Professional Documents
Culture Documents
Operation Guidelines For Auto Gas Sampling System
Operation Guidelines For Auto Gas Sampling System
RECEIVER A RECEIVER B
Tag Valve Trạng thái Tag Valve Trạng thái
Status Status
I1 Close I3 Close
I2 Close I4 Close
R1 Close R3 Close
R2 Close R4 Close
S1 Close S3 Close
Bleed valve - S2 Close Bleed valve -S4 Close
P1 Close P3 Close
Bleed valve - P2 Close Bleed valve -P4 Close
Inlet Bleed valve Close Inlet Bleed valve Close
Return Bleed valve Close Return Bleed valve Close
Tiến hành xã áp suất trong 2 flexible hole (gas sample inlet và Pre charge): Mở van S1,S2,P2
(Train B mở van S3,S4,P4) sau đó đóng các van này lại và lấy bình Receiver.
Release the pressure in 2 flexible holes (including gas sample inlet and Pre-charge): Open
valves S1, S2, P2 (Train B opens valves S3, S4, P4) after that close those valves and take out
the Receiver.
2. Lắp bình lấy mẫu Receiver.
Fitting the Receiver:
Tiến hành kết nối bình với 2 flexible hole (gas sample inlet và Pre charge), phải đảm bảo
flexible hole và Receiver đã được kết nối chắc chắn.
Connect the Receiver with 2 flexible holes (including Gas sample inlet and Pre – charge),
ensure that the flexible holes and Receiver are connected well.
Kiểm tra trạng thái các van theo bảng bên dưới
Check the valve status as the table below:
RECEIVER A RECEIVER B
Tag Valve Trạng thái Tag Valve Trạng thái
Status Status
I1 Open I3 Open
I2 Open I4 Open
R1 Open R3 Open
R2 Open R4 Open
S1 Close S3 Close
Bleed valve - S2 Open Bleed valve -S4 Open
P1 Open P3 Open
Bleed valve - P2 Close Bleed valve -P4 Close
Inlet Bleed valve Close Inlet Bleed valve Close
Return Bleed valve Close Return Bleed valve Close
Khi xã áp suất trong bình thì mở từ từ van S2 (train B: S4). Sau đó khôi phục lại theo bảng số 2
When releasing the pressure inside the Receiver, open gradually valve S2 (train B: S4). After
that, bring back the status as in table 2