It’s to be recalled that we were instructed to evaluate the financial proposal document
submitted by 2 (two) technically responsive consulting firms named as Tollen consulting
Architect and Engineers and Amerti Construction for the above mentioned project.
Accordingly, we went through each submitted document and came up with our evaluation
report attached with this letter. This is to let you have 3 pages of our final evaluation result
and recommendation for your approval.

With Regards

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum

1. Evaluation Process
The evaluation is made by checking each item for multiplication and summation error as
well. Accordingly, we went through two bidder submitted documents and have completed
the arithmetic checking. The errors found and the corrections made for each error are
shown in the following tables.

1.1. TOLLEN CONSULTING ARCHITECTS & ENGINEERS

Price Before Price After


Item Arithmetic Arithmetic
No Item of Work Currency Check Check Errors Remarks
A
Construction Work BIRR 6,081,771.00 6,081,771.00 0.00
B
Design Development and
Documentation BIRR 380,000.00 380,000.00 0.00

TOTAL SUMMARY BIRR 6,461,771.00 6,461,771.00 0.00

15% VAT BIRR 969,265.65 969,265.65 0.00

Grand Total BIRR 7,431,036.65 7,431,036.65 0.00

BUDJET FOR THE PROJECT BIRR

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum

Price Before Price After


Currenc Arithmetic Arithmetic Error Remark
Item No Item of Work y Check Check s s
A Construction Work
1 DEMOLISHING AND REPAIR
WORKS BIRR 30,258.00 30,258.00 0.00
2 OFFICE CEILING WORKS BIRR 535,000.00 535,000.00 0.00
3 ELECTRICAL ARRANGEMENT BIRR 176,900.00 176,900.00 0.00
4 HVAC SYSTEM BIRR 900,000.00 900,000.00 0.00
5 FIRE ALARM SYSTEM BIRR 75,000.00 75,000.00 0.00
6 RAISED FLOOR WORKS BIRR 728,100.00 728,100.00 0.00
7 PLUMBING ARRANGEMENTS BIRR 0.00 0.00 0.00
8 DATA CABLING BIRR 21,000.00 21,000.00 0.00
9 ACCESS CONTROL WORKS BIRR 100,000.00 100,000.00 0.00
10 METAL WORK BIRR 1,294,200.00 1,294,200.00 0.00
11 INTERIOR DECORATION AND
GRAPHICS BIRR 414,833.00 414,833.00 0.00
12 CORPORATE AND
STATUTORY SIGN WORKS BIRR 110,000.00 110,000.00 0.00
13 WINDOW TREATMENT BIRR 5,760.00 5,760.00 0.00
14 JOINERY BIRR 1,690,720.00 1,690,720.00 0.00
6,081,771.0
Total BIRR 0 6,081,771.00 0.00
B Design Development & Documentation
1 As built measurement & Interior
design works including drawings BIRR 365,000.00 365,000.00 0.00
2
Printing and Documentation BIRR 15,000.00 15,000.00 0.00
Total BIRR 380,000.00 380,000.00 0.00

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum


1.2. Amerti Construction
The submitted financial proposal by Amerti construction firms lacks the following important points.

 Detail description of the material and methods of work to be done in terms of type, brand
and quality of material not clearly specified.
 Unit of measurement not defined.
 Unit price or Unit rate not properly defined.
 Summary of total amount not clearly specified.
 Grand summary of the work not specified.
 On financial proposal there are also missed items (works).

In general, the submitted financial proposal by Amerti construction firms lacks the above points and
hence it is difficult to undergo the financial proposal evaluation.

2. Recommendation for financial proposal


As per your request, we have made the evaluation of two consulting firms. Based on our
evaluation we have found TOLLEN CONSULTING ARCHITECTS & ENGINEERS
submitted the financial proposal according to the required standards and offered price with
an amount of Birr 7,431,036.65(Seven Million four hundred thirty one thousand thirty
six and 65/100) based on the above evaluation shown in the table. However the evaluation
for Amerti Construction firm did not processed since the submitted financial proposal
found to be below the standards. Thus Amerti Construction found to be non-responsive

NB:-Since these financial proposals will be incorporated as part of contract document, we should be
alert for

 Variation work
 Missed work
 Incomplete specification.
 Quality of work and
 Financial failure.

