This form is intended for use with the Technical Review Portal’s Project Log.
Review Stage/Document Set Type Select the best match; provide details in Scope of work if necessary.
☐ Design Development Documents ☐ 100% Construction Docs (Stamped) ☐ FA Submittals
☐ 60% Construction Documents ☐ Report ☐ FS Submittals
☐ 90% Construction Documents ☐ Request for Information
☐ 100% Construction Docs (Unstamped) ☐ Change Order
Project Manager:
Project Scope:
Required Review Disciplines The disciplines associated with the review document set that will require a review.
☐ Architectural ☐ Fire Safety ☐ Mechanical
☐ Audio Visual (AV) ☐ Hardware ☐ Plumbing
☐ Civil ☐ Historical (Fran Gale) ☐ Signage/Wayfinding
☐ Electrical ☐ Interior Design ☐ Structural
☐ Energy and Resource Conservation ☐ ITS Security ☐ Utilities - Electrical
☐ Environmental Health & Safety ☐ ITS Telecom/Networking ☐ Utilities - Mechanical
☐ Facilities Maintenance ☐ Landscape ☐ UTPD
☐ Fire Prevention ☐ Locks & Keys
Additional Stakeholders These individuals will receive notifications throughout the process but will not be required to provide comments.
Construction Coordinator (90%, 100% unstamped &
☐ ☐
stamped)
☐ Contract Specialist (90%, 100% unstamped & stamped) ☐
☐ Building Manager ☐
☐ Zones ☐
☐ Internal Team Members ☐
☐ Client ☐
☐ Location Information (DD, 60% CD, 90% CD Unstamped) ☐
☐ Custodial ☐
☐ ☐