NO OF
HOUSEHOL NO OF
SITIO/PUROK D FAMILIES AGE BRACKET ELDERLY SPECIALLY ABLED
MALE FEMALE MALE FEMALE

TOTAL
BARANGAY SALANGSANG BDRRM FORM 2

URI NG BAHAY
BILANG NG KLASE NG BAHAY PER PUROK/SITIO PALIKURAN

YARI SA
YARI SA KAHOY AT NIPA/KAHOY AT YARI SA INODORO-
YARI SA SEMENTO-SEMI IBA PA-LIGHT KARTON, MAY WALANG WATER BALON(ANTIPOLO WALANG
SITIO/PUROK SEMENTO/CONCRETE CONCRETE MATERIALS PLASTIC KURYENTE KURYENTE SEALED TYPE PALIKURAN
HIGH
KM.18,BADIANGAN NONE NONE 15 HOUSEHOLD NONE NONE 15 NONE 15 NONE
SITIO LEMAN NONE 3 HOUSEHOLD 53 HOUSEHOLD NONE NONE 56 NONE 56 NONE
MODERATE TO HIGH
SITIO TUSUEN NONE NONE 20 HOUSEHOLD NONE NONE 20 NONE 20 NONE
SITIO DONGDONG NONE NONE 44 HOUSEHOLD NONE NONE 44 3 41 NONE
SITIO ELEM NONE 1 HOUSEHOLD 117 HOUSEHOLD NONE NONE 118 3 115 NONE
SITIO LANAO NONE NONE 21 HOUSEHOLD NONE NONE 21 1 20 NONE
SITIO MEGAGA NONE NONE 79 HOUSEHOLD NONE NONE 79 4 75 NONE
SITIO PALAYANGBAYAN NONE NONE 57 HOUSEHOLD NONE NONE 57 NONE 57 NONE
SITIO BADIANGAN NONE NONE 59 HOUSEHOLD NONE NONE 15 60 5 NONE

MODERATE
SITIO ALALAY NONE 4 HOUSEHOLD 61 HOUSEHOLD NONE NONE 65 60 5 NONE
SITIO BLAH NONE NONE 57 HOUSEHOLD NONE NONE 57 50 7 NONE
SITIO KAPARAN NONE NONE 32 HOUSEHOLD NONE NONE 32 26 6 NONE
SITIO KRATARO NONE NONE 32 HOUSEHOLD NONE NONE 32 27 5 NONE
SITIO KIWAG NONE 5 HOUSEHOLD 30 HOUSEHOLD NONE NONE NONE 30 5 NONE
SITIO LEBU NONE NONE 20 HOUSEHOLD NONE NONE 20 18 2 NONE
SITIO MANGGA 1 NONE 4 HOUSEHOLD 30 HOUSEHOLD NONE NONE 34 30 4 NONE
SITIO SOKONG NONE NONE 68 HOUSEHOLD NONE NONE 68 60 8 NONE
SITIO KM.23 3 65 HOUSEHOLD NONE NONE 45 15 45 15 NONE
LOW
POB.SALANGSANG 6 HOUSEHOLD 80 HOUSEHOLD 122 HOUSEHOLD NONE 208 NONE 200 8 NONE
SITIO BAGUILAN NONE 13 HOUSEHOLD 23 HOUSEHOLD NONE 36 HOUSEHOLD NONE 30 6 NONE
SITIO BITOGEN 1 NONE NONE 48 HOUSEHOLD NONE NONE 48 40 8 NONE
SITIO BITOGEN 2 3 5 40 HOUSEHOLD NONE NONE 48 43 5 NONE
SITIO PAG-ASA NONE NONE 42 HOUSEHOLD NONE NONE 42 22 20 NONE
SITIO MANGGA 2 NONE NONE 56 HOUSEHOLD NONE NONE 56 36 20 NONE
SITIO MIAGSONG NONE NONE 19 HOUSEHOLD NONE NONE 19 10 6 NONE
SITIO MIDTUDOK NONE NONE 24 HOUSEHOLD NONE NONE 24 20 4 NONE

TOTAL 12 180 1,169 0 289 1,010 818 501


BARANGAY SALANGSANG BDRRM FOR 4/1
URI NG HANAP BUHAY
BILANG NG TAO

PAG AALAGA DI PORMAL


NG HAYOP- PROFESSIONA EMPLEYADO EMPLEYADO PORMAL NA NA
PAGSASAKA- PANGINGISDA- POULTRY AND PAGKAKARPE L-DOCTOR, NG NG PRIVATE PAMAMASAD PAMAMASAD
SITIO/PUROK FARMING FISHING LIVESTOCK NTERO LAWYER GOBYERNO SECTOR PAG TITINDA A A BAKER PORTER
KM.18,BADIANGAN 15 0 0 0 0 0 0 0 0 0 0 0
SITIO LEMAN 57 0 0 0 0 0 0 0 0 0 0 0
SITIO TUSUEN 20 0 0 0 0 0 0 0 0 0 0 0
SITIO DONGDONG 44 0 0 0 0 0 0 0 0 0 0 0
SITIO ELEM 96 0 2 5 0 6 0 8 0 0 0 0
SITIO LANAO 15 0 0 0 0 0 0 0 0 0 0 0
SITIO MEGAGA 75 0 0 0 0 1 0 1 0 0 0 0
SITIO PALAYANGBAYAN 57 0 0 0 0 0 0 0 0 0 0 0
SITIO BADIANGAN 65 0 0 10 0 4 0 0 0 0 0 0
SITIO ALALAY 41 0 1 3 0 4 0 0 0 0 0 0
SITIO BLAH 57 0 0 0 0 0 0 0 0 0 0 0
SITIO KAPARAN 32 0 0 0 0 0 0 0 0 0 0 0
SITIO KRATARO 32 0 0 0 0 0 0 0 0 0 0 0
SITIO KIWAG 33 0 0 2 0 0 0 0 0 0 0 0
SITIO LEBU 20 0 0 0 0 0 0 0 0 0 0 0
SITIO MANGGA 1 33 0 0 1 0 0 0 0 0 0 0 0
SITIO SOKONG 64 0 0 0 0 0 0 0 0 0 0 0
SITIO KM.23 68 0 5 3 0 5 0 4 0 0 0 0
POB. SALANGSANG 138 0 22 6 0 14 0 10 5 11 1 0
SITIO BAGUILAN 38 0 2 0 0 3 0 0 0 0 0 0
SITIO BITOGEN 1 48 0 0 0 0 0 0 0 0 0 0 0
SITIO BITOGEN 2 39 0 0 0 0 4 0 0 0 0 0
SITIO CHECKPOINT 25 0 5 5 0 21 0 10 6 0 3 0
PAG-ASA 42 0 0 0 0 0 0 0 0 0 0 0
MANGGA 2 56 0 0 0 0 0 0 0 0 0 0 0
MIDTUDOK 24 0 0 0 0 0 0 0 0 0 0 0
MIAGSONG 19 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1,253 0 37 35 0 62 0 33 5 11 4 0
BDRRM FORM 4/2

HOUSE PAG
MASAHISTA HELPER ELECTRICIAN LABORER PAG MIMINA PAPAUTANG AT IBA PA
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
BARANGAY SALANGSANG BDRRM FORM 3

URI NG PAG MAMAY ARI NG BAHAY(BILANG NG PAMILYA)

