Epoxic Specification
Epoxic Specification
08/20/10
PIP STS03601
Epoxy Grout Specification
PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES
In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these technical
requirements into a single set of Practices, administrative, application, and engineering
costs to both the purchaser and the manufacturer should be reduced. While this Practice
is expected to incorporate the majority of requirements of most users, individual
applications may involve requirements that will be appended to and take precedence
over this Practice. Determinations concerning fitness for purpose and particular matters
or application of the Practice to particular project or engineering situations should not
be made solely on information contained in these materials. The use of trade names
from time to time should not be viewed as an expression of preference but rather
recognized as normal usage in the trade. Other brands having the same specifications
are equally correct and may be substituted for those named. All Practices or guidelines
are intended to be consistent with applicable laws and regulations including OSHA
requirements. To the extent these Practices or guidelines should conflict with OSHA or
other applicable laws or regulations, such laws or regulations must be followed.
Consult an appropriate professional before applying or acting on any material
contained in or suggested by the Practice.
PRINTING HISTORY
November 1996 Issued ____ 2010 Complete Revision
October 2001 Complete Revision
PIP STS03601
Epoxy Grout Specification
Table of Contents
1. Introduction................................. 2 Data Forms
1.1 Purpose ............................................ 2
1.2 Scope ............................................... 2 STS03601-F1 – Pre-Grouting Checklist
STS03601-F2 – Epoxy Grout Installation
2. References .................................. 2 Checklist
2.1 Process Industry Practices .............. 2 STS03601-F3 – Post-Grouting Checklist
2.2 Industrial Codes and Standards ...... 2
2.3 Government Regulations ................. 2
3. Definitions ................................... 3
4. Requirements.............................. 3
4.1 General ............................................ 3
4.2 Field Quality Control ........................ 4
4.3 Testing ............................................. 4
4.4 Submittals ........................................ 4
4.5 Safety ............................................... 5
4.6 Materials........................................... 5
4.7 Pre-Grouting Requirements ............. 6
4.8 Epoxy Grout Installation ................... 9
4.9 Post-Grouting Requirements ......... 11
4.10 Disposal ......................................... 11
1. Introduction
1.1 Purpose
This Practice provides requirements for epoxy grout materials and installation.
1.2 Scope
This Practice describes the requirements for supplying, testing, and installing epoxy
grout materials for machinery baseplates and soleplates.
Users of this Practice may also refer to PIP REIE686 for more detailed guidelines for
machinery installation and grouting.
2. References
Applicable parts of the following Practices, industry codes and standards, and references shall
be considered an integral part of this Practice. The edition in effect on the date of contract
award shall be used, except as otherwise noted. Short titles will be used herein where
appropriate.
3. Definitions
constructor: The party responsible for supplying the materials, equipment, tools, supervision,
and labor for the installation of the epoxy grout in accordance with the contract documents.
Unless otherwise noted, the term constructor shall apply also to the constructor’s
subcontractor(s) and vendor(s).
contract documents: Any and all documents, including codes, studies, design drawings,
specifications, sketches, practices, and data sheets, that the purchaser or engineer of record
has transmitted or otherwise communicated, either by incorporation or reference, and made
part of the legal contract agreement or purchase order between the purchaser and the
constructor
epoxy grout manufacturer: The party who produces and warrants the performance of the
epoxy grout materials provided in accordance with the contract documents. The epoxy grout
materials are manufactured in a controlled process using standard codes, specifications, tests
and possibly include shop drawings to assist in proper application, installation and/or use.
Unless otherwise noted, the term epoxy grout manufacturer shall apply also to the epoxy
grout manufacturer’s subcontractor(s) and/or vendor(s).
owner: The party who has authority through ownership, lease, or other legal agreement over
the project wherein the epoxy grout will be installed
purchaser: The party who awards the contract to the constructor. The purchaser may be the
owner or the owner’s authorized agent.
4. Requirements
4.1 General
4.1.1 Constructor shall provide all equipment, materials, labor, supervision, and
quality control of epoxy grout work. The constructor shall perform all work
necessary for preparation, forming, supplying, handling, mixing, placing,
locating joints including joint details, testing, inspection, curing and finishing
of epoxy grout, and disposal of excess epoxy grout and other materials in
accordance with the contract documents.
4.1.2 All work shall be in accordance with the epoxy grout manufacturer’s written
recommendations, including temperature restrictions.
4.1.3 Any conflicts or inconsistencies between this Practice, the design drawings,
the epoxy grout manufacturer’s specifications and recommendations, the
machine or equipment manufacturer’s recommendations, or other contract
documents shall be brought to the attention of the purchaser for resolution
before the performance of work.
