UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN
C. SEWA ALAT
Sewa Stemper Jam 113,700.00
Sewa Alat Bantu Strouss Pile Jam 11,000.00
Sewa Compresor Min. 5 Jam Jam 103,400.00
TAHUN ANGGARAN : 2020
UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN
A. UPAH
1 Mandor OH 150,000.00
2 Kepala Tukang OH 135,000.00
3 Tukang OH 125,000.00
4 Pekerja OH 100,000.00
DAFTAR UPAH KERJA DAN BAHAN
UKURAN /
NO. NAMA BARANG HARGA SATUAN KET
SATUAN
B BAHAN
- Kayu Meranti Usuk m3 3,893,229.17
- Kayu Meranti Papan 2/20, 4/10 m3 3,893,229.17
- Kayu Meranti Balok m3
3,743,489.58
- Kayu Meranti Begesting m3
3,231,380.21
- Plywood Uk .122x 244 x 9 mm Lbr 112,700.00
- Kalsiplank 0,8/20 m1 15,390.83
- Kalsiplank 0,8/30 m1 23,057.50
- Kalsiboard 1200x2400x60 mm Lembar 140,300.00
- Gypsumboard 1200x2400x90 mm Lembar 88,550.00
- Kayu Jati Balok 6/15 m3 6,845,238.10
- Kayu Kamper Balok 6/12, 6/15 m3 6,289,062.50
- Kayu Jati Papan 4/10 m3 4,704,545.45
- Kayu Kamper Papan 2/20, 4/10 m3 6,289,062.50
- Waterproof Kg 51,175.00
- Serat Fiber Lembar 2,012.50
- Cat Kayu Kg 58,545.45
- Cat Meni Kayu Kg 34,500.00
- Clear Gloss Kg 75,192.31
- Plamir Tembok 5 Kg Kaleng 71,875.00
- Kuas 4 inchi Bh 23,000.00
- Cat Besi Kg 40,250.00
- Kertas Gosok Halus Lembar 17,825.00
- Kertas Gosok Kasar Lembar 22,425.00
- Cat Meni Besi Kg 35,022.73
- Cat Tembok Dalam 2.5 Kg Kaleng 186,875.00
- Cat Tembok Luar 2.5 Kg Kaleng 277,006.25
- Dempul Tembok Kg 10,350.00
- CThinner A Liter 41,400.00
- Coumpond Kaleng 48,300.00
- Wood Filler Kg 43,125.00
- Clear Gloss Kg 75,192.31
- Shanding Kg 75,900.00
- Lem Kayu Kg 15,525.00
- Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 36,455.00
- Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 49,795.00
- Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 121,670.00
- Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 191,360.00
- Kran Air Dia. 3/4 Bh 50,600.00
- Rol TBA Roll 4,600.00
- Closet Duduk Porselin Bh 3,795,000.00
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN : 2020
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
24.01.01.06 Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
21,500.00
BAHAN
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
-
JUMLAH HARGA BAHAN
-
PERALATAN
JUMLAH HARGA ALAT
24.02.01 Pondasi
24.02.01.11 Pekerjaan Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0750 150,000.00 11,250.00
OH
2 Kepala tukang 0.0750 135,000.00 10,125.00
OH
3 Tukang 0.7500 125,000.00 93,750.00
OH
4 Pekerja 1.5000 100,000.00 150,000.00
JUMLAH TENAGA KERJA
265,125.00
BAHAN
-
JUMLAH HARGA BAHAN
-
PERALATAN
-
JUMLAH HARGA BAHAN
-
PERALATAN
24.02.01.24 Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.2500 125,000.00 31,250.00
OH
4 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
210,800.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,196,746.41
DIBULATKAN 1,196,700.00
24.03.01 Beton
24.03.01.02 Pekerjaan Beton K-125 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,120,654.23
DIBULATKAN 1,120,600.00
24.03.01.04 Lantai Kerja K-100 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 1.2000 100,000.00 120,000.00
JUMLAH TENAGA KERJA
148,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 985,730.27
DIBULATKAN 985,700.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,214,511.52
DIBULATKAN 1,214,500.00
24.03.01.07 Pekerjaan Beton K-225 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0280 150,000.00 4,200.00
OH
2 Tukang 0.2750 125,000.00 34,375.00
OH
3 Pekerja 1.6500 100,000.00 165,000.00
JUMLAH TENAGA KERJA
203,575.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,295,988.23
DIBULATKAN 1,295,900.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 1,320,176.55
DIBULATKAN 1,320,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 12,047.25
DIBULATKAN 12,000.00
24.03.01.14b Pekerjaan Pembesian dengan besi beton ulir Sat. : / Kg
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0007 150,000.00 105.00
OH
2 Tukang 0.0070 125,000.00 875.00
OH
3 Pekerja 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA
1,680.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 12,892.50
DIBULATKAN 12,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 241,977.11
DIBULATKAN 241,900.00