NAKIKIHATI SA
NANGUNGUPAHAN- INFORMAL SETTLER FAMILIES-
NANGUNGUPAHAN- NAKIKITIRA-SHARED SHARED WITH THE NAKATIRA SA LUPANG PAG
SITIO/PUROK SARILING BAHAY RENTER WITH THE OWNER RENTER MAMAY ARI NG GOBYERNO
HIGH
KM.18,BADIANGAN 10 0 5 0 0
SITIO LEMAN 57 0 0 0 0
MODERATE TO HIGH
SITIO TUSUEN 20 0 0 0 0
SITIO DONGDONG 44 0 0 0 0
SITIO ELEM 115 0 3 0 0
SITIO LANAO 21 0 0 0 0
SITIO MEGAGA 77 0 2 0 0
SITIO PALAYANGBAYAN 56 0 1 0 0
SITIO BADIANGAN 61 0 4 0 0
MODERATE
SITIO ALALAY 65 0 4 0 0
SITIO BLAH 56 0 1 0 0
SITIO KAPARAN 32 0 0 0 0
SITIO KRATARO 31 0 1 0 0
SITIO KIWAG 35 0 0 0 0
SITIO LEBU 21 0 1 0 0
SITIO MANGGA 1 32 0 2 0 0
SITIO SOKONG 64 0 0 0 0
SITIO KM.23 68 0 0 0 0
LOW
POB. SALANGSANG 200 0 8 0 0
SITIO BAGUILAN 36 0 1 0 0
SITIO BITOGEN 1 47 0 1 0 0
SITIO BITOGEN 2 37 0 2 0 0
SITIO CHECKPOINT 82 0 2 0 0
SITIO PAG-ASA 43 0 0 0 0
SITIO MANGGA 2 56 0 0 0 0
SITIO MIDTUDOK 24 0 0 0 0
SITIO MIAGSONG 19 0 0 0 0
TOTAL 1,371 0 38 0 0
BARANGAY SALANGSNG BDRRM FORM 5

PRIVATE OWNED(IF
PASILIDAD GOVERNMENT OWNED APPLICABLE)
COVERED COURT √
BARANGAY HALL √
MULTI PURPOSE BUILDING √
EVACUATION CENTERS √
PUBLIC SCHOOLS √
PRIVATE SCHOOLS NONE
SIMBAHAN/KAPILYA √
GOVERNMENT HOSPITAL NONE
CLINIC √
PRIVATE HOSPITALS NONE
BARANGAY HEALTH CENTER √
BARANGAY BIRTHING UNIT √
SENIOR CITIZEN BUILDING √
MILITARY/PNP/TANOD OUTPOST √
BARANGAY PWD CENTER NONE
BARANGAY GAD CENTER NONE
BARANGAY YOUTH/SK CENTER NONE
CHILDREN'S PLAYGROUND NONE
BILANGGUAN NONE
RESCUE VEHICLE √
AMBULANCE √
MAGDAGDAG KUNG MAY PASILIDAD NA HINDI NASABI SA TAAS
BARANGAY WAITING SHADE √
BARANGAY IP'S BUILDING √
BARANGAY GARAGE √
BAHAY NI NANAY BUILDING √
BARANGAY GUEST HOUSE √
MULTI PURPOSE BUILDING √
BARANGAY SALANGSANG BDRRM FORM 6
BILANG NG TAO O ORGANISASYON
HUMAN RESOURCES 0
DOCTOR 0
NURSES 1
MIDWIVES 1
BARANGAY HEALTH WORKER 1
EMERGENCY RESPONSE TEAMS 1
COMMUNITY VOLUNTEER ORGANIZATIONS 1
DAY CARE WORKERS 10
OPERATION CENTER PERSONNEL 4
PYSCHOSOCIAL COUNSELLOR 2
EVACUATION CENTER MANAGERS 2
BARANGAY SALANGSANG BDRRM FORM 9/1

LAGYAN NG CHECK OR
DAHILAN KUNG BAKIT BULNERABLE X ANG BOX KUNG
ANG BARANGAY SA DISASTER
TUGMA SA PARAAN PARA MAINGAT ANG ANTAS NG PAG HAHANDA NG BARANGAY
KALAGAYAN NG
BARANGAY

PREPAREDNESS PREVENTION AND MITIGATION RESPONSE REHABILITATION AND RECOVERY


1. PISIKAL O MATERYAL
ITSURA O KATANGIAN NG LUGAR
1 MALAPIT S TABING DAGAT
2 MALAPIT SA TABING ILOG √ Conduct Tree planting & Growing Activities
3 MALAPIT SA BUNDOK √ Installation of sainages and warning signs/appropriate signs
4 MALAPIT SA FAULTLINE
5 MALAPIT SA BULKAN
6 WALANG MAAYOS NA DRAINAGE Construction of drainage/Canal
7 MALAMBOT NA LUPA
8 KALBONG KAGUBATAN √ Conduct IEC Ordinance on no build zone along the mountain slopes
9 MARAMING SINKHOLE √ Tree planting and growing Activiies
10 BARADO ANG MGA KANAL √ Clean up drive clearing of water waste
WALANG MAAYOS NA TAPUNAN NG
11 BASURA √ Construction of dumping site IEC on waste segregatoin collection of residual trash only