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum

To: Manager, Procurement Team


From: A/Manager, Construction Projects (Anteneh Demerew)
Date: May 07, 2021
Subject: Submitting our recommendation for Interior Design and Construction.

We recall receiving a recent financial proposal dated 04/05/2021 from two consulting firm Tollen
and Amerti for the interior design that we intend to renovate Finfinne branch. In this proposal these
two firms have offered a total sum of Birr 7,824,898.94 and 9,999,364.425 respectively including
VAT before arithmetic checking for the interior design and construction.

In response to your instruction to evaluate the potential difference between the two quotations, and
to come up with our proposal, we have thoroughly assessed the two proposals, and learned that the
main difference between the two proposals arose from differences in design concept.

Following our evaluation on the financial proposals offered by the two firms, we have come to the
following conclusions:

1. The financial proposal offered by TOLLEN CONSULTING ARCHITECTS & ENGINEERS is


Birr 7,889,435.47 (Seven million eight hundred eighty nine thousand four hundred
thirty five and 47/100).
2. The financial proposal offered by AMERTI CONSTRUCTION is Birr 9,999,364.43 (Nine
million nine hundred ninety nine thousand three hundred sixty four and 43/100).

Therefore, this is to let you have 5 pages of our final evaluation result and recommendation for
your approval

Regards,

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum

1. Evaluation Process
The evaluation is made by checking each item for multiplication and summation error as
well. Accordingly, we went through two bidder submitted documents and have completed
the arithmetic checking. The errors found and the corrections made for each error are
shown in the following tables.

1.1. TOLLEN CONSULTING ARCHITECTS & ENGINEERS

Price Before Price After


Arithmetic Arithmetic
Item No Item of Work Currency Check Check Errors Remarks
Design Development
A and Documentation BIRR 380,000.00 380,000.00 0.00
Summatio
B Construction BIRR 6,453,059.95 6,480,378.67 -27,318.72 n error
TOTAL SUMMARY BIRR 6,833,059.95 6,860,378.67 -27,318.72

15% VAT BIRR 1,024,958.99 1,029,056.80 -4,097.81

Grand Total BIRR 7,858,018.94 7,889,435.47 -31,416.53


BUDJET FOR THE
PROJECT BIRR

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum


Price
Before Price After
Item Curre Arithmetic Arithmetic
No Item of Work ncy Check Check Errors Remarks
A Design Development & Documentation
1 Design Development BIRR 365,000.00 365,000.00 0.00
2 Documentation and
Printing BIRR 15,000.00 15,000.00 0.00
Total BIRR 380,000.00 380,000.00 0.00

Price
Ite Before Price After
m Curre Arithmetic Arithmetic
No Item of Work ncy Check Check Errors Remarks
B Construction Work
Demolishing and repair
1 works BIRR 58,449.98 58,449.98 0.00
2
Office ceiling works BIRR 827,332.74 827,332.74 0.00

3 Electrical arrangement BIRR 536,044.58 536,044.58 0.00


4
HVAC system BIRR 403,779.24 403,779.24 0.00
5 Fire alarm system BIRR 351,647.21 351,647.21 0.00
6
Raised floor works BIRR 340,991.48 340,991.48 0.00

7 Plumbing arrangements BIRR 61,151.54 61,151.54 0.00


8 Data cabling BIRR 57,687.67 57,687.67 0.00

9 Access control works BIRR 387,354.83 387,354.83 0.00


10 Partition and doors BIRR 509,385.47 509,385.47 0.00
Interior decoration and summation
11 graphics BIRR 704,103.45 731,422.17 -27,318.72 error
Corporate and statutory
12 sign works BIRR 14,507.43 14,507.43 0.00
13
Window treatment BIRR 14,382.08 14,382.08 0.00
14 2,186,242.2 2,186,242.2
Joinery BIRR 6 6 0.00
Total BIRR 6,453,059.96 6,480,378.67 -27,318.71