4.3 Testing
If required by the contract documents, epoxy grout shall be sampled and tested as
follows:
a. For each epoxy grout shipment or manufacturing lot, a minimum of nine
samples shall be tested for compressive strength in accordance with
ASTM C579, Method B and linear shrinkage in accordance with ASTM C531.
b. Three cubes shall be tested at 24 hours, three cubes at three days, and three
cubes at seven days.
c. All samples shall be labeled and their batch placement location noted.
4.4 Submittals
4.4.1 The epoxy grout manufacturer’s literature and certified test data shall be
submitted to the purchaser for approval a minimum of 15 days before
installation of the epoxy grout. The literature shall include the epoxy grout
material properties in accordance with this Practice.
4.4.2 A written quality control program, describing in detail how compliance with
this Practice will be ensured, shall be submitted to the purchaser for approval
a minimum of 15 days before installation of epoxy grout. The program shall
include procedures for preparation, forming, supplying, handling, mixing,
placing, locating joints including joint details, testing, inspection, curing and
finishing of epoxy grout, and disposal of excess epoxy grout and other
materials in accordance with the contract documents.
4.4.3 If testing is required by the contract documents, copies of all epoxy grout
placement and test reports shall be submitted to the purchaser within three
days after tests are performed. The reports shall include the following
information:
a. Identification of foundation for epoxy grout placement
b. Epoxy grout manufacturer and type
c. Epoxy grout design compressive strength
d. Date of epoxy grout placement
e. Air temperature at beginning of epoxy grout placement
f. Foundation temperature at beginning of epoxy grout placement
g. Epoxy grout compressive break strengths
h. Epoxy grout linear shrinkage.
4.5 Safety
The constructor shall be responsible for compliance with the safety requirements
specified in the contract documents and as recommended by the epoxy grout
manufacturer. The following minimum precautions shall be applied:
a. All epoxy grout Material Safety Data Sheets (MSDSs) shall be available and
associated hazards reviewed with all grouting personnel.
b. Goggles or face shields and aprons shall be worn by personnel mixing and
pouring the epoxy grout.
c. Protective gloves shall be worn by all personnel involved in the grouting
operation.
d. Dust masks or respirators (in accordance with MSDS requirements) shall be
worn by those personnel exposed to the aggregate prior to mixing.
e. Soap and water shall be available for periodic hand cleaning, should the need
arise.
f. Because some epoxy grouts exhibit a very strong exothermic reaction and the
possibility of thermal burns exists, caution shall be exercised for these epoxy
grouts.
4.6 Materials
4.6.1 Epoxy grout shall be in accordance with the following physical properties:
a. Minimum compressive strength (ASTM C579, Method B modified):
12,000 psi (80 MPa) at 7 days
b. Maximum linear shrinkage: epoxy grout shall not shrink and shall
expand not more than 4.0 percent when tested in accordance with ASTM
C827 (before set) and not more than 1.0 percent when tested in
accordance with ASTM C531
c. Maximum coefficient of thermal expansion (ASTM C531): 30 x 10-6
inch/inch/°F (54 x 10-6 mm/mm/°C)
4.8.3.14 Grout head boxes shall be removed after the epoxy grout has set.
4.8.3.15 Baseplate fill and vent holes shall not be plugged until the epoxy
grout has set because plugging can cause baseplate distortion
because of epoxy grout expansion.
4.10 Disposal
4.10.1 All materials shall be converted to solid waste for proper disposal.
4.10.2 The following procedure shall be used for making solid waste in any type of
hardener container:
a. The hardener shall be mixed with the resin.
Comment: The hardener/resin mixture is considered inert.
b. Excess hardener/resin mixture shall be poured into the hardener
container.
c. The container shall be closed and shaken until excess hardener mixes
with excess hardener/resin mixture.
Comment: This final mixture in the hardener container is considered
inert for proper solid waste disposal.
PAGE 1 OF 3
PRE-GROUTING CHECKLIST ____ 2010
This checklist may be used for quality control and assurance of pre-grouting work prior to epoxy grout
installation.
PAGE 2 OF 3
PRE-GROUTING CHECKLIST ____ 2010
PAGE 3 OF 3
PRE-GROUTING CHECKLIST ____ 2010
PAGE 1 OF 2
EPOXY GROUT INSTALLATION CHECKLIST ____ 2010
This checklist may be used for quality control and assurance of work during epoxy grout installation.
PAGE 2 OF 2
EPOXY GROUT INSTALLATION CHECKLIST ____ 2010
PAGE 1 OF 1
POST-GROUTING CHECKLIST ___ 2010
This checklist may be used for quality control and assurance of post-grouting work after epoxy grout
installation.