pembuatan Lubang Strous Pile diameter 30 cm kedalaman 3 m Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0720 150,000.00 10,800.00
OH
2 Pekerja 1.4400 100,000.00 144,000.00
JUMLAH TENAGA KERJA
154,800.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN

1 Sewa Alat Bantu Strouss Pile Jam 1.2000 11,000.00 13,200.00


JUMLAH HARGA ALAT
13,200.00
NILAI HSPK 168,000.00
DIBULATKAN 168,000.00

24.02.01.24 Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.2500 125,000.00 31,250.00
OH
4 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
210,800.00
BAHAN

1 Semen PC 40 Kg Sak 8.9504 65,550.00 586,697.08


2 Pasir Cor m3 0.4882 306,666.67 149,714.67
3 Batu Krikil Beton m3 0.8137 306,666.67 249,534.67
JUMLAH HARGA BAHAN
985,946.41
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,196,746.41
DIBULATKAN 1,196,700.00

24.03.01 Beton
24.03.01.02 Pekerjaan Beton K-125 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN

1 Semen PC 40 Kg Sak 8.6250 65,550.00 565,368.75


2 Pasir Cor m3 0.5175 306,666.67 158,700.00
3 Batu Pecah Mesin 1/2 cm m3 0.5326 306,666.67 163,340.48
4 Air Kerja Ltr 215.0000 138.00 29,670.00
JUMLAH HARGA BAHAN
917,079.23
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,120,654.23
DIBULATKAN 1,120,600.00
24.03.01.04 Lantai Kerja K-100 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 1.2000 100,000.00 120,000.00
JUMLAH TENAGA KERJA
148,000.00
BAHAN

1 Semen PC 40 Kg Sak 7.1875 65,550.00 471,140.63


2 Pasir Cor m3 0.5581 306,666.67 171,158.33
3 Batu Pecah Mesin 1/2 cm m3 0.5405 306,666.67 165,761.31
4 Air Kerja Ltr 215.0000 138.00 29,670.00
JUMLAH HARGA BAHAN
837,730.27
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 985,730.27
DIBULATKAN 985,700.00

24.03.01.05 Pekerjaan Beton K-175 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN

1 Semen PC 40 Kg Sak 10.1875 65,550.00 667,790.63


2 Pasir Cor m3 0.4806 306,666.67 147,391.67
3 Batu Pecah Mesin 1/2 cm m3 0.5416 306,666.67 166,084.23
4 Air Kerja Ltr 215.0000 138.00 29,670.00
JUMLAH HARGA BAHAN
1,010,936.52
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,214,511.52
DIBULATKAN 1,214,500.00
24.03.01.07 Pekerjaan Beton K-225 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN

1 Semen PC 40 Kg Sak 11.5938 65,550.00 759,970.31


2 Pasir Cor m3 0.4363 306,666.67 133,783.33
3 Batu Pecah Mesin 1/2 cm m3 0.5511 306,666.67 168,989.59
4 Air Kerja Ltr 215.0000 138.00 29,670.00
JUMLAH HARGA BAHAN
1,092,413.23
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,295,988.23
DIBULATKAN 1,295,900.00

24.03.01.07 Pekerjaan Beton K-250 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN

1 Semen PC 40 Kg Sak 12.0000 65,550.00 786,600.00


2 Pasir Cor m3 0.4325 306,666.67 132,633.33
3 Batu Pecah Mesin 1/2 cm m3 0.5468 306,666.67 167,698.21
4 Air Kerja Ltr 215.0000 138.00 29,670.00
JUMLAH HARGA BAHAN
1,116,601.55
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,320,176.55
DIBULATKAN 1,320,100.00

24.03.01.14 Pekerjaan Pembesian dengan besi beton polos Sat. : / Kg


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0007 150,000.00 105.00
OH
2 Tukang 0.0070 125,000.00 875.00
OH
3 Pekerja 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA
1,680.00
BAHAN

1 Besi Beton Polos Kg 1.0500 9,545.00 10,022.25


2 Kawat Beton Kg 0.0150 23,000.00 345.00
JUMLAH HARGA BAHAN
10,367.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 12,047.25
DIBULATKAN 12,000.00
24.03.01.14b Pekerjaan Pembesian dengan besi beton ulir Sat. : / Kg
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0007 150,000.00 105.00
OH
2 Tukang 0.0070 125,000.00 875.00
OH
3 Pekerja 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA
1,680.00
BAHAN

1 Besi Beton ulir Kg 1.0500 10,350.00 10,867.50


2 Kawat Beton Kg 0.0150 23,000.00 345.00
JUMLAH HARGA BAHAN
11,212.50
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 12,892.50
DIBULATKAN 12,800.00

24.03.01.17 Pekerjaan Bekisting Sloof Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0260 150,000.00 3,900.00
OH
2 Tukang 0.2600 125,000.00 32,500.00
OH
3 Pekerja 0.5200 100,000.00 52,000.00
JUMLAH TENAGA KERJA
88,400.00
BAHAN

1 Paku Usuk Kg 0.3000 19,550.00 5,865.00


2 Kayu Meranti Bekisting m3 0.0450 3,231,380.21 145,412.11
3 Minyak Bekisting Ltr 0.1000 23,000.00 2,300.00
JUMLAH HARGA BAHAN
153,577.11
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 241,977.11
DIBULATKAN 241,900.00
24.03.01.18 Pekerjaan Bekisting Kolom Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN

1 Paku Usuk Kg 0.4000 19,550.00 7,820.00


2 Plywood Uk .122x 244 x 9 mm Lbr 0.3500 112,700.00 39,445.00
3 Kayu Meranti Bekisting m3 0.0400 3,231,380.21 129,255.21
4 Kayu Meranti Balok 4/6, 5/7 m3 0.0150 3,743,489.58 56,152.34
5 Minyak Bekisting Ltr 0.2000 23,000.00 4,600.00
JUMLAH HARGA BAHAN
237,272.55
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 349,472.55
DIBULATKAN 349,400.00

24.03.01.19 Pekerjaan Bekisting Balok Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN

1 Paku Usuk Kg 0.4000 19,550.00 7,820.00


2 Plywood Uk .122x 244 x 9 mm Lbr 0.3500 112,700.00 39,445.00
3 Kayu Meranti Bekisting m3 0.0400 3,231,380.21 129,255.21
4 Kayu Meranti Balok 4/6, 5/7 m3 0.0180 3,743,489.58 67,382.81
5 Minyak Bekisting Ltr 0.2000 23,000.00 4,600.00
JUMLAH HARGA BAHAN
248,503.02
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 360,703.02
DIBULATKAN 360,700.00
24.03.01.20 Pekerjaan Bekisting Dak / Lantai Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN

1 Paku Usuk Kg 0.4000 19,550.00 7,820.00


2 Plywood Uk .122x 244 x 9 mm Lbr 0.3500 112,700.00 39,445.00
3 Kayu Meranti Bekisting m3 0.0400 3,231,380.21 129,255.21
4 Kayu Meranti Balok 4/6, 5/7 m3 0.0150 3,743,489.58 56,152.34
5 Minyak Bekisting Ltr 0.2000 23,000.00 4,600.00
JUMLAH HARGA BAHAN
237,272.55
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 349,472.55
DIBULATKAN 349,400.00

24.03.01.21 Pekerjaan Bekisting Tangga Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN

1 Paku Usuk Kg 0.4000 19,550.00 7,820.00


2 Plywood Uk .122x 244 x 9 mm Lbr 0.3500 112,700.00 39,445.00
3 Kayu Meranti Bekisting m3 0.0300 3,231,380.21 96,941.41
4 Kayu Meranti Balok 4/6, 5/7 m3 0.0150 3,743,489.58 56,152.34
5 Minyak Bekisting Ltr 0.1500 23,000.00 3,450.00
JUMLAH HARGA BAHAN
203,808.75
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 316,008.75
DIBULATKAN 316,000.00

24.03.01.32 Pembongkaran Beton Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Pekerja 3.6000 100,000.00 360,000.00
JUMLAH TENAGA KERJA
360,000.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 360,000.00
DIBULATKAN 360,000.00
Pekerjaan Poer 100x100x40 cm K. 225 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 91.2000 12,000.00 1,094,400.00
3 Begesteng Pondasi m2 JUMLAH 2.8000 175,000.00 490,000.00
HARGA 2,880,300.00
NILAI HSPK 2,880,300.00
DIBULATKAN 2,880,300.00

Pekerjaan Poer 80x80x30 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 125.6000 12,000.00 1,507,200.00
3 Begesteng Pondasi m2 JUMLAH 2.5998 175,000.00 454,965.00
HARGA 3,258,065.00
NILAI HSPK 3,258,065.00
DIBULATKAN 3,258,000.00

Pekerjaan Strous dia. 30 cm h. 300 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg JUMLAH79.0000 12,000.00 948,000.00
HARGA 2,243,900.00
NILAI HSPK 2,243,900.00
DIBULATKAN 2,243,900.00

Pekerjaan Sloof 25x40 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 35.5000 12,000.00 426,000.00
3 Besi Ulir Kg 126.3000 12,800.00 1,616,640.00
4 Begesteng Sloof m2 JUMLAH 2.6667 241,900.00 645,066.67
HARGA 3,983,606.67
NILAI HSPK 3,983,606.67
DIBULATKAN 3,983,600.00

Pekerjaan Sloof 15x20 cm K. 175 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.175 m3 1.0000 1,214,500.00 1,214,500.00


2 Besi Polos Kg 155.4000 12,000.00 1,864,800.00
3 Begesteng Sloof m2 JUMLAH 4.4444 241,900.00 1,075,111.11
HARGA 4,154,411.11
NILAI HSPK 4,154,411.11
DIBULATKAN 4,154,400.00

Pekerjaan Kolom 30x30 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00
2 Besi Polos Kg 36.5000 12,000.00 438,000.00
3 Besi Ulir Kg 92.6000 12,800.00 1,185,280.00
4 Begesteng Kolom m2 JUMLAH 4.4444 360,700.00 1,603,111.11
HARGA 4,522,291.11
NILAI HSPK 4,522,291.11
DIBULATKAN 4,522,200.00

Pekerjaan Kolom 25x25 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 44.2000 12,000.00 530,400.00
3 Besi Ulir Kg 133.4000 12,800.00 1,707,520.00
4 Begesteng Kolom m2 JUMLAH 5.3333 360,700.00 1,923,733.33
HARGA 5,457,553.33
NILAI HSPK 5,457,553.33
DIBULATKAN 5,457,500.00

Pekerjaan Kolom dia. 50 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 19.6000 12,000.00 235,200.00
3 Besi Ulir Kg 62.6000 12,800.00 801,280.00
4 Begesteng Kolom m2 JUMLAH 5.9164 360,700.00 2,134,045.33
HARGA 4,466,425.33
NILAI HSPK 4,466,425.33
DIBULATKAN 4,466,400.00

Pekerjaan Kolom Praktis 11x11 cm K. 175 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.175 m3 1.0000 1,214,500.00 1,214,500.00


2 Besi Polos Kg 263.8000 12,000.00 3,165,600.00
3 Begesteng Kolom m2 JUMLAH 4.5455 360,700.00 1,639,545.45
HARGA 6,019,645.45
NILAI HSPK 6,019,645.45
DIBULATKAN 6,019,600.00
Pekerjaan Balok 20x30 cm K. 225 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 39.5000 12,000.00 474,000.00
3 Besi Ulir Kg 138.9000 12,800.00 1,777,920.00
4 Begesteng Balok m2 JUMLAH 4.4444 360,700.00 1,603,111.11
HARGA 5,150,931.11
NILAI HSPK 5,150,931.11
DIBULATKAN 5,150,900.00

Pekerjaan Balok 25x40 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 53.3000 12,000.00 639,600.00
3 Besi Ulir Kg 142.1000 12,800.00 1,818,880.00
4 Begesteng Balok m2 JUMLAH 3.5000 360,700.00 1,262,450.00
HARGA 5,016,830.00
NILAI HSPK 5,016,830.00
DIBULATKAN 5,016,800.00

