Equipment Type Hi- Speed Lockstitch Sewing Machine
Equipment Code/Number DDL-555ON-3 Location Garment Room/Practical Work Area Schedule for the 1st Semester (C.Y. 2020-2021) Every Every Activities Manpower Daily other Weekly 15th Monthly Remarks day Day 1.Check electrical Electrian, Activity is done connection,cables Trainer, before and after and outlets Trainee using the equipment 2.Clean the Hi- Activity is done Speed Lockstitch Trainee after using the Sewing Machine equipment 3.Check the Activity is done functionability of Trainer, before and after Hi- Speed Trainee using the Lockstitch Sewing equipment Machine 4.Check if Hi- Activity is done Speed Lockstitch Trainer, before and after Sewing Machine is Trainee using the placed in proper equipment place 5.Check if Hi- Activity is done Speed Lockstitch Trainer, before and after Sewing Machine is Trainee using the protected and equipment covered by cloth 6. Run the equipment for 5 minutes and observe for Activity is done unusual noise Trainer, before and after or abnormal Trainee using the operation; if equipment repair is necessary, send to technician. Prepared by: Approved: