PEMBUKUAN BANGUNAN KANTOR

TANGGAL NAMA BARANG HARGA TOTAL


30 JUNI 2021 kasbon mas wanwan Rp 5,000,000.00 Rp 5,000,000.00
palu wipro 10lb Rp 375,000.00
benang tukang Rp 55,000.00
pleser 10 Rp 10,000.00
05 JULI 2021 (satu nota) Rp 805,000.00
gegep 3x Rp 120,000.00
sekop 2x Rp 170,000.00
kampak Rp 75,000.00
gegep kentaro 3x Rp 195,000.00
flasher 10 2x Rp 30,000.00
05 JULI 2021 (satu nota) selang tukang 20x Rp 40,000.00 Rp 425,000.00
batu asah
cangkul + gagang 2set Rp 160,000.00
05 JULI 2021 megic com Rp 675,000.00 Rp 675,000.00
06 JULI 2021 kayu 5x7 74x Rp 1,700,000.00 Rp 1,700,000.00
sepatu boot 6 pasang Rp 510,000.00
paku b 3 1 dus Rp 240,000.00
06 JULI 2021 (satu nota) Rp 1,060,000.00
kaos tangan 2 lusin Rp 70,000.00
paku b 1/2in 1dus Rp 240,000.00
kayu ulin 5x7x4 50btg Rp 4,000,000.00
06 JULI 2021 (satu nota) Rp 7,840,000.00
papan ulin 2m 80btg Rp 3,840,000.00
mesin alkon Rp 1,750,000.00
cangkul 2x Rp 130,000.00
gagang cangkul 3x Rp 45,000.00
07 JULI 2021 (satu nota) Rp 2,340,000.00
stop kontak Rp 20,000.00
stalber Rp 15,000.00
selang 1/2 10x Rp 380,000.00
07 JULI 2021 ember cor 8x Rp 104,000.00 Rp 104,000.00
07 JULI 2021 selang spiral 4x Rp 160,000.00 Rp 160,000.00
12 JULI 2021 obat cor Rp 480,000.00 Rp 480,000.00
13 JULI 2021 uang makan kantor Rp 500,000.00 Rp 500,000.00
14 JULI 2021 selang 5/8 royal 15m Rp 105,000.00 Rp 105,000.00
14 JULI 2021 sekop 2x Rp 190,000.00 Rp 190,000.00
14 JULI 2021 cangkul+gagang Rp 85,000.00 Rp 85,000.00
14 JULI 2021 T 1/2 3x Rp 12,000.00 Rp 12,000.00
16 JULI 2021 pasir 1 ret Rp 1,100,000.00 Rp 1,100,000.00
16 JULI 2021 papan 2m 100 Rp 43,000.00 Rp 43,000.00
17 JULI 2021 clap pompa 2in Rp 25,000.00 Rp 25,000.00
17 JULI 2021 clap pipa 2in Rp 6,000.00 Rp 6,000.00
17 JULI 2021 bensin 5 liter Rp 50,000.00 Rp 50,000.00
17 JULI 2021 pembayran progres kerja tukang Rp 7,660,000.00 Rp 7,660,000.00
30 JULI 2021 kayu 5x7 1 kubik Rp 1,700,000.00 Rp 1,700,000.00
baut 3/8 25cm 50x Rp 300,000.00
30 JULI 2021 (satu nota) Rp 368,000.00
mata bor Rp 68,000.00
30 JULI 2021 ulin 5x7 25 batang Rp 1,750,000.00 Rp 1,750,000.00
30 JULI 2021 transfod tukang Rp 500,000.00 Rp 500,000.00
02 AGUSTUS 2021 batu gunung 2x Rp 2,500,000.00 Rp 2,500,000.00
pipa 3in aw 6btg Rp 1,020,000.00
03 AGUSTUS 2021 (satu nota) Rp 1,150,000.00
elbow 100x Rp 130,000.00
04 AGUSTUS 2021 obat cor 2 kotak Rp 480,000.00 Rp 960,000.00
07 AGUSTUS 2021 jasa tukang kantor Rp 6,500,000.00 Rp 6,500,000.00
pipa 4in aw 9btg Rp 2,475,000.00
pipa 39n aw 6btg Rp 1,020,000.00
07 AGUSTUS 2021 (satu nota) Rp 3,653,000.00
elbow 6x Rp 108,000.00
lem pipa Rp 50,000.00
08 AGUSTUS 2021 biaya gambar kantor Rp 14,000,000.00 Rp14,000,000.00
09 AGUSTUS 2021 paku 3in Rp 23,500.00 Rp 23,500.00
paku b 2/4 Rp 46,000.00 Rp 46,000.00
09 AGUSTUS 2021 (satu nota)
baut 10in 8x Rp 28,000.00 Rp 28,000.00
pasir 2 ret Rp 2,200,000.00
10 AGUSTUS 2021 (satu nota) Rp 6,600,000.00
koral 2 ret Rp 4,400,000.00
11 AGUSTUS 2021 semen 100 sak Rp 5,500,000.00 Rp 5,500,000.00
17 AGUSTUS 2021 carter mobil tukang ke handil Rp 500,000.00 Rp 500,000.00
21 AGUSTUS 2021 upah tukang kantor Rp 19,235,000.00 Rp19,235,000.00
TOTAL Rp 95,378,500.00