Pekerjaan Balok 15x30 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 55.5000 12,000.00 666,000.00
3 Besi Ulir Kg 138.9000 12,800.00 1,777,920.00
4 Begesteng Balok m2 JUMLAH 5.5556 360,700.00 2,003,888.89
HARGA 5,743,708.89
NILAI HSPK 5,743,708.89
DIBULATKAN 5,743,700.00

Pekerjaan Balok 15x20 cm K. 175 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.175 m3 1.0000 1,214,500.00 1,214,500.00


2 Besi Polos Kg 119.2000 12,000.00 1,430,400.00
3 Begesteng Balok m2 JUMLAH 4.4444 360,700.00 1,603,111.11
HARGA 4,248,011.11
NILAI HSPK 4,248,011.11
DIBULATKAN 4,248,000.00

Pekerjaan Plat Dak/Lantai t. 10 cm K. 225 Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)

1 Beton K.225 m3 1.0000 1,295,900.00 1,295,900.00


2 Besi Polos Kg 161.1000 12,000.00 1,933,200.00
3 Begesteng Dak/Lantai m2 JUMLAH 5.0000 349,400.00 1,747,000.00
HARGA 4,976,100.00
NILAI HSPK 4,976,100.00
DIBULATKAN 4,976,100.00
24.04.01 Pekerjaan Dinding
24.04.01.02 Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1 bata Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 0.6000 100,000.00 60,000.00
JUMLAH TENAGA KERJA
88,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.8238 65,550.00 53,996.81


2 Pasir Pasang m3 0.0910 245,333.33 22,325.33
3 Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Bh 140.0000 977.50 136,850.00
JUMLAH HARGA BAHAN
213,172.15
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 301,172.15
DIBULATKAN 301,100.00

24.04.01.04 Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1 bata Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 0.6000 100,000.00 60,000.00
JUMLAH TENAGA KERJA
88,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.5550 65,550.00 36,380.25


2 Pasir Pasang m3 0.1020 245,333.33 25,024.00
3 Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Bh 140.0000 977.50 136,850.00
JUMLAH HARGA BAHAN
198,254.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 286,254.25
DIBULATKAN 286,200.00

24.04.01.07 Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Tukang 0.1000 125,000.00 12,500.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
44,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.3593 65,550.00 23,548.84


2 Pasir Pasang m3 0.0400 245,333.33 9,813.33
3 Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Bh 70.0000 977.50 68,425.00
JUMLAH HARGA BAHAN
101,787.17
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 145,787.17
DIBULATKAN 145,700.00
24.04.01.09 Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Tukang 0.1000 125,000.00 12,500.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
44,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.2420 65,550.00 15,863.10


2 Pasir Pasang m3 0.0450 245,333.33 11,040.00
3 Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Bh 70.0000 977.50 68,425.00
JUMLAH HARGA BAHAN
95,328.10
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 139,328.10
DIBULATKAN 139,300.00

24.04.01.12 Pembongkaran Dinding Tembok Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Pekerja 0.1334 100,000.00 13,335.40
JUMLAH TENAGA KERJA
13,335.40
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 13,335.40
DIBULATKAN 13,300.00

24.04.01.15 Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0150 150,000.00 2,250.00
OH
2 Tukang 0.1500 125,000.00 18,750.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
51,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.1944 65,550.00 12,742.92


2 Pasir Pasang m3 0.0230 245,333.33 5,642.67
JUMLAH HARGA BAHAN
18,385.59
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 69,385.59
DIBULATKAN 69,300.00
24.04.01.17 Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0150 150,000.00 2,250.00
OH
2 Tukang 0.1500 125,000.00 18,750.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
51,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.1296 65,550.00 8,495.28


2 Pasir Pasang m3 0.0260 245,333.33 6,378.67
JUMLAH HARGA BAHAN
14,873.95
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 65,873.95
DIBULATKAN 65,800.00

24.04.01.18 Pasang Benangan 1 Pc: 2Ps Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0400 150,000.00 6,000.00
OH
2 Tukang 0.0400 125,000.00 5,000.00
OH
3 Pekerja 0.0800 100,000.00 8,000.00
JUMLAH TENAGA KERJA
19,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.0125 65,550.00 819.38


2 Pasir Pasang m3 0.0130 245,333.33 3,189.33
JUMLAH HARGA BAHAN
4,008.71
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 23,008.71
DIBULATKAN 23,000.00

24.04.01.20 Kol-Kolan Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.0570 125,000.00 7,125.00
JUMLAH TENAGA KERJA
7,125.00
BAHAN

1 Semen PC 40 Kg Sak 0.0125 65,550.00 819.38


2 Pasir Pasang m3 0.0020 245,333.33 490.67
JUMLAH HARGA BAHAN
1,310.04
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 8,435.04
DIBULATKAN 8,400.00
24.04.01.21 Pekerjaan Acian Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Tukang 0.1000 125,000.00 12,500.00
OH
3 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
34,000.00
BAHAN

1 Semen PC 40 Kg Sak 0.0813 65,550.00 5,325.94


JUMLAH HARGA BAHAN
5,325.94
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 39,325.94
DIBULATKAN 39,300.00

24.04.02 Finishing Dinding


24.04.02.03 Pelapisan Waterproofing Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0075 150,000.00 1,125.00
OH
2 Tukang 0.0750 125,000.00 9,375.00
OH
3 Pekerja 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA
15,500.00
BAHAN

1 Waterproof Kg 0.3500 51,175.00 17,911.25


2 Serat Fiber Lbr 1.0000 2,012.50 2,012.50
JUMLAH HARGA BAHAN
19,923.75
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 35,423.75
DIBULATKAN 35,400.00

24.04.02.05 Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0040 150,000.00 600.00
OH
2 Tukang 0.1050 125,000.00 13,125.00
OH
3 Pekerja 0.0700 100,000.00 7,000.00
JUMLAH TENAGA KERJA
20,725.00
BAHAN

1 Cat Kayu Kg 0.1700 58,545.45 9,952.73


2 Cat Meni Kayu Kg 0.2000 34,500.00 6,900.00
3 Clear Gloss Kg 0.3500 75,192.31 26,317.31
4 Plamir Tembok 5 Kg Kaleng 0.1500 71,875.00 10,781.25
5 Kuas 4 inchi Bh 0.0100 23,000.00 230.00
JUMLAH HARGA BAHAN
54,181.28
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 74,906.28
DIBULATKAN 74,900.00
24.04.02.06 Pengecatan Besi Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
30,000.00
BAHAN

1 Cat Besi Kg 0.1000 40,250.00 4,025.00


2 Kuas 4 inchi Bh 0.0100 23,000.00 230.00
JUMLAH HARGA BAHAN
4,255.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 34,255.00
DIBULATKAN 34,200.00

24.04.02.08 Plamur Tembok Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0030 150,000.00 450.00
OH
2 Tukang 0.0300 125,000.00 3,750.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
6,200.00
BAHAN

1 Plamir Tembok 5 Kg Kaleng 0.1000 71,875.00 7,187.50


2 Kertas Gosok Halus Lembar 0.5000 17,825.00 8,912.50
JUMLAH HARGA BAHAN
16,100.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 22,300.00
DIBULATKAN 22,300.00

24.04.02.09 Pengecatan Dasar Meni Besi Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
30,000.00
BAHAN

1 Cat Meni Besi Kg 0.1000 35,022.73 3,502.27


2 Kuas 4 inchi Bh 0.0100 23,000.00 230.00
JUMLAH HARGA BAHAN
3,732.27
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 33,732.27
DIBULATKAN 33,700.00
24.04.02.10 Pengecatan Dinding Dalam Lama Tanpa Plamir (sewarna) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0042 150,000.00 630.00
OH
2 Tukang 0.0420 125,000.00 5,250.00
OH
3 Pekerja 0.0280 100,000.00 2,800.00
JUMLAH TENAGA KERJA
8,680.00
BAHAN

1 Cat Tembok Dalam 2.5 Kg Kaleng 0.1800 186,875.00 33,637.50


2 Dempul Tembok Kg 0.1200 10,350.00 1,242.00
3 Kertas Gosok Halus Bh 0.1000 17,825.00 1,782.50
JUMLAH HARGA BAHAN
36,662.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 45,342.00
DIBULATKAN 45,300.00

24.04.02.11 Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0042 150,000.00 630.00
OH
2 Tukang 0.0420 125,000.00 5,250.00
OH
3 Pekerja 0.0280 100,000.00 2,800.00
JUMLAH TENAGA KERJA
8,680.00
BAHAN

1 Cat Tembok Luar 2.5 Kg Kaleng 0.1800 277,006.25 49,861.13


2 Dempul Tembok Kg 0.1200 10,350.00 1,242.00
3 Kertas Gosok Halus Bh 0.1000 17,825.00 1,782.50
JUMLAH HARGA BAHAN
52,885.63
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 61,565.63
DIBULATKAN 61,500.00

24.04.02.12 Pengecatan Dinding Dalam Baru Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0063 150,000.00 945.00
OH
2 Tukang 0.0630 125,000.00 7,875.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
10,820.00
BAHAN

1 Cat Tembok Dalam 2.5 Kg Kaleng 0.1040 186,875.00 19,435.00


2 Dempul Tembok Kg 0.1000 10,350.00 1,035.00
3 Kertas Gosok Halus Bh 0.1000 17,825.00 1,782.50
JUMLAH HARGA BAHAN
22,252.50
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 33,072.50
DIBULATKAN 33,000.00
24.04.02.11 Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0063 150,000.00 945.00
OH
2 Tukang 0.0630 125,000.00 7,875.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
10,820.00
BAHAN

1 Cat Tembok Luar 2.5 Kg Kaleng 0.1040 277,006.25 28,808.65


2 Dempul Tembok Kg 0.1000 10,350.00 1,035.00
3 Kertas Gosok Halus Bh 0.1000 17,825.00 1,782.50
JUMLAH HARGA BAHAN
31,626.15
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 42,446.15
DIBULATKAN 42,400.00

24.04.02.16 Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0090 150,000.00 1,350.00
OH
2 Tukang 0.0900 125,000.00 11,250.00
OH
3 Pekerja 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA
20,100.00
BAHAN

1 Thinner A Liter 0.8370 41,400.00 34,651.80


2 Coumpond Kaleng 0.2000 48,300.00 9,660.00
3 Wood Filler Kg 0.2000 43,125.00 8,625.00
4 Clear Gloss Kg 0.2000 75,192.31 15,038.46
5 Shanding Kg 0.5000 75,900.00 37,950.00
6 Kertas Gosok Halus Lembar 1.0000 17,825.00 17,825.00
7 Kertas Gosok Kasar Lembar 1.0000 22,425.00 22,425.00
JUMLAH HARGA BAHAN
146,175.26
PERALATAN

1 Sewa Compresor Min. 5 Jam Jam 0.6250 103,400.00 64,625.00


JUMLAH HARGA ALAT
64,625.00
NILAI HSPK 230,900.26
DIBULATKAN 230,900.00
24.04.02.18 Pembersihan ACP dan Finishing Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Kepala Tukang 0.0200 135,000.00 2,700.00
OH
3 Tukang 0.2000 125,000.00 25,000.00
OH
4 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
31,200.00
BAHAN

-
JUMLAH HARGA BAHAN
-
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 31,200.00
DIBULATKAN 31,200.00

24.05.01 Pekerjaan Lantai


24.05.01.02 Pemasangan Tegel Keramik 30x30 cm (Rock Tile) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0350 150,000.00 5,250.00
OH
2 Kepala Tukang 0.0350 135,000.00 4,725.00
OH
3 Tukang 0.3500 125,000.00 43,750.00
OH
4 Pekerja 0.7000 100,000.00 70,000.00
JUMLAH TENAGA KERJA
123,725.00
BAHAN

