MIDAS/Civil Foundation Design

PROJECT TITLE : Balance Four Laning Work of Package-2 of section Amravati -Chikhli NH-6

Company CivilMantra Infracon Pvt. Ltd. Client National Highways Authority of India

Author Vikas Chauhan File Name VUP Foundation

( ). Calculate required shear reinforcement. ( Asw1 = 0.00008 m^2/m. )


-. Asw/s1 = Vwd / (0.9*fywd*d) = 0.00283
-. Calculate spacing s1 = 0.16656 m.
-. Rhow = 0.072*sqrt(fck)/fyw = 0.00085 (by concrete and steel classes).
-. Smax1 = Asw / (bw*Rhow) = 0.55287 m.
-. Smax2 = 0.75*d = 0.54787 m.
-. Applied spacing s_max = MIN[ s1, Smax1, Smax2 ] = 0.16656 m.
-. N_leg = 6
-. Asw/s_max = N_leg*Asw1 / s_max = 0.00283
-. Aswmax/s_max = 0.5*1.0*Nu*fcd*bw/fywd = 0.00957
-. Asw/s_use = N_leg*Asw1 / s_use = 0.00362
-. Asw/s_max < Asw/s_use ---> O.K !

( ). Calculate shear strength of reinforcement.


-. V_Rds = MIN[ Asw/s*0.9*d*fywd*cot(theta), V_RdMax ] = 1035.630 kN/m.
-. V_Ed/V_Rds = 0.78050 ---> O.K !

===============================================================================
[[[*]]] CHECK STRESS LIMITATION.
===============================================================================

( ). Calculate stress of bottom.


-. LCB = cLCB69
-. k1 = 0.60000
-. k3 = 0.80000