24.03.01.18 Pekerjaan Bekisting Kolom Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 349,472.55
DIBULATKAN 349,400.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 360,703.02
DIBULATKAN 360,700.00
24.03.01.20 Pekerjaan Bekisting Dak / Lantai Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0330 150,000.00 4,950.00
OH
2 Tukang 0.3300 125,000.00 41,250.00
OH
3 Pekerja 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA
112,200.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 349,472.55
DIBULATKAN 349,400.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 316,008.75
DIBULATKAN 316,000.00
-
JUMLAH HARGA BAHAN
-
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 360,000.00
DIBULATKAN 360,000.00
Pekerjaan Poer 100x100x40 cm K. 225 Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
-
JUMLAH HARGA ALAT
-
NILAI HSPK 301,172.15
DIBULATKAN 301,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 286,254.25
DIBULATKAN 286,200.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 145,787.17
DIBULATKAN 145,700.00
24.04.01.09 Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Tukang 0.1000 125,000.00 12,500.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
44,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 139,328.10
DIBULATKAN 139,300.00
-
JUMLAH HARGA BAHAN
-
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 13,335.40
DIBULATKAN 13,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 69,385.59
DIBULATKAN 69,300.00
24.04.01.17 Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0150 150,000.00 2,250.00
OH
2 Tukang 0.1500 125,000.00 18,750.00
OH
3 Pekerja 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA
51,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 65,873.95
DIBULATKAN 65,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 23,008.71
DIBULATKAN 23,000.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 8,435.04
DIBULATKAN 8,400.00
24.04.01.21 Pekerjaan Acian Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Tukang 0.1000 125,000.00 12,500.00
OH
3 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
34,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 39,325.94
DIBULATKAN 39,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 35,423.75
DIBULATKAN 35,400.00
24.04.02.05 Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0040 150,000.00 600.00
OH
2 Tukang 0.1050 125,000.00 13,125.00
OH
3 Pekerja 0.0700 100,000.00 7,000.00
JUMLAH TENAGA KERJA
20,725.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 74,906.28
DIBULATKAN 74,900.00
24.04.02.06 Pengecatan Besi Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
30,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 34,255.00
DIBULATKAN 34,200.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 22,300.00
DIBULATKAN 22,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 33,732.27
DIBULATKAN 33,700.00
24.04.02.10 Pengecatan Dinding Dalam Lama Tanpa Plamir (sewarna) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0042 150,000.00 630.00
OH
2 Tukang 0.0420 125,000.00 5,250.00
OH
3 Pekerja 0.0280 100,000.00 2,800.00
JUMLAH TENAGA KERJA
8,680.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 45,342.00
DIBULATKAN 45,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 61,565.63
DIBULATKAN 61,500.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 33,072.50
DIBULATKAN 33,000.00
24.04.02.11 Pengecatan Dinding Luar Lama Tanpa Plamir (sewarna) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0063 150,000.00 945.00
OH
2 Tukang 0.0630 125,000.00 7,875.00
OH
3 Pekerja 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA
10,820.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 42,446.15
DIBULATKAN 42,400.00
24.04.02.16 Pekerjaan Lapis Melamin Duco (2x Lapis Sampai Rata) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0090 150,000.00 1,350.00
OH
2 Tukang 0.0900 125,000.00 11,250.00
OH
3 Pekerja 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA
20,100.00
BAHAN
-
JUMLAH HARGA BAHAN
-
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 31,200.00
DIBULATKAN 31,200.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 271,442.50
DIBULATKAN 271,400.00