1 Semen PC 40 Kg Sak 0.2500 65,550.00 16,387.50


2 Semen Berwarna Yiyitan Kg 0.5000 18,400.00 9,200.00
3 Pasir Pasang m3 0.0450 245,333.33 11,040.00
4 Keramik Lantai Bermotif Uk. 30x30 cm (Rock Tile) m2 1.0500 105,800.00 111,090.00
JUMLAH HARGA BAHAN
147,717.50
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 271,442.50
DIBULATKAN 271,400.00
24.05.01.13 Pemasangan Lantai Granit 60 x 60 cm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0350 150,000.00 5,250.00
OH
2 Kepala Tukang 0.0350 135,000.00 4,725.00
OH
3 Tukang 0.3500 125,000.00 43,750.00
OH
4 Pekerja 0.7000 100,000.00 70,000.00
JUMLAH TENAGA KERJA
123,725.00
BAHAN

1 Semen PC 40 Kg Sak 0.2450 65,550.00 16,059.75


2 Semen Berwarna Yiyitan Kg 1.3000 18,400.00 23,920.00
3 Pasir Pasang m3 0.0450 245,333.33 11,040.00
4 Granit Tile 60x60 cm m2 1.0608 242,000.00 256,713.60
JUMLAH HARGA BAHAN
307,733.35
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 431,458.35
DIBULATKAN 431,400.00

24.05.01.05b Pemasangan Tegel Porselen 30x60 cm (Dinding) Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Kepala Tukang 0.0500 135,000.00 6,750.00
OH
3 Tukang 0.5000 125,000.00 62,500.00
OH
4 Pekerja 1.0000 100,000.00 100,000.00
JUMLAH TENAGA KERJA
176,750.00
BAHAN

1 Semen PC 40 Kg Sak 0.2325 65,550.00 15,240.38


2 Semen Berwarna Yiyitan Kg 1.5000 18,400.00 27,600.00
3 Pasir Pasang m3 0.0180 245,333.33 4,416.00
4 Keramik 60x60 cm m2 0.5203 97,750.00 50,859.33
JUMLAH HARGA BAHAN
98,115.70
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 274,865.70
DIBULATKAN 274,800.00
24.05.01.06 Pemasangan Tegel Plin Dinding Keramik uk. 7.5x20 cm Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0090 150,000.00 1,350.00
OH
2 Kepala Tukang 0.0050 135,000.00 675.00
OH
3 Tukang 0.0900 125,000.00 11,250.00
OH
4 Pekerja 0.0900 100,000.00 9,000.00
JUMLAH TENAGA KERJA
22,275.00
BAHAN

1 Semen PC 40 Kg Sak 0.0285 65,550.00 1,868.18


2 Semen Berwarna Yiyitan Kg 0.0250 18,400.00 460.00
3 Pasir Pasang m3 0.0030 245,333.33 736.00
4 Keramik (Plint) Uk. 7,5 x 20 Cm Bh 5.0000 8,200.00 41,000.00
JUMLAH HARGA BAHAN
44,064.18
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 66,339.18
DIBULATKAN 66,300.00

24.06.01 Rangka Atap


24.06.01.09 Pemasang rangka atap Galvalume Uk 0.8 mm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0050 150,000.00 750.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA
54,600.00
BAHAN

1 Rangka Galvalume Uk 0.8mm m2 1.1000 330,500.00 363,550.00


JUMLAH HARGA BAHAN
363,550.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 418,150.00
DIBULATKAN 418,100.00
24.06.01.09a Pemasang Reng Usuk Galvalume C.75 & R.45 Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0025 150,000.00 375.00
OH
2 Kepala Tukang 0.0050 135,000.00 675.00
OH
3 Tukang 0.0500 125,000.00 6,250.00
OH
4 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
27,300.00
BAHAN

1 Galvalume Uk 0.75 mm m2 1.1000 90,000.00 99,000.00


2 Reng Uk 0.45 mm m2 1.1000 80,000.00 88,000.00
JUMLAH HARGA BAHAN
187,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 214,300.00
DIBULATKAN 214,300.00

24.06.01.04 Pekerjaan Rangka Kuda - kuda WF Sat. : / Kg


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0030 150,000.00 450.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA
14,760.00
BAHAN

1 Besi Profil WF Kg 1.1500 12,075.00 13,886.25


JUMLAH HARGA BAHAN
13,886.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 28,646.25
DIBULATKAN 28,600.00

24.06.01.04a Pekerjaan Gording Canal C Sat. : / Kg


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0030 150,000.00 450.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA
14,760.00
BAHAN

1 Besi Canal C Kg 1.1500 11,394.01 13,103.11


JUMLAH HARGA BAHAN
13,103.11
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 27,863.11
DIBULATKAN 27,800.00
24.06.01.04b Pekerjaan Plat Joint/Plendes Sat. : / Kg
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0015 150,000.00 225.00
OH
2 Kepala Tukang 0.0030 135,000.00 405.00
OH
3 Tukang 0.0300 125,000.00 3,750.00
OH
4 Pekerja 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA
7,380.00
BAHAN

1 Besi Profil WF Kg 1.1500 23,575.00 27,111.25


JUMLAH HARGA BAHAN
27,111.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 34,491.25
DIBULATKAN 34,400.00

24.06.02.16 Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 60 cm) Sat. : / m1
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala Tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.8000 125,000.00 100,000.00
OH
4 Pekerja 0.5000 100,000.00 50,000.00
JUMLAH TENAGA KERJA
164,550.00
BAHAN

1 Seng Talang BJLS 30 Lbr 60 m 1.0000 31,050.00 31,050.00


2 Paku Asbes Sekrup 4 inchi Bh 5.0000 6,900.00 34,500.00
3 Kayu Kamper Balok 4/6, 5/7 m3 0.0052 6,289,062.50 32,703.13
4 Kayu Meranti Papan 2/20, 4/10 m3 0.0080 3,893,229.17 31,145.83
JUMLAH HARGA BAHAN
129,398.96
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 293,948.96
DIBULATKAN 293,900.00

24.06.02.03 Pemasangan Genteng Karang Pilang Flat Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0080 150,000.00 1,200.00
OH
2 Kepala Tukang 0.0080 135,000.00 1,080.00
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA
26,655.00
BAHAN

1 Genteng Karang Pilang 32 x 31,4 cm Bh 25.0000 9,775.00 244,375.00


JUMLAH HARGA BAHAN
244,375.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 271,030.00
DIBULATKAN 271,000.00
24.06.02.03a Pemasangan Genteng Beton Flat Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
35,350.00
BAHAN

1 Genteng Beton Flat Bh 11.5000 5,200.00 59,800.00


JUMLAH HARGA BAHAN
59,800.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 95,150.00
DIBULATKAN 95,100.00

24.06.02.10 Pemasangan Wuwung Genteng Karang Pilang Sat. : / m1


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Kepala Tukang 0.0020 135,000.00 270.00
OH
3 Tukang 0.2000 125,000.00 25,000.00
OH
4 Pekerja 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA
68,270.00
BAHAN

1 Semen PC 40 Kg Sak 0.2000 65,550.00 13,110.00


2 Pasir Pasang m3 0.0323 245,333.33 7,924.27
3 Genteng Wuwung Karang Pilang Bh 5.0000 17,825.00 89,125.00
JUMLAH HARGA BAHAN
110,159.27
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 178,429.27
DIBULATKAN 178,400.00
24.06.02.10a Pemasangan Wuwung Genteng Beton Flat Sat. : / m1
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Kepala Tukang 0.0020 135,000.00 270.00
OH
3 Tukang 0.2000 125,000.00 25,000.00
OH
4 Pekerja 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA
68,270.00
BAHAN

1 Semen PC 40 Kg Sak 0.3375 65,550.00 22,123.13


2 Pasir Pasang m3 0.0320 245,333.33 7,850.67
Paku biasa ½”-1”
3 Kg 0.0500 19,550.00 977.50
Semen warna
4 Kg 1.0000 18,400.00 18,400.00
5 Genteng Beton Flat Wuwung Bh 3.5000 7,200.00 25,200.00
JUMLAH HARGA BAHAN
74,551.29
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 142,821.29
DIBULATKAN 142,800.00

24.06.02.12b Pemasangan Listplank Kalsiplank 0,8/20 Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0015 150,000.00 225.00
OH
2 Kepala Tukang 0.0070 135,000.00 945.00
OH
3 Tukang 0.0700 125,000.00 8,750.00
OH
4 Pekerja 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA
13,420.00
BAHAN

1 Paku Reng Kg 0.1000 20,700.00 2,070.00


2 Kalsiplank 0,8/20 m1 1.1000 15,390.83 16,929.92
JUMLAH HARGA BAHAN
18,999.92
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 32,419.92
DIBULATKAN 32,400.00
24.06.02.12c Pemasangan Listplank Kalsiplank 0,8/30 Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0015 150,000.00 225.00
OH
2 Kepala Tukang 0.0070 135,000.00 945.00
OH
3 Tukang 0.0700 125,000.00 8,750.00
OH
4 Pekerja 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA
13,420.00
BAHAN

1 Paku Reng Kg 0.1000 20,700.00 2,070.00


2 Kalsiplank 0,8/20 m1 1.1000 23,057.50 25,363.25
JUMLAH HARGA BAHAN
27,433.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 40,853.25
DIBULATKAN 40,800.00

24.06.02.17 Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 90 cm) Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala Tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.8000 125,000.00 100,000.00
OH
4 Pekerja 0.5000 100,000.00 50,000.00
JUMLAH TENAGA KERJA
164,550.00
BAHAN

1 Seng Talang BJLS 30 Lbr 90 m1 1.0000 46,000.00 46,000.00


2 Paku Asbes Sekrup 4 inchi Bh 5.0000 6,900.00 34,500.00
3 Kayu Meranti Papan 2/20, 4/10 m3 0.0160 3,893,229.17 62,291.67
JUMLAH HARGA BAHAN
142,791.67
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 307,341.67
DIBULATKAN 307,300.00

24.06.02.22 Pemasangan Talang Pembuluh Pipa PVC 3" Type AW Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1350 125,000.00 16,875.00
OH
2 Pekerja 0.0810 100,000.00 8,100.00
JUMLAH TENAGA KERJA
24,975.00
BAHAN

1 Klem PVC Bh 1.0000 2,530.00 2,530.00


2 Pipa Plastik PVC Tipe AW Uk. 3 Pj. 4 mtr Btng 0.3000 224,940.00 67,482.00
JUMLAH HARGA BAHAN
70,012.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 94,987.00
DIBULATKAN 94,900.00
24.06.03 Pemasangan Plafon
24.06.03.14 Pemasangan Plafond Kalsiboard Rangka Plafon Hollow Galvalum Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN

1 Besi Hollow 40 X 40 X 0.45 mm Batang 0.7500 27,025.00 20,268.75


2 Besi Hollow 20 X 40 X 0.35 mm Batang 0.2000 14,950.00 2,990.00
3 Kalsiboard 1200x2400x60 mm Lembar 0.3819 140,300.00 53,580.57
4 Paku Asbes Sekrup 4 inchi Bh 4.0000 6,900.00 27,600.00
JUMLAH HARGA BAHAN
104,439.32
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 133,251.82
DIBULATKAN 133,200.00

24.06.03.14 Pemasangan Plafond Gypsumboard Rangka Plafon Hollow Galvalu Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN

1 Besi Hollow 40 X 40 X 0.45 mm Batang 0.7500 27,025.00 20,268.75


2 Besi Hollow 20 X 40 X 0.35 mm Batang 0.2000 14,950.00 2,990.00
3 Gypsumboard 1200x2400x90 mm Lembar 0.3819 88,550.00 33,817.25
4 Paku Asbes Sekrup 4 inchi Bh 4.0000 6,900.00 27,600.00
JUMLAH HARGA BAHAN
84,676.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 113,488.50
DIBULATKAN 113,400.00

24.06.03.14b Plafond Gypsumboard Rangka Plafon Hollow Galvanis Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN

