Professional Documents
Culture Documents
Rencana Kerja
Rencana Kerja
Tanggal
No Deskripsi Pekerjaan Personil Sparepart
27 28 29 30 1 2 3 4
1 Setting controller untuk capasity of 2nd generator Sydiq, Riki
Bambang, Sydiq, thermocouple type K; transmitter
2 Instalasi thermocouple dan Pressure Transitter PTRS
Riki STG 700; kabel NYY 2x1,5mm
3 Cleaning Computer DCS Suroyo
4 Back up data Server dan PC DCS Suroyo
thermis 1x6A; box thermis; rel
5 Pasang thermis untuk PC DCS L Suroyo, Riki thermis; terminal isi 3; wire deck
I 45x45mm; kabel NYY 2x1,5mm
B
6 Ganti thermowell boiler 01 Bambang, Sydiq thermowell wear
U
7 Pindah controller desuperheater ekstraksi turbin R All personil
8 Pasang inverter pompa demin Bambang, Sydiq, inverter ACS580; controller SWP-
Riki ND825-020-04/12 HL
9 Ganti terminal block R2-MB6 DO PLC HC900 Bambang, Sydiq
10 Connect kabel 505 start turbin R2- MB6 DO PLC HC900 Bambang, Sydiq
11 Ganti kabel jumper R2- MB2 DI PLC HC900 Bambang, Sydiq
12 Persiapan start boiler dan turbin All personil