24.05.01.13 Pemasangan Lantai Granit 60 x 60 cm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0350 150,000.00 5,250.00
OH
2 Kepala Tukang 0.0350 135,000.00 4,725.00
OH
3 Tukang 0.3500 125,000.00 43,750.00
OH
4 Pekerja 0.7000 100,000.00 70,000.00
JUMLAH TENAGA KERJA
123,725.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 431,458.35
DIBULATKAN 431,400.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 274,865.70
DIBULATKAN 274,800.00
24.05.01.06 Pemasangan Tegel Plin Dinding Keramik uk. 7.5x20 cm Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0090 150,000.00 1,350.00
OH
2 Kepala Tukang 0.0050 135,000.00 675.00
OH
3 Tukang 0.0900 125,000.00 11,250.00
OH
4 Pekerja 0.0900 100,000.00 9,000.00
JUMLAH TENAGA KERJA
22,275.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 66,339.18
DIBULATKAN 66,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 418,150.00
DIBULATKAN 418,100.00
24.06.01.09a Pemasang Reng Usuk Galvalume C.75 & R.45 Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0025 150,000.00 375.00
OH
2 Kepala Tukang 0.0050 135,000.00 675.00
OH
3 Tukang 0.0500 125,000.00 6,250.00
OH
4 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
27,300.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 214,300.00
DIBULATKAN 214,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 28,646.25
DIBULATKAN 28,600.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 27,863.11
DIBULATKAN 27,800.00
24.06.01.04b Pekerjaan Plat Joint/Plendes Sat. : / Kg
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0015 150,000.00 225.00
OH
2 Kepala Tukang 0.0030 135,000.00 405.00
OH
3 Tukang 0.0300 125,000.00 3,750.00
OH
4 Pekerja 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA
7,380.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 34,491.25
DIBULATKAN 34,400.00
24.06.02.16 Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 60 cm) Sat. : / m1
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala Tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.8000 125,000.00 100,000.00
OH
4 Pekerja 0.5000 100,000.00 50,000.00
JUMLAH TENAGA KERJA
164,550.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 293,948.96
DIBULATKAN 293,900.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 271,030.00
DIBULATKAN 271,000.00
24.06.02.03a Pemasangan Genteng Beton Flat Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0100 150,000.00 1,500.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.1000 125,000.00 12,500.00
OH
4 Pekerja 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA
35,350.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 95,150.00
DIBULATKAN 95,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 178,429.27
DIBULATKAN 178,400.00
24.06.02.10a Pemasangan Wuwung Genteng Beton Flat Sat. : / m1
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Kepala Tukang 0.0020 135,000.00 270.00
OH
3 Tukang 0.2000 125,000.00 25,000.00
OH
4 Pekerja 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA
68,270.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 142,821.29
DIBULATKAN 142,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 32,419.92
DIBULATKAN 32,400.00
24.06.02.12c Pemasangan Listplank Kalsiplank 0,8/30 Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0015 150,000.00 225.00
OH
2 Kepala Tukang 0.0070 135,000.00 945.00
OH
3 Tukang 0.0700 125,000.00 8,750.00
OH
4 Pekerja 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA
13,420.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 40,853.25
DIBULATKAN 40,800.00
24.06.02.17 Pemasangan Talang Tritisan dari Seng BJLS 30 (lebar 90 cm) Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0250 150,000.00 3,750.00
OH
2 Kepala Tukang 0.0800 135,000.00 10,800.00
OH
3 Tukang 0.8000 125,000.00 100,000.00
OH
4 Pekerja 0.5000 100,000.00 50,000.00
JUMLAH TENAGA KERJA
164,550.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 307,341.67
DIBULATKAN 307,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 94,987.00
DIBULATKAN 94,900.00
24.06.03 Pemasangan Plafon
24.06.03.14 Pemasangan Plafond Kalsiboard Rangka Plafon Hollow Galvalum Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 133,251.82
DIBULATKAN 133,200.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 113,488.50