1 Besi Hollow 40 X 40 X 1.1 mm Batang 0.7500 103,500.00 77,625.00


2 Besi Hollow 20 X 40 X 1.1 mm Batang 0.2000 78,200.00 15,640.00
3 Gypsumboard 1200x2400x90 mm Lembar 0.3819 88,550.00 33,817.25
4 Paku Asbes Sekrup 4 inchi Bh 4.0000 6,900.00 27,600.00
JUMLAH HARGA BAHAN
154,682.25
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 183,494.75
DIBULATKAN 183,400.00
24.06.03.14c Plafond Kaca Tempert 8 mm Rangka Plafon Hollow Galvanis Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN

1 Besi Hollow 40 X 40 X 1.1 mm Batang 0.7500 103,500.00 77,625.00


2 Besi Hollow 20 X 40 X 1.1 mm Batang 0.2000 78,200.00 15,640.00
3 Kaca Tempert 8 mm m2 1.0000 1,800,000.00 1,800,000.00
4 Accessories 25% 1,800,000.00 450,000.00
JUMLAH HARGA BAHAN
2,343,265.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 2,372,077.50
DIBULATKAN 2,372,000.00

24.07.01 Kusen, Pintu, & Jendela


24.07.01.01 Kusen Pintu / Jendela Kayu Jati Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 2.1000 150,000.00 315,000.00
OH
2 Tukang 21.0000 125,000.00 2,625,000.00
OH
3 Pekerja 7.0000 100,000.00 700,000.00
JUMLAH TENAGA KERJA
3,640,000.00
BAHAN

1 Lem Kayu Kg 1.0000 15,525.00 15,525.00


2 Paku Klem (No 4) / Beton Dos 1.2500 10,350.00 12,937.50
3 Kayu Jati Balok 6/15 m3 1.1000 6,845,238.10 7,529,761.90
JUMLAH HARGA BAHAN
7,558,224.40
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 11,198,224.40
DIBULATKAN 11,198,200.00
24.07.01.02 Kusen Pintu / Jendela Kayu kamper Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 1.8000 150,000.00 270,000.00
OH
2 Tukang 18.0000 125,000.00 2,250,000.00
OH
3 Pekerja 6.0000 100,000.00 600,000.00
JUMLAH TENAGA KERJA
3,120,000.00
BAHAN

1 Lem Kayu Kg 1.0000 15,525.00 15,525.00


2 Paku Klem (No 4) / Beton Dos 1.2500 10,350.00 12,937.50
3 Kayu Kamper Balok 6/12, 6/15 m3 1.2000 6,289,062.50 7,546,875.00
JUMLAH HARGA BAHAN
7,575,337.50
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 10,695,337.50
DIBULATKAN 10,695,300.00

24.07.01.03 Kusen Pintu/Jendela Kayu Meranti Sat. : / m3


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 1.8000 150,000.00 270,000.00
OH
2 Tukang 18.0000 125,000.00 2,250,000.00
OH
3 Pekerja 6.0000 100,000.00 600,000.00
JUMLAH TENAGA KERJA
3,120,000.00
BAHAN

1 Lem Kayu Kg 1.0000 15,525.00 15,525.00


2 Paku Klem (No 4) / Beton Dos 1.2500 10,350.00 12,937.50
3 Kayu Meranti Balok 6/15, 6/12, 8/12 m3 1.2000 3,743,489.58 4,492,187.50
JUMLAH HARGA BAHAN
4,520,650.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 7,640,650.00
DIBULATKAN 7,640,600.00

24.07.01.08 Daun Pintu Panil (Kayu Jati Klas II) Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.3000 150,000.00 45,000.00
OH
2 Tukang 3.0000 125,000.00 375,000.00
OH
3 Pekerja 1.0000 100,000.00 100,000.00
JUMLAH TENAGA KERJA
520,000.00
BAHAN

1 Paku Usuk Kg 0.0500 19,550.00 977.50


2 Kayu Jati Papan 4/10 m3 0.0400 4,704,545.45 188,181.82
JUMLAH HARGA BAHAN
189,159.32
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 709,159.32
DIBULATKAN 709,100.00
24.07.01.09 Daun Pintu Panil (Kayu Kamper) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.3000 150,000.00 45,000.00
OH
2 Tukang 3.0000 125,000.00 375,000.00
OH
3 Pekerja 1.0000 100,000.00 100,000.00
JUMLAH TENAGA KERJA
520,000.00
BAHAN

1 Paku Usuk Kg 0.0500 19,550.00 977.50


2 Kayu Kamper Papan 2/20, 4/10 m3 0.0400 6,289,062.50 251,562.50
JUMLAH HARGA BAHAN
252,540.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 772,540.00
DIBULATKAN 772,500.00

24.07.01.10 Pintu/Jendela Kaca Papan Kayu jati Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.2400 150,000.00 36,000.00
OH
2 Tukang 2.4000 125,000.00 300,000.00
OH
3 Pekerja 0.8000 100,000.00 80,000.00
JUMLAH TENAGA KERJA
416,000.00
BAHAN

1 Lem Kayu Kg 0.3000 15,525.00 4,657.50


2 Kayu Jati Papan 4/10 m3 0.0240 4,704,545.45 112,909.09
JUMLAH HARGA BAHAN
117,566.59
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 533,566.59
DIBULATKAN 533,500.00

24.07.01.11 Pintu/Jendela Kaca Papan Kayu Kamper Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.2400 150,000.00 36,000.00
OH
2 Tukang 2.0000 125,000.00 250,000.00
OH
3 Pekerja 0.8000 100,000.00 80,000.00
JUMLAH TENAGA KERJA
366,000.00
BAHAN

1 Lem Kayu Kg 0.3000 15,525.00 4,657.50


2 Kayu Kamper Papan 2/20, 4/10 m3 0.0240 6,289,062.50 150,937.50
JUMLAH HARGA BAHAN
155,595.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 521,595.00
DIBULATKAN 521,500.00
24.07.01.13 Pemasangan Kaca Mati tebal 5 mm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0008 150,000.00 120.00
OH
2 Kepala Tukang 0.0150 135,000.00 2,025.00
OH
3 Tukang 0.1500 125,000.00 18,750.00
OH
4 Pekerja 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA
22,395.00
BAHAN

1 Kaca Polos 5 mm m2 1.1000 138,000.00 151,800.00


JUMLAH HARGA BAHAN
151,800.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 174,195.00
DIBULATKAN 174,100.00

24.07.01.14 Pemasangan Kaca Mati Rayban tebal 5 mm Sat. : / m2


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0008 150,000.00 112.50
OH
2 Kepala Tukang 0.0150 135,000.00 2,025.00
OH
3 Tukang 0.1500 125,000.00 18,750.00
OH
4 Pekerja 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA
22,387.50
BAHAN

1 Kaca Ryband 5 mm m2 1.1000 149,500.00 164,450.00


JUMLAH HARGA BAHAN
164,450.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 186,837.50
DIBULATKAN 186,800.00

24.07.01.18 Pemasangan Kunci Tanam Kecil Sat. : / Bh


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0050 150,000.00 750.00
OH
2 Kepala Tukang 0.0500 135,000.00 6,750.00
OH
3 Tukang 0.5000 125,000.00 62,500.00
OH
4 Pekerja JUMLAH 0.0100 100,000.00 1,000.00
TENAGA KERJA 71,000.00
BAHAN

1 Kunci Tanam Bh 1.0000 113,900.00 113,900.00


JUMLAH HARGA BAHAN
113,900.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 184,900.00
DIBULATKAN 184,900.00
24.07.01.19 Pemasangan Kunci Tanam Besar 2x Putar kuningan Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0050 150,000.00 750.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.5000 125,000.00 62,500.00
OH
4 Pekerja JUMLAH 0.0100 100,000.00 1,000.00
TENAGA KERJA 65,600.00
BAHAN

1 Kunci Tanam Besar (Kuningan) Bh 1.0000 330,000.00 330,000.00


JUMLAH HARGA BAHAN
330,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 395,600.00
DIBULATKAN 395,600.00

24.07.01.21 Pemasangan Engsel Kuningan Untuk Jendela Sat. : / Stel


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0005 150,000.00 75.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja JUMLAH 0.0100 100,000.00 1,000.00
TENAGA KERJA 14,925.00
BAHAN

1 Engsel Jendela Pasang 1.0000 25,900.00 25,900.00


JUMLAH HARGA BAHAN
25,900.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 40,825.00
DIBULATKAN 40,800.00

24.07.01.22 Pemasangan Engsel Kuningan Untuk Pintu Sat. : / Stel


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0008 150,000.00 120.00
OH
2 Kepala Tukang 0.0150 135,000.00 2,025.00
OH
3 Tukang 0.1500 125,000.00 18,750.00
OH
4 Pekerja JUMLAH 0.0150 100,000.00 1,500.00
TENAGA KERJA 22,395.00
BAHAN

1 Engsel Pintu Pasang 1.0000 66,000.00 66,000.00


JUMLAH HARGA BAHAN
66,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 88,395.00
DIBULATKAN 88,300.00
24.07.01.23 Pemasangan Grendel Kecil Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1200 125,000.00 15,000.00
OH
2 Pekerja JUMLAH 0.0600 100,000.00 6,000.00
TENAGA KERJA 21,000.00
BAHAN

1 Grendel Biasa (Kecil) Bh 1.0000 27,000.00 27,000.00


JUMLAH HARGA BAHAN
27,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 48,000.00
DIBULATKAN 48,000.00

24.07.01.24 Pemasangan Grendel Panjang Sat. : / Bh


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1200 125,000.00 15,000.00
OH
2 Pekerja JUMLAH 0.0600 100,000.00 6,000.00
TENAGA KERJA 21,000.00
BAHAN

1 Grendel Panjang Bh 1.0000 103,000.00 103,000.00


JUMLAH HARGA BAHAN
103,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 124,000.00
DIBULATKAN 124,000.00

24.07.01.26 Pemasangan Grendel Tanam Sat. : / Bh


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1400 125,000.00 17,500.00
OH
2 Pekerja JUMLAH 0.0800 100,000.00 8,000.00
TENAGA KERJA 25,500.00
BAHAN

1 Grendel Tanam Bh 1.0000 92,200.00 92,200.00


JUMLAH HARGA BAHAN
92,200.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 117,700.00
DIBULATKAN 117,700.00
24.07.01.29 Pemasangan Hak Angin (Sikutan) Sat. : / Stel
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1400 125,000.00 17,500.00
OH
2 Pekerja JUMLAH 0.0800 100,000.00 8,000.00
TENAGA KERJA 25,500.00
BAHAN

1 Hak Angin Sikutan Biasa Stel 1.0000 20,200.00 20,200.00


JUMLAH HARGA BAHAN
20,200.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 45,700.00
DIBULATKAN 45,700.00

24.07.01.30 Pemasangan Hak Angin Lurus Sat. : / Bh


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1200 125,000.00 15,000.00
OH
2 Pekerja JUMLAH 0.0600 100,000.00 6,000.00
TENAGA KERJA 21,000.00
BAHAN

1 Hak Angin Lurus Biasa Bh 1.0000 31,100.00 31,100.00


JUMLAH HARGA BAHAN
31,100.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 52,100.00
DIBULATKAN 52,100.00

24.07.02 Instalasi Listrik


24.07.02.01 Pemasangan Titik Stop Kontak Gedung Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 32,600.00
BAHAN

1 Kabel NYM 3 x 2,5 mm m 10.0000 11,902.50 119,025.00


2 Stop Kontak Unit 1.0000 32,200.00 32,200.00
3 Pipa Pralon 5/8 Batang 2.5000 4,025.00 10,062.50
4 T Doos Pvc Bh 1.0000 3,450.00 3,450.00
JUMLAH HARGA BAHAN
164,737.50
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 197,337.50
DIBULATKAN 197,300.00
24.07.02.02 Pemasangan Titik Lampu Gedung Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 32,600.00
BAHAN

1 Kabel NYM 3 x 2,5 mm m 10.0000 11,902.50 119,025.00


2 Fiting Plafon Bh 1.0000 14,950.00 14,950.00
3 Isolator Unit 4.0000 7,705.00 30,820.00
4 Pipa Pralon 5/8 Batang 3.0000 4,025.00 12,075.00
5 T Doos Pvc Bh 3.0000 3,450.00 10,350.00
JUMLAH HARGA BAHAN
187,220.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 219,820.00
DIBULATKAN 219,800.00

