Activity Details:
Inspection date Time Inspection Period Contact Person (PAS)
Engr. Yousef T. Habib /
Engr. Mohammad Kashif /
17‐Apr‐2022 10:30 AM Engr. Turki Al‐Ghamdi /
To To 07 Days Engr. Hashim Kiwi
ME EE CE
25‐Apr‐2022 01:00 PM Phone 014 513 4739
Mobile 050 164 6460
Important Notes:
‐ Refer to Page ( 2 ) for Facility Description, Location, & Meeting Place.
‐ Refer to Page ( 2 ) for Construction Dept. Contact Person Information.
‐ Your representative is requested to attend the subject Contract Inspection at the given time and date indicated
above.
‐ In the event of any notice or modification please contact the above contact person (PAS) within two days of receiving
this form..
Confirmed By: Distribution To:
Const. Dept. Authorized Rept. ‐ PIC K‐1801
Manager, Fire & Safety – Fax # 396‐7883
Engr. Ahmad A. Al‐Montasheri
Manager. Community O&M Section (Buildings Dept.) – Fax
Manager, Projects Acceptance Section
# 325‐4618
Manager, Telecom O & M Section ( GUD Dept.)‐Fax # 321‐
CC: File 3756/3597
Thursday, April 14, 2022
IC-TA-PMD-05-02-B
6++9 Jl+rqalJ Ar-5loJI E-iro'Jl
(246/s) Royal Commission for Jubail & Yanbu
Architectural Works:
All lnternal Architectural works within floors GF, 1st, 2nd & 3rd of the building excluding staircases
area, elevators, external cladding and external architectural items.
The work includes but not limited to: Building works: Masonry Works including CMU and stone
cladding, Concrete Curbs and Pavers. Metals: Metal Deck for Floor, Architecturally Exposed structural
steel and Expansion joints cover assemblies. Wood casework: Cabinets. Thermal and Moisture
Protection: liquid waterproofing for wet areas, Thermal insulation at building soffit, spray applied fire
proofing material, sealants and caulking and Fire Stopping sealant. Door & Windows: Aluminum Doors
& Frames, Frameless glazed doors and lnternal Frameless glazed partition, Aluminum unitized system
with PVDF coating, Aluminum structural glazing. Finishes: Floor, Wall, Ceiling, Skirting, Gypsum wall
board, Cement Wall Board, Toilet and bath accessories, toilet partition and internal Signage.
(Under -PO #1126-17-005)-Finish Hardware for all Doors (for all Wooden and Hollow Metal Doors).
(Under-PO# 8138-18-001)-Supply and lnstall, Test and Commission, Fully Functional Motorized
Sunshades (rolling) Work lncludes all Necessary Installation Hardware, Mounting Brackets, Conduit,
Cables, Electrical Connection, Switch, Automatic Controls, Remote -Control, and all lncidentals
unication works:
Electrical Distri bution Works :
Low Voltage in RCHQ Building within Floors GF, Ist, 2nd & 3d lncluding building electrical power and
lighting system within the RCHQ Building Lighting and Power Panels, Emergency Power Panels, First
Fix installations (integrated security system & AV system), Power supply for services Low Voltage
000Volt) Cables /Control Cables & Wires, Grounding Conductors, Disconnect Switches,
& Connection outlets with boxes, Underfloor ducting system & related power outlets,
Fixtures, Lighting Switches with boxes, Rigid, Flexible & EMT Conduits, Cable ladder &
, Occupancy Sensors and related TPN Bus Ducts & Risers.
OF SAUDI ARABIA - YANBU INDUSTRIAL CITY aEl:.^tl t]+ a+u - o:r*Jl :,j,.Fl aSIA-ll
P.O.BOX. 1 YANBU INDUSTRIAL CITY 41912 : I 1l Y ;ELj,-Jt L;r r . .Y I r. €
TEL:O14 21 6000 Ref.: 1801-lAl-005-R01 .,,'i'., .,... , -,,L
FAX : O14 800'l Date: 11 April 2022 (111911443) .r ! r1\ A.., : .,rr.b
WWW.R
6+-i+g rhJ+lJ e+-lloJl q-i r^ ll I
Royal Commission for Jubail & Yanbu \
Public Addressi nq Svstem:
Supply, installation of fully functional Public Address System for RCHQ Building within Floors GF, 1st,
2nd & 3d including Conduits, Junction Boxes, Pull Boxes, Identification Tags and related equipment in
Telecom Room as per contract drawings and the scope of work Under (PO# 8131-18-001).
Telecommunication:
(Data & Telephone System within Floors GF, 1st, 2nd & 3'd Telecommunication Raceways, cable tray,
cable trunking, junction boxes for data & telephone outlets, data outlets materials and related conduits
including under floor ducting and junction boxes.
Mechanical Works:
Fire Fiqhtinq Svstem:
Work includes but not limited to all Fire Suppression System within Floors GF, 1st, 2nd & 3'd from each
floor interface points through-out the system, comprising all piping network (painted black steel pipe),
sprinklers, firehose cabinets, identification tags, zone control valve assembly with drain facility, Testing
& Commissioning.
@:
Work lncluding but not limited to Potable Fire Extinguishers installation.
HVAC Svstem:
Work includes but not limited to all HVAC System within Floors GF, 1st, 2nd & 3'd from each floor
interface points through-out the system, comprising AHUs, FCUs, VFDs, Air diffusers, Registers and
grills, Fire dampers, Fire smoke dampers, Motorized Dampers, Fire rated motorized dampers, sound
attenuators, VAVs, duct works, hangers, accessories, insulation and identification tags.
Plumbinq Svstem:
Potable Water System:
Work includes but not limited to all Potable Water System within Floors GF, 1st, 2nd & 3'd from each
floor interface points through-out the system, comprising all piping network (Copper pipes), piping
specialties insulation, identification tags.
This initial acceptance has requested by the Contractor via letter No. BCEG/RCHQ/1801/RC-
1871, dated 05 April2022
Best Regards,