DIBULATKAN 113,400.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 183,494.75
DIBULATKAN 183,400.00
24.06.03.14c Plafond Kaca Tempert 8 mm Rangka Plafon Hollow Galvanis Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0125 150,000.00 1,875.00
OH
2 Kepala Tukang 0.0375 135,000.00 5,062.50
OH
3 Tukang 0.0750 125,000.00 9,375.00
OH
4 Pekerja 0.1250 100,000.00 12,500.00
JUMLAH TENAGA KERJA
28,812.50
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 2,372,077.50
DIBULATKAN 2,372,000.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 11,198,224.40
DIBULATKAN 11,198,200.00
24.07.01.02 Kusen Pintu / Jendela Kayu kamper Sat. : / m3
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 1.8000 150,000.00 270,000.00
OH
2 Tukang 18.0000 125,000.00 2,250,000.00
OH
3 Pekerja 6.0000 100,000.00 600,000.00
JUMLAH TENAGA KERJA
3,120,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 10,695,337.50
DIBULATKAN 10,695,300.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 7,640,650.00
DIBULATKAN 7,640,600.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 709,159.32
DIBULATKAN 709,100.00
24.07.01.09 Daun Pintu Panil (Kayu Kamper) Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.3000 150,000.00 45,000.00
OH
2 Tukang 3.0000 125,000.00 375,000.00
OH
3 Pekerja 1.0000 100,000.00 100,000.00
JUMLAH TENAGA KERJA
520,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 772,540.00
DIBULATKAN 772,500.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 533,566.59
DIBULATKAN 533,500.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 521,595.00
DIBULATKAN 521,500.00
24.07.01.13 Pemasangan Kaca Mati tebal 5 mm Sat. : / m2
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0008 150,000.00 120.00
OH
2 Kepala Tukang 0.0150 135,000.00 2,025.00
OH
3 Tukang 0.1500 125,000.00 18,750.00
OH
4 Pekerja 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA
22,395.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 174,195.00
DIBULATKAN 174,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 186,837.50
DIBULATKAN 186,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 184,900.00
DIBULATKAN 184,900.00
24.07.01.19 Pemasangan Kunci Tanam Besar 2x Putar kuningan Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0050 150,000.00 750.00
OH
2 Kepala Tukang 0.0100 135,000.00 1,350.00
OH
3 Tukang 0.5000 125,000.00 62,500.00
OH
4 Pekerja JUMLAH 0.0100 100,000.00 1,000.00
TENAGA KERJA 65,600.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 395,600.00
DIBULATKAN 395,600.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 40,825.00
DIBULATKAN 40,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 88,395.00
DIBULATKAN 88,300.00
24.07.01.23 Pemasangan Grendel Kecil Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1200 125,000.00 15,000.00
OH
2 Pekerja JUMLAH 0.0600 100,000.00 6,000.00
TENAGA KERJA 21,000.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 48,000.00
DIBULATKAN 48,000.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 124,000.00
DIBULATKAN 124,000.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 117,700.00
DIBULATKAN 117,700.00
24.07.01.29 Pemasangan Hak Angin (Sikutan) Sat. : / Stel
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Tukang 0.1400 125,000.00 17,500.00
OH
2 Pekerja JUMLAH 0.0800 100,000.00 8,000.00
TENAGA KERJA 25,500.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 45,700.00
DIBULATKAN 45,700.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 52,100.00
DIBULATKAN 52,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 197,337.50
DIBULATKAN 197,300.00
24.07.02.02 Pemasangan Titik Lampu Gedung Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0500 150,000.00 7,500.00
OH
2 Tukang 0.2000 125,000.00 25,000.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 32,600.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 219,820.00
DIBULATKAN 219,800.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 87,685.00
DIBULATKAN 87,600.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 104,935.00
DIBULATKAN 104,900.00
24.07.02.04 Pasang Lampu LED 18 Watt Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 130,100.00
DIBULATKAN 130,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 84,100.00