24.07.02.03 Pemasangan Saklar Tunggal Sat. : / Titik


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 32,600.00
BAHAN

1 Saklar Tunggal Unit 1.0000 55,085.00 55,085.00


JUMLAH HARGA BAHAN
55,085.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 87,685.00
DIBULATKAN 87,600.00

24.07.02.03 Pemasangan Saklar Ganda Sat. : / Titik


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 32,600.00
BAHAN

1 Saklar Ganda Unit 1.0000 72,335.00 72,335.00


JUMLAH HARGA BAHAN
72,335.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 104,935.00
DIBULATKAN 104,900.00
24.07.02.04 Pasang Lampu LED 18 Watt Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN

1 Lampu LED 18 Watt Unit 1.0000 120,750.00 120,750.00


JUMLAH HARGA BAHAN
120,750.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 130,100.00
DIBULATKAN 130,100.00

24.07.02.05 Pasang Lampu LED 11 Watt Sat. : / Titik


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN

1 Lampu LED 11 Watt Unit 1.0000 74,750.00 74,750.00


JUMLAH HARGA BAHAN
74,750.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 84,100.00
DIBULATKAN 84,100.00

24.07.02.06 Pasang Lampu LED 5 Watt Sat. : / Titik


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN

1 Lampu LED 5 Watt Unit 1.0000 27,600.00 27,600.00


JUMLAH HARGA BAHAN
27,600.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 36,950.00
DIBULATKAN 36,900.00
24.07.02.07 Pasang Lampu Downlight LED 11 Watt Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN

1 Downlight 4" Unit 1.0000 86,250.00 86,250.00


2 Lampu LED 11 Watt Unit 1.0000 74,750.00 74,750.00
JUMLAH HARGA BAHAN
161,000.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 170,350.00
DIBULATKAN 170,300.00

24.07.03 Sanitair
24.07.03.10 Pemasangan Pipa Air Bersih diameter 3/4'' Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0018 150,000.00 270.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja JUMLAH 0.0360 100,000.00 3,600.00
TENAGA KERJA 12,180.00
BAHAN

1 Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 0.3000 36,455.00 10,936.50
2 Accessories 10% 36,455.00 3,645.50
JUMLAH HARGA BAHAN
14,582.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 26,762.00
DIBULATKAN 26,700.00
24.07.03.11 Pemasangan Pipa Air Bersih diameter 1'' Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0018 150,000.00 270.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja JUMLAH 0.0360 100,000.00 3,600.00
TENAGA KERJA 12,180.00
BAHAN

1 Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 0.3000 49,795.00 14,938.50
2 Accessories 10% 49,795.00 4,979.50
JUMLAH HARGA BAHAN
19,918.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 32,098.00
DIBULATKAN 32,000.00

24.07.03.15 Pemasangan Pipa Air Kotor diameter 3'' Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0041 150,000.00 615.00
OH
2 Kepala Tukang 0.0135 135,000.00 1,822.50
OH
3 Tukang 0.1350 125,000.00 16,875.00
OH
4 Pekerja JUMLAH 0.0810 100,000.00 8,100.00
TENAGA KERJA 27,412.50
BAHAN

1 Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 0.3000 121,670.00 36,501.00
2 Accessories 10% 121,670.00 12,167.00
JUMLAH HARGA BAHAN
48,668.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 76,080.50
DIBULATKAN 76,000.00

24.07.03.16 Pemasangan Pipa Air Kotor diameter 4'' Sat. : / m


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0041 150,000.00 615.00
OH
2 Kepala Tukang 0.0135 135,000.00 1,822.50
OH
3 Tukang 0.1350 125,000.00 16,875.00
OH
4 Pekerja JUMLAH 0.0810 100,000.00 8,100.00
TENAGA KERJA 27,412.50
BAHAN

1 Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 0.3000 191,360.00 57,408.00
2 Accessories 10% 191,360.00 19,136.00
JUMLAH HARGA BAHAN
76,544.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 103,956.50
DIBULATKAN 103,900.00
24.07.03.19 Pemasangan Kran Air Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0300 150,000.00 4,500.00
OH
2 Tukang JUMLAH 0.1500 125,000.00 18,750.00
TENAGA KERJA 23,250.00
BAHAN

1 Kran Air Dia. 3/4 Bh 1.0000 50,600.00 50,600.00


2 Rol TBA Roll 1.0000 4,600.00 4,600.00
JUMLAH HARGA BAHAN
55,200.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 78,450.00
DIBULATKAN 78,400.00

24.07.03.21 Kloset Duduk Porselen Sat. : / Bh


No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.1600 150,000.00 24,000.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 1.1000 125,000.00 137,500.00
OH
4 Pekerja JUMLAH 3.3000 100,000.00 330,000.00
TENAGA KERJA 492,850.00
BAHAN

1 Closet Duduk Porselin Bh 1.0000 3,795,000.00 3,795,000.00


2 Accessories 10% 3,795,000.00 379,500.00
JUMLAH HARGA BAHAN
4,174,500.00
PERALATAN

-
JUMLAH HARGA ALAT
-
NILAI HSPK 4,667,350.00
DIBULATKAN 4,667,300.00
BACKUP VOLUME

Panjang Lebar Tinggi Keliling Luas Berat Jumlah


NO URAIAN PEKERJAAN KETERANGAN Berat Jenis VOLUME
m m m m m2 kg Bh

A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bouwplank (UITZET) - - - - - - - 1.00 1.00 Ls
2 Pekerjaan Bongkar Atap - - - - - - - 1.00 1.00 Ls
3 Pekerjaan Bonkar Beton - - - - - - - 1.00 1.00 Ls
4 Pekerjaan Bongkar Dinding - - - - - - - 1.00 1.00 Ls
5 Pekerjaan Pembersihan dari Awal s/d Akhir Pekerjaan - - - - - - - 1.00 1.00 Ls

II. PEKERJAAN TANAH


1 Pekerjaan Gali Tanah Poer 1 1.00 1.00 1.15 - - - - 28.00 32.20
Poer 2 0.80 0.80 1.15 - - - - 4.00 2.94
Batu Kali 82.00 0.90 1.00 - - - - - 73.80
Jumlah 108.94 m3
2 Pekerjaan Urug Tanah Kembali - - - - - - - - 32.68 m3
3 Pekerjaan Urug Pasir Dibawah Pondasi t. 5 cm Poer 1 1.00 1.00 0.10 - - - - 28.00 2.80
Poer 2 0.80 0.80 0.10 - - - - 4.00 0.26
Batu Kali 82.00 0.80 0.10 - - - - - 6.56
Jumlah 9.62 m3
4 Pekerjaan Urug Pasir Dibawah Lantai t. 5 cm - - 0.05 - 251.88 - - - 12.59 m3
5 Pekerjaan Urug Sirtu Peninggihan Lantai t. 24 cm - - 0.30 - 251.88 - - - 75.56 m3
6 Pekerjaan Bor Strous dia. 30 h. 300 cm - - - - - - - 32.00 32.00 Ttk

III. PEKERJAAN PONDASI


1 Pekerjaan Pondasi Rollag 1pc:5psr 63.45 0.44 - - - - - - 27.92 m2
2 Pekerjaan Anstampeng 82.00 0.80 0.20 - - - - - 13.12 m3
3 Pekerjaan Pondasi Batu Kali 1pc:4psr 82.00 0.50 0.70 - - - - - 28.70 m3
4 Pekerjaan Lantai Kerja t. 5 cm 1.00 1.00 0.05 - - - - 28.00 1.40
0.80 0.80 0.05 - - - - 4.00 0.13
Jumlah 1.53 m3
5 Pekerjaan Pondasi Poer Type 100x100x40 cm K.225 1.00 1.00 0.40 - - - - 28.00 11.20 m3
6 Pekerjaan Pondasi Poer Type 80x80x30 cm K.225 0.80 0.80 0.30 - - - - 4.00 0.77 m3
7 Pekerjaan Pondasi Strous dia. 30 cm h. 300 cm K.225 - - 3.00 - 0.07 - - 32.00 6.78 m3

IV. PEKERJAAN BETON


LANTAI 1
1 Pekerjaan Beton Sloof 25x40 cm K.225 189.00 0.25 0.40 - - - - 18.90 m3
2 Pekerjaan Beton Sloof 15x20 cm K.225 10.00 0.15 0.20 - - - - 0.30 m3
3 Pekerjaan Beton Kolom 30x30 cm K.225 0.30 0.30 5.05 - - - - 26.00 11.82
0.30 0.30 5.15 - - - - 4.00 1.85
Jumlah 13.67 m3
4 Pekerjaan Beton Kolom dia. 60 cm K.225 - - 5.05 - 0.28 - - 2.00 2.85 m3
5 Pekerjaan Beton Kolom Praktis 11x1 cm K.175 0.11 0.11 4.25 - - - - 8.00 0.41 m3
6 Pekerjaan Beton Balok 25x40 cm K.225 Horisontal 74.50 0.25 0.40 - - - - - 7.45
Vertical 78.60 0.25 0.40 - - - - - 7.86
Jumlah 15.31 m3
7 Pekerjaan Beton Balok 20x30 cm K.225 38.90 0.20 0.30 - - - - - 2.33 m3
8 Pekerjaan Beton Balok Konsol 25x40 cm K.225 1.50 0.25 0.40 - - - - 12.00 1.80 m3
9 Pekerjaan Beton Balok Bordes 15x30 cm K.225 14.50 0.15 0.30 - - - - - 0.65 m3
10 Pekerjaan Beton Balok 15x20 cm K.225 36.10 0.15 0.20 - - - - - 1.08 m3
11 Pekerjaan Beton Plat Lantai t. 12 cm K.225 - - 0.12 - 163.13 - - - 19.58 m3
12 Pekerjaan Beton Plat Atap t. 12 cm K.225 - - 0.12 - 82.14 - - - 9.86 m3
13 Pekerjaan Beton Plat Tangga t. 12 cm K.225 - - 0.12 - 17.06 - - - 2.05 m3

LANTAI 2
1 Pekerjaan Beton Kolom 30x30 cm K.225 0.30 0.30 4.00 - - - - 26.00 9.36 m3
2 Pekerjaan Beton Kolom dia. 60 cm K.225 - - 4.00 - 0.28 - - 2.00 2.26 m3
3 Pekerjaan Beton Kolom Praktis 11x1 cm K.175 0.11 0.11 4.00 - - - - 22.00 1.06 m3
4 Pekerjaan Beton Balok 25x40 cm K.225 Horisontal 65.50 0.25 0.40 - - - - - 6.55
Vertical 66.45 0.25 0.40 - - - - - 6.65
Jumlah 13.20 m3
5 Pekerjaan Beton Balok 20x30 cm K.225 32.90 0.20 0.30 - - - - - 1.97 m3
6 Pekerjaan Beton Balok Konsol 25x40 cm K.225 0.70 0.25 0.40 - - - - 23.00 1.61 m3
7 Pekerjaan Beton Balok 15x20 cm K.225 72.60 0.15 0.20 - - - - - 2.18 m3
8 Pekerjaan Beton Plat Atap t. 12 cm K.225 - - 0.12 - 179.00 - - - 21.48 m3
9 Pekerjaan Beton Plat Lisplank t. 7 cm K.225 69.30 0.07 0.20 - - - - - 0.97 m3

