srt0r22, @10 Pat
HMaharashtra State Board of Technical Education
‘STATEMENT OF MARKS
MR. / Ms. DUBEY PIvUSH ANAND
course Diploma in Mechanical Engineering
Tw | course TOTAL MARKS
pk | HEAD wax | ont
[MANAGEMENT TH ESE, 100, 083
A 000
POWER ENGNEERING AND REFRIGERATION Ta _| ss 00 | “oa
A 000
mm ws
25 [010
[ADVANCED MANUFACTURING PROCESSES oI ‘70 | om 7
‘avers oF wacine DesIGN 7 ‘oro | oan a
30 | 000
mm 23 | —o10 ws
5 | o10
POWER PLANT ENGINEERING 7 ‘70 | om w=
30 | 000
mm 25 [010 a
JnoustaaL ean mm ors [om ue
[ ors | om0
{cADSTONE PROIECT PLANNING om 23 [010 a
23 [010
‘Tie oF courses creorrs
oare This Marshes Downloaded om ernet TOTAL MAK. RESULTWAT ] TOTAL MARES T ora cnepit
10/03/2022
SECRETARY 1050 91.62 962 39
MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION
2/0334/Mes! FIRST CLASS ois.
{Report Discrepancy inthis crifcate to Head of
the institution,
| Sctietty fr semesters based on toa
number of faltue subjects in 1 I semesters
taken together.
5 class awarded for Diploma is based an aggregate marks Obtained in pre-final & fal semester,
'ABBREVATION DETAILS.
7 Theo Tw "eam Work a ase Percentage of Maks
Tw_| Theory Test Marks PL Project Werk & Exemption Resule Withheld Ove to
Pa Pract ow. Sessional ‘Optional Pending Lower Year
Pw | Praca Test Marker Industrial Trang 1sP | Lower Semester Pending Condoned
2. this coreeate of mark is sued a per prevalng rules and regulations of MSBTE at the time ofthis exam.
candidate seg for admission to V/V Semester only f he/she s fully passed in & 1 & WV
‘semesters &avaled benefit of ATK T/PASS at Il & IV /V& Vi semesters taken together respectively
Failore But Allowed To
Keep Term
P| Aaaonal Practical . Falre Marks ATT | Allowed to Keep Term
— ET] wns | Result Withheld Ove To
ra ary Forward Mars S| pending owersemester | — oist Distinction
End'Semester am | PA | Progressive Assessment
‘Re-Formerly known as The board of Technical Barinations Maharashtra State of Technical Education Act 1997(Mah XXKVII of 1997) and Maharashtra
Government Gazette Notification Section IV-B issued on march 31,1999(172/16/200/20-0407:2007 12:00:28)
as Aggregate e Condoned Maris pv | Pending tower Year rr
WAR nwo abe Om
E&OE
Result Oecared On 10/03/2022
wesrt0r22, 210 Pat
22