DIBULATKAN 84,100.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 36,950.00
DIBULATKAN 36,900.00
24.07.02.07 Pasang Lampu Downlight LED 11 Watt Sat. : / Titik
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0200 150,000.00 3,000.00
OH
2 Tukang 0.0500 125,000.00 6,250.00
OH
3 Pekerja JUMLAH 0.0010 100,000.00 100.00
TENAGA KERJA 9,350.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 170,350.00
DIBULATKAN 170,300.00
24.07.03 Sanitair
24.07.03.10 Pemasangan Pipa Air Bersih diameter 3/4'' Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0018 150,000.00 270.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja JUMLAH 0.0360 100,000.00 3,600.00
TENAGA KERJA 12,180.00
BAHAN
1 Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 0.3000 36,455.00 10,936.50
2 Accessories 10% 36,455.00 3,645.50
JUMLAH HARGA BAHAN
14,582.00
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 26,762.00
DIBULATKAN 26,700.00
24.07.03.11 Pemasangan Pipa Air Bersih diameter 1'' Sat. : / m
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0018 150,000.00 270.00
OH
2 Kepala Tukang 0.0060 135,000.00 810.00
OH
3 Tukang 0.0600 125,000.00 7,500.00
OH
4 Pekerja JUMLAH 0.0360 100,000.00 3,600.00
TENAGA KERJA 12,180.00
BAHAN
1 Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 0.3000 49,795.00 14,938.50
2 Accessories 10% 49,795.00 4,979.50
JUMLAH HARGA BAHAN
19,918.00
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 32,098.00
DIBULATKAN 32,000.00
1 Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 0.3000 121,670.00 36,501.00
2 Accessories 10% 121,670.00 12,167.00
JUMLAH HARGA BAHAN
48,668.00
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 76,080.50
DIBULATKAN 76,000.00
1 Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 0.3000 191,360.00 57,408.00
2 Accessories 10% 191,360.00 19,136.00
JUMLAH HARGA BAHAN
76,544.00
PERALATAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 103,956.50
DIBULATKAN 103,900.00
24.07.03.19 Pemasangan Kran Air Sat. : / Bh
No Satuan Koefisien
Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
OH
1 Mandor 0.0300 150,000.00 4,500.00
OH
2 Tukang JUMLAH 0.1500 125,000.00 18,750.00
TENAGA KERJA 23,250.00
BAHAN
-
JUMLAH HARGA ALAT
-
NILAI HSPK 78,450.00
DIBULATKAN 78,400.00
-
JUMLAH HARGA ALAT
-
NILAI HSPK 4,667,350.00
DIBULATKAN 4,667,300.00
BACKUP VOLUME
A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bouwplank (UITZET) - - - - - - - 1.00 1.00 Ls
2 Pekerjaan Bongkar Atap - - - - - - - 1.00 1.00 Ls
3 Pekerjaan Bonkar Beton - - - - - - - 1.00 1.00 Ls
4 Pekerjaan Bongkar Dinding - - - - - - - 1.00 1.00 Ls
5 Pekerjaan Pembersihan dari Awal s/d Akhir Pekerjaan - - - - - - - 1.00 1.00 Ls
LANTAI 2
1 Pekerjaan Beton Kolom 30x30 cm K.225 0.30 0.30 4.00 - - - - 26.00 9.36 m3
2 Pekerjaan Beton Kolom dia. 60 cm K.225 - - 4.00 - 0.28 - - 2.00 2.26 m3
3 Pekerjaan Beton Kolom Praktis 11x1 cm K.175 0.11 0.11 4.00 - - - - 22.00 1.06 m3
4 Pekerjaan Beton Balok 25x40 cm K.225 Horisontal 65.50 0.25 0.40 - - - - - 6.55
Vertical 66.45 0.25 0.40 - - - - - 6.65
Jumlah 13.20 m3
5 Pekerjaan Beton Balok 20x30 cm K.225 32.90 0.20 0.30 - - - - - 1.97 m3
6 Pekerjaan Beton Balok Konsol 25x40 cm K.225 0.70 0.25 0.40 - - - - 23.00 1.61 m3
7 Pekerjaan Beton Balok 15x20 cm K.225 72.60 0.15 0.20 - - - - - 2.18 m3
8 Pekerjaan Beton Plat Atap t. 12 cm K.225 - - 0.12 - 179.00 - - - 21.48 m3
9 Pekerjaan Beton Plat Lisplank t. 7 cm K.225 69.30 0.07 0.20 - - - - - 0.97 m3
ATAP
1 Pekerjaan Beton Kolom 25x25 cm K.225 Menara 0.25 0.25 8.10 - - - - 4.00 2.03
Kuba 0.25 0.25 2.05 - - - - 8.00 1.03
Jumlah 3.05 m3
2 Pekerjaan Beton Kolom Praktis 11x1 cm K.175 Kuba Kecil 0.11 0.11 0.80 - - - - 8.00 0.08
Kuba Besar 0.11 0.11 0.50 - - - - 8.00 0.05
Menara 0.11 0.11 2.10 - - - - 4.00 0.10
Jumlah 0.23 m3
3 Pekerjaan Beton Balok 20x30 cm K.225 Kuba Besar 65.45 0.20 0.30 - - - - - 3.93
Menara 24.00 0.20 0.30 - - - - - 1.44
Jumlah 5.37 m3
4 Pekerjaan Beton Balok 15x20 cm K.225 Kuba Kecil 15.70 0.15 0.20 - - - - - 0.47
Kuba Besar 18.85 0.15 0.20 - - - - - 0.57
Menara 6.60 0.15 0.20 - - - - - 0.20
Jumlah 1.23 m3
5 Pekerjaan Beton Plat Atap t. 12 cm K.225 Kuba Besar - - 0.12 - 35.75 - - - 4.29
Menara - - 0.12 - 11.75 - - - 1.41
Jumlah 5.70 m3
V. PEKERJAAN ATAP
