You are on page 1of 2

EQUIPMENT MAINTENANCE SCHEDULE

Equipment Type Hi- Speed Lockstitch Sewing Machine


Equipment Code/Number DDL-555ON-3
Location Garment Room/Practical Work Area
Schedule for the 1st Semester (C.Y. 2020-2021)
Every Every
Activities Manpower
Daily other Weekly 15th Monthly Remarks
day Day
1.Check electrical Electrian,  Activity is done
connection,cables Trainer, before and after
and outlets Trainee using the
equipment
2.Clean the Hi-  Activity is done
Speed Lockstitch Trainee after using the
Sewing Machine equipment
3.Check the 
Activity is done
functionability of Trainer,
before and after
Hi- Speed Trainee
using the
Lockstitch Sewing
equipment
Machine
4.Check if Hi-
Activity is done
Speed Lockstitch Trainer,
before and after
Sewing Machine is Trainee
 using the
placed in proper
equipment
place
5.Check if Hi-
Activity is done
Speed Lockstitch Trainer,
before and after
Sewing Machine is Trainee
using the
protected and
 equipment
covered by cloth
6. Run the
equipment for 5
minutes and
observe for Activity is done
unusual noise Trainer,
before and after
or abnormal Trainee
using the
operation; if equipment
repair is
necessary, send
to technician.
Prepared by: Approved:

ERLENE B. ESPINA WILGERMINA D.JUHAILI


Trainer HT-1

You might also like