12 WALANG RAMPA ANG MGA GUSALI


MARAMING MGA BATONG NAKA
USLI SA GILID NG BUNDOK MALAPIT
13 SA KABAHAYAN √ Installation of sainages /Ordinance on no build zone along high landslide/rockslide areas

14 WALANG FIRE EXIT ANG MGA GUSALI


WALANG CIRCUIT BREAKER ANG
15 MGA GUSALI √ Purchased of circuit breaker
WALANG FIRE EXTINGUISHER ANG
16 MGA GUSALI Purchased of fire estinguisher /refill of existing fire estinguizer

KULANG SA KAGAMITAN ANG BARANGAY SA


PAG RESPONDE SA PANAHON NG KALAMIDAD
17 O EMERGENCY √ Purchase of rescue equipment
2 EVACUATION CENTER BDRRM FORM 9/2
KAKULANGAN NG EVACUATION
1 CENTER
MAY EVACUATION CENTER PERO
2 WALANG MAAYOS NA PALIKURAN X Construction of CR
WALANG HIWALAY NA PALIKURAN
3 ANG BABAE, LALAKI AT PWD X Construction of genderize CR/ PWD
4 BILANG NG PALIKURAN 2 2 comfort rooms in the eva.center
5 WALANG EVACUATION CENTER X Construction of Evacuation Center
MAY EVACUATION CENTER PERO
6 WALANG RAMPA X Cons. of Evacution Center RAMPA
7 WALANG KAGAMITAN √ Purchased of Evacution Center equip.
ESKWELAHAN ANG GINAGAMIT NA
8 EVACUATION CENTER x Execute a MOA for the possible use of the school as eva center
GYMNASIUM ANG GINAGAMIT NA
9 EVACUATION CENTER √ Repair and Maintenance of gym facilities
WALANG WHEEL CHAIR ANG
10 EVACUATION CENTER X purchased of wheel chairs
WALANG DIBISYON ANG MGA
11 TULUGAN SA EVACUATION CENTER X Contruction of movable room division
WALANG GAMIT NA PWEDENG
MATULUGAN, BANIG, KULAMBO,
12 KUMOT X Provision of blanket ,mosquito nets and sleeping mats to IPDS and /or fabrication for folding beds
WALANG GAMIT PANG KUSINA,
13 PANG LUTO AT IBA PA √ Purchased of kitchen implements/Provision of water tanks for clean water source

3 PASILIDAD
WALANG SIGNAL NG MOBILE
1 NETWORK SA BUONG BARANGAY √ Provision of dual band base of dual band handled radio to high risk area's and near the river bank for easy monitoring
2 WALANG SIGNAL SA MGA sitio's √ Provision of handled radios to sitio Leader
3 SIRA ANG KALSADA √ Repair and maintenance of roads
4 MALAYO SA HOSPITAL √ Conduct training on Basic life support and standard first aid Provision of first aid kits and over the counter medicines
5 WALANG KURYENTE X Purchased of generator
90% PORSYENTO NG BAHAY ANG
6 UMAASA SA DEEP WELL/spring 90% IEC on proper water sanitation fit for drinking
4 EARLY WARNING SYSTEM BDRRM FORM 9/3
WALANG BABALANG NAKASULAT O
NAKALAGAY SA MGA DESIGNATE NA
1 LUGAR X Installation of Sainage and warning signs
KULANG ANG BATINGAW OR SIREN
PANG GAMIT SA PAG BIGAY NG
2 BABALA