1 Pekerjaan Atap Enamel + Rangka Kuba Besar 6.00 - 2.92 - - - 3.14 - 55.01
Kuba Kecil 2.50 - 1.35 - - - 3.14 2.00 21.20
Jumlah 76.21 m2
B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1
Dinding Total 88.60 - 4.50 - - - - - 398.70
Jumlah 398.70 m2
Lubang Pintu - - - - 398.70 - - 0.55 219.29
TOTAL 179.42 m2
LANTAI 2
Dinding Total 66.25 - 4.00 - - - - - 265.00
Jumlah 265.00 m2
Lubang Pintu - - - - 265.00 - - 0.55 145.75
TOTAL 119.25 m2
ATAP
Dinding Total Kuba Besar 32.00 - 0.30 - - - - - 9.60
Kuba Kecil 15.70 - 0.30 - - - - - 4.71
Menara 6.60 - 0.60 - - - - - 3.96
Jumlah 18.27 m2
TOTAL 18.27 m2
LANTAI 2
1 Pekerjaan Granit Tile Lantai 60x60 cm - - - - 119.90 - - - 119.90 m2
2 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 22.00 - 4.00 - - - - - 88.00 m2
LANTAI 2
1 Pekerjaan Kusen + Pintu Type P.1 - - - - - - - 2.00 2.00 Unit
2 Pekerjaan Kusen + Jendela Type J.3 - - - - - - - 2.00 2.00 Unit
3 Pekerjaan Kusen + Jendela Type J.4 - - - - - - - 4.00 4.00 Unit
4 Pekerjaan Kusen + Jendela Type J.5 - - - - - - - 4.00 4.00 Unit
5 Pekerjaan Panel GRC Kerawangan Type G.4 - 0.60 4.30 - - - - 10.00 25.80 m2
6 Pekerjaan Panel GRC Kerawangan Type G.5 - 0.60 3.60 - - - - 3.00 6.48 m2
7 Pekerjaan Panel GRC Kerawangan Type G.6 1.20 2.40 - - - - - 1.00 2.88 m2
8 Pekerjaan Panel GRC Kerawangan Type G.7 1.20 1.80 - - - - - 1.00 2.16 m2
9 Pekerjaan Panel GRC Kerawangan Type G.8 1.20 2.40 - - - - - 1.00 2.88 m2
ATAP
1 Pekerjaan Panel GRC 3D Type GD.1 - 1.20 3.60 - - - - 8.00 34.56 m2
2 Pekerjaan Panel GRC 3D Type GD.2 - 0.60 7.80 - - - - 12.00 56.16 m2
V. PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan Pengecatan Dinding Dalam - - - - 358.83 - - 0.65 233.24 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 358.83 - - 0.35 125.59 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 262.33 - - - 262.33 m2
LANTAI 2
1 Pekerjaan Pengecatan Dinding Dalam - - - - 256.90 - - 0.65 166.99 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 256.90 - - 0.35 89.92 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 179.00 - - - 179.00 m2
Atap
1 Pekerjaan Pengecatan Dinding Dalam - - - - 36.54 - - 0.65 23.75 m2
2 Pekerjaan Pengecatan Dinding Luar - - - - 36.54 - - 0.35 12.79 m2
3 Pekerjaan Pengecatan Dibawah Dak - - - - 47.50 - - - 47.50 m2
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL
I. PEKERJAAN INSTALASI LISTRIK
LANTAI 1
1 Pekerjaan Titik Lampu - - - - - - - 29.00 29.00 Ttk
2 Pekerjaan Titik Stop Kontak - - - - - - - 5.00 5.00 Ttk
3 Pekerjaan Titik Stop Kontak AC - - - - - - - 4.00 4.00 Ttk
4 Pekerjaan Lampu LED 18 Watt - - - - - - - 16.00 16.00 Bh
5 Pekerjaan Lampu LED 11 Watt - - - - - - - 5.00 5.00 Bh
6 Pekerjaan Lampu LED 5 Watt - - - - - - - 4.00 4.00 Bh
7 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 4.00 4.00 Bh
8 Pekerjaan Saklar Tunggal - - - - - - - 4.00 4.00 Bh
9 Pekerjaan Saklar Ganda - - - - - - - 7.00 7.00 Bh
10 Pekerjaan Box+MCB 4 Group - - - - - - - 1.00 1.00 Unit
11 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls
LANTAI 2
1 Pekerjaan Titik Lampu - - - - - - - 41.00 41.00 Ttk
2 Pekerjaan Titik Stop Kontak - - - - - - - 3.00 3.00 Ttk
3 Pekerjaan Titik Stop Kontak AC - - - - - - - 2.00 2.00 Ttk
4 Pekerjaan Lampu Gantung 8x11Watt 1.00 1.00 Bh
5 Pekerjaan Lampu LED 18 Watt - - - - - - - 25.00 25.00 Bh
6 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 8.00 8.00 Bh
7 Pekerjaan Saklar Tunggal - - - - - - - 2.00 2.00 Bh
8 Pekerjaan Saklar Ganda - - - - - - - 9.00 9.00 Bh
9 Pekerjaan Box+MCB 4 Group - - - - - - - 1.00 1.00 Unit
10 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls
ATAP
1 Pekerjaan Titik Lampu - - - - - - - 4.00 4.00 Ttk
2 Pekerjaan Downlight Lampu LED 11 Watt - - - - - - - 4.00 4.00 Bh
3 Pekerjaan Saklar Ganda - - - - - - - 1.00 1.00 Bh
4 Pekerjaan Penyambungan - - - - - - - 1.00 1.00 Ls
LANTAI 2
1 Pekerjaan Stop Kran 3/4" - - - - - - - 2.00 2.00 Bh
2 Pekerjaan Stop Kran 1" - - - - - - - 2.00 2.00 Bh
3 Pekerjaan Pipa Air Bersih PVC 1" AW 4.00 - - - - - - - 4.00 m1
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 4.00 - - - - - - - 4.00 m1
5 Pekerjaan Pipa Air Hujan PVC 3" AW 80.00 - - - - - - - 80.00 m1
6 Pekerjaan Profil Tank Kap. 1.100 Ltr - - - - - - - 1.00 1.00 Unit
RENCANA ANGGARAN BIAYA ( RAB )
