Pin Bushing
Remedy
Measuring point Normal Recomm. Limit Recomm. Limit
Mark &
(Pin and Bushing) value service of service of
Remark
limit use limit use
A Boom Rear 75 74 73.5 75.5 76 Replace
B Boom Cylinder Head 70 69 68.5 70.5 71 ţ
C Boom Cylinder Rod 75 74 73.5 75.5 76 ţ
D Arm Cylinder Head 70 69 68.5 70.5 71 ţ
E Boom Front 75 74 73.5 75.5 76 ţ
F Arm Cylinder Rod 70 69 68.5 70.5 71 ţ
G Bucket Cylinder Head 70 69 68.5 70.5 71 ţ
H Arm Link 70 69 68.5 70.5 71 ţ
I Bucket and Arm Link 70 69 68.5 70.5 71 ţ
J Bucket Cylinder Rod 70 69 68.5 70.5 71 ţ
K Bucket Link 70 69 68.5 70.5 71 ţ
L Dozer Link(B) 60 59 58.5 60.5 61 ţ
M Dozer Link(A) 60 59 58.5 60.5 61 ţ
N Dozer Cylinder Rod 70 69 68.5 70.5 71 ţ
O Dozer Link(A) 60 59 58.5 60.5 61 ţ
P Dozer Link(B) 60 59 58.5 60.5 61 ţ
Q Dozer Cylinder Head 70 69 68.5 70.5 71 ţ
R Outrigger Cylinder Head 75 74 73.5 75.5 76 ţ
S Outrigger Foot 70 69 68.5 70.5 71 ţ
T Outrigger Leg 70 69 68.5 70.5 71 ţ
U Outrigger Cylinder Rod 75 74 73.5 75.5 76 ţ