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum


1.2. Amerti Construction

Price Before Price After


Currenc Arithmetic Arithmetic Error Remark
Item No Item of Work y Check Check s s
Design Development and
A Documentation BIRR 158,000.50 158,000.50 0.00

B Construction BIRR 8,537,099.00 8,537,099.00 0.00


8,695,099.5
TOTAL SUMMARY BIRR 0 8,695,099.50 0.00

1,304,264.9
15% VAT BIRR 3 1,304,264.93 0.00

9,999,364.4
Grand Total BIRR 3 9,999,364.43 0.00
BUDJET FOR THE
PROJECT BIRR

Price Before Price After


Arithmetic Arithmetic Error Remark
Item No Item of Work Currency Check Check s s
A Design Development & Documentation
Design Development
1 and Documentation BIRR 158,000.50 158,000.50 0.00

Total BIRR 158,000.50 158,000.50 0.00

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum

Price Before Price After


Currenc Arithmetic Arithmetic
Item No Item of Work y Check Check Errors Remarks
B Construction Work

1 Block work BIRR 1,163,235.00 1,163,235.00 0.00

2 Metal work BIRR 1,599,265.00 1,599,265.00 0.00

3 Floor finish BIRR 376,890.00 376,890.00 0.00


4 Paint work BIRR 108,490.00 108,490.00 0.00

5 Wood work BIRR 1,263,150.00 1,263,150.00 0.00


Company logo,
6 signage and
decoration BIRR 241,200.00 241,200.00 0.00

7 Joinery BIRR 39,000.00 39,000.00 0.00

8 Electrical work BIRR 1,009,700.00 1,009,700.00 0.00

9 Furniture BIRR 2,228,560.00 2,228,560.00 0.00

10 Sanitary work BIRR 31,500.00 31,500.00 0.00

11 Gate structure BIRR 426,100.00 426,100.00 0.00

12 Demolition work BIRR 50,009.00 50,009.00 0.00

Total BIRR 8,537,099.00 8,537,099.00 0.00

Committed to Breakthrough!
Baankii Hojii Gamtaa Oromiyaa
የኦሮሚያ ኀብረት ሥራ ባንክ

Inter Office Memorandum


2. Recommendation for financial proposal
As per your request, we have made the evaluation of two consulting firms. Based on our
evaluation we have found TOLLEN CONSULTING ARCHITECTS & ENGINEERS
submitted the financial proposal and offered list price with an amount of Birr
7,889,435.47(Seven million eight hundred eighty nine thousand four hundred thirty
five and 47/100) and AMERTI CONSTRUCTION offered Birr 9,999,364.43(Nine million
nine hundred ninety nine thousand three hundred sixty four and 43/100).

Thus as we compared the financial proposal of the two firms, we found TOLLEN
CONSULTING ARCHITECTS & ENGINEERS offered the list price.

Note:-The price offered by the two firms after cost of furniture deduction will be as follow

1. Furniture price offered by TOLLEN CONSULTING ARCHITECTS & ENGINEERS


Birr 1,005,540 (One million five thousand five hundred forty) and Total offered
after deduction will be Birr 6,733,064.47 (Six million seven hundred thirty three
thousand sixty four and 47/100) including VAT.
2. Furniture price offered by AMERTI CONSTRUCTION Birr 1,720,760 (One million
seven hundred twenty thousand seven hundred sixty) and Total offered after
deduction will be Birr 8,020,490.43 (Eight million twenty thousand four
hundred ninety and 43/100) including VAT.

Therefore after furniture price deduction we found TOLLEN CONSULTING ARCHITECTS


& ENGINEERS offered the list price.