JUMLAH 231,800,000.00
JUMLAH 195,330,000.00
RENCANA ANGGARAN BIAYA ( RAB )
JUMLAH 16,084,300.00
LANTAI 2
1 Pekerjaan Titik Lampu 41.00 Ttk 219,800.00 9,011,800.00
2 Pekerjaan Titik Stop Kontak 3.00 Ttk 197,300.00 591,900.00
3 Pekerjaan Titik Stop Kontak AC 2.00 Ttk 197,300.00 394,600.00
4 Pekerjaan Lampu Gantung 8x11Watt 1.00 Bh 5,172,800.00 5,172,800.00
5 Pekerjaan Lampu LED 18 Watt 25.00 Bh 130,100.00 3,252,500.00
6 Pekerjaan Downlight Lampu LED 11 Watt 8.00 Bh 170,300.00 1,362,400.00
7 Pekerjaan Saklar Tunggal 2.00 Bh 87,600.00 175,200.00
8 Pekerjaan Saklar Ganda 9.00 Bh 104,900.00 944,100.00
9 Pekerjaan Box+MCB 4 Group 1.00 Unit 950,000.00 950,000.00
10 Pekerjaan Penyambungan 1.00 Ls 750,000.00 750,000.00
11 Biaya Pemasanagan Kembali Audio Lama 1.00 Ls 2,500,000.00 2,500,000.00
JUMLAH 25,105,300.00
ATAP
1 Pekerjaan Titik Lampu 4.00 Ttk 219,800.00 879,200.00
2 Pekerjaan Lampu LED 11 Watt 4.00 Bh 84,100.00 336,400.00
3 Pekerjaan Saklar Ganda 1.00 Bh 104,900.00 104,900.00
4 Pekerjaan Penyambungan 1.00 Ls 250,000.00 250,000.00
5 Pekerjaan Penangkal Petir Konvensional 1.00 Ls 10,000,000.00 10,000,000.00
JUMLAH 11,570,500.00
II. PEKERJAAN SANITARY
LANTAI 1
1 Pekerjaan Klosed Duduk (komplite) 4.00 Unit 4,667,300.00 18,669,200.00
2 Pekerjaan Kran 3/4" 18.00 Bh 78,400.00 1,411,200.00
3 Pekerjaan Pipa Air Bersih PVC 1" AW 44.00 m1 32,000.00 1,408,000.00
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 24.00 m1 26,700.00 640,800.00
5 Pekerjaan Pipa Air Kotor PVC 3" AW 24.00 m1 76,000.00 1,824,000.00
6 Pekerjaan Pipa Air Kotor PVC 4" AW 60.00 m1 103,900.00 6,234,000.00
7 Pekerjaan Pipa Kotoran PVC 4" AW 48.00 m1 103,900.00 4,987,200.00
8 Pekerjaan Pipa Air Hujan PVC 3" AW 120.00 m1 94,900.00 11,388,000.00
9 Pekerjaan Bak Kontrol 8.00 Bh 750,000.00 6,000,000.00
10 Pekerjaan Septiktank & Resapan 1.00 Unit 4,500,000.00 4,500,000.00
11 Pekerjaan Rumah Pompa 1.00 Unit 3,500,000.00 3,500,000.00
JUMLAH 60,562,400.00
LANTAI 2
1 Pekerjaan Stop Kran 3/4" 2.00 Bh 78,400.00 156,800.00
2 Pekerjaan Stop Kran 1" 2.00 Bh 86,240.00 172,480.00
3 Pekerjaan Pipa Air Bersih PVC 1" AW 4.00 m1 32,000.00 128,000.00
4 Pekerjaan Pipa Air Bersih PVC 3/4" AW 4.00 m1 26,700.00 106,800.00
5 Pekerjaan Pipa Air Hujan PVC 3" AW 80.00 m1 94,900.00 7,592,000.00
6 Pekerjaan Profil Tank Kap. 1.100 Ltr 1.00 Unit 2,000,000.00 2,000,000.00
JUMLAH 10,156,080.00
RENCANA ANGGARAN BIAYA ( RAB )
B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 29.90 m2 145,700.00 4,356,794.25
2 Pekerjaan Pasang Dinding 1/2 Bata 1pc:5psr 149.51 m2 139,300.00 20,827,091.25
3 Pekerjaan Plester + Acian 1pc:3psr 59.81 m2 69,300.00 4,144,486.50
4 Pekerjaan Plester + Acian 1pc:5psr 299.03 m2 65,800.00 19,675,845.00
5 Pekerjaan Benangan 531.60 m1 23,000.00 12,226,800.00
6 Pekerjaan Acian 262.33 m2 39,300.00 10,309,470.75
7 Pekerjaan Relling Tangga Hollow Galvanis 21.00 m2 450,000.00 9,450,000.00
8 Pekerjaan Pasang batu Alam + Coating 94.75 m2 425,000.00 40,268,750.00
JUMLAH 121,259,237.75
LANTAI 2
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 10.43 m2 145,700.00 1,520,288.44
2 Pekerjaan Pasang Dinding 1/2 Bata 1pc:5psr 108.82 m2 139,300.00 15,158,016.56
3 Pekerjaan Pasang Dinding Ralling 1/2 Bata 1pc:5psr 9.20 m2 139,300.00 1,281,560.00
4 Pekerjaan Plester + Acian 1pc:3psr 20.87 m2 69,300.00 1,446,204.38
5 Pekerjaan Plester + Acian 1pc:5psr 217.63 m2 65,800.00 14,320,136.25
6 Pekerjaan Plester + Acian Dinding Ralling 1pc:5psr 18.40 m2 65,800.00 1,210,720.00
7 Pekerjaan Benangan 397.50 m1 23,000.00 9,142,500.00
8 Pekerjaan Acian 179.00 m2 39,300.00 7,034,700.00
9 Pekerjaan Relling Void Hollow Galvanis 37.00 m2 450,000.00 16,650,000.00
10 Pekerjaan Pasang batu Alam + Coating 21.12 m2 425,000.00 8,975,298.75
JUMLAH 76,739,424.38
ATAP
1 Pekerjaan Pasang Dinding 1/2 Bata 1pc:3psr 18.27 m2 145,700.00 2,661,939.00
2 Pekerjaan Plester + Acian 1pc:3psr 36.54 m2 69,300.00 2,532,222.00
3 Pekerjaan Benangan 108.60 m1 23,000.00 2,497,800.00
4 Pekerjaan Acian 47.50 m2 39,300.00 1,866,750.00
JUMLAH 9,558,711.00
JUMLAH 255,351,847.00
LANTAI 2
1 Pekerjaan Granit Tile Lantai 60x60 cm 119.90 m2 431,400.00 51,724,860.00
2 Pekerjaan Granit Tile Dinding Area Dalam Masjid 30x60 cm 88.00 m2 431,400.00 37,963,200.00
