12.

55

J J
5 6
+15.55 说明:
1、根据电梯单位提供图纸,L1与L2电梯机房底板预留孔洞定位如上图所示,
机房顶板梁下吊钩定位如左图所示;
2、梁下吊钩大样详前期报审吊钩大样图;
3、现场预留洞及吊钩定位完成后需请监理。电梯单位现场确认,无误后方可
浇筑混凝土。
illustrate:
1.According to the drawings provided by the elevator unit, the
positioning of the reserved holes on the floor of the elevator

+15.55 machine room of L1 and L2 is shown in the above figure, and the
positioning of the hook under the roof beam of the machine room is
shown in the figure on the left;
2.The large sample of the hook under the beam is detailed in the
large sample of the hook that was submitted for review in the early
stage;
J J 3.Supervision is required after the on-site reserved holes and hook
positioning are completed. The elevator unit confirms on-site, and
the concrete can be poured only after it is correct.

5 6
RB5
250X450

Extra 16Tor at the top of


slab

3
Extra 16Tor

L L L

22

RB3 SLAB
SHORTER DIRECTION LONGER DIRECTION THICKNESS
SLAB NO. MAT
REINFORMENT REINFORMENT (mm)
S1 8Tor @ 150mm c/c 8Tor @ 200mm c/c 150 DOUBLE