Date: February 24, 2022

To: Rosswyn Tejada


TBI
Thru: Ariel Reyes, Mark Mendoza
CM Engineer
Project: Proposed 18- storey mixed used building
Subject: As stated

Good day Sir, 您好,先生

We would like to request to your good office for the testing of drainage pipes inside the pipe
chase before we close the ceiling at 5th floor tower 2 and tower 3. We are not allowing to have the
same leakage we encounter at 5th floor tower 1, because if this things happen again all consequences
will be at your office. We would also like to participate in the inspection together with CM.

在关闭 5 楼第 2 座和第 3 座的天花板之前,我们想向你们的好办公室要求对管道内的排水管进


行测试。 我们不允许在 5 楼 1 号楼发生同样的泄漏,因为如果这种事情再次发生,所有的后
果都将在你的办公室。 我们也想和 CM 一起参加检查.

Another thing, we would like to formally request the testing of water supply at tower 2
starting March 6, 2022 now that we are preparing for the finish painting on the said area.

另外,由于我们正在为上述地区的完成油漆做准备,我们正式要求从 2022 年 3 月 6 日
开始在 2 号塔进行供水测试。

Thank you and we are hoping for your cooperation regarding this matter.

谢谢你,我们希望你在这件事上给予合作.

Very truly yours,

Mr. Wang Zhen Tang

Hwalun Project Manager