You are on page 1of 9

PEMBANGUNAN DERMAGA CPO PT.

WIRA INOVA NUSANTARA


BAGAN CUACA
Pemilik Proyek : PT. WIRA INOVA NUSANTARA
Konsultan : PT. LAPI ITB
Kontraktor : PT. BUDI PERKASA ALAM BULAN : DESEMBER

TANGGAL
Jam
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
07.00 A A A A A A A A A A A A A A A A A A
08.00 A A A A A A A A A A A A A A A A A A
09.00 A A A A A A A A A A A A A A A A A A
10.00 A A A A A B A A A A A A A A A A A A
11.00 A A A A A B A A A A A A A A A A A A
12.00 A A A A A B A A A A A A A A A A A A
13.00 A A A A A A A A A A A A A A A A A A
14.00 A A A A A D A A A A A A A A A A A A
15.00 A A A A A D A A A A A A A A A A A A
16.00 A A A A A D A A A A A A A A A A A A
17.00 A A A A A D A A A A A A A A A A A A
18.00 A A A A A B A A A A A A A A A A A A
19.00 A A B A A B B D A A A A A A A A A A
20.00 A A B A A B B D A A A A A A A A A A
21.00 A A B A A B D D A A A A A A A A A A
22.00 A A B A A B D D A A A A A A A A A A
23.00 A A B A A B B B A A A A A A A A A A
24.00 A A B B D B B B A A A A A A A A A A
01.00 A A B B D D D B A A A A A A A A A A
02.00 A A B B D D D A A A A A A A A A A A
03.00 A A B D A D D A A A A A A A A A A A
04.00 A A B D A D B A A A A A A A A A A A
05.00 A A B D A B B A A A A A A A A A A A
06.00 A A B D A B B A A A A A A A A A A A

Keterangan:
A. Cerah

B. Cerah dan Berawan Pengawas PT. WIN Pengawas PT. BPA Diketahui

C. Gerimis
D. Hujan Bp. Joemar PT. LAPI ITB
PROYEK DADAHUP KALIMANTAN TENGAH
BAGAN CUACA
Pemilik Proyek : PT. XXX
Konsultan : PT. XXX
Kontraktor : PT. BASUKI RAHMANTA PUTRA BULAN : MARET

TANGGAL
Jam
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
01.00
02.00
03.00
04.00
05.00
06.00

Keterangan:
A. Cerah

B. Cerah dan Berawan Pengawas PT. BRP Pengawas PT. Virama Karya Diketahui

C. Gerimis
D. Hujan PT. XXX
PROYEK DADAHUP KALIMANTAN TENGAH
BAGAN CUACA
Pemilik Proyek : PT. XXX
Konsultan : PT. VIRAMA KARYA (PERSERO)
Kontraktor : PT. BASUKI RAHMANTA PUTRA BULAN : MARET

TANGGAL
Jam
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00 D
16.00 D
17.00 D
18.00
19.00
20.00
21.00
22.00
23.00
24.00
01.00
02.00
03.00
04.00
05.00
06.00

Keterangan:
A. Cerah

B. Cerah dan Berawan Pengawas PT. BRP Pengawas PT. Virama Karya Diketahui

C. Gerimis
D. Hujan PT. XXX
PROYEK DADAHUP KALIMANTAN TENGAH
BAGAN CUACA
Pemilik Proyek : PT. XXX
Konsultan : PT. VIRAMA KARYA (PERSERO)
Kontraktor : PT. BASUKI RAHMANTA PUTRA BULAN : APRIL

TANGGAL
Jam
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
07.00
08.00 D.
09.00 0
10.00 0
11.00 0
12.00 0
13.00 0
14.00 0
15.00 0
16.00 0
17.00 0
18.00 0
19.00 0
20.00 0
21.00
22.00
23.00
24.00
01.00
02.00
03.00
04.00
05.00
06.00

Keterangan:
A. Cerah

B. Cerah dan Berawan Pengawas PT. BRP Pengawas PT. Virama Karya Diketahui

C. Gerimis
D. Hujan PT. XXX