You are on page 1of 1

of the United States, such as stone, clays, cement, and so forth, under the supervision of the Director of

the United States Geological Survey, to be immediately available, one hundred thousand dollars. As
illustrating the magnitude of the work which may be affected by. these investigations, it may be stated-
that the expenditures of the Federal Government for building and construction work now approximate
$30,000,000 per annum, while the expenditures of the country at large for similar purposes are in excess
of $1,000,000,000 per annum. * ~ It was with a view to reducing the cost and improving the quality of
the materials used in this building and construction work that Congress was asked to provide for the

manner as to best meet the needs of the Government in this respect, an advisory board was organized,,
on which were placed by the President the chiefs of each of the Government bureaus having in charge
important building and construction work, viz, the Chief Engineer of the Isthmian Canal; the Chief

public wherein they agree with the needs of the Government, representatives of the national
engineering and allied organizations were similarly brought into consultation

of the United States, such as stone, clays, cement, and so forth, under the supervision of the Director of
the United States Geological Survey, to be immediately available, one hundred thousand dollars. As
illustrating the magnitude of the work which may be affected by. these investigations, it may be stated-
that the expenditures of the Federal Government for building and construction work now approximate
$30,000,000 per annum, while the expenditures of the country at large for similar purposes are in excess

-that the expenditures of the Federal Government for building and construction work now approximate
$30,000,000 per annum, while the expenditures of the country at large for similar purposes are in excess
n

LOVE EARTH

You might also like