Current scenario of all powers and specifically hydropower in Pakistan/world Each Student chose one existing/under construction hydropower in Pakistan and have to find its potential power production Environmental Impacts of the specific power facility Does before construction EIA was conducted for the specific power plant or not One of the students must select Kala Bagh project