ATAP
1 Pekerjaan Beton Kolom 25x25 cm K.225 Menara 0.25 0.25 8.10 - - - - 4.00 2.03
Kuba 0.25 0.25 2.05 - - - - 8.00 1.03
Jumlah 3.05 m3
2 Pekerjaan Beton Kolom Praktis 11x1 cm K.175 Kuba Kecil 0.11 0.11 0.80 - - - - 8.00 0.08
Kuba Besar 0.11 0.11 0.50 - - - - 8.00 0.05
Menara 0.11 0.11 2.10 - - - - 4.00 0.10
Jumlah 0.23 m3
3 Pekerjaan Beton Balok 20x30 cm K.225 Kuba Besar 65.45 0.20 0.30 - - - - - 3.93
Menara 24.00 0.20 0.30 - - - - - 1.44
Jumlah 5.37 m3
4 Pekerjaan Beton Balok 15x20 cm K.225 Kuba Kecil 15.70 0.15 0.20 - - - - - 0.47
Kuba Besar 18.85 0.15 0.20 - - - - - 0.57
Menara 6.60 0.15 0.20 - - - - - 0.20
Jumlah 1.23 m3
5 Pekerjaan Beton Plat Atap t. 12 cm K.225 Kuba Besar - - 0.12 - 35.75 - - - 4.29
Menara - - 0.12 - 11.75 - - - 1.41
Jumlah 5.70 m3

V. PEKERJAAN ATAP
1 Pekerjaan Atap Enamel + Rangka Kuba Besar 6.00 - 2.92 - - - 3.14 - 55.01
Kuba Kecil 2.50 - 1.35 - - - 3.14 2.00 21.20
Jumlah 76.21 m2
B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1
Dinding Total 88.60 - 4.50 - - - - - 398.70
Jumlah 398.70 m2
Lubang Pintu - - - - 398.70 - - 0.55 219.29
TOTAL 179.42 m2

1 Pekerjaan Pasang Dinidng 1/2 Bata 1pc:3psr - - - - 179.42 - - 0.17 29.90 m2


2 Pekerjaan Pasang Dinidng 1/2 Bata 1pc:5psr - - - - 179.42 - - 0.83 149.51 m2
3 Pekerjaan Plester + Acian 1pc:3psr - - - - 29.90 - - 2.00 59.81 m2
4 Pekerjaan Plester + Acian 1pc:5psr - - - - 149.51 - - 2.00 299.03 m2
5 Pekerjaan Benangan 88.60 - - - - - - 6.00 531.60 m1
6 Pekerjaan Acian - - - - 262.33 - - - 262.33 m2
7 Pekerjaan Relling Tangga Hollow Galvanis 10.50 - 1.00 - - - - 2.00 21.00 m2
8 Pekerjaan Pasang batu Alam - - - - 94.75 - - - 94.75 m2

LANTAI 2
Dinding Total 66.25 - 4.00 - - - - - 265.00
Jumlah 265.00 m2
Lubang Pintu - - - - 265.00 - - 0.55 145.75
TOTAL 119.25 m2

1 Pekerjaan Pasang Dinidng 1/2 Bata 1pc:3psr - - - - 119.25 - - 0.09 10.43 m2


2 Pekerjaan Pasang Dinidng 1/2 Bata 1pc:5psr - - - - 119.25 - - 0.91 108.82 m2
3 Pekerjaan Pasang Dinding Ralling 1/2 Bata 1pc:5psr 36.80 - 0.25 - - - - - 9.20 m2
4 Pekerjaan Plester + Acian 1pc:3psr - - - - 10.43 - - 2.00 20.87 m2
5 Pekerjaan Plester + Acian 1pc:5psr - - - - 108.82 - - 2.00 217.63 m2
6 Pekerjaan Plester + Acian Dinding Ralling 1pc:5psr - - - - 9.20 - - 2.00 18.40 m2
7 Pekerjaan Benangan 66.25 - - - - - - 6.00 397.50 m1
8 Pekerjaan Acian - - - - 179.00 - - - 179.00 m2
9 Pekerjaan Relling Void Hollow Galvanis 37.00 - 1.00 - - - - - 37.00 m2
10 Pekerjaan Pasang batu Alam - - - - 4.60 - - 2.00 9.19
2.98 - - 4.00 11.93
Jumlah 21.12 m2

ATAP
Dinding Total Kuba Besar 32.00 - 0.30 - - - - - 9.60
Kuba Kecil 15.70 - 0.30 - - - - - 4.71
Menara 6.60 - 0.60 - - - - - 3.96
Jumlah 18.27 m2
TOTAL 18.27 m2

1 Pekerjaan Pasang Dinidng 1/2 Bata 1pc:3psr - - - - 18.27 - - 1.00 18.27 m2


2 Pekerjaan Plester + Acian 1pc:3psr - - - - 18.27 - - 2.00 36.54 m2
3 Pekerjaan Benangan 54.30 - - - - - - 2.00 108.60 m1
4 Pekerjaan Acian - - - - 47.50 - - - 47.50 m2
II. PEKERJAAN LANTAI
LANTAI 1
1 Pekerjaan Rabat Lantai t. 5 cm - - 0.05 - 262.45 - - - 13.12 m3
2 Pekerjaan Granit Tile Lantai 60x60 cm - - - - 244.45 - - - 244.45 m2
3 Pekerjaan Granit Tile Lantai Tangga 60x60 cm - - - - 49.22 - - - 49.22 m2
4 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 20.00 - 4.00 - - - - - 80.00 m2
5 Pek. Granit Tile Dinding Kamar Mandi & T. Wudlu 30x60 cm 42.30 - 4.00 - - - - - 169.20 m2
6 Pek, Keramik Lantai Kamar Mandi & T. Wudlu 30x30 cm Rock Tile - - - - 30.30 - - - 30.30 m2

LANTAI 2
1 Pekerjaan Granit Tile Lantai 60x60 cm - - - - 119.90 - - - 119.90 m2
2 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 22.00 - 4.00 - - - - - 88.00 m2

III. PEKERJAAN PLAFOND


1 Pekerjaan List Plafond Gypsum 10 cm Lt.1 261.50 - - - - - - - 261.50 m1
2 Pekerjaan List Plafond Gypsum 10 cm Lt.2 319.20 - - - - - - - 319.20 m1

IV. PEKERJAAN PINTU/JENDELA


LANTAI 1
1 Pekerjaan Kusen + Pintu Type P.1 - - - - - - - 1.00 1.00 Unit
2 Pekerjaan Kusen + Pintu Type P.2 - - - - - - - 4.00 4.00 Unit
3 Pekerjaan Kusen + Pintu + Jendela Type PJ.1 - - - - - - - 1.00 1.00 Unit
4 Pekerjaan Kusen + Pintu + Jendela Type PJ.2 - - - - - - - 2.00 2.00 Unit
5 Pekerjaan Kusen + Jendela Type J.1 - - - - - - - 2.00 2.00 Unit
6 Pekerjaan Kusen + Jendela Type J.2 - - - - - - - 2.00 2.00 Unit
7 Pekerjaan Kusen + Kaca Type BV - - - - - - - 6.00 6.00 Unit
8 Pekerjaan Panel GRC Kerawangan Type G.1 - 0.60 3.00 - - - - 8.00 14.40 m2
9 Pekerjaan Panel GRC Kerawangan Type G.2 0.60 1.80 - - - - - 1.00 1.08 m2
10 Pekerjaan Panel GRC Kerawangan Type G.3 0.60 2.40 - - - - - 7.00 10.08 m2

LANTAI 2
1 Pekerjaan Kusen + Pintu Type P.1 - - - - - - - 2.00 2.00 Unit
2 Pekerjaan Kusen + Jendela Type J.3 - - - - - - - 2.00 2.00 Unit
3 Pekerjaan Kusen + Jendela Type J.4 - - - - - - - 4.00 4.00 Unit
4 Pekerjaan Kusen + Jendela Type J.5 - - - - - - - 4.00 4.00 Unit
5 Pekerjaan Panel GRC Kerawangan Type G.4 - 0.60 4.30 - - - - 10.00 25.80 m2
6 Pekerjaan Panel GRC Kerawangan Type G.5 - 0.60 3.60 - - - - 3.00 6.48 m2
7 Pekerjaan Panel GRC Kerawangan Type G.6 1.20 2.40 - - - - - 1.00 2.88 m2
8 Pekerjaan Panel GRC Kerawangan Type G.7 1.20 1.80 - - - - - 1.00 2.16 m2
9 Pekerjaan Panel GRC Kerawangan Type G.8 1.20 2.40 - - - - - 1.00 2.88 m2

ATAP
1 Pekerjaan Panel GRC 3D Type GD.1 - 1.20 3.60 - - - - 8.00 34.56 m2
2 Pekerjaan Panel GRC 3D Type GD.2 - 0.60 7.80 - - - - 12.00 56.16 m2

V. PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan Pengecatan Dinding Dalam - - - - 358.83 - - 0.65 233.24 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 358.83 - - 0.35 125.59 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 262.33 - - - 262.33 m2

LANTAI 2
1 Pekerjaan Pengecatan Dinding Dalam - - - - 256.90 - - 0.65 166.99 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 256.90 - - 0.35 89.92 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 179.00 - - - 179.00 m2

Atap
1 Pekerjaan Pengecatan Dinding Dalam - - - - 36.54 - - 0.65 23.75 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 36.54 - - 0.35 12.79 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 47.50 - - - 47.50 m2
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL
I. PEKERJAAN INSTALASI LISTRIK
LANTAI 1
1 Pekerjaan Titik Lampu - - - - - - - 29.00 29.00 Ttk
2 Pekerjaan Titik Stop Kontak - - - - - - - 5.00 5.00 Ttk
3 Pekerjaan Titik Stop Kontak AC - - - - - - - 4.00 4.00 Ttk
4 Pekerjaan Lampu LED 18 Watt - - - - - - - 16.00 16.00 Bh
5 Pekerjaan Lampu LED 11 Watt - - - - - - - 5.00 5.00 Bh
6 Pekerjaan Lampu LED 5 Watt - - - - - - - 4.00 4.00 Bh
7 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 4.00 4.00 Bh
8 Pekerjaan Saklar Tunggal - - - - - - - 4.00 4.00 Bh
9 Pekerjaan Saklar Ganda - - - - - - - 7.00 7.00 Bh
10 Pekerjaan Box+MCB 4 Group - - - - - - - 1.00 1.00 Unit
11 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls

LANTAI 2
1 Pekerjaan Titik Lampu - - - - - - - 41.00 41.00 Ttk
2 Pekerjaan Titik Stop Kontak - - - - - - - 3.00 3.00 Ttk
3 Pekerjaan Titik Stop Kontak AC - - - - - - - 2.00 2.00 Ttk
4 Pekerjaan Lampu Gantung 8x11Watt 1.00 1.00 Bh
5 Pekerjaan Lampu LED 18 Watt - - - - - - - 25.00 25.00 Bh
6 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 8.00 8.00 Bh
7 Pekerjaan Saklar Tunggal - - - - - - - 2.00 2.00 Bh
8 Pekerjaan Saklar Ganda - - - - - - - 9.00 9.00 Bh
9 Pekerjaan Box+MCB 4 Group - - - - - - - 1.00 1.00 Unit
10 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls

ATAP
1 Pekerjaan Titik Lampu - - - - - - - 4.00 4.00 Ttk
2 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 4.00 4.00 Bh
3 Pekerjaan Saklar Ganda - - - - - - - 1.00 1.00 Bh
4 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls

II. PEKERJAAN SANITARY


LANTAI 1
1 Pekerjaan Klosed Duduk (komplite) - - - - - - - 4.00 4.00 Unit
2 Pekerjaan Kran 3/4 - - - - - - - 18.00 18.00 Bh
3 Pekerjaan Pipa Air Bersih PVC 1" AW 44.00 - - - - - - - 44.00 m1
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 24.00 - - - - - - - 24.00 m1
5 Pekerjaan Pipa Air Kotor PVC 3" AW 24.00 - - - - - - - 24.00 m1
6 Pekerjaan Pipa Air Kotor PVC 4" AW 60.00 - - - - - - - 60.00 m1
7 Pekerjaan Pipa Kotoran PVC 4" AW 48.00 - - - - - - - 48.00 m1
8 Pekerjaan Pipa Air Hujan PVC 3" AW 120.00 - - - - - - - 120.00 m1
9 Pekerjaan Bak Kontrol - - - - - - - 8.00 8.00 Bh
10 Pekerjaan Septiktank & Resapan - - - - - - - 1.00 1.00 Unit
11 Pekerjaan Rumah Pompa - - - - - - - 1.00 1.00 Unit

LANTAI 2
1 Pekerjaan Stop Kran 3/4" - - - - - - - 2.00 2.00 Bh
2 Pekerjaan Stop Kran 1" - - - - - - - 2.00 2.00 Bh
3 Pekerjaan Pipa Air Bersih PVC 1" AW 4.00 - - - - - - - 4.00 m1
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 4.00 - - - - - - - 4.00 m1
5 Pekerjaan Pipa Air Hujan PVC 3" AW 80.00 - - - - - - - 80.00 m1
6 Pekerjaan Profil Tank Kap. 1.100 Ltr - - - - - - - 1.00 1.00 Unit
RENCANA ANGGARAN BIAYA ( RAB )

HARGA SAT. JML. HARGA


NO. URAIAN PEEKRJAAN VOLUME
Rp. Rp.

