Professional Documents
Culture Documents
02 - Shipping Instructions English
02 - Shipping Instructions English
TABLE OF CONTENTS
1. SCOPE
3. DOCUMENTATION REQUIRED FOR IMPORT FORMALITIES AND RELEASE IN PERU AND CARGO
HANDLING
3.1 Master bill of landing, sea waybill, house bill of landing or airway bill
3.2 Invoice, pakcing list, technical data sheet, material safety data sheet and certificate of
origin
5. DANGEROUS GOODS
6. SHIPPING MARKS
8. TEMPORARY IMPORTATIONS
1. SCOPE:
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
These instructions cover the requirements and procedures to be followed by Supplier for shipping and
packing of the equipment of the materials which has been purchased by Cobra for the construction
of Talara project, located in Peru.
Supplier shall prepare proper shipping documents and ensure the appropriate packing and marking
of the cargo in accordance with this instruction.
Any deviation from these instructions must have the prior approval of Cobra. These instructions are
applicable to Suppliers and Sub-suppliers.
Cobra Logistics Department, hereinafter referred to as (LD) must always be informed in advance of
any shipment for Talara project; whatever the nature or circumstances; and independently of the
Incoterm ( also applying to DDP deliveries or reposition pieces which are in the scope of the suppliers).
2. SHIPMENTS OF GOODS:
Delivery location of the equipment and materials is established in the Contract through the
corresponding Incoterms 2010.
Commercial Invoice and packing list (it can be merged into a single document as long as it is
valid for custom purposes).
EUR1 certificate for nuts, bolts, valves, cables, reposition/spare parts and tools which have
been manufactured in the EU.
In case of dangerous goods classified into “IMO Code” (International Maritime Dangerous Code), 1
copy of the MSDS (Material Safety Date sheet)
3.1. Bill of Landing, Sea Waybill, House Bill of Landing or Airway Bill
A. Bill of Landing or Sea Waybill
For FLC cargo (Full Load Containers) only a Master Bill of Lading or a Sea Way Bill will be accepted.
However should a Bill of Lading be issued, the supplier must make sure that an Express Release is
organized in all instances/shipments directly with the shipping line.
As soon as the express release has been accepted by the carrier, the supplier must immediately send
it to our LD.
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
If the supplier is not allowed to issue an express release of the B/L, it is mandatory to send the 3
original copies of the B/L to our LD by express courier as this will be requested by the shipping line
in order to release the cargo in destination. This document will be required to reach our office in
Lima at least 3 working days before the arrival of the vessel.
Cobra Perú
For Full Load Containers the House Bill of Lading won’t be accepted. Any additional charges to
Cobra from the supplier’s local agent will be for the account of the supplier (for example: B/L
handover charges, etc).
B. LCL shipments
Only in those cases where consignments are grouped by either shipping lines NVOCC or freight
forwarders, a House Bill of Lading (HBL) will be accepted. As soon as the express release has been
accepted by the carrier, the supplier must immediately send such stamped express release to the LD.
Airfreight shipments must be sent to Lima airport. Discharge in the airport of Lima is only allowed for
cargo with such dimensions where only a Cargo freighter can be utilized.
The AWB must be sent together with the goods, however ( the same as for the sea freight) a provisional
copy must be sent to the LD via e mail in order to be double checked and corrected if necessary, at
least 2 days before the departure of the flight.
Before issuing the final B/L or AWB, it is mandatory to send a draft to our LD whose e mails are
indicated in the point 4 of this instructions.
The shipping documents shall clearly specify the information of the Contractor/ Supplier, the
Consignee and the Notify.
Below please find the details that the shipping documents must contain:
Notify:
To be advised by the LD
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
Goods description:
A. Marks and numbers of the goods
B. Detailed description of the goods
C. Number of parcels
D. Weight net and gross
E. Dimensions and volume
3.2. Invoice, packing list, technical data sheet, material safety data sheet and certificate
of origin- Please check- “Import documentation English” Document
Any of the required draft and final documents (Invoices, EUR-1 etc) must always be submitted to our LD well
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
before the departure of the vessel/Aircraft. All the above documentation is absolutely essential for Cobra in
order to complete any Import Customs formalities and to obtain release of the goods in Peru; therefore Cobra
must enforce the above instructions to all suppliers. Any additional costs which have been caused by the non-
observance of these instructions will be absorbed by the Supplier.
