4- laning of aligarh -n kanpur section from Km.140.200 (Design Chainage 194.900) to Km.186.000 (Design chainage 195.

733) [Package -1 from aligarh-Bhadwas] of nh- 91 in the atae of utar Pradesh pn hybrid
Annuit mode under Bharatmala Pariyojna

Chainage : 165+400 Flyover A1& A2

Pile Cutoff Level:- 178.418 Pile Termination Level:- 157.868 Pile Diameter:- 1200 mm R0
Section Cutting Unit
Length Deduction Total Length Weight
S.No Bar No. Description Bar Shape Dia Spacing Nos. Location Length Length Weight Remarks
(mm) (mm) (m) (MT)
(mm) (mm) (kg)
350

1 s1 Vertical main Bar 20 24 1 21600 21950 40 21910 525.84 2.469 1.298

2 s2 (A) Helical Spiral 12 100 21 1 2000 68449 68449 68.449 0.889 0.061

3 s2 (B) Helical Spiral 12 100 102 1 10075 332428 332428 332.43 0.889 0.295

4 s3 (A) Helical Spiral 16 100 37 1 3600 12011 12011 120.110 1.580 0.190

5 s3 (B) Helical Spiral 16 100 49 1 4800 15906 15906 159.06 1.580 0.251

6 Main Ring 16 1500 15 1 20550 3045 3205 3.205 1.580 0.005

Total Weight (MT):- 2.101


Note :- Lap length should be 50d
4- laning of aligarh -n kanpur section from Km.140.200 (Design Chainage 194.900) to Km.186.000 (Design chainage 195.733) [Package -1 from aligarh-Bhadwas] of nh- 91 in the atae of utar Pradesh pn hybrid
Annuit mode under Bharatmala Pariyojna

Chainage : 165+400 Flyover P1& P2

Pile Cutoff Level:- 178.115 Pile Termination Level:- 157.565 Pile Diameter:- 1200 mm R0
Section Length Deduction Cutting Total Length Unit Weight
S.No Bar No. Description Bar Shape Dia Spacing Nos. Location Length (mm) (mm) Length (m) Weight (MT) Remarks
(mm) (mm) (kg)
350

1 s1 Vertical main Bar 20 22 1 21600 21950 40 21910 482.02 2.469 1.190

2 s2 (A) Helical Spiral 12 100 21 1 2000 68449 68449 68.449 0.889 0.061

3 s2 (B) Helical Spiral 12 100 102 1 10075 332428 332428 332.43 0.889 0.295

4 s3 (A) Helical Spiral 16 100 37 1 3600 12011 12011 120.110 1.580 0.190

5 s3 (B) Helical Spiral 16 100 49 1 4800 15906 15906 159.06 1.580 0.251

6 Main Ring 16 1500 15 1 20550 3045 3205 3.205 1.580 0.005

Total Weight (MT):- 1.993


Note :- Lap length should be 50d
4- laning of aligarh -n kanpur section from Km.140.200 (Design Chainage 194.900) to Km.186.000 (Design chainage 195.733) [Package -1 from aligarh-Bhadwas] of nh- 91 in the atae of utar Pradesh pn hybrid Annuit
mode under Bharatmala Pariyojna
Chainage : 165+400 Flyover A1 LHS Abutment Shaft
R0
Cutting Unit
Section Length Length Deduction Length Total Weight Weight
S.No Bar No. Description Shape Dia Spacing Nos. Location Total No. (mm) (mm) (mm) Length (m) (MT) Remarks
(mm) (kg)

7445
500

1 A1 Abutment Shaft Vertical 20 32 2 64 4350 8445 80 8365 535.36 2.469 1.322


500

7445
500

2 A2 Abutment Shaft Vertical 16 8 2 16 950 8445 64 8381 134.10 1.580 0.212


500
800

3 A3 Horizontal Main Bar 4350 16 125 43 2 86 5201 5950 64 5886 506.20 1.580 0.800
800

1000
4 A4 Link Bar 8 240 x 150 660 1 660 5201 1100 16 1084 715.44 0.395 0.283 22x30
50 50

Total Weight (MT):- 2.616


Lap Length 50d Extra