You are on page 1of 5

CLiENT ’S REQUIREMENTS CHECKLISt

Project No.: Date: Time:

Project Reference:

Location:

Construction Area:

Land Area:
Presents:

E. STRUCTURAL
Verify if the owner wishes to have
the foundation design for any
additional floors
Structural System
R.C. Frame
Slab and Beams
Hourdi System
Flat Slab
Waffle Slab
PLASTBAUe Deck
Load Bearing Walls
Precast Structure Client Preference
on Contractors
Steel Structure (Client Preference on
supplier)

F. MECHANICAL (HVAC)
F.1. Type of System
Chilled Water System
Package Unit
Central Split System .
Mini Split Units (high wall)
Split units

F.2. Exhaust System


Roof Mounted
Wall Mounted

F.3. Temperature Control &


Zoning
Project Architect Together with
HVAC Dept. has to suggest zoning
Based on the concept design
Comment on grouping.

G.PLUMBING
G.1. water Supply System
No. of expected occupants
Separate domestic and irrigation
Page: 1 of 14
CLiENT’S REQUIREMENTS CHECKLIST
(continued)

DESCRIPTION AECC CLINT Notes


Recommendation Requirement

water tank
Combined domestic and irrigation
water tank
Domestic water storage period
Irrigation water storage period
Type of water supply
Pressurized system
Gravity system
Combination of Both

G.2. electric Water Heating


System
Central system of each Building
Separate Central System per Floor
An individual heater for each
bathroom
Other Options (specify zoning)

G.3. swimming Pool System


Skimmer Type
Overflow Gutter Type
With pool Heater
Chlorine Free System
Ultra Violet Disinfectant
Automatic Chlorination
Others (specify)

G.4. Irrigation System


Automatic Drip and Sprinkler
Semi Automatic System without
control
Automatic Bubblier and Sprinkler
System
Manual using Garden Hose

G.5. Sanitary Sewerage System


To city sewer line if available
Septic Tank with Leaching chamber
Sewerage Holding tank with
minimum 5 days holding capacity,
emptied by tanker
Sewage treatment plant

G.6. L.P.G. System


Central Gas Bank Storage
No. of gas storage (30 days)
Others
G.7. Fire Protection System
Automatic Sprinkler System

Page: 2 of 5
CLiENT’S REQUIREMENTS CHECKLIST
(continued)

DESCRIPTION AECC CLINT Notes


Recommendation Requirement

Alternate to Halon System


CO 2 System
Wet Standpipe – fire hose and
Valves
Portable Fire Extinguishers
Foam, Generator System
Fire hydrant cabinet
H. ELECTRICAL SERVICES
H.1. Electricity Supply
Is Electrical Room Substation
required?
Supply Voltage required
380 – 220 V
220 – 127 V
Is 380 – 220 V to be used for
mechanical plant?
Are supply cables and external cable
to be
In duct bank?
Directly buried?
H.2. Emergency Generator
Is an emergency generator required?
Is emergency generator to have an
automatic
change over?
Items supplied by emergency
generator (specify area)
Air – conditioning (specify
area)
Lighting
External Lighting
Elevator
Water pumps
Water Heater
Sprinkler System
Fire Alarm
Communication System
Others

H.3. power Receptacles


Are 3 phase socket outlet required?
Specify area
Are 220 V receptacles required?
Specify area.

H.4. Room Lighting


Coordinate with ID/ Architect.
Page: 3 of 5
CLiENT’S REQUIREMENTS CHECKLIST
(continued)

DESCRIPTION AECC CLINT Notes


Recommendation Requirement

Chandeliers
Down Light
Recessed
Surface Mounded
Wall Light
Wall Washer
Track Light
Cove Light
Floor Lamp
Others
Specify Type of Lamps
Incandescent
Fluorescent
Low Voltage
Dichroi
Halogen
Metal Halide

H.5. External Lighting


Perimeter Wall
Feature Lighting (Landscape)
Footpath Lighting
Road Lighting
Car Parking Lighting
Others
Operation System
Manual
Automatic Timer control
Photocell Control

H.6. Fire Alarm System


Full Fire Alarm System with
Detector and
sounder in all rooms
Addressable
Collective
Partial Fire Alarm system in
Corridor and
Kitchen Only

H.7. Accessories
Requirements plate cover for
switches and socket outlets
Brass
Stainless Steel
Plastic (white)
Others
Cooker Outlets
Page: 4 of 5
CLiENT’S REQUIREMENTS CHECKLIST
(continued)

DESCRIPTION AECC CLINT Notes


Recommendation Requirement

Washing Machine and Dryer outlet

H.8. Lighting control


Individual room dimmer
Centralized pre-set scene dimmer
system( specify zones)

H.9. Telephones
No. of incoming lines required
No. of extension required (maximum
one extension per room)
Is intercom system integrated with
telephone system?
Is PABX required? Specify numbers
in and out
Handsets are excluded from contract.
Specify otherwise.

H.10. T.V.
TV antenna outlet
AM/ FM/ UHF antenna ksa TV
Satellite Dish
Dishes included or only
conduit and wiring
included
No. of Dishes

H.11. System in General


FMS (Facility Management System)
Intrusion Detector System (Burglar
Alarm)
CCTV (closed circuit TV)
Door Entry Phone (multi-way)
Door Entry Video Phone(specify
location of cameras and monitor)
motorized Gate Closing
Central Paging and Music System
Servants call system
Central Video System
Master Clock System

Page: 5 of 5

You might also like