Javier.villar@grupocobra.com
Address for sending the original documents when applicable (BL / AWB, invoice & packing list, EUR-
01, others):
Cobra Perú
5. DANGEROUS GOODS
Is in each supplier’s duties (when unsure) to double check with the proper authorities of any
commodity that might be considered as dangerous. Cobra will not accept any responsibility for any
dangerous cargo that is not properly declared by this manufacturer.
The Supplier will be responsible for shipping all the components included in its scope in such a way
that the goods do not suffer damages or deterioration during transportation, loading and unloading,
or while being stored in a customs area or transit warehouse.
This mark shall be stenciled with water-resistant black paint or indelible Ink on tow opposite
longitudinal sides of each package in capital letters not less than 25mm height.
For bares, bundles and drums, this mark shall be stenciled at one side of each package. In case the
main shipping mark is not able to stencil on the cargo or package, metal labels shall be attached with
the material at minimum two convenient points.
Cobra will reserve the right to refuse acceptance of the shipment should the same arrive either in
inferior packing quality or packed in such a way that might cause any security hazard to personnel
handling such shipments. Alternatively Cobra will reserve the right to repack in such a manner that is
deemed fit and proper and charge all the additional packing expenses back to the Supplier.
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
It is compulsory that all shipments are packed with proper, solid and sturdy packing material which
must be both seaworthy and roadworthy and that does not pose any safety risk to any personnel
involved with the physical handling of such shipments.
The goods must be loaded into the containers strictly in accordance to what specified in the contract
between the Supplier and Cobra.
All containers space must be utilized at their maximum capacity without compromising the safety of
the goods during the transport or the safety of the personnel working on the loading/offloading
Whenever goods loaded in the container is beyond the standard ways the Supplier must supply to our
LD details of how the goods have been loaded inside the container together with their guideline on
how their goods must be handled during the offloading and re-loading at the destination port of
discharge.
Suppliers must not exceed the payload weights indicated both inside and outside the containers.
Weight shown on invoices or packing lists must be exactly the same as the weight loaded into the
container.
Any discrepancies in this regard will end up in penalties that are to be paid by Cobra due to a Supplier
mis-declaration, Cobra will recover these penalties directly from the Supplier.
For any sensitive cargo such as, dangerous goods, fragile cargo, temperature controlled cargo, cargo
subject to deterioration if exposed to natural elements etc, the Supplier must provide a written
detailed guideline on how to transport, handle and store such commodities. Should the supplier fail
to provide such guidelines, Cobra will accept no responsibilities for any damages which could be
caused by Cobra or any of their nominated service provider.
In case of a breach of these requirements, all subsequent costs will be charged to the Supplier, except
if the Supplier had presented before the loading a “Load and Unload plan” that was approved by the
Cobra
8. TEMPORARY IMPORTATIONS
Temporary importation of materials belonging to the supplier such as tool for temporary works at site
must be organized in the country of origin by the supplier.
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.
PROYECTO: TAL
TALARA OIL REFINERY- AUXILIARY UNITS
Should a Supplier (for his own internal reasons) have to send partial shipments over and above the
contractually agreed number of shipments, any additional costs originated by such shipments will be
fully absorbed by the Supplier. These expenses include for example (but are not limited to): customs
clearance in the country of origin, customs clearance in the country of destination, transportation
costs, handling of the merchandise from factory to its final destination, any additional custom
clearance expenses etc
Heavy lifts will be provided with cradles or any supports needed for the offloading and the transport.
If the equipment itself does not have sufficient cradles, the supplier will manufacture and supply the
necessary elements for an stable and safe transportation.
Este documento contiene información privada y no puede ser duplicado, modificado o divulgado a terceros sin el consentimiento escrito
de COBRA SCL. La única copia controlada de este documento está en el Sistema Informático de Gestión Documental de COBRA SCL.