D. PEKERJAAN PAGAR & LANSEKAP


I. PEKERJAAN PAGAR KELILING
1 Pekerjaan Pagar Samping & Belakang Dinding Batu Bata 102.00 m1 1,500,000.00 153,000,000.00
2 Pekerjaan Pagar Depan Dinding Batu Bata 36.00 m1 1,250,000.00 45,000,000.00
3 Pekerjaan Pagar Hollow Galvanis 31.00 m2 550,000.00 17,050,000.00
4 Pekerjaan Gerbang Hollow Galvanis 15.00 m2 750,000.00 11,250,000.00
5 Pekerjaan Papan Nama 1.00 Ls 5,500,000.00 5,500,000.00

JUMLAH 231,800,000.00

II. PEKERJAAN LANSEKAP


1 Pekerjaan Pasang Paving Segi Empat Abu2 t.6 cm 948.00 m2 185,000.00 175,380,000.00
2 Pekerjaan Lansekap/ Taman Keliling 133.00 m2 150,000.00 19,950,000.00

JUMLAH 195,330,000.00
RENCANA ANGGARAN BIAYA ( RAB )

HARGA SAT. JML. HARGA


NO. URAIAN PEEKRJAAN VOLUME
Rp. Rp.

C. PEKERJAAN MEKANIKAL & ELEKTRIKAL


I. PEKERJAAN INSTALASI LISTRIK
LANTAI 1
1 Pekerjaan Titik Lampu 29.00 Ttk 219,800.00 6,374,200.00
2 Pekerjaan Titik Stop Kontak 5.00 Ttk 197,300.00 986,500.00
3 Pekerjaan Titik Stop Kontak AC 4.00 Ttk 197,300.00 789,200.00
4 Pekerjaan Lampu LED 18 Watt 16.00 Bh 130,100.00 2,081,600.00
5 Pekerjaan Lampu LED 11 Watt 5.00 Bh 84,100.00 420,500.00
6 Pekerjaan Lampu LED 5 Watt 4.00 Bh 36,900.00 147,600.00
8 Pekerjaan Saklar Tunggal 4.00 Bh 87,600.00 350,400.00
9 Pekerjaan Saklar Ganda 7.00 Bh 104,900.00 734,300.00
10 Pekerjaan Box+MCB 4 Group 1.00 Unit 950,000.00 950,000.00
11 Pekerjaan Penyambungan 1.00 Ls 750,000.00 750,000.00
12 Biaya Pemasanagan Kembali Audio Lama 1.00 Ls 2,500,000.00 2,500,000.00

JUMLAH 16,084,300.00

LANTAI 2
1 Pekerjaan Titik Lampu 41.00 Ttk 219,800.00 9,011,800.00
2 Pekerjaan Titik Stop Kontak 3.00 Ttk 197,300.00 591,900.00
3 Pekerjaan Titik Stop Kontak AC 2.00 Ttk 197,300.00 394,600.00
4 Pekerjaan Lampu Gantung 8x11Watt 1.00 Bh 5,172,800.00 5,172,800.00
5 Pekerjaan Lampu LED 18 Watt 25.00 Bh 130,100.00 3,252,500.00
6 Pekerjaan Downlight Lampu LED 11 Watt 8.00 Bh 170,300.00 1,362,400.00
7 Pekerjaan Saklar Tunggal 2.00 Bh 87,600.00 175,200.00
8 Pekerjaan Saklar Ganda 9.00 Bh 104,900.00 944,100.00
9 Pekerjaan Box+MCB 4 Group 1.00 Unit 950,000.00 950,000.00
10 Pekerjaan Penyambungan 1.00 Ls 750,000.00 750,000.00
11 Biaya Pemasanagan Kembali Audio Lama 1.00 Ls 2,500,000.00 2,500,000.00

JUMLAH 25,105,300.00

ATAP
1 Pekerjaan Titik Lampu 4.00 Ttk 219,800.00 879,200.00
2 Pekerjaan Lampu LED 11 Watt 4.00 Bh 84,100.00 336,400.00
3 Pekerjaan Saklar Ganda 1.00 Bh 104,900.00 104,900.00
4 Pekerjaan Penyambungan 1.00 Ls 250,000.00 250,000.00
5 Pekerjaan Penangkal Petir Konvensional 1.00 Ls 10,000,000.00 10,000,000.00

JUMLAH 11,570,500.00
II. PEKERJAAN SANITARY
LANTAI 1
1 Pekerjaan Klosed Duduk (komplite) 4.00 Unit 4,667,300.00 18,669,200.00
2 Pekerjaan Kran 3/4" 18.00 Bh 78,400.00 1,411,200.00
3 Pekerjaan Pipa Air Bersih PVC 1" AW 44.00 m1 32,000.00 1,408,000.00
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 24.00 m1 26,700.00 640,800.00
5 Pekerjaan Pipa Air Kotor PVC 3" AW 24.00 m1 76,000.00 1,824,000.00
6 Pekerjaan Pipa Air Kotor PVC 4" AW 60.00 m1 103,900.00 6,234,000.00
7 Pekerjaan Pipa Kotoran PVC 4" AW 48.00 m1 103,900.00 4,987,200.00
8 Pekerjaan Pipa Air Hujan PVC 3" AW 120.00 m1 94,900.00 11,388,000.00
9 Pekerjaan Bak Kontrol 8.00 Bh 750,000.00 6,000,000.00
10 Pekerjaan Septiktank & Resapan 1.00 Unit 4,500,000.00 4,500,000.00
11 Pekerjaan Rumah Pompa 1.00 Unit 3,500,000.00 3,500,000.00

JUMLAH 60,562,400.00

LANTAI 2
1 Pekerjaan Stop Kran 3/4" 2.00 Bh 78,400.00 156,800.00
2 Pekerjaan Stop Kran 1" 2.00 Bh 86,240.00 172,480.00
3 Pekerjaan Pipa Air Bersih PVC 1" AW 4.00 m1 32,000.00 128,000.00
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 4.00 m1 26,700.00 106,800.00
5 Pekerjaan Pipa Air Hujan PVC 3" AW 80.00 m1 94,900.00 7,592,000.00
6 Pekerjaan Profil Tank Kap. 1.100 Ltr 1.00 Unit 2,000,000.00 2,000,000.00

JUMLAH 10,156,080.00
RENCANA ANGGARAN BIAYA ( RAB )

HARGA SAT. JML. HARGA


NO. URAIAN PEEKRJAAN VOLUME
Rp. Rp.

B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 29.90 m2 145,700.00 4,356,794.25
2 Pekerjaan Pasang Dinding 1/2 Bata 1pc:5psr 149.51 m2 139,300.00 20,827,091.25
3 Pekerjaan Plester + Acian 1pc:3psr 59.81 m2 69,300.00 4,144,486.50
4 Pekerjaan Plester + Acian 1pc:5psr 299.03 m2 65,800.00 19,675,845.00
5 Pekerjaan Benangan 531.60 m1 23,000.00 12,226,800.00
6 Pekerjaan Acian 262.33 m2 39,300.00 10,309,470.75
7 Pekerjaan Relling Tangga Hollow Galvanis 21.00 m2 450,000.00 9,450,000.00
8 Pekerjaan Pasang batu Alam + Coating 94.75 m2 425,000.00 40,268,750.00

JUMLAH 121,259,237.75

LANTAI 2
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 10.43 m2 145,700.00 1,520,288.44
2 Pekerjaan Pasang Dinding 1/2 Bata 1pc:5psr 108.82 m2 139,300.00 15,158,016.56
3 Pekerjaan Pasang Dinding Ralling 1/2 Bata 1pc:5psr 9.20 m2 139,300.00 1,281,560.00
4 Pekerjaan Plester + Acian 1pc:3psr 20.87 m2 69,300.00 1,446,204.38
5 Pekerjaan Plester + Acian 1pc:5psr 217.63 m2 65,800.00 14,320,136.25
6 Pekerjaan Plester + Acian Dinding Ralling 1pc:5psr 18.40 m2 65,800.00 1,210,720.00
7 Pekerjaan Benangan 397.50 m1 23,000.00 9,142,500.00
8 Pekerjaan Acian 179.00 m2 39,300.00 7,034,700.00
9 Pekerjaan Relling Void Hollow Galvanis 37.00 m2 450,000.00 16,650,000.00
10 Pekerjaan Pasang batu Alam + Coating 21.12 m2 425,000.00 8,975,298.75

JUMLAH 76,739,424.38

ATAP
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 18.27 m2 145,700.00 2,661,939.00
2 Pekerjaan Plester + Acian 1pc:3psr 36.54 m2 69,300.00 2,532,222.00
3 Pekerjaan Benangan 108.60 m1 23,000.00 2,497,800.00
4 Pekerjaan Acian 47.50 m2 39,300.00 1,866,750.00

JUMLAH 9,558,711.00

II. PEKERJAAN LANTAI


LANTAI 1
1 Pekerjaan Rabat Lantai t. 5 cm 13.12 m3 985,700.00 12,934,848.25
2 Pekerjaan Granit Tile Lantai 60x60 cm 244.45 m2 431,400.00 105,455,730.00
3 Pekerjaan Granit Tile Lantai Tangga 60x60 cm 49.22 m2 431,400.00 21,232,968.75
4 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 80.00 m2 431,400.00 34,512,000.00
5 Pek. Granit Tile Dinding Kamar Mandi & T. Wudlu 30x60 cm 169.20 m2 431,400.00 72,992,880.00
6 Pek, Keramik Lantai Kamar Mandi & T. Wudlu 30x30 cm Rock Tile 30.30 m2 271,400.00 8,223,420.00

JUMLAH 255,351,847.00
LANTAI 2
1 Pekerjaan Granit Tile Lantai 60x60 cm 119.90 m2 431,400.00 51,724,860.00
2 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 88.00 m2 431,400.00 37,963,200.00

JUMLAH 89,688,060.00

III. PEKERJAAN PLAFOND


1 Pekerjaan Plafond Gypsum Board 120x240x9 mm Lt.1 171.75 m2 113,400.00 19,476,450.00
2 Pekerjaan List Plafond Gypsum 10 cm Lt.1 261.50 m2 37,500.00 9,806,250.00
3 Pekerjaan Plafond Gypsum Board 120x240x9 mm Lt.2 179.00 m2 113,400.00 20,298,600.00
4 Pekerjaan List Plafond Gypsum 10 cm Lt.2 319.20 m2 37,500.00 11,970,000.00

JUMLAH 61,551,300.00

IV. PEKERJAAN PINTU/JENDELA


LANTAI 1
1 Pekerjaan Kusen + Pintu Type P.1 1.00 Unit 4,612,500.00 4,612,500.00
2 Pekerjaan Kusen + Pintu Type P.2 4.00 Unit 4,100,000.00 16,400,000.00
3 Pekerjaan Kusen + Pintu + Jendela Type PJ.1 1.00 Unit 21,021,000.00 21,021,000.00
4 Pekerjaan Kusen + Pintu + Jendela Type PJ.2 2.00 Unit 18,963,000.00 37,926,000.00
5 Pekerjaan Kusen + Jendela Type J.1 2.00 Unit 10,631,250.00 21,262,500.00
6 Pekerjaan Kusen + Jendela Type J.2 2.00 Unit 11,340,000.00 22,680,000.00
7 Pekerjaan Kusen + Kaca Type BV 6.00 Unit 513,000.00 3,078,000.00
8 Pekerjaan Panel GRC Kerawangan Type G.1 14.40 m2 950,000.00 13,680,000.00
9 Pekerjaan Panel GRC Kerawangan Type G.2 1.08 m2 950,000.00 1,026,000.00
10 Pekerjaan Panel GRC Kerawangan Type G.3 10.08 m2 950,000.00 9,576,000.00