WALANG BABALA PARA SA MGA


3 MAY KAPANSANAN(BINGI O BULAG) X Installation of Appoiriate signs
WALANG BABALA PARA SA SISTEMA
NG EVACUATION AT ROTA
PAPUNTANG EVACUATION CENTER
4 OR PICK UP AREAS x Install eva.system guidelines on purok center and the evacuation center

5 BARANGAY DISASTER OPERATION CENTER


WALANG DESIGNADONG BARANGAY
DISASTER OPERATION
1 CENTER(BDOC) X Construction of BDOC center Procurement of COVID -19 Vaccine giving assistance to needs of affected families

2 ANG BDOC AY KULANG SA PASILIDAD provision of food subsistence & relief goods non goods
3 WALANG GENERATOR SA BDOC x Purchased of one (1) unit set generator ( BDOC )
WALANG NAKA TALAGANG DUTY SA
BDOC LALONG LALO NA SA
4 PANAHON NG KALAMIDAD
WALANG BASE RADIO (KUNG
MALAYONG BARANGAY) OR
HANDHELD RADIO SA MGA
5 MALALAPIT NA BARANGAY

6 KABAHAYAN/TIRAHAN
1 ____50_____% NG KABAHAYAN AY
GAWA SA LIGHT MATERIALS
50%
10% NG KABAHAYAN AY NAKATIRA
2 SA TABING ILOG 10%
___20% NG KABAHAYAN AY NAKA
3 TIRA SA GILID NG BUNDOK 20%
30% NG KABAHAYN AY MAG KADIKIT
4 DIKIT 30%
7 HANAPBUHAY BDRRM FORM 9/4
ISANG HANAPBUHAY LANG ANG
PINAGKIKITAAN NG MGA TAO SA
1 BARANGAY √ conduct orientation/seminar farming technology
KULANG SA ALTERNATIBONG
2 HANAPBUHAY ANG MGA TAO X Conduct training farm technology
WALANG BACKYARD VEGETABLE
3 GARDEN X Conduct training on vegetables gardenning

8 SOSYAL AT ORANISASYONAL
BDRRM COMMITTEE

HINDI ORGANISADO AT FUNCTIONAL


1 ANG BDRRM COMMITTEE X Conduct quaterly meeting BDRRM Comm.
WALANG MAAYOS AT MALINAW NA Prepare organizational structure and list down tasks needed and assigned those to
RESPONSIBILIDAD ANG BAWAT X
MYEMBRO appropriate members/teams.
2
KULANG SA KAPASIDAD ANG
MYEMBRO DAHIL SA WALANG MGA
3 PAGSASANAY NA DINALUHAN X Conduct trainings

4 60% NG MYEMBRO AY HINDI AKTIBO 50%


10% NG MYEMBRO AY HINDI
NAKAKA UNAWA KUNG ANO ANG
5 IBIG SABIHIN NG DRR OR DRRM 10%
30% NG MYEMBRO AY HINDI ALAM
KUNG ANO ANG RA 10121 AT IBA
PANG BATAS AY KAUGNAYAN SA
6 DRRM 30% conduct orientation

WALANG REGULAR NA MEETING


7 ANF BDRRMC X Conduct meeting of BDRRM Comm.

SAMAHAN O ORGANISAYON SA BARANGAY

MAY MGA SAMAHAN SA BARANGAY


1 PERO WALANG ALAM SA DRRM X Include BDRRM orientation during general assembly day

MAY SAMAHAN SA BARANGAY PERO


2 WALANG PROGRAMA SA DRRM Ensure
School based DRRM program DRRM and climate change inclusion in all aspects of the barangay plans and programs

MAY SAMAHAN SA BARANGAY PERO


HINDI AKTIBONG LUMALAHOK SA
GAWAIN SA BARANGAY LALO NA
3 TUNGKOL SA DRRM X Encourage active participation of all barangay organizations/conduct orientaion

