MCT (Roxtec) shall be install for cable penetration in order to protect from multiple hazards
WAREHOUSE / ALL LIGTHING WAWAN
3 including fire, water, gas, dust, vibrations, electro-magnetic disturbances, vermin, and the risk of A 18-Jan
SAMPLING FIXTURE (BVI)
explosion
Page 1 of 5
PROJECT: LOREAL CATEGORY DESCRIPTION
REF: IEC 60079 A To be completed before operation
SUBJECT: Inspection Punch List Warehouse and Sampling Area B To be completed before documentation
UPDATED: 16th January, 2019
EQUIPMENT:
DOC No:
Need correct
Equipment andcertificate to analise Special
cable identification shall beconditions
installed of use for ligthing installed are complied with WAREHOUSE / ALL LIGTHING WAWAN
5 A 18-Jan
( LCIE 06 ATEX 3045X the sign X is for special condition for safe use ) SAMPLING FIXTURE (BVI)
Wrong certificate number for Ex lighting fixture refer to actual certificate number installed LCIE 06 WAREHOUSE / ALL LIGTHING WAWAN
6 A 18-Jan
ATEX 3045X ( Available certicate LCIE 06 ATEX 6035X ) SAMPLING FIXTURE (BVI)
CENTRIFUGAL WAWAN
7 Motor installed found uncertify Explosion proof WAREHOUSE B 18-Jan
FAN (BVI)
CENTRIFUGAL WAWAN
8 Certified Gland and blanking element shall be installed WAREHOUSE A 18-Jan
FAN (BVI)
Page 2 of 5
PROJECT: LOREAL CATEGORY DESCRIPTION
REF: IEC 60079 A To be completed before operation
SUBJECT: Inspection Punch List Warehouse and Sampling Area B To be completed before documentation
UPDATED: 16th January, 2019
EQUIPMENT:
DOC No:
CENTRIFUGAL WAWAN
10 Motor identification and cable identification shall be installed WAREHOUSE B 18-Jan
FAN (BVI)
CENTRIFUGAL WAWAN
11 Earthing bonding jumper shall be installed WAREHOUSE A 18-Jan
FAN (BVI)
CENTRIFUGAL WAWAN
12 Sealing of ducts is not satisfactory. WAREHOUSE A 18-Jan
FAN (BVI)
Page 3 of 5
PROJECT: LOREAL CATEGORY DESCRIPTION
REF: IEC 60079 A To be completed before operation
SUBJECT: Inspection Punch List Warehouse and Sampling Area B To be completed before documentation
UPDATED: 16th January, 2019
EQUIPMENT:
DOC No:
Loose ground
Equipment andcable
cableconnection andshall
identification incomplete installation (tighten ground connection and ensure to
be installed WAWAN
13 WAREHOUSE - A 18-Jan
complete installation with serrated, flat and spring washer) (BVI)
CENTRIFUGAL WAWAN
14 Motor installed found uncertify Explosion proof SAMPLING A 18-Jan
FAN (BVI)
CENTRIFUGAL WAWAN
15 Cable gland installed found uncertify Explosion proof SAMPLING A 18-Jan
FAN (BVI)
Cable core connection shall be installed with ferrule (Copper Ring Type Terminal End (Insulated)), CENTRIFUGAL WAWAN
16 SAMPLING A 18-Jan
sleeve and core name FAN (BVI)
Page 4 of 5
PROJECT: LOREAL CATEGORY DESCRIPTION
REF: IEC 60079 A To be completed before operation
SUBJECT: Inspection Punch List Warehouse and Sampling Area B To be completed before documentation
UPDATED: 16th January, 2019
EQUIPMENT:
DOC No:
CENTRIFUGAL WAWAN
18 Cable not properly seal on penetration SAMPLING A 18-Jan
FAN (BVI)
Ground cable found loose on gland at wall penetration, Ground cable shall be properly sealed WAWAN
19 SAMPLING - A 18-Jan
(ensure to remove gland from wall penetration and use MCT (Roxtec) for cable penetration) (BVI)