Consumption Rates:

/ 0.70 /
/ 0.65 /
/ 0.60 /
Connection Charges: (Progressive)
/
/ 3/ /
/ /
, / /
, / /

Discharge Rates:
0.70 /
Waste water discharge volume is calculated based on 70% of industrial water consumption or the volume stated in
UKL/UPL (Water balance), which has been approved by the Local Government and PT Suryacipta Swadaya with
minimum discharge 50% of industrial water consumption.

Connection Charges: (Progressive)


/
.
/ / /
/ /
, / /
, / /

, 0.075 /
, , 0.065 /
, 0.055 /

10% from Building Permit Retribution (Excludes government retribution).

Connection Charges & Utilization Charges based on prevailing rates from the Telecommunication Providers.

Connection Charges & Consumption Charges based on contractual agreement between the Customer and Gas Company.

OPTIONAL SERVICES
Landscaping Services Based on contractual agreement
Nursery/Plantation Services Based on contractual agreement
Lawn Mowing Services Based on contractual agreement

Specifications and rates are subject to change without prior notice.


Connection Charges
Variable Charges
Substation Charges
Up to 2,500 KVA 132,500,000
Above 2,500 KVA 180,500,000

Deposit* KVA Depends on the Connected


Capacity

Consumption Charges TTL + IDR 200 /KWh


(single tariff for 24 hours) with adjustment**

Connection Service Charge IDR 50 / VA IDR 50 / VA

Minimum Consumption Charges***


a. Up to 6 th month 40 hours
after the electricity is on
7th month onwards 110 hours
after the electricity is on

F. EXCESS KVARH

Point D is payable to Suryacipta


Based on the Decree of PLN's Director (Keputusan Direksi PT PLN (Persero)) No. 424.K/DIR/2013 dated May 31, 2013
Formula of Adjustment Tariff based on Regulation of Ministry of Energy (Peraturan Menteri ESDM)
No. 19 Tahun 2019 dated Oct 10, 2019
Minimum Consumption Charge (hours) = Total of KWh / Capacity Connected
TTL = Tariff of electricity (Tarif Tenaga Listrik) is known as Regular Tariff