9 AKTITUDINAL/MOTIVATION BDRRM FORM 9/5


PAGTINGIN SA BUHAY
HINDI PINANINIWALAAN NG MGA
1 TAO ANG BARANGAY OPISYAL x Include DRRM orientation during gen.assembly.provide funds for the celebration of Disaster resllence Month activities (July)
MARAMI ANG MGA PILOSOPONG
TAO NA HINDI SUMUSUNOD SA
2 SINASABI NG BARANGAY OPISYAL x Reach out to the comm. Invite them in all activities for DRRM
WALANG PAKIALAN ANG IBANG TAO
3 SA KANILANG KAPITBAHAY X Conduct meetings(meals and sanacks and supplies),trainings possible give tokens to members
BARANGAY SALANGSANG BDRRM FORM 7
BENJAMIN B. CHANGCO SR.
BARANGAY CAPTAIN
HON.ANALYN I. TAN
BARANGAY DRRM OFFICER

PREVENTION AND MITIGATION PREPAREDNESS RESPONSE REHABILITATION AND RECOVERY

FIRE BRIGADE: HON. JUNBILL J.


SECURITY; HON. OSIAS A. GASPAR UMPAL HON. JUNBILL J. UMPAL MERY JEAN V. ELLONG-MIDWIFE
STAFF TEAM: HON. UNAS A. DAMAGE FIRE: HON.
CALABA HON. UNAS A. CALABA HENRYCK VERMAN CHIEF TANOD/ BPATS
SUPPLY: HON. CHRISTOPHER EVACUATION: NEPTALY AGSAMOSAM/ HON. OSIAS A. GASPAR/SITIO
SAMILLANO SECRETARY/CLERK/TREASURER/BPATS CHIEF TANOD LEADERS
TRANSPORTATION: HON. NOWIE
M. BLAG HON. OSIAS A. GASPAR MR. MONSITO BASA BLGU AND BPATS

COMMUNICATION: HON. CHELLY JOHN REY LEONG/ JOSEPHINE A.


MAE PASINABO HON. CHELLY MAE A. PASINABO MR. LEOPOLDO BUENO GREGORIO

WARNING: HON. MANOLING B. MRS. JOSEPHINE


LEON MIDWIFE/ BHW'S A.GREGORIO LEOPOLDO BUENO
MEDICAL: MRS. MERY JEAN V. RELEIF : HON.ANALYN
ELLONG SITIO LEADERS I.TAN BLGU, BHW'S BPATS

RESCUE: HON. BENJAMIN B.