JUMLAH 89,688,060.00
JUMLAH 61,551,300.00
JUMLAH 151,262,000.00
LANTAI 2
1 Pekerjaan Kusen + Pintu Type P.1 2.00 Unit 4,612,500.00 9,225,000.00
2 Pekerjaan Kusen + Jendela Type J.3 2.00 Unit 5,255,818.75 10,511,637.50
3 Pekerjaan Kusen + Jendela Type J.4 4.00 Unit 5,020,312.50 20,081,250.00
4 Pekerjaan Kusen + Jendela Type J.5 4.00 Unit 6,401,718.75 25,606,875.00
5 Pekerjaan Panel GRC Kerawangan Type G.4 25.80 m2 950,000.00 24,510,000.00
6 Pekerjaan Panel GRC Kerawangan Type G.5 6.48 m2 950,000.00 6,156,000.00
7 Pekerjaan Panel GRC Kerawangan Type G.6 2.88 m2 950,000.00 2,736,000.00
8 Pekerjaan Panel GRC Kerawangan Type G.7 2.16 m2 950,000.00 2,052,000.00
9 Pekerjaan Panel GRC Kerawangan Type G.8 2.88 m2 950,000.00 2,736,000.00
JUMLAH 103,614,762.50
ATAP
1 Pekerjaan Panel GRC 3D Type GD.1 34.56 Unit 1,150,000.00 39,744,000.00
2 Pekerjaan Panel GRC 3D Type GD.2 56.16 Unit 1,150,000.00 64,584,000.00
JUMLAH 104,328,000.00
V. PEKERJAAN PENGECATAN
LANTAI 1
1 Pekerjaan Pengecatan Dinding Dalam 233.24 m2 33,000.00 7,696,903.50
2 Pekerjaan Pengecatan Dinding Luar 125.59 m2 42,400.00 5,325,037.20
3 Pekerjaan Pengecatan Dibawah Dak 262.33 m2 33,000.00 8,656,807.50
JUMLAH 21,678,748.20
LANTAI 2
1 Pekerjaan Pengecatan Dinding Dalam 166.99 m2 33,000.00 5,510,505.00
2 Pekerjaan Pengecatan Dinding Luar 89.92 m2 42,400.00 3,812,396.00
3 Pekerjaan Pengecatan Dibawah Dak 179.00 m2 33,000.00 5,907,000.00
JUMLAH 15,229,901.00
ATAP
1 Pekerjaan Pengecatan Dinding Dalam 23.75 m2 33,000.00 783,783.00
2 Pekerjaan Pengecatan Dinding Luar 12.79 m2 42,400.00 542,253.60
3 Pekerjaan Pengecatan Dibawah Dak 47.50 m2 33,000.00 1,567,500.00
JUMLAH 2,893,536.60
RENCANA ANGGARAN BIAYA ( RAB )
A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bouwplank (UITZET) 1.00 Ls 1,500,000.00 1,500,000.00
2 Pekerjaan Bongkar Atap 1.00 Ls 2,000,000.00 2,000,000.00
3 Pekerjaan Bongkar Beton 1.00 Ls 5,500,000.00 5,500,000.00
4 Pekerjaan Bongkar Dinding 1.00 Ls 1,500,000.00 1,500,000.00
5 Pekerjaan Pembersihan dari Awal s/d Akhir Pekerjaan 1.00 Ls 1,500,000.00 1,500,000.00
JUMLAH 12,000,000.00
JUMLAH 41,791,410.88
JUMLAH 93,110,752.56
JUMLAH 416,436,228.08
LANTAI 2
1 Pekerjaan Beton Kolom 30x30 cm K.225 9.36 m3 4,522,200.00 42,327,792.00
2 Pekerjaan Beton Kolom dia. 60 cm K.225 2.26 m3 4,466,400.00 10,097,637.12
3 Pekerjaan Beton Kolom Praktis 11x11 cm K.175 1.06 m3 6,019,600.00 6,409,670.08
4 Pekerjaan Beton Balok 25x40 cm K.225 13.20 m3 5,016,800.00 66,196,676.00
5 Pekerjaan Beton Balok 20x30 cm K.225 1.97 m3 5,150,900.00 10,167,876.60
6 Pekerjaan Beton Balok Konsol 25x40 cm K.225 1.61 m3 5,016,800.00 8,077,048.00
7 Pekerjaan Beton Balok 15x20 cm K.175 2.18 m3 4,248,000.00 9,252,144.00
8 Pekerjaan Beton Plat Atap t. 12 cm K.225 21.48 m3 4,976,100.00 106,886,628.00
9 Pekerjaan Beton Plat Lisplank t. 7 cm K.225 0.97 m3 4,976,100.00 4,827,812.22
JUMLAH 264,243,284.02
ATAP
1 Pekerjaan Beton Kolom 25x25 cm K.225 3.05 m3 5,457,500.00 16,645,375.00
2 Pekerjaan Beton Kolom Praktis 11x11 cm K.175 0.23 m3 6,019,600.00 1,369,338.61
3 Pekerjaan Beton Balok 20x30 cm K.225 5.37 m3 5,150,900.00 27,644,880.30
4 Pekerjaan Beton Balok 15x20 cm K.175 1.23 m3 4,248,000.00 5,244,156.00
5 Pekerjaan Beton Plat Atap t. 12 cm K.225 5.70 m3 4,976,100.00 28,363,770.00
JUMLAH 79,267,519.91
V. PEKERJAAN ATAP
1 Pekerjaan Atap Enamel + Rangka 55.01 m2 1,375,000.00 75,642,600.00
JUMLAH 75,642,600.00
SUB REKAPITULASI ANGGRAN BIAYA ( SUB REKAP RAB )
JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.
A. PEKERJAAN STRUKTURAL
I. PEKERJAAN PERSIAPAN 12,000,000.00
II. PEKERJAAN TANAH 41,791,410.88
III. PEKERJAAN PONDASI 93,110,752.56
IV. PEKERJAAN BETON
LANTAI 1 416,436,228.08
LANTAI 2 264,243,284.02
ATAP 79,267,519.91
V. PEKERJAAN ATAP 75,642,600.00
B. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN
LANTAI 1 121,259,237.75
LANTAI 2 76,739,424.38
ATAP 9,558,711.00
II. PEKERJAAN LANTAI
LANTAI 1 255,351,847.00
LANTAI 2 89,688,060.00
III. PEKERJAAN PLAFOND 61,551,300.00
IV. PEKERJAAN PINTU/JENDELA
LANTAI 1 151,262,000.00
LANTAI 2 103,614,762.50
ATAP 104,328,000.00
V. PEKERJAAN PENGECATAN
LANTAI 1 21,678,748.20
LANTAI 2 15,229,901.00
ATAP 2,893,536.60
JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.