RENCANA ANGGARAN BIAYA PEKERJAAN

PEMBANGUNAN RUMAH SEDERHANA TYPE 30


N0 PEKERJAAN VOL SAT HARGA JUMLAH
A PEKERJAAN PERSIAPAN TANAH/PONDASI
1 Perapihan tanah lokasi 60.00 m2 10,000 600,000
2 Bouw Plank 28.00 m2 30,000 840,000
3 Galian tanah pondasi / urug kembali 7.16 m2 35,000 250,600
4 Pondasi Lajur batu kali 5.60 m2 375,000 2,100,000
Sub Total : 3,190,600

B PEKERJAAN PASANGAN BETON / DINDING


1 Sloof Beton 15 x 20 1.02 m3 3,250,000 3,315,000
2 Kolom praktis, Ring buck beton 12 x 15 1.09 m3 2,750,000 2,997,500
3 Beton topi 10 x 30 0.30 m3 2,200,000 660,000
4 Bon 2/20 plester / aci 7.00 m3 27,500 192,500
5 Dinding batako press teras 56.00 m3 71,000 3,976,000
7 Plesteran & Aci Dinding Camp. 1:5 93.30 m2 54,000 5,038,200
Sub Total : 16,179,200
C PEKERJAAN KUSEN- PINTU/ JENDELA
1 Pas. Kusen Pintu Alumunium 0.50 m3 3,000,000 1,500,000
2 Pas. Daun Utama semi panel Double triplek Teakwood 1.00 buah 750,000 750,000
3 Pas. Daun Pintu Teak Wood kamar tidur 2.00 buah 250,000 500,000
4 Pas. Kunci Utama 1.00 buah 22,000 22,000
5 Pas. Pintu kamar/wc fiber glass 1.00 buah 22,000 22,000
6 Pas. Pasangan kunci pintu kamar tidut/wc 2.00 buah 75,000 150,000
7 Pas. Ram jendela kaca 5 mm kayu kls II Uk. 40 x 120cm 5.00 buah 255,000 1,275,000
8 Pas. Engsel Pintu 6.00 buah 30,000 180,000
9 Pas. Engsel Jendela 10.00 buah 20,000 200,000
10 Pas. Slot pintu / Jendela 5.00 buah 25,000 125,000
11 Pas.Hak angin Jendela 5.00 buah 175,000 875,000
Sub Total : 5,599,000
D PEKERJAAN KM/WC & LANTAI
1 Pas.Lantai Keramik 30/30 Mulia 32.00 m2 65,000 2,080,000
2 Pas. Lantai Keramik km/wc 20/20 dinding Mulia 12.50 m2 65,000 812,500
3 Pas. Closet jongkok 1.00 bh 100,000 100,000
4 Pas. Kran air 2.00 bh 35,000 70,000
5 Pas. Saringan Plastik 1.00 bh 25,000 25,000
6 Pas.Instalasi air bersih PVC 1.00 Ls 650,000 650,000
7 Pas.Instalasi air Kotor PVC 1.00 Ls 650,000 650,000
8 Pas. Instalasi air Hujan PVC 1.00 Ls 750,000 750,000
9 Septi Tank & Rembesan air 1.00 Unit 2,700,000 2,700,000
Sub Total : 7,837,500

E PEKERJAAN PLAFOND & MEKANIK / ELEKTRIKAL


1 Pas. Fibersement uk. 1 x 1 rangka kayu 5/5 42.00 m2 95,000 3,990,000
2 Pas. Titik Lampu 6.00 bh 120,000 720,000
2 Pas. Stop Kontak / saklar 3.00 bh 120,000 360,000
4 Pas. Lampu TL 8 Watt Philip 6.00 bh 16,000 96,000
5 Pas. Sekring NCB 2 Grup 4 pase 1.00 unit 80,000 80,000
6 Pas. Floor lantai karpet 5cm 10.00 m2 75,000 750,000
Sub Total : 5,996,000

F PEKERJAAN ATAP / PENGECETAN & FINISHING


1 Rangka Atap Baja Ringan 45.80 m2 94,600 4,332,680
2 Penutup Atap Morando Natural 45.80 m2 40,000 1,832,000
3 Nok Murando 6.00 m2 100,000 600,000
4 Lisplank GRC 2/20 10.00 m2 30,000 300,000
5 Pengecatan Plapon / Dinding 135.00 m2 8,000 1,080,000
6 Pengecatan Kayu Kusen / Jendela /Pintu/ Plafon 40.00 m2 10,000 400,000
7 Jera / talang / pipa / karpet 4.50 m2 75,000 337,500
8 Buang puing bekas 1.00 Ls 300,000 300,000
Sub Total : 9,182,180
GRAND TOTAL 47,984,480

REKAPITULASI RAB PEMBANGUNAN RUMAH TAPAK TYPE . 30 LUAS TANAH 60


A PEKERJAAN PERSIAPAN TANAH/PONDASI 3,190,600
B PEKERJAAN PASANGAN BETON / DINDING 16,179,200
C PEKERJAAN KUSEN- PINTU/ JENDELA 5,599,000
D PEKERJAAN KM/WC & LANTAI 7,837,500
E PEKERJAAN PLAFOND & MEKANIK / ELEKTRIKAL 5,996,000
F PEKERJAAN ATAP / PENGECETAN & FINISHING 9,182,180

GRAND TOTAL 47,984,480

DIBULATKAN Rp. 48,000,000


TERBILANG : EMPAT PULUH DELAPAN JUTA RUPIAH
BIAYA PEMBANGUNAN RUMAH T. 30 / M2 = 48.000.000,-/ 30 = Rp. 1.600.000,-

Bogor, 15 Maret 2018


PT. KIRARA GLOBAL INDO

TTD
DIREKSI
REKAPITULASI PROGRESS RUMAH TYPTE 30.

BLOCK BLOCK
PERSENTASI PROGRESS % PEKERJAAN C3-1
A PEKERJAAN PERSIAPAN TANAH/PONDASI
B PEKERJAAN PASANGAN BETON / DINDING
C PEKERJAAN KUSEN- PINTU/ JENDELA
D PEKERJAAN KM/WC & LANTAI
E PEKERJAAN PLAFOND & MEKANIK / ELEKTRIKAL
F PEKERJAAN ATAP / PENGECETAN & FINISHING

GRAND TOTAL
BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK
BLOCK BLOCK BLOCK BLOCK
3,190,600
16,179,200
5,599,000
7,837,500
5,996,000
9,182,180

47,984,480