JUMLAH 151,262,000.00

LANTAI 2
1 Pekerjaan Kusen + Pintu Type P.1 2.00 Unit 4,612,500.00 9,225,000.00
2 Pekerjaan Kusen + Jendela Type J.3 2.00 Unit 5,255,818.75 10,511,637.50
3 Pekerjaan Kusen + Jendela Type J.4 4.00 Unit 5,020,312.50 20,081,250.00
4 Pekerjaan Kusen + Jendela Type J.5 4.00 Unit 6,401,718.75 25,606,875.00
5 Pekerjaan Panel GRC Kerawangan Type G.4 25.80 m2 950,000.00 24,510,000.00
6 Pekerjaan Panel GRC Kerawangan Type G.5 6.48 m2 950,000.00 6,156,000.00
7 Pekerjaan Panel GRC Kerawangan Type G.6 2.88 m2 950,000.00 2,736,000.00
8 Pekerjaan Panel GRC Kerawangan Type G.7 2.16 m2 950,000.00 2,052,000.00
9 Pekerjaan Panel GRC Kerawangan Type G.8 2.88 m2 950,000.00 2,736,000.00

JUMLAH 103,614,762.50

ATAP
1 Pekerjaan Panel GRC 3D Type GD.1 34.56 Unit 1,150,000.00 39,744,000.00
2 Pekerjaan Panel GRC 3D Type GD.2 56.16 Unit 1,150,000.00 64,584,000.00

JUMLAH 104,328,000.00

V. PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan Pengecatan Dinding Dalam 233.24 m2 33,000.00 7,696,903.50
2 Pekerjaan Pengecatan Dinding Luar 125.59 m2 42,400.00 5,325,037.20
3 Pekerjaan Pengecatan Dibawah Dak 262.33 m2 33,000.00 8,656,807.50
JUMLAH 21,678,748.20
LANTAI 2
1 Pekerjaan Pengecatan Dinding Dalam 166.99 m2 33,000.00 5,510,505.00
2 Pekerjaan Pengecatan Dinding Luar 89.92 m2 42,400.00 3,812,396.00
3 Pekerjaan Pengecatan Dibawah Dak 179.00 m2 33,000.00 5,907,000.00

JUMLAH 15,229,901.00

ATAP
1 Pekerjaan Pengecatan Dinding Dalam 23.75 m2 33,000.00 783,783.00
2 Pekerjaan Pengecatan Dinding Luar 12.79 m2 42,400.00 542,253.60
3 Pekerjaan Pengecatan Dibawah Dak 47.50 m2 33,000.00 1,567,500.00

JUMLAH 2,893,536.60
RENCANA ANGGARAN BIAYA ( RAB )

HARGA SAT. JML. HARGA


NO. URAIAN PEEKRJAAN VOLUME
Rp. Rp.

A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bouwplank (UITZET) 1.00 Ls 1,500,000.00 1,500,000.00
2 Pekerjaan Bongkar Atap 1.00 Ls 2,000,000.00 2,000,000.00
3 Pekerjaan Bongkar Beton 1.00 Ls 5,500,000.00 5,500,000.00
4 Pekerjaan Bongkar Dinding 1.00 Ls 1,500,000.00 1,500,000.00
5 Pekerjaan Pembersihan dari Awal s/d Akhir Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00

JUMLAH 12,000,000.00

II. PEKERJAAN TANAH


1 Pekerjaan Gali Tanah 108.94 m3 78,700.00 8,573,892.80
2 Pekerjaan Urug Tanah Kembali 32.68 m3 57,500.00 1,879,284.00
3 Pekerjaan Urug Pasir Dibawah Pondasi t. 5 cm 9.62 m3 316,700.00 3,045,387.20
4 Pekerjaan Urug Pasir Dibawah Lantai t. 5 cm 12.59 m3 316,700.00 3,988,440.63
5 Pekerjaan Urug Sirtu Peninggihan Lantai t. 24 cm 75.56 m3 250,500.00 18,928,406.25
7 Pekerjaan Bor Strous dia. 30 h. 300 cm 32.00 Ttk 168,000.00 5,376,000.00

JUMLAH 41,791,410.88

III. PEKERJAAN PONDASI


1 Pekerjaan Pondasi Rollag 1pc:5psr 27.92 m2 286,200.00 7,990,131.60
2 Pekerjaan Anstampeng 13.12 m3 516,500.00 6,776,480.00
3 Pekerjaan Pondasi Batu Kali 1pc:4psr 28.70 m3 935,800.00 26,857,460.00
4 Pekerjaan Lantai Kerja t. 5 cm 1.53 m3 985,700.00 1,506,149.60
5 Pekerjaan Pondasi Poer Type 100x100x40 cm K.225 11.20 m3 2,880,300.00 32,259,360.00
6 Pekerjaan Pondasi Poer Type 80x80x30 cm K.225 0.77 m3 3,258,000.00 2,502,144.00
7 Pekerjaan Pondasi Strous dia. 30 cm h. 300 cm K.225 6.78 m3 2,243,900.00 15,219,027.36

JUMLAH 93,110,752.56

IV. PEKERJAAN BETON


LANTAI 1
1 Pekerjaan Beton Sloof 25x40 cm K.225 18.90 m3 3,983,600.00 75,290,040.00
2 Pekerjaan Beton Sloof 15x20 cm K.175 0.30 m3 4,154,400.00 1,246,320.00
3 Pekerjaan Beton Kolom 30x30 cm K.225 13.67 m3 4,522,200.00 61,822,996.20
4 Pekerjaan Beton Kolom dia. 60 cm K.225 2.85 m3 4,466,400.00 12,748,266.86
5 Pekerjaan Beton Kolom Praktis 11x11 cm K.175 0.41 m3 6,019,600.00 2,476,463.44
6 Pekerjaan Beton Balok 25x40 cm K.225 15.31 m3 5,016,800.00 76,807,208.00
7 Pekerjaan Beton Balok 20x30 cm K.225 2.33 m3 5,150,900.00 12,022,200.60
8 Pekerjaan Beton Balok Konsol 25x40 cm K.225 1.80 m3 5,016,800.00 9,030,240.00
9 Pekerjaan Beton Balok Bordes 15x30 cm K.225 0.65 m3 5,743,700.00 3,747,764.25
10 Pekerjaan Beton Balok 15x20 cm K.175 1.08 m3 4,248,000.00 4,600,584.00
11 Pekerjaan Beton Plat Lantai t. 12 cm K.225 19.58 m3 4,976,100.00 97,407,157.50
12 Pekerjaan Beton Plat Atap t. 12 cm K.225 9.86 m3 4,976,100.00 49,048,422.48
13 Pekerjaan Beton Plat Tangga t. 12 cm K.225 2.05 m3 4,976,100.00 10,188,564.75

JUMLAH 416,436,228.08
LANTAI 2
1 Pekerjaan Beton Kolom 30x30 cm K.225 9.36 m3 4,522,200.00 42,327,792.00
2 Pekerjaan Beton Kolom dia. 60 cm K.225 2.26 m3 4,466,400.00 10,097,637.12
3 Pekerjaan Beton Kolom Praktis 11x11 cm K.175 1.06 m3 6,019,600.00 6,409,670.08
4 Pekerjaan Beton Balok 25x40 cm K.225 13.20 m3 5,016,800.00 66,196,676.00
5 Pekerjaan Beton Balok 20x30 cm K.225 1.97 m3 5,150,900.00 10,167,876.60
6 Pekerjaan Beton Balok Konsol 25x40 cm K.225 1.61 m3 5,016,800.00 8,077,048.00
7 Pekerjaan Beton Balok 15x20 cm K.175 2.18 m3 4,248,000.00 9,252,144.00
8 Pekerjaan Beton Plat Atap t. 12 cm K.225 21.48 m3 4,976,100.00 106,886,628.00
9 Pekerjaan Beton Plat Lisplank t. 7 cm K.225 0.97 m3 4,976,100.00 4,827,812.22

JUMLAH 264,243,284.02

ATAP
1 Pekerjaan Beton Kolom 25x25 cm K.225 3.05 m3 5,457,500.00 16,645,375.00
2 Pekerjaan Beton Kolom Praktis 11x11 cm K.175 0.23 m3 6,019,600.00 1,369,338.61
3 Pekerjaan Beton Balok 20x30 cm K.225 5.37 m3 5,150,900.00 27,644,880.30
4 Pekerjaan Beton Balok 15x20 cm K.175 1.23 m3 4,248,000.00 5,244,156.00
5 Pekerjaan Beton Plat Atap t. 12 cm K.225 5.70 m3 4,976,100.00 28,363,770.00

JUMLAH 79,267,519.91

V. PEKERJAAN ATAP
1 Pekerjaan Atap Enamel + Rangka 55.01 m2 1,375,000.00 75,642,600.00

JUMLAH 75,642,600.00
SUB REKAPITULASI ANGGRAN BIAYA ( SUB REKAP RAB )

JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.

A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN 12,000,000.00
II. PEKERJAAN TANAH 41,791,410.88
III. PEKERJAAN PONDASI 93,110,752.56
IV. PEKERJAAN BETON
LANTAI 1 416,436,228.08
LANTAI 2 264,243,284.02
ATAP 79,267,519.91
V. PEKERJAAN ATAP 75,642,600.00

JUMLAH PEKERJAAN STRUKTURAL 982,491,795.45

B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1 121,259,237.75
LANTAI 2 76,739,424.38
ATAP 9,558,711.00
II. PEKERJAAN LANTAI
LANTAI 1 255,351,847.00
LANTAI 2 89,688,060.00
III. PEKERJAAN PLAFOND 61,551,300.00
IV. PEKERJAAN PINTU/JENDELA
LANTAI 1 151,262,000.00
LANTAI 2 103,614,762.50
ATAP 104,328,000.00
V. PEKERJAAN PENGECATAN
LANTAI 1 21,678,748.20
LANTAI 2 15,229,901.00
ATAP 2,893,536.60

JUMLAH PEKERJAAN ARSITEKTURAL 1,013,155,528.43


C. PEKERJAAN MEKANIKAL & ELEKTRIKAL
I. PEKERJAAN INSTALASI LISTRIK
LANTAI 1 16,084,300.00
LANTAI 2 25,105,300.00
ATAP 11,570,500.00
II. PEKERJAAN SANITARY
LANTAI 1 60,562,400.00
LANTAI 2 10,156,080.00

JUMLAH PEKERJAAN MEKANIKAL & ELEKTRIKAL 123,478,580.00

D. PEKERJAAN PAGAR & LANSEKAP


I. PEKERJAAN PAGAR KELILING 231,800,000.00
II. PEKERJAAN LANSEKAP 195,330,000.00

JUMLAH PEKERJAAN PAGAR & LANSEKAP 427,130,000.00


REKAPITULASI ANGGRAN BIAYA ( REKAP RAB )

JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.

A. PEKERJAAN STRUKTURAL 982,491,795.45

B. PEKERJAAN ARSITEKTURAL 1,013,155,528.43

C. PEKERJAAN MEKANIKAL & ELEKTRIKAL 123,478,580.00

D. PEKERJAAN PAGAR & LANSEKAP 427,130,000.00

JUMLAH HARGA 2,546,255,903.87


DIBULATKAN 2,546,255,000.00
Terbilang :
Dua Milyar Lima Ratus Empat Puluh Enam Juta Dua Ratus Lima Puluh Lima Ribu Rupiah