CHANGCO HON. CHELLY MAE A. PASINABO MIDWIFE/ BHW'S/BPATS BLGU , SITIO LEADERS

* PWEDENG
* PWEDENG MAGDAGDAG NG * PWEDENG MAGDAGDAG NG MGA MAGDAGDAG NG MGA * PWEDENG MAGDAGDAG NG MGA
MGA TEAMS TEAMS TEAMS TEAMS
TEACHING FORCE TEAM WOMEN' S ASSOCIATION TEAM 4P'S/ IP'S TEAM FARMERS ASSOCIATION TEAM
TRUCK OPRATORS TEAM
BARANGAY SALANGSANG BDRRM FOR 8/1
PREPAREDNESS PAANO ANG SINO SINO ANG
PANGUNAHING GAWAIN TIMELINE AND BUDGETED AMOUNTPAG SUBAYBAY MAG SU SUBAYBAY
YEAR 1 YEAR 2 YEAR 3
1 Contruction of drainage/canal 19,600.00 19, 600 26, 600 BDRRM Comm. BDRRM Comm.& BLGU
2 Conduct IEC and Ordinance on no build zone along the mountains slopes,landslide/rockslide areas 10,000 10,000 10,000 BDRRM Comm. BDRRM Comm.& BLGU
3 Clean up drive clearing of water waste 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
4 Construction of dumping site IEC on waste segregation collection of residual trash only 30,000 40,000 30,000 BDRRM Comm. BDRRM Comm.& BLGU
5 purchased of Circuit breaker 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
6 Purchased of fire extinguizer/refill existing fire extinguizer 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
7 Construction of CR 20,000 20,000 20,000 BDRRM Comm. BDRRM Comm.& BLGU
8 Construction of Genderize CR.(PWD) 16,600 16,600 16,600 BDRRM Comm. BDRRM Comm.& BLGU
9 Construction of Evacuation Center 33,300 33,300 33,300 BDRRM Comm. BDRRM Comm.& BLGU
10 Purchased of Evacuation Center equipment 30,000 20,000 20,000 BDRRM Comm. BDRRM Comm.& BLGU
11 Repair and Maintenance of gym facilities 40,000 40,000 40,000 BDRRM Comm. BDRRM Comm.& BLGU
12 Purchased of wheel chairs 10,000 10,000 10,000 BDRRM Comm. BDRRM Comm.& BLGU
13 Construction of movable room division 20,000 20,000 20,000 BDRRM Comm. BDRRM Comm.& BLGU
14 Provision of dual band base of dual band handled radio to high risk area's and near the river bank 20,000 20,000 20,000 BDRRM Comm. BDRRM Comm.& BLGU
15 Conduct training on Basic life support and standart first aid 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
16 Installation evacuation system guidelines on purok center and the evacuation center 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
17 Contruction of BDOC center 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
18 Purchased of one (1) unit generator of BDOC 30,000 40,000 30,000 BDRRM Comm. BDRRM Comm.& BLGU
19 Conduct oriention /seminar farming technology and vegetables gardenning 25,000 25,000 25,000 BDRRM Comm. BDRRM Comm.& BLGU
20 Conduct quaterly meeting of BDRRM Comm. 10,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
21 Conduct trainings ,orientation and Seminars 1,500 2,000 1,500 BDRRM Comm. BDRRM Comm.& BLGU
10,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
PREVENTION AND MITIGATION
PAANO ANG SINO SINO ANG
PANGUNAHING GAWAIN TIMELINE AND BUDGETED AMOUNTPAG SUBAYBAY MAG SU SUBAYBAY
YEAR 1 YEAR 2 YEAR 3
Conduct Tree planting & growing Activities 3,000 3,000 4,000 BDRRM Comm. BDRRM Comm.& BLGU
Installation of Sainage and warning signs 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
Installation of Appropriate signs 5,000 5,000 5,000 BDRRM Comm. BDRRM Comm.& BLGU
BARANGAY SALANGSANG BDRRM FORM 8/3
RESPONSE
PAANO ANG SINO SINO ANG
PANGUNAHING GAWAIN TIMELINE AND BUDGETED AMOUNTPAG SUBAYBAY MAG SU SUBAYBAY
YEAR 1 YEAR 2 YEAR 3
1 Purchase of recue equipment( rope,axe, search camera, 50,000 39,000 30,000 BDRRM Comm. BDRRM & BLGU
Flaslights ,Emergency lights, and fuel BDRRM Comm. BDRRM & BLGU
2 provision of blanket , mosquito nets and sleeping mats to IPDS and /of 16,600 16,600 16,600 BDRRM Comm. BDRRM & BLGU
Pabrication for folding beds BDRRM Comm. BDRRM & BLGU
3 Purchased of kitchen implements /Provision of water tanks for clean water 30,000 35,000 35,000 BDRRM Comm. BDRRM & BLGU
source
4 IEC on proper water sanitation fit drinking 5,000 5,000 5,000 BDRRM Comm. BDRRM & BLGU
5 Provision of first aid kits and over the counter medicines 30,000 40,000 30,000 BDRRM Comm. BDRRM & BLGU
6 Procurement of COVID -19 Vaccine 15,000 10,000 5,000 BDRRM Comm. BDRRM & BLGU
7 provision of food subsistence & relief goods non goods 34,500 30,000 35,000 BDRRM Comm. BDRRM & BLGU
BARANGAY SALANGSAG

REHABILITATION AND RECOVERY


PAANO ANG SINO SINO ANG
PANGUNAHING GAWAIN TIMELINE AND BUDGETED AMOUNTPAG SUBAYBAY MAG SU SUBAYBAY
YEAR 1 YEAR 2 YEAR 3
1 Repair and maintenance of roads 100,000 100,000 100,000 BDRRM Comm. BDRRM & BLGU
2 giving assistance to the needs of affected families 25,000 25,000 25,000 BDRRM Comm. BDRRM & BLGU